International Journal of Civil Engineering and Technology (IJCIET)
Volume 10, Issue 02, February 2019, pp. 854–864, Article ID: IJCIET_10_02_082
Available online at http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&VType=10&IType=2
ISSN Print: 0976-6308 and ISSN Online: 0976-6316
©IAEME Publication Scopus Indexed
ANALYSIS OF AFFECTED FACTORS ON
CONSTRUCTION PRODUCTIVITY IN
VIETNAM
Dinh Tuan Hai
Faculty of Urban Management, Hanoi Architectural University
Km 10, Nguyen Trai Road, Thanh Xuan District, Ha Noi City, Vietnam
Nguyen Van Tam
Faculty of Construction Economics and Management,
National University of Civil Engineering, Vietnam
ABSTRACT
Labor productivity of Vietnamese economy in general and Vietnamese
construction industry in particular is low in comparison with other countries. There
are many reason causing this low productivity in Vietnam. Boosting labor productivity
is becoming an urgency and is attracting much attention from both domestic and
foreign researchers. This paper focuses on a series of factors affecting labour
productivity on construction sites in Vietnam. The research aims to evaluate and rate
the extent of impact of each factor on labour productivity in Vietnam. The Relative
Importance Index (RII) is used to measure the impact of these factors on labor
productivity of construction workers on site in Vietnam based on the results of a
survey collected all the necessary data. Totally, 43 factors are identified and classified
into eight groups affecting the labor productivity of construction workers on sites in
Vietnam while ten most influential factors have been determined that will provide the
basis for the construction firms to provide effective solutions to achieve and increase
the productivity of construction workers. By referring to the outcomes of this study,
Vietnamese construction contractors will be able to come up with workable solutions
which will contribute towards a better performance of construction workers. On that
basis, the productivity of construction firms and national economy will be improved
correspondingly.
Key words: Construction, Factors, Labor, Productivity, Vietnam.
Cite this Article: Dinh Tuan Hai, Nguyen Van Tam, Analysis of Affected Factors on
Construction Productivity in Vietnam, International Journal of Civil Engineering and
Technology (IJCIET) 10(2), 2019, pp. 854–864.
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=10&IType=2
Dinh Tuan Hai, Nguyen Van Tam
http://www.iaeme.com/IJCIET/index.asp 855 editor@iaeme.com
1. INTRODUCTION
In the context of increasingly widening international integration, labour productivity is one of
the most important factors affecting the competitive capacity of national economy in general
and of each business in particular. Although Vietnamese labour productivity has recently
beenimproved, it is still lower than other countries in ASEAN. According to Seminars
“Boosting productivity in the context of industrialisation”, Vietnam’s labour productivity is
approximately equivalent to 7% that of Singapore, 17.6% of Malaysia, 36.5% of Thailand,
42.3% of Indonesia [1], 56.7% of Phillippines, especially 87.4% of Laos [2]. In recent years,
although there have been great scientific and techonologicaldevelopments, they have not yet
been exploited by Vietnamese construction firms. Specifically, labour productivity in
construction is only equal to 85% of those obtained in other industries.The growth rate of
productivity reachs about 10%, which is lower than average annual growth rate of about 16%
[3]. One of the causes is the lack of applying advanced technology, heavy equipment and
machine. Construction labour productivity, therefore, is one of the most important factors to
productivity of business, which has a direct effect on labour productivity in construction field
and national economy. Studying factors affecting construction labour productivity contributes
to appraising effect level of each factor at its true worth, and then proposing effective solution
for construction business.
2. FACTORS AFFECTING LABOR PRODUCTIVITY ON
CONSTRUCTION WORKERS
Construction process has unique characteristics such as: long executiontime, a large number
of stages and stakeholders, labour productivity is consequently affected by differents factors
[4]. By referencing literature and consideringpractices on construction site in Hanoi, authors
sutilise 43 factors and divide into eight groups (Table 1). Of which, some are referenced from
literature whilst the remains are proposed by authors.
Table 1 Factors affecting labor productivity of construction workers
Factors Factors
A Factors relevant to construction worker [5] E Factors relevant to working time
