Our story today
• What’s the problem
• Demand for finance in Mali/Somagep
• Stage 1: Dutch public finance
• Stage 2: small investments
• Stage 3: pitching for additional/larger investments
• Conclusions
Mobilizing infrastructural investments through Water Operators'
Partnerships
What’s the problem?
• Big loans by IFI’s (>30 million),
mostly for CAPEX investments
• Utilities not able to absorb (usually
low operational capacity incl.
financial)
→ Water Operators’ Partnerships (WOP) as catalyst
Mobilizing infrastructural investments through Water Operators'
Partnerships
Demand for finance in Mali/Somagep
• Bamako population 2017: 2.5 million 2030: 5.0 million
• Current 56% of population access to improved drinking water 2030: SDG goal 100%
• WWX budget capacity building: €1.5 million (4 years)
• Small investments budget: €5 million (2 years)
• Large infrastructural investment needs Mali: €764 million (till 2030):
• Doubling production capacity Bamako: €350 million
• 17 secondary cities: €194 million
• 72 areas: € 220 million
Mobilizing infrastructural investments through Water Operators'
Partnerships
0
20000
40000
60000
80000
100000
120000
140000
160000
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
year
amount of funds mobilizedx1000
Stage1
Stage3
Stage2
Case: Mali
Mobilizing infrastructural investments through Water Operators'
Partnerships
FMO NL Business
develops Société Malienne de Gestion de l'Eau Potable
Utility Performance Improvement in Mali “Decreasing NRW and improving energy efficiency”
Potential
Project EUR 5 mln
Size
Contributes to improving performance of Mali’s water utility
 Reducing non-revenue water by improving commercial and physical losses in the
water supply system
 Lowering utility operating costs by increasing energy efficiency
Strengthening the balance sheet to improve access to finance
 This relatively small loan could improve the balance sheet of SOMAGEP
significantly, which would open the door to financing larger projects
 Creative financing structure that allows for replication is under development
Collaboration with expert partner institutions to maximize impact
 World Waternet is working with SOMAGEP to build their capacity under a Water
Operator Partnership.
 Dutch consultant involved in providing a cost-benefit-analysis for SOMAGEP
Reducing NRW to <20%
and reducing energy use
by >50%
Improving performance accelerates utility
creditworthiness and universal access to
safe and clean drinking water
Mobilizing infrastructural investments through Water Operators'
Partnerships
Stage 1: Dutch public finance
• WaterWorX program/BuZa involvement
• WaterWorX SDG ambition: drinking water for 10 million people. This is not possible without
investments.
• Performance improvement
• Where do we see needs?
• How do we evaluate and validate these needs for performance improvement?
Mobilizing infrastructural investments through Water Operators'
Partnerships
Stage 2: small
investments
• Involvement FMO
• Pre-feasibility, business case
• “Low-hanging fruit”
• Energy efficiency
• NRW management
Mobilizing infrastructural investments through Water Operators'
Partnerships
Stage 3: Pitching for Additional/Larger
Investments
• What’s the size?
• Who to approach? – Bilateral, IFIs
• What type of financing? – ODA, Private Finance etc.
Mobilizing infrastructural investments through Water Operators'
Partnerships
Discussion
• This model only for drinking water?
• What role do we see for WOP’s?
• Is there potential for scaling up?
• Need for commercial loans?

Weitere ähnliche Inhalte

Ähnlich wie Mobilizing infrastructural investments through Water Operators' Partnerships : an example from Mali

COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYCOMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYwle-ss
 
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...OECD Environment
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarOECD Environment
 
Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Parti Djibouti
 
Supporting the Chilean government in developing a NAMA proposal
Supporting the Chilean government in developing a NAMA proposalSupporting the Chilean government in developing a NAMA proposal
Supporting the Chilean government in developing a NAMA proposalLeonardo ENERGY
 
Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...
Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...
Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...International WaterCentre
 
