International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072
© 2015, IRJET ISO 9001:2008 Certified Journal Page 100
Contribution Of Building Information Modeling (BIM) To Solve Problems In
Architecture, Engineering and Construction (AEC) Industry and Addressing
Barriers to Implementation of BIM
Vinay Kushwaha
Assistant Professor, Civil Engineering Department, SSITM, Chhattisgarh, kushvinay161@gmail.com
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – In 21st century, Building Information
Modelling (BIM) is one of the most eminent
advancement that has taken place in architecture,
engineering and construction (AEC) industry. BIM
provides a digital platform for managing the
functional and physical characteristics of a building
throughout its lifecycle. It offers a collaborative
approach for design, planning, construction and
operation of the facility. BIM has served to satisfy the
objectives of AEC industry to improve productivity
and quality of project delivered, curtail the project
delivery time and cost. BIM enables architects and
engineers to visualize any design, construction,
managerial or operational barrier which may arise
during the actual construction activities. Also, BIM
finds the application of cloud computing which
enables all the stakeholders to access data related to
construction project. As the visualization and
hardware technology is improving, the framework
approach is moving from “client based” to “host
based” which is referred to as Cloud Computing. This
paper aims at evaluating the extent to which BIM has
contributed to soothe the plight of AEC industry and
the various hurdles which were faced during
implementation of BIM and are still contemporary.
Key Words: Building Information Modelling, BIM, AEC
Industry
1. INTRODUCTION
1.1What is Building Information Modelling?
In simple terms, BIM is a tool to collaboratively design
various elements of a structure in 3-D format and provides
a better means to visualize and analyze these structures.
In actual, a BIM design is equivalent to virtually designing
a structure which shows virtual elements of actual
building parts and pieces used to build a building. These
virtual elements are digital prototype of physical building
elements that allows us to simulate the building and
understand its behavior in a computer environment way
before actual construction starts. BIM provides a much
better means of communication and distribution of
information between clients, construction and
architecture firms and legal authorities involved in
project.
Fig-1 Virtual designing using BIM and it’s comparison
with actual construction of same BIM design.
1.2 What Special Does BIM Offer?
Apart from designing BIM serves a wide variety of purpose
in Construction Project Management. What makes BIM
unique is its collaborative effort to solve problems related
to Construction Engineering. The collaborative feature it
offers can be appreciated very well by its application in
almost all construction related activities. BIM serves an
essential purpose in all aspects of construction and project
management including design, scheduling and estimating,
resource allocation, supply chain management, account of
deliverables during the course of construction, structural
health monitoring, Data Management and Structural
Management. Looking at these aspects it can rightly be
said that instead of implementing BIM as a technology it is
rather implemented as a process which starts even before
actual construction and is serves useful purpose
throughout the service period of structure.
1.2(A) Improved 3-D Visualization.
The 3-D visualization provided by the BIM is more densely
packed with information about the various elements of
structure, hence it provides a more comprehensive prior
analysis of possible problems that are faced during actual
construction which ensures timely completion of projects
and prevents overshooting of budget arising due to
uncertainties which pop up during actual construction.
The visualization also helps to keep track of the
construction and if any changes are required in designing
during the course of construction then it can be analyzed
and made readily using BIM. The accuracy which BIM 3-D
visualization models provides through animation
diminishes the possibility of risk at which the engineers
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072
© 2015, IRJET ISO 9001:2008 Certified Journal Page 101
and architects are at when it comes to successful delivery
of projects.
Fig-2 A 3-D model design of a building using BIM.
1.2 (B) Unique “D” Feature of BIM.
In addition to 3-D visualization which signifies length,
breadth and height of structure, BIM offers 4-D, 5-D, 6-D
and 7-D features. The 4th, 5th, 6th and 7th dimension
pertains to Time (Scheduling), Cost (Estimating),
Sustainability and Facility Management.
a) 4TH Dimension—Time (Scheduling).
Prior to BIM many software like MS Project and Primavera
were available for scheduling purpose but in these the
scheduling can’t be collaborated with design but BIM
solves this intricacy. With the 3-D visualization the
scheduling can be done simultaneously taking time as 4th
dimension.
Fig-3 -- Scheduling timeline is collaborated with 3-D
Model of Structure taking time as 4th Dimension
b) 5TH Dimension—Cost (Estimating).
The 5th dimension is cost which relates to estimating
purpose. Estimating involves precise quantification of
modeled material and generates cost estimates at a faster
rate. BIM provide forehand cost information to the owner
which makes decision making process more effective. It
allows BIM experts to concentrate more on value adding
activities in estimation such as construction assembly
identification, generating price and factoring risks which
are very much useful for high quality estimation. When
synchronized with the construction schedule, a BIM cost
estimate can help track budget throughout the
construction phase.
Fig4 – An intermediate step in BIM for cost estimation
using Autodesk Revit.
c) 6th Dimension – Sustainability.
A 5-D BIM model limit itself and fail to consider the
environmental impact because of its negligence to
consider two important aspects of Sustainability: the
economic and the social aspect. These aspects are complex
to analyze and adds to the cost of project and therefore are
of limited value while comparing design options. To make
BIM environment friendly, a new concept called “Green
BIM” has been introduced which involves collaboration of
Green Building and BIM to keep check on adverse effects
of construction on environment.
Fig 5 -- Zero-energy, and carbon neutral community in
USA. BIM was used to create sun studies which helped
shape the roofs.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072
© 2015, IRJET ISO 9001:2008 Certified Journal Page 102
d) 7TH Dimension-- Facility and Asset Management
Building assets database can be linked to BIM record
model and is utilized to reinforce the planning and
decision making relevant to facility management issues.
The impact of enhancing or altering the building assets can