1 Age[6,7] 1 Break time
2 Experiences of workers [2,8,9] 2 Delay time [7,24]
3 Gender 3 Number of working hours [15]
4 Labor discipline [10] 4 Operating time [7]
5 Labor intensity 5 Preparing and finalizing time
6 Level of training [11,12] 6 Working mode [25]
7 Physical ability F
Factors relevant to labor condition
[3,28]
8 Psychophysiology ability [7] 1 Exposure to toxic substances [28]
B
Factors relevant to operation and
management on construction site
[12,13,14,15]
2 Height of working place [7]
1 Ability to organize production 3 Intensity of lighting, ventilation
2 Application of technology [16] 4 Noise
3 Attitude towards employees [12,17,18] 5 Working in hazardous areas [29]
4 The manager's experience [19] G Factors relevant to labor safety [9,11]
C Factors relevant to motivation [20] 1 Arrangement of safety staff
1 Initiative at work 2 Occupational accidents [30]
2 Reward mechanism [17,21] 3 Regulations on labor safety
3 Spiritual life 4 Safety equipment
4 Staff support 5 Safety signs [4,11]
5 Training and improving skills [22] 6 The sense of observance of regulations by laborers
Analysis of Affected Factors on Construction Productivity in Vietnam
http://www.iaeme.com/IJCIET/index.asp 856 editor@iaeme.com
Factors Factors
[31]
6 Types of salary payment [17,20,23] 7 Training on labor safety
D Factors relevant to tools and subject of labor H
Factors relevant to natural environment and
society [4,32,33]
1 Complexity of works 1 Geological and hydrological conditions
2 Material transport methods 2 Regulations, laws on construction [33]
3 Quality of building materials [7,26] 3 Weather conditions [4,9,11]
4 Quality of working tools [27]
3. RESEARCH METHODOLOGY
3.1. Method of measuring the influence of factors
Within the scope of the study, the authors used the method of The Relative Importance Index
(RII) to measure the impact of these factors on labor productivity of construction workers on
site in Vietnam based on the results of a survey collected all the necessary data. The RII
method uses an ordinal scale of 1 to 5 to determine the impact of each factor (1 - No impact, 2
- Low impact, 3 - Moderate impact, 4 - High impact, 5 - Very high impact). For the analysis
of the level of influence, the RII method [26] uses the following equation:
RII =
∑
∑
(1)
Where:Wi isthe rating given to each factor by the respondents ranging from 1 to 5; Xi is
the percentage of respondents scoring; i is the order score ranging from 1 to 5. The influence
of factors thereby is expressed through the following scale [26]:
- 1.0 ≤ RII< 1.8: No impact;
- 1.8 ≤ RII < 2.6: Low impact;
- 2.6 ≤ RII < 3.4: Moderate impact;
- 3.4 ≤RII <4.2: High impact;
- 4.2 ≤ RII < 5.0: Very high impact.
To obtain the data used to identify RII, the authors designed a questionnaire to survey the
opinions of those working in the construction industry on the impact of factors on labor
productivity of construction workers. The sample size was determined according to the
following formula (Hogg and Tannis, 1997) [34]with a reliability of 95%:
m = (2)
n = (3)
Where: n -sample size of limited population; m -sample size of unlimited population; P -
degree of variance between the elements of population (usually P = 0.5); - tolerance (± 3%,
± 4%, ± 5 %,...); z - distribution value corresponding to the reliability of choice (95%
confidence, the z value is 1.96); N -is the total number of responses collected.
3.2. The plan of survey
The author conducted a survey to collect data to determine the level of impact (5 levels) of 43
factors in eight groups of factors affecting labor productivity of construction workers. By
using direct interview questionnaires, interviewees were construction workers on sites in
Hanoi. 200 samples were sent.
Determine the sample size needed through following formula in which z = 1.96; N = 200
; P = 0.5; pick = 0.04 (4%). By using formulas (2) and (3) with value m = 600 and N = 200,
the number of samples needed is 150.
Dinh Tuan Hai, Nguyen Van Tam
http://www.iaeme.com/IJCIET/index.asp 857 editor@iaeme.com
4. DATA ANALYSIS
One of the most important stages was to collect accurate data, the total number of
questionnaires sent was 200, the number of responses received and validated was 185. This
figure is greater than the required sample size, so the data obtained satisfies the quality
requirements.The results of the survey were synthesized by the author and evaluated the
impact of 43 factors, which are divided into seven groups of factors affecting the labor
productivity of construction workers on sites in Vetnam as follows (Table 2).
4.1. Group 1: factors relevant to construction workersthemselves
