8D REPORT
A Step by Step Problem Solving Process
Written by: Siu Wai Au
ASQ CSSBB, CQA, CMQ/OE, LBC-Sensei, PMP
1
DOCUMENTATIONDOCUMENTATION
2
Document Detail
Case Number:
Case Title:
Opened Date:
Prepared by:
Reviewed by:
Closed Date:
Verified by:
Approved by:
D1: Team Formation 建立團隊
D2: Problem Description 問題描述
D3: Immediate Action 即時行動
D4: Root Cause Analysis 原因分析
D5: Corrective Action 糾正行動
D6: Implement and Validate 執行及驗證
D7: Prevention 預防措施
D8: Closure 總結
3
TABLE OF CONTENTTABLE OF CONTENT
 Name 1, Process Engineer, Leader
 Name 2, Project Manager
 Name 3, Electrical Engineer
 Name 4, Electrical Engineer
 Name 5, Quality Engineer
 Name 6 , Production Officer
A cross-functional team shall be formed in order to tackle the problem, the team should include
subject matter expert (who has relevant process knowledge), as well as the people who familiar with
the problem solving tools.
4
D1: TEAM FORMATIOND1: TEAM FORMATION 建立建立 團隊團隊
DateDate
發生日期發生日期
LocationLocation
發生地點發生地點 // 場所場所
ProcessProcess
制程制程
CustomerCustomer
客戶客戶
Product P/NProduct P/N
品產品產
Failure RateFailure Rate
不良率不良率
OwnerOwner
責任人責任人
Problem StatementProblem Statement
問題陳述問題陳述
ImpactImpact
影响影响
Specify the problem by identifying in quantifiable terms the who, what, where, when, why, how, and how many
(5W2H) for the problem.
5
D2: PROBLEMD2: PROBLEM DESCRIPTIONDESCRIPTION 問題描述問題描述
D2: PROBLEM DESCRIPTIOND2: PROBLEM DESCRIPTION 問題描述問題描述
Illustrate the problem with Defects Pictures / Flow Chart / Process Mapping / Pareto Chart
according to its nature.
6
D3D3
D3 Guideline
7
Risk AssessmentRisk AssessmentRisk AssessmentRisk Assessment
Understanding of
the Problem
Defective Rate
Stop Ship / Stop Build
Decision
Containment Action(s)
Immediate Actions
Traceability Data
AffectedAffected
P/NP/N
Stop ShipStop Ship DateDate
ResumeResume
DateDate
Stop BuildStop Build DateDate
Resume
Date
D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動
8
Stop Build / Stop Ship
Decide whether stop ship / stop build is required
WhereWhere How ManyHow Many DefectivesDefectives What to doWhat to do WhenWhen
WIP - Shop Floor
FG - Store
Materials - Store
Hubs/ In Transit
Field
End Customer
D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動
9
Containment Actions
To prevent these problem / defectives from reaching the customer.
D4D4
D4 Guideline
5-Why5-Why
Cause & Effect DiagramCause & Effect Diagram
Pareto ChartPareto Chart
IPO AnalysisIPO Analysis
FMEAFMEA
Fault Tree AnalysisFault Tree Analysis
Statistical MethodStatistical Method
5-Why5-Why
Cause & Effect DiagramCause & Effect Diagram
Pareto ChartPareto Chart
IPO AnalysisIPO Analysis
FMEAFMEA
Fault Tree AnalysisFault Tree Analysis
Statistical MethodStatistical Method
Team Knowledge
Process Mapping
Process Parameter
Detection Cause(s)
Systemic Cause(s)
Direct Root Cause(s)
Root Causes Analysis
(RCA)
Traceability Data
10
D4 Guideline
Definition
11
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
5-Why Analysis 五次為甚麼
Drilling down into a problem, digging out the root cause
WHY?
WHY?
WHY?
WHY?
Cause of the Problem
Cause of the 1st
Cause
Cause of the 2nd
Cause
Cause of the 3rd
Cause
Cause of the 4th
Cause
ProblemProblem
WHY?
12
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