be reflected explicitly using BIM further quantity takeoffs
of the assets can also be developed for cost estimation and
financial reporting. Facility managers are responsible for
operating and maintaining the structures throughout their
service period which span a period of 30 years or even
more. BIM provides two essential features which are used
in Facility Management: Geometry of building and related
assets, and bill of the materials. BIM system doesn’t only
produce a model of building but also provides an action
plan for logistics, facility management and real-time
collaboration.
Fig-6 BIM modelling making it useful through every step
of Facility Management.
Fig-7 Different dimensions of Building Information
Modelling.
2. APPLICATION OF BIM TO SOLVE PROBLEMS IN
AEC INDUSTRY.
Proper implementation of BIM can solve the excruciating
problems related to construction, project management
and facility management.
 Visualization:
The 3-D visuals of BIM contains precise geometry
and present amazingly accurate and detailed
building model. Simulation based visuals obtained
from BIM expands the visual context of a design
concept for more effective validation. This
accurate and precise visualization facilitates the
prior understanding of any anomaly which may
arise during the actual construction activities.
 Parametric Objects:
A Building Information Model is designed using
parametric objects such as ventilators, windows,
steel bars, concrete slabs, water supply pipes,
electrical fitting lines. These parametric objects
are integral part of BIM which allows for exact
modelling of the targeted building to be
constructed. This way you are constructing a
virtual building which is properly defined with
intelligent objects.
 Faster and Better Communication:
Similar to Cloud Computing, BIM provides a
common platform for all the stakeholders to have
access to information. This common platform
eliminates the need to apprising every
stakeholder when any change is made in project
in subsequent time during the project completion
period. This saves time, effort and fosters a better
communication among the stakeholders.
 Scheduling and Estimating:
Prior to BIM, the scheduling and estimating
activities were done in software like Primavera or
MS Project and designing was done separately in
CAD. These two endeavor took plenty of time, but
after designing in BIM it takes much lesser time to
schedule and do the cost estimates.
 Change Management:
The data is placed in a central location in BIM, so
any modification made to any element of building
design will automatically make the proportionate
changes to other elements of design. This serves
to the strict quality assurance demands of
industry and also makes the documentation
faster. In tradition methods if a change is made in
position of a beam or wall, then the changes were
made accordingly in each and every component
affected by this change. But in BIM, if a change is
made in one component then it automatically gets
reflected in all other components.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072
© 2015, IRJET ISO 9001:2008 Certified Journal Page 103
 Conflict Management:
Since Building Information Models provides 3D
visualization of all elements of a building, any
interference arising among different elements of
building can be easily detected. For example, if an
electric wiring line is intersecting with water
supply system then it can be easily detected and
can be rectified instantly.
 6D and 7D Approach to Projects Using BIM:
As the advancement in technology is taking place
rapidly, a need for sustainable development is
equally vital. The 6th dimension of BIM with
pertains to Sustainability provide alternate
solutions to construction activities without
compromising on environment health. In recent
developments to sustainability, efforts have been
made to collaborate Green Building Concept with
BIM to make construction even more ecofriendly.
Other dedicated efforts like conceptual energy
analysis via DProfiler, detailed energy analysis via
Eco tech and LEED tracking makes BIM even more
special.
Facility Management as the 7th dimension enables
the Facility Managers for maintenance and
renovation operations. BIM can be used
effectively in infrastructure health monitoring
which continues till service period of structure
which is usually 30 years or even more.
 Waste Minimization:
Demand of more profitability has made waste
minimization an important criteria to take care of.
So far, many efforts have been made for
construction waste minimization but a
comprehensive approach to all construction
related activities including design and pre
construction phase was first introduced by BIM.
Virtual design before the actual construction
ensures a limited waste production and also
optimizes energy usage.
 Controls and Minimizes the Cost of Project:
The combined application of lean construction
and BIM optimizes the resource utilization and
minimize the waste generated in project. A
significant amount of funds is saved by the
prefabrication and scheduling aspects of BIM. The
amalgam of Green construction and BIM also
makes the project economical.
 Fast Delivery of Project:
As the technology is growing faster, the need to
complete projects shortly is on high demand by
clients. Because of collaborative effort made by
BIM for precise documentation, instant change
management, better communication, improved
visualization the projects are delivered well
before time and adheres to client satisfaction
simultaneously.
 Prefabrication:
The process of BIM was developed presuming
prefabrication. BIM development follows the
general truth “The more the building is built off
site and then onsite, the better the saving, both in
labor and material costs”. Prior to BIM, the 2D
document of the material to be manufactured was
designed and then handed over to CAD expert
who design in a simulated computerized
environment. Whereas BIM, instead of generation
a 2D document directly generates 3D design
model for prefabricators thus saving time and
cost involved in 2D designing and CAD.
 Acoustic and Lighting Feature:
Analysis features available in BIM can allow to
analyze the reverberation time for different
conditions allowing the designer to test and
decide for STC (Sound Transmission Class) rated
building especially in a location where noise
pollution is a menace. While designing it is an
important issue to determine how much light will
enter the building and is this level of light
sufficient enough the lightning condition to work.
Efficient and comfortable lighting is a LEED
certification criteria as well.
 Energy Analysis and LEED Achievement :
Leadership in Energy and Environmental Design
(LEED) is concerned with sustainability and
environmental impact of the projects. 40% of the
energy produced worldwide is used by the
buildings. So, legal authorities are very much
stringent about energy usage of buildings. BIM
accompanied with green construction soothes this
concern. BIM also provides tools to calculate heat
loss or gain by building and modelling