According to the interviewed participants, the experience of construction workers was the
leading factor among the influencing factors in the group of factors of the workers
themselves, with RII = 4.31. The results coincide with previous studies[35,36], which found
that workers' experience greatly influenced labor productivity. Labor discipline was ranked
second with RII = 4.28, physical ability with RII = 4.20 was ranked third in this group.
Factors such as physiological ability, labor intensity, and age were in the greatly
influential factors, with RIIs of 3.74, 3.53 and 3.52 respectively. This result is somewhat
predictable because high professional qualifications correspond to skilled workers or high
ranks should increase productivity. The lower the labor intensity, the lower the labor
productivity, the physiological psychological problems of people will affect the efficiency of
work thus affecting the labor productivity. The higher the age, the more accumulated
experience, but the physical strength can be reduced, thus greatly affecting labor productivity.
Gender and level of training are two factors ranked 8th and 9th with RIIs of 3.22 and 3.08
respectively, which means that the moderate influence. This proves that, although the job of
construction workers is strenuous, but this does not significantly affect the increase or
decrease labor productivity.Education, likewise,has the low impact on productivity of
construction workers on sites in Hanoi.
Table 2 Ranking of factors on workers themselves
Factors RII Impact Ranking
Experiences of workers 4.31 Very high 1
Labor discipline 4.28 Very high 2
Physical ability 4.20 Very high 3
Psychophysiology ability 3.74 High 4
Labor intensity 3.53 High 5
Age 3.52 High 6
Gender 3.22 Moderate 7
Level of training 3.08 Moderate 8
4.2. Group 2: factors relevant to operation and management on construction site
This is the group with the highest number of influencing factors, ranked as follows on Table
3:
Table 3 Ranking of operational and managerial factors
Factors RII Impact Ranking
Ability to organize production 4.25 Very high 1
Construction supervision 4.23 Very high 2
Application of technology 3.95 High 3
Workers’ arrangement 3.74 High 4
Analysis of Affected Factors on Construction Productivity in Vietnam
http://www.iaeme.com/IJCIET/index.asp 858 editor@iaeme.com
The results in Table 3 show that the ability to organize production is the leading factor in
the group affecting labor productivity with RII = 4.25, ranking second is the organization of
construction supervision with RII = 4.23. It can be seen that the ability to organize and
supervise the construction of contractors, especially the site manager will decide the
management and organization. Manufacture is direct construction on the site. These have a
direct impact and greatly affect the increase or decrease of labor productivity.With RIIs being
3.74 and 3.95, the factors to be assessed with a high degree of influence are the application of
technology andworker’s arrangement. That is to say, under workers’ perspective, technology
and labour’s arrangement significantly contribute to their performance
4.3. Group 3: factors relevant to motivation
According to research results (Table 4), the form of salary payment is a factor that has a very
high impact on labor productivity ranked first with RII = 4.28. Income is the legitimate
purpose. Monetary incentive therefore is the goal that every construction worker aiming for.
High levels of welfare were the welfare, incentive, and spiritual well-being factors that RII is
4.08, 3.96 and 3.82 respectively.These factors will directly affect the motivation of
employees, good motivation will relieve unnecessary stress, enhance the attractiveness of pay,
bonus. The workers will be eager to work, stick with the organization, willing to devote
themselves for the organization.
Professional training, skills upgrading and innovations in labor are factors that have high
impact on labor productivity. These factors directly influence the motivation of employees,
bring satisfaction and sense of responsibility of construction workers to the work.
Table 4 Ranking of factors that motivate employees
Factors RII Impact Ranking
Types of salary payment 4.28 Very high 1
Staff support 4.08 High 2
Reward mechanism 3.96 High 3
Spiritual life 3.82 High 4
Training and improving skills 3.38 Moderate 5
Initiative at work 3.19 Moderate 6
4.4. Group 4: factors relevant to tools and objects of labour
Table 5 shows the impact of these factors of working tools and objects onvariation in labor
productivity. Quality of building materials is the leading factor with RII = 4.26, ranked