Cause & Effect Diagram 因果圖
Brainstorm all the possible causes of the problem, circle the critical & controllable items
ManMan
MaterialMaterialMeasureMeasure
PROBLEMPROBLEM
MethodMethod
MachineMachineEnvironmentEnvironment
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
13
Input Process Output
14
Input-Process-Output (IPO) Analysis
Identify all possible causes of the problem by listing all the input parameters throughout the processes
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
TypeType Item#Item# Root CausesRoot Causes
Root Cause
(Failure Mode)
1
2
Detection 3
4
Systemic 5
6
15
Conclusion of RCA
D5D5
D5 Guideline
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklist
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklistDetection Cause(s)
Direct Root Cause(s)
Generation of Corrective Actions
Corrective Actions
16
D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動
17
Benefit-Effort Matrix
Brainstorm all the possible SOLUTIONS, select the best solution(s) base on the cost-effectiveness.
BENEFIT
EFFORT
• werwe
• ewrew
• ewrew
• erwe
• 2fedv
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動
Base on the root causes identified, list the corrective actions that are able to eliminate the root
causes permanently. The corrective actions must be feasible and cost-effective.
18
Root
Cause #
Corrective Action(s) % Effect
Est. Completion
Date
Owner
1
D6D6
D6 Guideline
Hypothesis TestsHypothesis Tests
Data Collection FormsData Collection Forms
Hypothesis TestsHypothesis Tests
Data Collection FormsData Collection Forms
Sampling Method
Deployed Corrective
Actions
Implement & Validation Process
Validated Corrective
Actions
19
New Process
Sample Size
Acceptance Criteria
Results
D6: IMPLEMENT & VALIDATED6: IMPLEMENT & VALIDATE 執行及驗證執行及驗證
After the corrective actions are implemented, verify the result to determine the effectiveness of the
actions taken.
SamplingSampling
MethodMethod
Sample SizeSample Size CriteriaCriteria
Est.Est.
CompletionCompletion
DateDate
ResultResult Criteria Met?Criteria Met?
20
D7: PREVETION 預防措施D7D7
D7 Guideline
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklist
Control ChartsControl Charts
FMEAFMEA
Control PlanControl Plan
BrainstormingBrainstorming
Benefit-Effort MatrixBenefit-Effort Matrix
Mistake-ProofingMistake-Proofing
Error-ProofingError-Proofing
ChecklistChecklist
Control ChartsControl Charts
FMEAFMEA
Control PlanControl Plan
Systemic Causes
Weakness of
Management System
Preventive Actions
Control Plan
21
New Procedure /
Policies
History of Similar
Cases
Corrective Actions
D7: PREVETIOND7: PREVETION 預防措施預防措施
If there are systemic cause identified, modification of the management systems, operation systems,
practices, MI, and procedures might required to prevent recurrence of this and all similar problems.
22
RootRoot
Cause #Cause #
Preventive ActionsPreventive Actions % Effect% Effect
Est. CompletionEst. Completion
DateDate
OwnerOwner
D8: CLOSURED8: CLOSURE 總結總結
State the conclusion, why the project can be closed like what are the objectives achieved, what is gained
and in what extent, give your lesson learned, and explore the possibility of horizontal deployment.
23
24
ATTACHMENTATTACHMENT