performance of the building throughout the year
when energy availability vary.
 Return on Investment:
For small scale projects BIM is not beneficial
because the initial cost involved with usage of BIM
is high. But, if used for large complicated projects
BIM incurs heavy chunk of profit because of
increased productivity. The qualitative benefits of
reduced time overruns and lower change order
cost are appreciable.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072
© 2015, IRJET ISO 9001:2008 Certified Journal Page 104
3. BIM Benefits: Case Studies.
3.1 Aquarium Hilton Garden Inn,
Atlanta, Georgia:
The Aquarium Hilton Garden Inn project comprised a
mixed-use hotel, retail shops, and a parking deck.
Brief project details are as follows:
• Project scope: $46 million, 484,000-square-foot hotel
and parking structure
• Delivery method: Construction manager at-risk
(CM at-risk)
• Contract type: Guaranteed maximum price
• BIM scope: Design coordination, clash detection and
work sequencing.
• BIM cost to project: $90,000, or 0.2% of project budget
($40,000 paid by owner)
• Cost benefit: Over $200,000 attributed to elimination of
clashes
• Schedule benefit: 1,143 hours saved.
Fig 8 Building Information Models of Aquarium Hilton
Garden Hill.
More than 590 clashes were detected before the actual
construction began and the overall cost saving pertaining
to this was $801,565. For the purpose of calculating net
cost saving it was assumed that 75% of the collision can be
detected by traditional practices. So, the net cost saving by
implementation of BIM was estimated to be $200,392.
3.2 Savannah State University, Georgia, USA
• Project: Higher education facility, Savannah State
University, Savannah, Georgia
• Cost: $12 million
• Delivery method: CM at-risk, guaranteed maximum price
• BIM scope: Planning, value analysis
• BIM cost to project: $5,000
• Cost benefit: $1,995,000
For this project three different building information
models were prepared and BIM based cost estimate was
also calculated. The entire process took around 2 weeks to
finalize the design and the client saved $1,995,000 at the
predesign stage by selecting the most economical design.
This was possible only because of proper implementation
of BIM to project.
Fig 9 Scope and Budget options for Savannah State
University.
4. Barriers to Effective Implementation of BIM:
 Hesitancy to Adopt New Technology:
The stakeholders are with a stiff mindset and are
not comfortable enough to adopt new technology
as it would to change the whole approach in the
way they manage projects which require lot of
efforts.
 Lack of BIM Experts:
Since BIM is relatively a new technology in AEC
industry and because of lack of BIM education in
professional and academic institutes there are not
much available BIM experts in market. This makes
the AEC industry even more vulnerable to stick to
traditional methods of project delivery.
 Unavailability of BIM Specific Clients:
Due to concrete mindset of clients to adhere to
tradition approaches of project delivery, there is
not much demand for BIM specific projects. The
awareness about the benefits of BIM is not
sufficient enough to motivate the clients to
demand for BIM driven projects.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072
© 2015, IRJET ISO 9001:2008 Certified Journal Page 105
 Return on Investment:
BIM is not suitable for small scale projects. The
cost incurred in BIM implementation may exceed
the proposed funds for project if the project is
small scale. Hence, in these type of projects the
return of investment generally results in
overshooting of project budget.
 Lack of BIM Education:
Even though there are short term courses
available in market to learn BIM, but these
courses are not equipped to facilitate an
appreciable level of BIM learning. The lack of
proper curriculum and insufficient training make
these courses superfluous.
 High Initial Cost:
The economic benefits of BIM can be realized only
at the end of projects. BIM implementation
requires huge initial investment which
demotivates the clients and firms to implement
the use of BIM. This is the reason why BIM is not
used in small scale projects.
 Little Efforts from Government to Adopt BIM:
In every country a major number of projects are
handled by Government institutes or public sector
projects are handed over to private firms. But, the
government also doesn’t show enthusiasm to
implement BIM. It’s difficult to change mindset of
private clients because their main motive is profit,
but if the government takes an initiative adopt
BIM in more number of projects then this would
serve as an motivation and lesson to other private
firms to implement BIM.
 Software and Training:
Implementation of BIM requires purchasing of
software and training the staff to operate it. The
may impact the financial condition of
organizations. Software packages are costly and
need regular updates which adds to the financial
concerns of the organization. Also, providing
training to staff from experts needs an
appreciable chunk of funds.
 Lack of Supply Chain buy-in:
To ensure the effective implementation of BIM all
the stake holders i.e. clients, contractors, sub-
contractors and pre-fabricators must have
knowledge of BIM. Adoption of BIM involves a
collaborative effort from all the stakeholders,
otherwise a conflict may rise.
Fig 10- Barriers to Building Information Modelling
5. CONCLUSION
Without any doubt Building Information Modelling has
brought a revolution in the AEC industry, but the rate of
implementation of BIM in the industry is low because of
various barriers addressed here. The lack of initiative from
government organizations and educational institutes is the
major factor which is responsible for very limited
awareness and implementation of BIM. Transforming
from traditional approaches to BIM is not an easy task, it
requires collaborative efforts from government agencies
and private organizations. To make the industry aware of
benefits of BIM various seminars should be organized
throughout the AEC industry which makes use of case
study approach to enumerate the usefulness of BIM
adoption. The government and education institutes must
take an initiative to ensure that the advantage offered by
the BIM is properly explored.
6. REFERENCES
[1]Zeng, Xu Dong, and Wei Qiang Zhou. "Research into the
Building Information Model during the Whole Building Life-
Cycle." Advanced Materials Research 368 (2012): 3797-3800.
[2] Azhar, S. (2011). "Building Information Modeling (BIM):
Trends, Benefits, Risks, and Challenges for the AEC Industry."
Leadership Manage. Eng., 10.1061/ (ASCE) LM.1943-
5630.0000127, 241-252.
[3] Sawhney, Anil “State of BIM Adoption and Outlook in
India: A Report”.
[4] Chougule, N.S and Konnur, B.A “A Review of Building
Information Modelling for Construction Industry”
International Journal of Innovative Research in Advanced
Engineering, Issue 4, Volume-2, April 2015.
[5] Azhar, S et al. “Building Information Modelling: Now and
Beyond” Australian Journal of Construction Economics and
Building, 12 (4) 15-28.

