Diese Präsentation wurde erfolgreich gemeldet.
Die SlideShare-Präsentation wird heruntergeladen. ×

Project scope Management - PMP/CAPM

Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Nächste SlideShare
CAPM Week 2 Chapter 5
CAPM Week 2 Chapter 5
Wird geladen in …3
×

Hier ansehen

1 von 2 Anzeige

Project scope Management - PMP/CAPM

Herunterladen, um offline zu lesen

For details https://mudassiriqbal.net/project-scope-management/

Project Scope Management defines the Product scope, project requirement scope, project work, making the work breakdown structure; a graphical breakdown of project deliverables, making the scope baselines and finally delivering the scope of the project i.e deliverables regularly approved by the sponsor or stakeholder.

For details https://mudassiriqbal.net/project-scope-management/

Project Scope Management defines the Product scope, project requirement scope, project work, making the work breakdown structure; a graphical breakdown of project deliverables, making the scope baselines and finally delivering the scope of the project i.e deliverables regularly approved by the sponsor or stakeholder.

Anzeige
Anzeige

Weitere Verwandte Inhalte

Diashows für Sie (20)

Ähnlich wie Project scope Management - PMP/CAPM (20)

Anzeige

Weitere von Mudassir Iqbal (17)

Aktuellste (20)

Anzeige

Project scope Management - PMP/CAPM

  1. 1. Project Scope Management (A high-level snapshot) Define all the work required and only the work required to complete the project is the goal of Project Scope management. This is the 2nd Project Management Knowledge area after Project Integration. Project Scope Management Processes There are six major elements in the process of scope management to achieve and outline the project’s parameters. These are: Plan Scope Management  It provides guidance and direction on how scope will be managed throughout the project  The process of creating a scope management plan that documents how the project and product scope will be defined, validated, and controlled  Performed once or at predefined points in the project Collect Requirements  It provides the basis for defining the product scope and project scope  The process of determining, documenting, and managing stakeholder needs and requirements to meet objectives  Performed once or at predefined points in the project Define Scope  It describes the product, service, or result boundaries and acceptance criteria  The process of developing a detailed description of the project and product  The Define Scope process can be highly iterative  It provides the vision of Project Results Create WBS  It provides a framework of what has to be delivered
  2. 2.  A process of subdividing project deliverables and project work into smaller, more manageable components  Performed once or at predefined points in the project Validate Scope  Brings objectivity to the acceptance process and increases the probability of final product, service, or result acceptance by validating each deliverable  The process of formalizing acceptance of the completed project deliverables  Performed periodically throughout the project as needed Control Scope  The scope baseline is maintained throughout the project  The process of monitoring the status of the project and product scope and managing changes to the scope baseline  Performed throughout the project Further Information on Scope Management

×