More Related Content

What's hot

8D _ Problem Solving
8D _ Problem Solving 8D _ Problem Solving
8D _ Problem Solving Senthil kumar
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthGoLeanSixSigma.com
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving ProcessAnand Subramaniam
 
8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex Training8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex TrainingBryan Len
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving ApproachJ. García - Verdugo
 
8D Problem Solving
8D Problem Solving8D Problem Solving
8D Problem SolvingAjay Garg
 
SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Trainingchaudhryshailja
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniquesAhsan Saleem
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
A3 problem solving tools
A3 problem solving toolsA3 problem solving tools
A3 problem solving toolsArshaful Hoque
 
Six Sigma Tools Project Templates
Six Sigma Tools Project TemplatesSix Sigma Tools Project Templates
Six Sigma Tools Project Templatesacribe
 

What's hot (20)

8D _ Problem Solving
8D _ Problem Solving 8D _ Problem Solving
8D _ Problem Solving
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
The Global 8D Problem Solving Process
The Global 8D Problem Solving ProcessThe Global 8D Problem Solving Process
The Global 8D Problem Solving Process
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-Depth
 
Dmaic
DmaicDmaic
Dmaic
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
8D problem solving
8D problem solving8D problem solving
8D problem solving
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex Training8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex Training
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
 
8D Problem Solving
8D Problem Solving8D Problem Solving
8D Problem Solving
 
Dmaic
DmaicDmaic
Dmaic
 
SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Training
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
A3 problem solving tools
A3 problem solving toolsA3 problem solving tools
A3 problem solving tools
 
Six Sigma Tools Project Templates
Six Sigma Tools Project TemplatesSix Sigma Tools Project Templates
Six Sigma Tools Project Templates
 

Similar to 8D Problem Solving Report Template with Guidance

Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...
Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...
Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...Catavolt, Inc.
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Production Support
Production SupportProduction Support
Production Supportr_shanki
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopAccendo Reliability
 
Velocity NY 2016 - Devops: Who Does What?
Velocity NY 2016 - Devops: Who Does What?Velocity NY 2016 - Devops: Who Does What?
Velocity NY 2016 - Devops: Who Does What?cornelia davis
 
Business Continuity The 9 Step Process
Business Continuity   The 9 Step ProcessBusiness Continuity   The 9 Step Process
Business Continuity The 9 Step ProcessZaszou
 
Quality improvement
Quality improvementQuality improvement
Quality improvementAdel Younis
 
Global 8D Training (Philippines)
Global 8D Training (Philippines)Global 8D Training (Philippines)
Global 8D Training (Philippines)Henry Jr Tadena
 
Steps in simulation study
Steps in simulation studySteps in simulation study
Steps in simulation studyEstiak Khan
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapLeanleaders.org
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapLeanleaders.org
 
Manual Testing Guide1.pdf
Manual Testing Guide1.pdfManual Testing Guide1.pdf
Manual Testing Guide1.pdfKhushal Chate
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.Bill Bearnson
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptssuser09851b1
 

Similar to 8D Problem Solving Report Template with Guidance (20)

Ford
FordFord
Ford
 
Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...
Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...
Applying Real-Time Data to The Eight Discipline Problem Solving Process in Ma...
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
8d_en.pdf
8d_en.pdf8d_en.pdf
8d_en.pdf
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
8 D Report
8 D Report8 D Report
8 D Report
 
Production Support
Production SupportProduction Support
Production Support
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) Workshop
 
Tata Project
Tata ProjectTata Project
Tata Project
 
Velocity NY 2016 - Devops: Who Does What?
Velocity NY 2016 - Devops: Who Does What?Velocity NY 2016 - Devops: Who Does What?
Velocity NY 2016 - Devops: Who Does What?
 