second factor is quality of working tools with RII = 4.25. It can be seen that if a good
bricklayers do not have built-in tools, the quality of bricks or mortar is poor, so the
performance of building walls can not be high.
Table 5 Ranking of factors of working tools and objects
Factors RII Impact Ranking
Quality of building materials 4.26 Very high 1
Quality of working tools 4.25 Very high 2
Complexity of works 3.89 High 3
Material transport methods 3.27 Moderate 4
High-impact factor is the complexity of the work with RII = 3.89 and factor of material
transport methodswith RII = 3.27. These factors affect the performance of the work that will
also affect labor productivity as reported by Thomas and Sanders (1991) [37]. In order to
ensure the achievement and growth of labor productivity, organisations need to utilise
Dinh Tuan Hai, Nguyen Van Tam
http://www.iaeme.com/IJCIET/index.asp 859 editor@iaeme.com
machines, equipments and tools which must be suitable with products and technologies;
ensure routinereadiness and operation throughout the working shift; ensureraw materials,
semi-finished products putting into production must have evident origin and qualification.
4.5. Group 5: factors relevant to working time
The total working time and finishing product time of construction workers will determine
their productivity is high or low. Operating time; working hours in shift; preparing and
finishing time; Break time and delaying time are factors that have a high impact on labor
productivity. In which, the operating time is the leading factor in the group with RII = 3.90,
secondly the factor of working hours with RII = 3.78 (Table 6).
The working mode factor is the factor with moderate impact and ranked at the bottom of
the group with RII = 3.29. In order to increase labor productivity, construction firms should
take measures to reduce wasted time and increase value-added time, thereby increasing the
efficiency of the squad of workers.
Table 6 Ranking of factors relevant to working time
Factors RII Impact Ranking
Operating time 3.90 High 1
Number of working hours 3.78 High 2
Break time 3.71 High 3
Preparing and finalizing time 3.53 High 4
Delay time 3.50 High 5
Working mode 3.29 Moderate 6
4.6. Group 6: factors relevant to labour condition
Table 7 Ranking of factors of labor conditions
Factors RII Impact Ranking
Height of working place 4.20 Very high 1
Working in hazardous areas 4.13 High 2
Exposure to toxic substances 3.80 High 3
Noise 3.74 High 4
Intensity of lighting, ventilation 3.16 Moderate 5
Research results show that with RII = 4.20, the factor of height has a great influence on
labor productivity and ranked first in this group. This is perfectly suited to the fact that the
higher the level of construction work, the more likely it is that the construction worker will
suffer the effects of natural factors and the more difficult work done for the type of work. At
civil construction having high elevation, this factor has a greater affect on labor productivity,
so the system of norms in Vietnam is currently according to the heights, i.e. ≤ 4m; ≤ 16 m; ≤
50m and> 50m.
The second highest risk factor is working in hazardous areas with RII = 4.13, which has
the same high impact with exposure to toxic substances and noise levels having 3.80 and 3.74,
respectively. The factor having amoderate impact is the intensity of lighting, ventilation with
RII = 3.16. Places with poor working conditions such as too bright or too dark will affect the
eyes and vision of the workers, reducing their working capacity as a result. The contaminated
and unsafe workplaces, without a doubt,have possibility to affect the health of workers.
Moreover, it makes workers feel not assured, so they do not concentrate on work, thereby
reducing labor productivity.
Analysis of Affected Factors on Construction Productivity in Vietnam
http://www.iaeme.com/IJCIET/index.asp 860 editor@iaeme.com
4.7. Group 7: factors relevant to labour safety
Not only the construction industry, but for all kinds of occupations, the safety of people,
safety of machinery, safety of products are placed on top of priority. According to the survey
results, the factor of occupational safety equipment has the highest effect on the construction
workers with RII = 4.23 (Table 8). Construction workers often work in dangerous
environment, so that the firms having adequate protection and safety equipment is essential to
prevent occupational accidents and help the workers peace of mind. On that basis, increasing
productivity is achievable.
Factors of RII from 3.54 to 3.81 are rated as having a high impact including employees'