More Related Content

What's hot

How BIM is Facilitating Facility Management Process
How BIM is Facilitating Facility Management ProcessHow BIM is Facilitating Facility Management Process
How BIM is Facilitating Facility Management ProcessUnited-BIM
 
The Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowThe Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowUnited-BIM
 
Building Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research PaperBuilding Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research Paperabhishek chougule
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DYee Len Wan
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3United-BIM
 
Bim challenges and potential
Bim challenges and potentialBim challenges and potential
Bim challenges and potentialThomas Goubau
 
10 points and the benefits of bim
10 points and the benefits of bim10 points and the benefits of bim
10 points and the benefits of bimEr. Jigar Rana
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiBim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiAri Nassi
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2Stephen Au
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Designnevena_psu
 
THE IMPACT OF BUILDING INFORMATION MODELLING (BIM) ON THE ARCHITECTURAL D...
THE IMPACT OF   BUILDING INFORMATION MODELLING (BIM)  ON THE ARCHITECTURAL  D...THE IMPACT OF   BUILDING INFORMATION MODELLING (BIM)  ON THE ARCHITECTURAL  D...
THE IMPACT OF BUILDING INFORMATION MODELLING (BIM) ON THE ARCHITECTURAL D...opemzy
 
Bim implementation
Bim implementationBim implementation
Bim implementationOmar Selim
 
end-to-end-collaboration-enabled-by-bim-level-3-white-paper-aec
end-to-end-collaboration-enabled-by-bim-level-3-white-paper-aecend-to-end-collaboration-enabled-by-bim-level-3-white-paper-aec
end-to-end-collaboration-enabled-by-bim-level-3-white-paper-aecAlban Thomann
 

What's hot (20)

How BIM is Facilitating Facility Management Process
How BIM is Facilitating Facility Management ProcessHow BIM is Facilitating Facility Management Process
How BIM is Facilitating Facility Management Process
 
The Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowThe Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should Know
 
Application of BIM
Application of BIMApplication of BIM
Application of BIM
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Building Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research PaperBuilding Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research Paper
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
BIM Maturity Levels Explained Level 0, Level 1, Level 2, Level 3
 
Bim challenges and potential
Bim challenges and potentialBim challenges and potential
Bim challenges and potential
 
10 points and the benefits of bim
10 points and the benefits of bim10 points and the benefits of bim
10 points and the benefits of bim
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiBim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
 
THE IMPACT OF BUILDING INFORMATION MODELLING (BIM) ON THE ARCHITECTURAL D...
THE IMPACT OF   BUILDING INFORMATION MODELLING (BIM)  ON THE ARCHITECTURAL  D...THE IMPACT OF   BUILDING INFORMATION MODELLING (BIM)  ON THE ARCHITECTURAL  D...
THE IMPACT OF BUILDING INFORMATION MODELLING (BIM) ON THE ARCHITECTURAL D...
 