Business Continuity The 9 Step Process
Business Continuity   The 9 Step ProcessBusiness Continuity   The 9 Step Process
Business Continuity The 9 Step Process
 
Quality improvement
Quality improvementQuality improvement
Quality improvement
 
Global 8D Training (Philippines)
Global 8D Training (Philippines)Global 8D Training (Philippines)
Global 8D Training (Philippines)
 
Steps in simulation study
Steps in simulation studySteps in simulation study
Steps in simulation study
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable Roadmap
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable Roadmap
 
Manual Testing Guide1.pdf
Manual Testing Guide1.pdfManual Testing Guide1.pdf
Manual Testing Guide1.pdf
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
 

Recently uploaded

CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girladitipandeya
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 

Recently uploaded (20)

CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 

8D Problem Solving Report Template with Guidance

  • 1. 8D REPORT A Step by Step Problem Solving Process Written by: Siu Wai Au ASQ CSSBB, CQA, CMQ/OE, LBC-Sensei, PMP 1
  • 2. DOCUMENTATIONDOCUMENTATION 2 Document Detail Case Number: Case Title: Opened Date: Prepared by: Reviewed by: Closed Date: Verified by: Approved by:
  • 3. D1: Team Formation 建立團隊 D2: Problem Description 問題描述 D3: Immediate Action 即時行動 D4: Root Cause Analysis 原因分析 D5: Corrective Action 糾正行動 D6: Implement and Validate 執行及驗證 D7: Prevention 預防措施 D8: Closure 總結 3 TABLE OF CONTENTTABLE OF CONTENT
  • 4.  Name 1, Process Engineer, Leader  Name 2, Project Manager  Name 3, Electrical Engineer  Name 4, Electrical Engineer  Name 5, Quality Engineer  Name 6 , Production Officer A cross-functional team shall be formed in order to tackle the problem, the team should include subject matter expert (who has relevant process knowledge), as well as the people who familiar with the problem solving tools. 4 D1: TEAM FORMATIOND1: TEAM FORMATION 建立建立 團隊團隊
  • 5. DateDate 發生日期發生日期 LocationLocation 發生地點發生地點 // 場所場所 ProcessProcess 制程制程 CustomerCustomer 客戶客戶 Product P/NProduct P/N 品產品產 Failure RateFailure Rate 不良率不良率 OwnerOwner 責任人責任人 Problem StatementProblem Statement 問題陳述問題陳述 ImpactImpact 影响影响 Specify the problem by identifying in quantifiable terms the who, what, where, when, why, how, and how many (5W2H) for the problem. 5 D2: PROBLEMD2: PROBLEM DESCRIPTIONDESCRIPTION 問題描述問題描述
  • 6. D2: PROBLEM DESCRIPTIOND2: PROBLEM DESCRIPTION 問題描述問題描述 Illustrate the problem with Defects Pictures / Flow Chart / Process Mapping / Pareto Chart according to its nature. 6
  • 7. D3D3 D3 Guideline 7 Risk AssessmentRisk AssessmentRisk AssessmentRisk Assessment Understanding of the Problem Defective Rate Stop Ship / Stop Build Decision Containment Action(s) Immediate Actions Traceability Data
  • 8. AffectedAffected P/NP/N Stop ShipStop Ship DateDate ResumeResume DateDate Stop BuildStop Build DateDate Resume Date D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動 8 Stop Build / Stop Ship Decide whether stop ship / stop build is required
  • 9. WhereWhere How ManyHow Many DefectivesDefectives What to doWhat to do WhenWhen WIP - Shop Floor FG - Store Materials - Store Hubs/ In Transit Field End Customer D3: IMMEDIATE ACTIOND3: IMMEDIATE ACTION 即時行動即時行動 9 Containment Actions To prevent these problem / defectives from reaching the customer.
  • 10. D4D4 D4 Guideline 5-Why5-Why Cause & Effect DiagramCause & Effect Diagram Pareto ChartPareto Chart IPO AnalysisIPO Analysis FMEAFMEA Fault Tree AnalysisFault Tree Analysis Statistical MethodStatistical Method 5-Why5-Why Cause & Effect DiagramCause & Effect Diagram Pareto ChartPareto Chart IPO AnalysisIPO Analysis FMEAFMEA Fault Tree AnalysisFault Tree Analysis Statistical MethodStatistical Method Team Knowledge Process Mapping Process Parameter Detection Cause(s) Systemic Cause(s) Direct Root Cause(s) Root Causes Analysis (RCA) Traceability Data 10