Finance for Urban Climate Change Resilience
Finance for Urban Climate Change ResilienceFinance for Urban Climate Change Resilience
Finance for Urban Climate Change ResilienceKimberly Junmookda
 
Scaling up water treatment and distribution in Cambodia
Scaling up water treatment and distribution in CambodiaScaling up water treatment and distribution in Cambodia
Scaling up water treatment and distribution in CambodiaGlobal Institute For Tomorrow
 
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013FIA Business School
 
Watercredit case study (wcs) kenya
Watercredit case study (wcs) kenyaWatercredit case study (wcs) kenya
Watercredit case study (wcs) kenyaNoah Tarinyebwa
 
OECD/ADB High-level Workshop on funding and financing subnational infrastruct...
OECD/ADB High-level Workshop on funding and financing subnational infrastruct...OECD/ADB High-level Workshop on funding and financing subnational infrastruct...
OECD/ADB High-level Workshop on funding and financing subnational infrastruct...OECDregions
 
Financial management in watsan sector
Financial management in watsan sectorFinancial management in watsan sector
Financial management in watsan sectorKanika Saxena
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David TylerBecarAsset
 
Urban development investing in the business potential
Urban development   investing in the business potentialUrban development   investing in the business potential
Urban development investing in the business potentialLijitha Kallimakula
 

Ähnlich wie Mobilizing infrastructural investments through Water Operators' Partnerships : an example from Mali (20)

COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYCOMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
 
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
 
Final project
Final projectFinal project
Final project
 
Chapter+8 local+financing+mechanisms
Chapter+8 local+financing+mechanismsChapter+8 local+financing+mechanisms
Chapter+8 local+financing+mechanisms
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinar
 
Leveraging non-public resources
Leveraging non-public resourcesLeveraging non-public resources
Leveraging non-public resources
 
Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010
 
Final Project ms
Final Project msFinal Project ms
Final Project ms
 
Supporting the Chilean government in developing a NAMA proposal
Supporting the Chilean government in developing a NAMA proposalSupporting the Chilean government in developing a NAMA proposal
Supporting the Chilean government in developing a NAMA proposal
 
Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...
Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...
Financing Local Governance for Sustainable WatSan Service Delivery: HYSAWA Mo...
 
Finance for Urban Climate Change Resilience
Finance for Urban Climate Change ResilienceFinance for Urban Climate Change Resilience
Finance for Urban Climate Change Resilience
 
Scaling up water treatment and distribution in Cambodia
Scaling up water treatment and distribution in CambodiaScaling up water treatment and distribution in Cambodia
Scaling up water treatment and distribution in Cambodia
 
11. capnet ch8.1
11. capnet ch8.111. capnet ch8.1
11. capnet ch8.1
 
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
 
15 jan water
15 jan water15 jan water
15 jan water
 
Watercredit case study (wcs) kenya
Watercredit case study (wcs) kenyaWatercredit case study (wcs) kenya
Watercredit case study (wcs) kenya
 
OECD/ADB High-level Workshop on funding and financing subnational infrastruct...
OECD/ADB High-level Workshop on funding and financing subnational infrastruct...OECD/ADB High-level Workshop on funding and financing subnational infrastruct...
OECD/ADB High-level Workshop on funding and financing subnational infrastruct...
 
Financial management in watsan sector
Financial management in watsan sectorFinancial management in watsan sector
Financial management in watsan sector
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
 
Urban development investing in the business potential
Urban development   investing in the business potentialUrban development   investing in the business potential
Urban development investing in the business potential
 

Mehr von IRC

Session Building from WASH to IWRM - photo gallery
Session Building from WASH to IWRM - photo gallerySession Building from WASH to IWRM - photo gallery
Session Building from WASH to IWRM - photo galleryIRC
 
Photostory from Norton Town, Zimbabwe.pptx
Photostory from Norton Town, Zimbabwe.pptxPhotostory from Norton Town, Zimbabwe.pptx
Photostory from Norton Town, Zimbabwe.pptxIRC
 
Climate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationClimate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationIRC
 