sense of compliance; safety signs; occupational accidents; regulations on labor safety
andarrangement of safety staff. According to Thomas and Sanders (1991) [37], accidents have
a significant impact on occupational accidents with three types comprising fatal accidents will
cause the construction process to interrupt for a number of days; accidents causing injured
construction workers to be hospitalized for at least 24 hours will adversely affect the
performance of such work; the remaining minor accidents affect the labor productivity in
certain cases.
However, the respondents propose that the factor of training on occupational safety has a
moderate impact on labor productivity with RII = 3.24. These factors affect the worker's
psychology and working processes that affect labor productivity, in order to ensure
occupational safety
Table 8 Ranking of factors of ooccupational safety
Factors RII Impact Ranking
Safety equipment 4.23 Very high 1
The sense of observance of regulations
by laborers
3.81 High 2
Safety signs 3.79 High 3
Occupational accidents 3.78 High 4
Regulations on labor safety 3.62 High 5
Arrangement of safety staff 3.58 High 6
Training on labor safety 3.31 Moderate 7
and reduce occupational accidents and diseases during the construction process.
4.8. Group 8: factor relevant to natural enviroment and society
Table 9 Ranking of natural environmental factors
Factors RII Impact Ranking
Weather conditions 3.84 High 1
Regulations, laws on construction 3.52 High 2
Geological and hydrological conditions 3.39 High 3
Weather factor is a factor that has a high impact on labor productivity and is ranked first
with RII of 3.84 (Table 9). Most construction works are built in natural spaces, where are
affected directly by the weather.The weather not supporting or sometimes becoming severe
has a not small impact on labor productivity. The role of natural conditions for labor
productivity is objective and unavoidable. Therefore, to ensure the achievement and increase
productivity, construction firms need to anticipate the difficulties arising due to natural
environment conditions to mitigate risks in the production process. The second most
influential factor is the factor of regulations on construction with RII = 3.52. Regulations and
national policies that influence the goals and direction of the production of the construction
Dinh Tuan Hai, Nguyen Van Tam
http://www.iaeme.com/IJCIET/index.asp 861 editor@iaeme.com
firms, affecting the organisational policies for workerson wages, investment in science and
technology, so on, thus affecting productivity.
4.9. Rank the impact of factor groups
According to the research results, the construction workers themselves are the most influential
factor in labor productivity of construction workers with RII = 4.32. This result is consistent
with the fact that labor is the first and most important factor affecting labor productivity.
Ranking second with RII = 4.03 is the motivating factor for construction workers, so
construction workers argue that when the firm has motivational policies, the workers will try
their best to work to increase productivity. Furthermore, thanks to it, workers will stick
together and ready to dedicate themselves to the organization. The group of natural-social
environment factors is highly influenced but ranked in groups with RII = 3.49 only (Table
10).
Table 10 Ranking of groups of factor
Factors RII Impact Ranking
The construction workers themselves 4.32 Very high 1
Motivating for construction workers 4.03 High 2
Working tools and objects of labor 3.91 High 3
Organization and management of production on site 3.86 High 4
Labor safety 3.72 High 5
Working time 3.61 High 6
Working condition 3.58 High 7
Natural environment and society 3.49 High 8
4.10. Summary of ranking factors affecting labor productivity
The result shows that the factor of experience of the employees is the highest impact factor
among the 43 factors that affect the labor productivity of the construction workers (Tablr 11).
There are ten factors that are highly influential: employee experience; labor discipline; pay
forms; quality of construction materials; ability to organize production; quality of tools and
tools; organization of construction supervision; strength and heights. At the same time,
25factors have high impact and 8factors have a moderate impact on the labor productivity of
construction workers at the construction sites in Hanoi. As a result, construction firms
wishing to increase labor productivity must offer solutions that address the most influential
factors or the ten factors identified by the study.
Table 11 Summary of ranking factors affecting labor productivity