  • 12. D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析 5-Why Analysis 五次為甚麼 Drilling down into a problem, digging out the root cause WHY? WHY? WHY? WHY? Cause of the Problem Cause of the 1st Cause Cause of the 2nd Cause Cause of the 3rd Cause Cause of the 4th Cause ProblemProblem WHY? 12
  • 13. D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析 Cause & Effect Diagram 因果圖 Brainstorm all the possible causes of the problem, circle the critical & controllable items ManMan MaterialMaterialMeasureMeasure PROBLEMPROBLEM MethodMethod MachineMachineEnvironmentEnvironment • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 13
  • 14. Input Process Output 14 Input-Process-Output (IPO) Analysis Identify all possible causes of the problem by listing all the input parameters throughout the processes D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析
  • 15. D4: ROOT CAUSE ANALYSISD4: ROOT CAUSE ANALYSIS 根本原因分析根本原因分析 TypeType Item#Item# Root CausesRoot Causes Root Cause (Failure Mode) 1 2 Detection 3 4 Systemic 5 6 15 Conclusion of RCA
  • 16. D5D5 D5 Guideline BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklist BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklistDetection Cause(s) Direct Root Cause(s) Generation of Corrective Actions Corrective Actions 16
  • 17. D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動 17 Benefit-Effort Matrix Brainstorm all the possible SOLUTIONS, select the best solution(s) base on the cost-effectiveness. BENEFIT EFFORT • werwe • ewrew • ewrew • erwe • 2fedv • • • • • • • • • • • • • • • • • • • • • • •
  • 18. D5: CORRECTIVE ACTIOND5: CORRECTIVE ACTION 糾正行動糾正行動 Base on the root causes identified, list the corrective actions that are able to eliminate the root causes permanently. The corrective actions must be feasible and cost-effective. 18 Root Cause # Corrective Action(s) % Effect Est. Completion Date Owner 1
  • 19. D6D6 D6 Guideline Hypothesis TestsHypothesis Tests Data Collection FormsData Collection Forms Hypothesis TestsHypothesis Tests Data Collection FormsData Collection Forms Sampling Method Deployed Corrective Actions Implement & Validation Process Validated Corrective Actions 19 New Process Sample Size Acceptance Criteria Results
  • 20. D6: IMPLEMENT & VALIDATED6: IMPLEMENT & VALIDATE 執行及驗證執行及驗證 After the corrective actions are implemented, verify the result to determine the effectiveness of the actions taken. SamplingSampling MethodMethod Sample SizeSample Size CriteriaCriteria Est.Est. CompletionCompletion DateDate ResultResult Criteria Met?Criteria Met? 20
  • 21. D7: PREVETION 預防措施D7D7 D7 Guideline BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklist Control ChartsControl Charts FMEAFMEA Control PlanControl Plan BrainstormingBrainstorming Benefit-Effort MatrixBenefit-Effort Matrix Mistake-ProofingMistake-Proofing Error-ProofingError-Proofing ChecklistChecklist Control ChartsControl Charts FMEAFMEA Control PlanControl Plan Systemic Causes Weakness of Management System Preventive Actions Control Plan 21 New Procedure / Policies History of Similar Cases Corrective Actions
  • 22. D7: PREVETIOND7: PREVETION 預防措施預防措施 If there are systemic cause identified, modification of the management systems, operation systems, practices, MI, and procedures might required to prevent recurrence of this and all similar problems. 22 RootRoot Cause #Cause # Preventive ActionsPreventive Actions % Effect% Effect Est. CompletionEst. Completion DateDate OwnerOwner
  • 23. D8: CLOSURED8: CLOSURE 總結總結 State the conclusion, why the project can be closed like what are the objectives achieved, what is gained and in what extent, give your lesson learned, and explore the possibility of horizontal deployment. 23