The concept of Climate Resilient WASH
The concept of Climate Resilient WASHThe concept of Climate Resilient WASH
The concept of Climate Resilient WASHIRC
 
Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH IRC
 
Self-Supply made simple
Self-Supply made simple Self-Supply made simple
Self-Supply made simple IRC
 
Self-Supply made simple
Self-Supply made simpleSelf-Supply made simple
Self-Supply made simpleIRC
 
Giving Tuesday 2020 - Don't Give, Take - NL
Giving Tuesday 2020 - Don't Give, Take - NLGiving Tuesday 2020 - Don't Give, Take - NL
Giving Tuesday 2020 - Don't Give, Take - NLIRC
 
Giving Tuesday 2020 - Don't Give, Take
Giving Tuesday 2020 - Don't Give, TakeGiving Tuesday 2020 - Don't Give, Take
Giving Tuesday 2020 - Don't Give, TakeIRC
 
Webinar : Adapting your advocacy to COVID-19 health crisis
Webinar : Adapting your advocacy to COVID-19 health crisisWebinar : Adapting your advocacy to COVID-19 health crisis
Webinar : Adapting your advocacy to COVID-19 health crisisIRC
 
Novel partnership between NWSC and Kabarole District to provide safe water to...
Novel partnership between NWSC and Kabarole District to provide safe water to...Novel partnership between NWSC and Kabarole District to provide safe water to...
Novel partnership between NWSC and Kabarole District to provide safe water to...IRC
 
Conflict sensitivity support and tools
Conflict sensitivity support and toolsConflict sensitivity support and tools
Conflict sensitivity support and toolsIRC
 
Watershed Mali : strengthening civil society for sustainable WASH-IWRM in Mali
Watershed Mali : strengthening civil society for sustainable WASH-IWRM in MaliWatershed Mali : strengthening civil society for sustainable WASH-IWRM in Mali
Watershed Mali : strengthening civil society for sustainable WASH-IWRM in MaliIRC
 
WASH systems strengthening in the Central African Republic
WASH systems strengthening in the Central African RepublicWASH systems strengthening in the Central African Republic
WASH systems strengthening in the Central African RepublicIRC
 
Finding the flow in fragile contexts : IWRM in Mali
Finding the flow in fragile contexts : IWRM in MaliFinding the flow in fragile contexts : IWRM in Mali
Finding the flow in fragile contexts : IWRM in MaliIRC
 
Sanitation and hygiene sector trends
Sanitation and hygiene sector trendsSanitation and hygiene sector trends
Sanitation and hygiene sector trendsIRC
 
Social accountability : civil society and the human rights to water and sanit...
Social accountability : civil society and the human rights to water and sanit...Social accountability : civil society and the human rights to water and sanit...
Social accountability : civil society and the human rights to water and sanit...IRC
 
Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030
Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030
Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030IRC
 
The end of the poldermodel? : the role of dissent in Dutch international wate...
The end of the poldermodel? : the role of dissent in Dutch international wate...The end of the poldermodel? : the role of dissent in Dutch international wate...
The end of the poldermodel? : the role of dissent in Dutch international wate...IRC
 
Voice for Change Partnership : roles of CSOs in achieving SDG6
Voice for Change Partnership : roles of CSOs in achieving SDG6Voice for Change Partnership : roles of CSOs in achieving SDG6
Voice for Change Partnership : roles of CSOs in achieving SDG6IRC
 

Mehr von IRC (20)

Session Building from WASH to IWRM - photo gallery
Session Building from WASH to IWRM - photo gallerySession Building from WASH to IWRM - photo gallery
Session Building from WASH to IWRM - photo gallery
 
Photostory from Norton Town, Zimbabwe.pptx
Photostory from Norton Town, Zimbabwe.pptxPhotostory from Norton Town, Zimbabwe.pptx
Photostory from Norton Town, Zimbabwe.pptx
 
Climate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationClimate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan Implementation
 