Bim implementation
Bim implementationBim implementation
Bim implementation
 
end-to-end-collaboration-enabled-by-bim-level-3-white-paper-aec
end-to-end-collaboration-enabled-by-bim-level-3-white-paper-aecend-to-end-collaboration-enabled-by-bim-level-3-white-paper-aec
end-to-end-collaboration-enabled-by-bim-level-3-white-paper-aec
 

Similar to Contribution Of Building Information Modeling (BIM) To Solve Problems In Architecture, Engineering and Construction (AEC) Industry and Addressing Barriers to Implementation of BIM

An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET Journal
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGIRJET Journal
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsCAD Outsourcing
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsTawwabKhan4
 
Building Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisBuilding Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisIRJET Journal
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?Anees Ur Rehman
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...IRJET Journal
 
Structural BIM Workflow From Design to Fabrication
Structural BIM Workflow From Design to FabricationStructural BIM Workflow From Design to Fabrication
Structural BIM Workflow From Design to FabricationTop BIM Company
 
5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdf5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdfPratap Dhopte
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering LLC U.S.
 
How is BIM Facilitating Facility Management Process 2024?
How is BIM Facilitating Facility Management Process 2024?How is BIM Facilitating Facility Management Process 2024?
How is BIM Facilitating Facility Management Process 2024?Chandresh Chudasama
 

Similar to Contribution Of Building Information Modeling (BIM) To Solve Problems In Architecture, Engineering and Construction (AEC) Industry and Addressing Barriers to Implementation of BIM (20)

An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
 
BIM Assignment.doc
BIM Assignment.docBIM Assignment.doc
BIM Assignment.doc
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projects
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
Building Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisBuilding Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability Analysis
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
 
Structural BIM Workflow From Design to Fabrication
Structural BIM Workflow From Design to FabricationStructural BIM Workflow From Design to Fabrication
Structural BIM Workflow From Design to Fabrication
 
5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdf5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdf
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling Services
 
Facilities Management in BIM
Facilities Management in BIMFacilities Management in BIM
Facilities Management in BIM
 
Bim overview
Bim overviewBim overview
Bim overview
 
How is BIM Facilitating Facility Management Process 2024?
How is BIM Facilitating Facility Management Process 2024?How is BIM Facilitating Facility Management Process 2024?
How is BIM Facilitating Facility Management Process 2024?
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Contribution Of Building Information Modeling (BIM) To Solve Problems In Architecture, Engineering and Construction (AEC) Industry and Addressing Barriers to Implementation of BIM