Factors RII Impact Ranking
Experiences of workers 4.31 Very high 1
Labor discipline 4.28 Very high 2
Types of salary payment 4.28 Very high 3
Quality of building materials 4.26 Very high 4
Ability to organize production 4.25 Very high 5
Quality of working tools 4.25 Very high 6
Construction supervision 4.23 Very high 7
Safety equipment 4.23 Very high 8
Physical ability 4.20 Very high 9
Height of working place 4.20 Very high 10
Working in hazardous areas 4.13 High 11
Staff support 4.08 High 12
Reward mechanism 3.96 High 13
Application of technology 3.95 High 14
Analysis of Affected Factors on Construction Productivity in Vietnam
http://www.iaeme.com/IJCIET/index.asp 862 editor@iaeme.com
Factors RII Impact Ranking
Operating time 3.90 High 15
Complexity of works 3.89 High 16
Weather conditions 3.84 High 17
Spiritual life 3.82 High 18
The sense of observance of regulations by laborers 3.81 High 19
Exposure to toxic substances 3.80 High 20
Safety signs 3.79 High 21
Number of working hours 3.78 High 22
Occupational accidents 3.78 High 23
Psychophysiology ability 3.74 High 24
Workers’ arrangement 3.74 High 25
Noise 3.74 High 26
Break time 3.71 High 27
Regulations on labor safety 3.62 High 28
Arrangement of safety staff 3.58 High 29
Labor intensity 3.53 High 30
Preparing and finalizing time 3.53 High 31
Age 3.52 High 32
Regulations, laws on construction 3.52 High 33
Delay time 3.50 High 34
Geological and hydrological conditions 3.39 High 35
Training and improving skills 3.38 Moderate 36
Training on labor safety 3.31 Moderate 37
Working mode 3.29 Moderate 38
Material transport methods 3.27 Moderate 39
Gender 3.22 Moderate 40
Initiative at work 3.19 Moderate 41
Intensity of lighting, ventilation 3.16 Moderate 42
Level of training 3.08 Moderate 43
5. CONCLUSIONS
Labor productivity plays an absolutely important role in economic growth and improving the
competitiveness of each business as well as in each country. The research has identified 43
factors that are classified into eight groups affecting the labor productivity of construction
workers on site in Vietnam. Through the survey responded by construction workers who are
working on site in Vietnam, the author has used the RII relative importance index method to
evaluate and rank the impact of these 43 factors. Ten most influential factors have been
determined that will provide the basis for the construction firms to provide effective solutions
to achieve and increase the productivity of construction workers.
REFERENCES
[1] General Statistics Office of Vietnam (2017), Vietnamese productivity is lower than Laos,
by 7% Singapore, VnEconomy.
[2] Tuan, N.V. (2018), Improving Productivity in State-owned Enterprises, Seminar on
Improving productivity in industrialized context, Vietnam Economic Forum II: Towards a
more rapid and sustainable growth of Vietnam’s economy, 11 January 2018, Hanoi.
[3] Anh, V. (2017), Raising productivity in construction sector, Bidding Newspaper.
[4] Thanh, N. H. (2016), Lecture Organizing the implementation of construction investment
projects, National University of Civil Engineering, Hanoi.
[5] Vu, N.T. (2015), Research on factors influencing human resource development of Tien
Giang garment enterprises, PhD thesis in Economics, University of Economics, Ho Chi
Minh,
Dinh Tuan Hai, Nguyen Van Tam
http://www.iaeme.com/IJCIET/index.asp 863 editor@iaeme.com
[6] Clarkson, H. O., Henry, W. P., Gregory, A. H., (1989), Productivity Improvement in
Construction. McGraw-Hill.
[7] Vy, N. B., Yem, B.V.(2007), Textbook of Building construction norm, Construction
Publishing House, Hanoi.
[8] Sanders, S. R.,Thomas, H. R. (1991), Factors Affecting Masonry-Labor Productivity,
Journal of Construction Engineering and Management. 117(4), pp. 626-644.
[9] Adnan Enshassi, Sherif Mohamed, Ziad Abu Mustafa, Peter Eduard Mayer (2007),
Factors affecting labour productivity in building projects in the Gaza strip, Journal of
Civil Engineering and Management. Volume 12, pp. 245–254.
[10] Thomas, H. R., Riley, D. R.,Sanvido, V. E. (1999), Loss of Labor Productivity due to
Delivery Methods and Weather, Journal of Construction Engineering and Management.
125(1), pp. 39-46.
[11] Makulsawatudom, Arun, Emsley, Margaret, and Sinthawanarong, Kuldej (2004), "Critical
factors influencing construction productivity in Thailand", The Journal of KMITNB. 14(3),
pp. 1-6.
[12] Lam, V.Q. (2010), Analysis of Factors Affecting Public Investment Project Management -
Case Study in Ho Chi Minh City, Thesis of Economics, University of Economics in Ho
Chi Minh City.
[13] Lim, E. C., Alum, J. (1995), Construction Productivity: issues encountered by contractors