The concept of Climate Resilient WASH
The concept of Climate Resilient WASHThe concept of Climate Resilient WASH
The concept of Climate Resilient WASH
 
Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH
 
Self-Supply made simple
Self-Supply made simple Self-Supply made simple
Self-Supply made simple
 
Self-Supply made simple
Self-Supply made simpleSelf-Supply made simple
Self-Supply made simple
 
Giving Tuesday 2020 - Don't Give, Take - NL
Giving Tuesday 2020 - Don't Give, Take - NLGiving Tuesday 2020 - Don't Give, Take - NL
Giving Tuesday 2020 - Don't Give, Take - NL
 
Giving Tuesday 2020 - Don't Give, Take
Giving Tuesday 2020 - Don't Give, TakeGiving Tuesday 2020 - Don't Give, Take
Giving Tuesday 2020 - Don't Give, Take
 
Webinar : Adapting your advocacy to COVID-19 health crisis
Webinar : Adapting your advocacy to COVID-19 health crisisWebinar : Adapting your advocacy to COVID-19 health crisis
Webinar : Adapting your advocacy to COVID-19 health crisis
 
Novel partnership between NWSC and Kabarole District to provide safe water to...
Novel partnership between NWSC and Kabarole District to provide safe water to...Novel partnership between NWSC and Kabarole District to provide safe water to...
Novel partnership between NWSC and Kabarole District to provide safe water to...
 
Conflict sensitivity support and tools
Conflict sensitivity support and toolsConflict sensitivity support and tools
Conflict sensitivity support and tools
 
Watershed Mali : strengthening civil society for sustainable WASH-IWRM in Mali
Watershed Mali : strengthening civil society for sustainable WASH-IWRM in MaliWatershed Mali : strengthening civil society for sustainable WASH-IWRM in Mali
Watershed Mali : strengthening civil society for sustainable WASH-IWRM in Mali
 
WASH systems strengthening in the Central African Republic
WASH systems strengthening in the Central African RepublicWASH systems strengthening in the Central African Republic
WASH systems strengthening in the Central African Republic
 
Finding the flow in fragile contexts : IWRM in Mali
Finding the flow in fragile contexts : IWRM in MaliFinding the flow in fragile contexts : IWRM in Mali
Finding the flow in fragile contexts : IWRM in Mali
 
Sanitation and hygiene sector trends
Sanitation and hygiene sector trendsSanitation and hygiene sector trends
Sanitation and hygiene sector trends
 
Social accountability : civil society and the human rights to water and sanit...
Social accountability : civil society and the human rights to water and sanit...Social accountability : civil society and the human rights to water and sanit...
Social accountability : civil society and the human rights to water and sanit...
 
Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030
Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030
Wash Debates: Looking at the role of civil society in achieving SDG 6 by 2030
 
The end of the poldermodel? : the role of dissent in Dutch international wate...
The end of the poldermodel? : the role of dissent in Dutch international wate...The end of the poldermodel? : the role of dissent in Dutch international wate...
The end of the poldermodel? : the role of dissent in Dutch international wate...
 
Voice for Change Partnership : roles of CSOs in achieving SDG6
Voice for Change Partnership : roles of CSOs in achieving SDG6Voice for Change Partnership : roles of CSOs in achieving SDG6
Voice for Change Partnership : roles of CSOs in achieving SDG6
 

Kürzlich hochgeladen

Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfAndrew Griffith
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxjennysansano2
 
2024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 232024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 23JSchaus & Associates
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Christina Parmionova
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaTrinity Care Foundation
 
NL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfNL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfBertrand Coppin
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Servicesahcitycouncil
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24JSchaus & Associates
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.Christina Parmionova
 
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONGOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONShivamShukla147857
 
23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programme23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programmeChristina Parmionova
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...Christina Parmionova
 
2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptx2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptxMariaFionaDuranMerqu
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Christina Parmionova
 
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Cristal Montañéz
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.Christina Parmionova
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfKatrina Sriranpong
 