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072 © 2015, IRJET ISO 9001:2008 Certified Journal Page 100 Contribution Of Building Information Modeling (BIM) To Solve Problems In Architecture, Engineering and Construction (AEC) Industry and Addressing Barriers to Implementation of BIM Vinay Kushwaha Assistant Professor, Civil Engineering Department, SSITM, Chhattisgarh, kushvinay161@gmail.com ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – In 21st century, Building Information Modelling (BIM) is one of the most eminent advancement that has taken place in architecture, engineering and construction (AEC) industry. BIM provides a digital platform for managing the functional and physical characteristics of a building throughout its lifecycle. It offers a collaborative approach for design, planning, construction and operation of the facility. BIM has served to satisfy the objectives of AEC industry to improve productivity and quality of project delivered, curtail the project delivery time and cost. BIM enables architects and engineers to visualize any design, construction, managerial or operational barrier which may arise during the actual construction activities. Also, BIM finds the application of cloud computing which enables all the stakeholders to access data related to construction project. As the visualization and hardware technology is improving, the framework approach is moving from “client based” to “host based” which is referred to as Cloud Computing. This paper aims at evaluating the extent to which BIM has contributed to soothe the plight of AEC industry and the various hurdles which were faced during implementation of BIM and are still contemporary. Key Words: Building Information Modelling, BIM, AEC Industry 1. INTRODUCTION 1.1What is Building Information Modelling? In simple terms, BIM is a tool to collaboratively design various elements of a structure in 3-D format and provides a better means to visualize and analyze these structures. In actual, a BIM design is equivalent to virtually designing a structure which shows virtual elements of actual building parts and pieces used to build a building. These virtual elements are digital prototype of physical building elements that allows us to simulate the building and understand its behavior in a computer environment way before actual construction starts. BIM provides a much better means of communication and distribution of information between clients, construction and architecture firms and legal authorities involved in project. Fig-1 Virtual designing using BIM and it’s comparison with actual construction of same BIM design. 1.2 What Special Does BIM Offer? Apart from designing BIM serves a wide variety of purpose in Construction Project Management. What makes BIM unique is its collaborative effort to solve problems related to Construction Engineering. The collaborative feature it offers can be appreciated very well by its application in almost all construction related activities. BIM serves an essential purpose in all aspects of construction and project management including design, scheduling and estimating, resource allocation, supply chain management, account of deliverables during the course of construction, structural health monitoring, Data Management and Structural Management. Looking at these aspects it can rightly be said that instead of implementing BIM as a technology it is rather implemented as a process which starts even before actual construction and is serves useful purpose throughout the service period of structure. 1.2(A) Improved 3-D Visualization. The 3-D visualization provided by the BIM is more densely packed with information about the various elements of structure, hence it provides a more comprehensive prior analysis of possible problems that are faced during actual construction which ensures timely completion of projects and prevents overshooting of budget arising due to uncertainties which pop up during actual construction. The visualization also helps to keep track of the construction and if any changes are required in designing during the course of construction then it can be analyzed and made readily using BIM. The accuracy which BIM 3-D visualization models provides through animation diminishes the possibility of risk at which the engineers
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072 © 2015, IRJET ISO 9001:2008 Certified Journal Page 101 and architects are at when it comes to successful delivery of projects. Fig-2 A 3-D model design of a building using BIM. 1.2 (B) Unique “D” Feature of BIM. In addition to 3-D visualization which signifies length, breadth and height of structure, BIM offers 4-D, 5-D, 6-D and 7-D features. The 4th, 5th, 6th and 7th dimension pertains to Time (Scheduling), Cost (Estimating), Sustainability and Facility Management. a) 4TH Dimension—Time (Scheduling). Prior to BIM many software like MS Project and Primavera were available for scheduling purpose but in these the scheduling can’t be collaborated with design but BIM solves this intricacy. With the 3-D visualization the scheduling can be done simultaneously taking time as 4th dimension. Fig-3 -- Scheduling timeline is collaborated with 3-D Model of Structure taking time as 4th Dimension b) 5TH Dimension—Cost (Estimating). The 5th dimension is cost which relates to estimating purpose. Estimating involves precise quantification of modeled material and generates cost estimates at a faster rate. BIM provide forehand cost information to the owner which makes decision making process more effective. It allows BIM experts to concentrate more on value adding activities in estimation such as construction assembly identification, generating price and factoring risks which are very much useful for high quality estimation. When synchronized with the construction schedule, a BIM cost estimate can help track budget throughout the construction phase. Fig4 – An intermediate step in BIM for cost estimation using Autodesk Revit. c) 6th Dimension – Sustainability. A 5-D BIM model limit itself and fail to consider the environmental impact because of its negligence to consider two important aspects of Sustainability: the economic and the social aspect. These aspects are complex to analyze and adds to the cost of project and therefore are of limited value while comparing design options. To make BIM environment friendly, a new concept called “Green BIM” has been introduced which involves collaboration of Green Building and BIM to keep check on adverse effects of construction on environment. Fig 5 -- Zero-energy, and carbon neutral community in USA. BIM was used to create sun studies which helped shape the roofs.