in Singapore, International Journal of Project Management. 13(1), pp. 51 - 58.
[14] Lema, N.M. (1995), Construction of labour productivity modeling, University of Dar
Elsalaam. 1.
[15] Hanna, A. S., Taylor, C. S., Sullivan, K.T. (2005), Impact of Extended Overtime on
Construction Labor Productivity, Journal of Construction Engineering and Management.
131(6), pp. 734-739.
[16] Junbok Lee, Young-Jin Park,Chang-Hoon Choi, Choong-Hee Han2017), BIM-assisted
labor productivity measurement method for structural formwork, Automation in
Construction Journal. Volume 84, pp. 121-132.
[17] Langford D, Hancock MR, Fellows R, Gale AW(1995), Human Resources Management
in Construction, Longman Scientific & Technical.
[18] Hung, L.V. (2016), Factors affecting labor productivity in Vietnam, PhD thesis in
Economics, Vietnam Academy of Social Sciences.
[19] Farnad, N., Pouya, N. (2013), Dynamic modeling of labor productivity in construction
projects, International Journal of Project Management. 31(6), pp. 903-911.
[20] Kazaz, A., Manisali, E., Ulubeyli, S. (2008), Effect of Basic Motivational Factors on
Construction Workforce Productivity in Turkey, Journal of Civil Engineering and
Management. 14(2), pp. 95-106.
[21] Soekiman, A. (2009), Quality of Work Life as an Alternative Strategy for Managing
Human Resource in Construction Industry, Proceeding of the 1st International
Conference on Engineering, Environment, Economic, Safety & Health (1st CONVEEESH-
2009), B-III-2 pp. 1-7, Manado, Indonesia.
[22] Olomolaiye, P., Jayawardane, A., Harris, F. (1988), Construction Productivity
Management, Chartered Institute of Building, UK.
[23] Loan, T.T.K., Hung, B.N.(2009), Research on management factors affecting productivity
of garment enterprises, Science and Technology Development Review, National
University of Ho Chi Minh City. 12 (1), pp. 60 - 70
Analysis of Affected Factors on Construction Productivity in Vietnam
http://www.iaeme.com/IJCIET/index.asp 864 editor@iaeme.com
[24] Thomas, H. R. (1992), Effects of Schedule Overtime on Labor Productivity, Journal of
Construction Engineering and Management. 118(1), pp. 60-76.
[25] Hanna AS, Chang CK, Sullivan KT, Lackney JA (2008), Impact of Shift Work on Labor
Productivity for Labor Intensive Contractor, Journal of Construction Engineering and
Management 134(3), pp. 197-204.
[26] A. Soekiman, K.S. Pribadi, B.W. Soemardi, R.D. Wirahadikusumah, (2011), Factors
Relating to Labor Productivity Affecting the Project Schedule Performance in Indonesia,
The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction.
Volume 14, pp. Pages 865-873.
[27] Loi, D.N., Khanh, N.N.(2016), Research on solutions to improve the quality of technical
workers in construction enterprises, University-level scientific research projects,
NationalUniversity of Civil Engineering.
[28] Mostafa, E. S., Khaled, M. E. (2011), Towards improving construction labor productivity
and projects’ performance, Alexandria Engineering Journal. 50(4), pp. 321-330.
[29] Lowe, G. (1987), The Measurement of Productivity in the Construction Industry,
Construction Management and Economics. 5, pp. 101-113.
[30] Ministry of Construction (2016), Final report of the Ministry of Construction on the
implementation of the five-year plan, 2011-2015.
[31] Kaming PF, Olomolaiye P, Holt GD, Harris FC, (1997), Factors Influencing Craftmen’s
Productivity in Indonesia, International Journal of Project Management. 15(1), pp. 21–
30.
[32] Xiaodong Li, Kwan Hang Chow, Yimin Zhu, Ying Lin (2016), Evaluating the impacts of
high-temperature outdoor working environments on construction laborproductivity in
China: A case study of rebar workers, Building and Environment. 95, pp. 42-52.
[33] Cu, L.V., Long, L.V., Thuy, P. N., Ngoc, H. K,. (2017), Mechanisms and policies to
improve the productivity of the construction industry: the status quo and recommendation,
Research by Ministry of Construction, Hanoi.
[34] Hogg, R. V. Tannis, E. A. (1997), Probability and statistical inferences, Prentice Hall.
[35] Paulson Jr, Boyd C (1975), "Estimation and control of construction labor costs", Journal
of the Construction Division. 101 (ASCE# 11579 Proceeding).
[36] Heizer, Jay and Render, Barry (1996), "Production and operation management: strategic
and tactical decisions", New Jersey.
[37] Sanders SR and Thomas HR (1991), "Factors Affecting Masonry-Labor Productivity",
Journal of Construction Engineering and Management. 117(4), pp. 626-644.
[38] Saurav Dixit, Amit Kumar Pandey, Satya N Mandal And Sanjeev Bansal A Study of
Enabling Factors Affecting Construction Productivity: Indian Scnerio, International
Journal of Civil Engineering and Technology, 8(6), 2017, pp. 741–758