Kürzlich hochgeladen (20)

Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processes
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdf
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptx
 
2024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 232024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 23
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, India
 
NL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfNL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdf
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Services
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
 
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONGOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
 
23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programme23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programme
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
 
2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptx2023 Barangay Officials pre assumption PPT.pptx
2023 Barangay Officials pre assumption PPT.pptx
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
 
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
 

Mobilizing infrastructural investments through Water Operators' Partnerships : an example from Mali

  • 1. Mobilizing infrastructural investments through Water Operators' Partnerships An example from Mali, IRC Wash Debate 3 December 2018 Steven van Rossum (Word Waternet) & Pritha Hariram (FMO)
  • 2. Mobilizing infrastructural investments through Water Operators' Partnerships Our story today • What’s the problem • Demand for finance in Mali/Somagep • Stage 1: Dutch public finance • Stage 2: small investments • Stage 3: pitching for additional/larger investments • Conclusions
  • 3. Mobilizing infrastructural investments through Water Operators' Partnerships What’s the problem? • Big loans by IFI’s (>30 million), mostly for CAPEX investments • Utilities not able to absorb (usually low operational capacity incl. financial) → Water Operators’ Partnerships (WOP) as catalyst
  • 4. Mobilizing infrastructural investments through Water Operators' Partnerships Demand for finance in Mali/Somagep • Bamako population 2017: 2.5 million 2030: 5.0 million • Current 56% of population access to improved drinking water 2030: SDG goal 100% • WWX budget capacity building: €1.5 million (4 years) • Small investments budget: €5 million (2 years) • Large infrastructural investment needs Mali: €764 million (till 2030): • Doubling production capacity Bamako: €350 million • 17 secondary cities: €194 million • 72 areas: € 220 million
  • 5. Mobilizing infrastructural investments through Water Operators' Partnerships 0 20000 40000 60000 80000 100000 120000 140000 160000 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 year amount of funds mobilizedx1000 Stage1 Stage3 Stage2 Case: Mali
  • 6. Mobilizing infrastructural investments through Water Operators' Partnerships FMO NL Business develops Société Malienne de Gestion de l'Eau Potable Utility Performance Improvement in Mali “Decreasing NRW and improving energy efficiency” Potential Project EUR 5 mln Size Contributes to improving performance of Mali’s water utility  Reducing non-revenue water by improving commercial and physical losses in the water supply system  Lowering utility operating costs by increasing energy efficiency Strengthening the balance sheet to improve access to finance  This relatively small loan could improve the balance sheet of SOMAGEP significantly, which would open the door to financing larger projects  Creative financing structure that allows for replication is under development Collaboration with expert partner institutions to maximize impact  World Waternet is working with SOMAGEP to build their capacity under a Water Operator Partnership.  Dutch consultant involved in providing a cost-benefit-analysis for SOMAGEP Reducing NRW to <20% and reducing energy use by >50% Improving performance accelerates utility creditworthiness and universal access to safe and clean drinking water
  • 7. Mobilizing infrastructural investments through Water Operators' Partnerships Stage 1: Dutch public finance • WaterWorX program/BuZa involvement • WaterWorX SDG ambition: drinking water for 10 million people. This is not possible without investments. • Performance improvement • Where do we see needs? • How do we evaluate and validate these needs for performance improvement?
  • 8. Mobilizing infrastructural investments through Water Operators' Partnerships Stage 2: small investments • Involvement FMO • Pre-feasibility, business case • “Low-hanging fruit” • Energy efficiency • NRW management
  • 9. Mobilizing infrastructural investments through Water Operators' Partnerships Stage 3: Pitching for Additional/Larger Investments • What’s the size? • Who to approach? – Bilateral, IFIs • What type of financing? – ODA, Private Finance etc.
  • 10. Mobilizing infrastructural investments through Water Operators' Partnerships Discussion • This model only for drinking water? • What role do we see for WOP’s? • Is there potential for scaling up? • Need for commercial loans?