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072 © 2015, IRJET ISO 9001:2008 Certified Journal Page 102 d) 7TH Dimension-- Facility and Asset Management Building assets database can be linked to BIM record model and is utilized to reinforce the planning and decision making relevant to facility management issues. The impact of enhancing or altering the building assets can be reflected explicitly using BIM further quantity takeoffs of the assets can also be developed for cost estimation and financial reporting. Facility managers are responsible for operating and maintaining the structures throughout their service period which span a period of 30 years or even more. BIM provides two essential features which are used in Facility Management: Geometry of building and related assets, and bill of the materials. BIM system doesn’t only produce a model of building but also provides an action plan for logistics, facility management and real-time collaboration. Fig-6 BIM modelling making it useful through every step of Facility Management. Fig-7 Different dimensions of Building Information Modelling. 2. APPLICATION OF BIM TO SOLVE PROBLEMS IN AEC INDUSTRY. Proper implementation of BIM can solve the excruciating problems related to construction, project management and facility management.  Visualization: The 3-D visuals of BIM contains precise geometry and present amazingly accurate and detailed building model. Simulation based visuals obtained from BIM expands the visual context of a design concept for more effective validation. This accurate and precise visualization facilitates the prior understanding of any anomaly which may arise during the actual construction activities.  Parametric Objects: A Building Information Model is designed using parametric objects such as ventilators, windows, steel bars, concrete slabs, water supply pipes, electrical fitting lines. These parametric objects are integral part of BIM which allows for exact modelling of the targeted building to be constructed. This way you are constructing a virtual building which is properly defined with intelligent objects.  Faster and Better Communication: Similar to Cloud Computing, BIM provides a common platform for all the stakeholders to have access to information. This common platform eliminates the need to apprising every stakeholder when any change is made in project in subsequent time during the project completion period. This saves time, effort and fosters a better communication among the stakeholders.  Scheduling and Estimating: Prior to BIM, the scheduling and estimating activities were done in software like Primavera or MS Project and designing was done separately in CAD. These two endeavor took plenty of time, but after designing in BIM it takes much lesser time to schedule and do the cost estimates.  Change Management: The data is placed in a central location in BIM, so any modification made to any element of building design will automatically make the proportionate changes to other elements of design. This serves to the strict quality assurance demands of industry and also makes the documentation faster. In tradition methods if a change is made in position of a beam or wall, then the changes were made accordingly in each and every component affected by this change. But in BIM, if a change is made in one component then it automatically gets reflected in all other components.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072 © 2015, IRJET ISO 9001:2008 Certified Journal Page 103  Conflict Management: Since Building Information Models provides 3D visualization of all elements of a building, any interference arising among different elements of building can be easily detected. For example, if an electric wiring line is intersecting with water supply system then it can be easily detected and can be rectified instantly.  6D and 7D Approach to Projects Using BIM: As the advancement in technology is taking place rapidly, a need for sustainable development is equally vital. The 6th dimension of BIM with pertains to Sustainability provide alternate solutions to construction activities without compromising on environment health. In recent developments to sustainability, efforts have been made to collaborate Green Building Concept with BIM to make construction even more ecofriendly. Other dedicated efforts like conceptual energy analysis via DProfiler, detailed energy analysis via Eco tech and LEED tracking makes BIM even more special. Facility Management as the 7th dimension enables the Facility Managers for maintenance and renovation operations. BIM can be used effectively in infrastructure health monitoring which continues till service period of structure which is usually 30 years or even more.  Waste Minimization: Demand of more profitability has made waste minimization an important criteria to take care of. So far, many efforts have been made for construction waste minimization but a comprehensive approach to all construction related activities including design and pre construction phase was first introduced by BIM. Virtual design before the actual construction ensures a limited waste production and also optimizes energy usage.  Controls and Minimizes the Cost of Project: The combined application of lean construction and BIM optimizes the resource utilization and minimize the waste generated in project. A significant amount of funds is saved by the prefabrication and scheduling aspects of BIM. The amalgam of Green construction and BIM also makes the project economical.  Fast Delivery of Project: As the technology is growing faster, the need to complete projects shortly is on high demand by clients. Because of collaborative effort made by BIM for precise documentation, instant change management, better communication, improved visualization the projects are delivered well before time and adheres to client satisfaction simultaneously.  Prefabrication: The process of BIM was developed presuming prefabrication. BIM development follows the general truth “The more the building is built off site and then onsite, the better the saving, both in labor and material costs”. Prior to BIM, the 2D document of the material to be manufactured was designed and then handed over to CAD expert who design in a simulated computerized environment. Whereas BIM, instead of generation a 2D document directly generates 3D design model for prefabricators thus saving time and cost involved in 2D designing and CAD.  Acoustic and Lighting Feature: Analysis features available in BIM can allow to analyze the reverberation time for different conditions allowing the designer to test and decide for STC (Sound Transmission Class) rated building especially in a location where noise pollution is a menace. While designing it is an important issue to determine how much light will enter the building and is this level of light sufficient enough the lightning condition to work. Efficient and comfortable lighting is a LEED certification criteria as well.  Energy Analysis and LEED Achievement : Leadership in Energy and Environmental Design (LEED) is concerned with sustainability and environmental impact of the projects. 40% of the energy produced worldwide is used by the buildings. So, legal authorities are very much stringent about energy usage of buildings. BIM accompanied with green construction soothes this concern. BIM also provides tools to calculate heat loss or gain by building and modelling performance of the building throughout the year when energy availability vary.  Return on Investment: For small scale projects BIM is not beneficial because the initial cost involved with usage of BIM is high. But, if used for large complicated projects BIM incurs heavy chunk of profit because of increased productivity. The qualitative benefits of reduced time overruns and lower change order cost are appreciable.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072 © 2015, IRJET ISO 9001:2008 Certified Journal Page 104 3. BIM Benefits: Case Studies. 3.1 Aquarium Hilton Garden Inn, Atlanta, Georgia: The Aquarium Hilton Garden Inn project comprised a mixed-use hotel, retail shops, and a parking deck. Brief project details are as follows: • Project scope: $46 million, 484,000-square-foot hotel and parking structure • Delivery method: Construction manager at-risk (CM at-risk) • Contract type: Guaranteed maximum price • BIM scope: Design coordination, clash detection and work sequencing. • BIM cost to project: $90,000, or 0.2% of project budget ($40,000 paid by owner) • Cost benefit: Over $200,000 attributed to elimination of clashes • Schedule benefit: 1,143 hours saved. Fig 8 Building Information Models of Aquarium Hilton Garden Hill. More than 590 clashes were detected before the actual construction began and the overall cost saving pertaining to this was $801,565. For the purpose of calculating net cost saving it was assumed that 75% of the collision can be detected by traditional practices. So, the net cost saving by implementation of BIM was estimated to be $200,392. 3.2 Savannah State University, Georgia, USA • Project: Higher education facility, Savannah State University, Savannah, Georgia • Cost: $12 million • Delivery method: CM at-risk, guaranteed maximum price • BIM scope: Planning, value analysis • BIM cost to project: $5,000 • Cost benefit: $1,995,000 For this project three different building information models were prepared and BIM based cost estimate was also calculated. The entire process took around 2 weeks to finalize the design and the client saved $1,995,000 at the predesign stage by selecting the most economical design. This was possible only because of proper implementation of BIM to project. Fig 9 Scope and Budget options for Savannah State University. 4. Barriers to Effective Implementation of BIM:  Hesitancy to Adopt New Technology: The stakeholders are with a stiff mindset and are not comfortable enough to adopt new technology as it would to change the whole approach in the way they manage projects which require lot of efforts.  Lack of BIM Experts: Since BIM is relatively a new technology in AEC industry and because of lack of BIM education in professional and academic institutes there are not much available BIM experts in market. This makes the AEC industry even more vulnerable to stick to traditional methods of project delivery.  Unavailability of BIM Specific Clients: Due to concrete mindset of clients to adhere to tradition approaches of project delivery, there is not much demand for BIM specific projects. The awareness about the benefits of BIM is not sufficient enough to motivate the clients to demand for BIM driven projects.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 01 | Jan-2016 www.irjet.net p-ISSN: 2395-0072 © 2015, IRJET ISO 9001:2008 Certified Journal Page 105  Return on Investment: BIM is not suitable for small scale projects. The cost incurred in BIM implementation may exceed the proposed funds for project if the project is small scale. Hence, in these type of projects the return of investment generally results in overshooting of project budget.  Lack of BIM Education: Even though there are short term courses available in market to learn BIM, but these courses are not equipped to facilitate an appreciable level of BIM learning. The lack of proper curriculum and insufficient training make these courses superfluous.  High Initial Cost: The economic benefits of BIM can be realized only at the end of projects. BIM implementation requires huge initial investment which demotivates the clients and firms to implement the use of BIM. This is the reason why BIM is not used in small scale projects.  Little Efforts from Government to Adopt BIM: In every country a major number of projects are handled by Government institutes or public sector projects are handed over to private firms. But, the government also doesn’t show enthusiasm to implement BIM. It’s difficult to change mindset of private clients because their main motive is profit, but if the government takes an initiative adopt BIM in more number of projects then this would serve as an motivation and lesson to other private firms to implement BIM.  Software and Training: Implementation of BIM requires purchasing of software and training the staff to operate it. The may impact the financial condition of organizations. Software packages are costly and need regular updates which adds to the financial concerns of the organization. Also, providing training to staff from experts needs an appreciable chunk of funds.  Lack of Supply Chain buy-in: To ensure the effective implementation of BIM all the stake holders i.e. clients, contractors, sub- contractors and pre-fabricators must have knowledge of BIM. Adoption of BIM involves a collaborative effort from all the stakeholders, otherwise a conflict may rise. Fig 10- Barriers to Building Information Modelling 5. CONCLUSION Without any doubt Building Information Modelling has brought a revolution in the AEC industry, but the rate of implementation of BIM in the industry is low because of various barriers addressed here. The lack of initiative from government organizations and educational institutes is the major factor which is responsible for very limited awareness and implementation of BIM. Transforming from traditional approaches to BIM is not an easy task, it requires collaborative efforts from government agencies and private organizations. To make the industry aware of benefits of BIM various seminars should be organized throughout the AEC industry which makes use of case study approach to enumerate the usefulness of BIM adoption. The government and education institutes must take an initiative to ensure that the advantage offered by the BIM is properly explored. 6. REFERENCES [1]Zeng, Xu Dong, and Wei Qiang Zhou. "Research into the Building Information Model during the Whole Building Life- Cycle." Advanced Materials Research 368 (2012): 3797-3800. [2] Azhar, S. (2011). "Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry." Leadership Manage. Eng., 10.1061/ (ASCE) LM.1943- 5630.0000127, 241-252. [3] Sawhney, Anil “State of BIM Adoption and Outlook in India: A Report”. [4] Chougule, N.S and Konnur, B.A “A Review of Building Information Modelling for Construction Industry” International Journal of Innovative Research in Advanced Engineering, Issue 4, Volume-2, April 2015. [5] Azhar, S et al. “Building Information Modelling: Now and Beyond” Australian Journal of Construction Economics and Building, 12 (4) 15-28.