More Related Content

What's hot

Design of workplace for the assembly of monoblock pump
Design of workplace for the assembly of monoblock pumpDesign of workplace for the assembly of monoblock pump
Design of workplace for the assembly of monoblock pump
eSAT Journals
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated members
IAEME Publication
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
Bisher Marad
 

What's hot (20)

IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
Design of workplace for the assembly of monoblock
Design of workplace for the assembly of monoblockDesign of workplace for the assembly of monoblock
Design of workplace for the assembly of monoblock
 
Design of workplace for the assembly of monoblock pump
Design of workplace for the assembly of monoblock pumpDesign of workplace for the assembly of monoblock pump
Design of workplace for the assembly of monoblock pump
 
Introduction to Production Engineering Department
Introduction to Production Engineering DepartmentIntroduction to Production Engineering Department
Introduction to Production Engineering Department
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
A Survey of work related injuries among building construction workers in soth...
A Survey of work related injuries among building construction workers in soth...A Survey of work related injuries among building construction workers in soth...
A Survey of work related injuries among building construction workers in soth...
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated members
 
Towards The Development of an Index to Measure the Performance of Multi-Produ...
Towards The Development of an Index to Measure the Performance of Multi-Produ...Towards The Development of an Index to Measure the Performance of Multi-Produ...
Towards The Development of an Index to Measure the Performance of Multi-Produ...
 
ANALYSIS OF THAI DENDROCALAMUS GIGANTUES BAMBOO (TDG) STRIPS OF PRODUCTION IN...
ANALYSIS OF THAI DENDROCALAMUS GIGANTUES BAMBOO (TDG) STRIPS OF PRODUCTION IN...ANALYSIS OF THAI DENDROCALAMUS GIGANTUES BAMBOO (TDG) STRIPS OF PRODUCTION IN...
ANALYSIS OF THAI DENDROCALAMUS GIGANTUES BAMBOO (TDG) STRIPS OF PRODUCTION IN...
 
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
 
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
 
The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Concepts
 
Introduction of Industrial Engineering
Introduction of Industrial EngineeringIntroduction of Industrial Engineering
Introduction of Industrial Engineering
 
What Is Industrial Engineering
What Is Industrial EngineeringWhat Is Industrial Engineering
What Is Industrial Engineering
 

Similar to Ijciet 10 02_082

IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IAEME Publication
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Journals
 
STUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION PROJECTS
STUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION  PROJECTSSTUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION  PROJECTS
STUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION PROJECTS
nitinrane33
 
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
IAEME Publication
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
IAEME Publication
 

Similar to Ijciet 10 02_082 (20)

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurement
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
 
STUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION PROJECTS
STUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION  PROJECTSSTUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION  PROJECTS
STUDY OF EFFECTS OF LABOUR PRODUCTIVITY ON CONSTRUCTION PROJECTS
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Assessment of craftsmen turnover in the construction industry
Assessment of craftsmen turnover in the construction industryAssessment of craftsmen turnover in the construction industry
Assessment of craftsmen turnover in the construction industry
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
The Organization Motivation on Employee Performance in an Engineering College...
The Organization Motivation on Employee Performance in an Engineering College...The Organization Motivation on Employee Performance in an Engineering College...
The Organization Motivation on Employee Performance in an Engineering College...
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
ppt final final.pptx
ppt final final.pptxppt final final.pptx
ppt final final.pptx
 
Ijciet 08 04_220
Ijciet 08 04_220Ijciet 08 04_220
Ijciet 08 04_220
 
Time delay and cost escalation in construction works
Time delay and cost escalation in construction worksTime delay and cost escalation in construction works
Time delay and cost escalation in construction works
 
Antecedents Of Migrated Construction Workers Stress – An Indian Perspective
Antecedents Of Migrated Construction Workers Stress – An Indian PerspectiveAntecedents Of Migrated Construction Workers Stress – An Indian Perspective
Antecedents Of Migrated Construction Workers Stress – An Indian Perspective
 
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 

More from IAEME Publication

A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
IAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
IAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
IAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 

Ijciet 10 02_082

  • 1. http://www.iaeme.com/IJCIET/index.asp 854 editor@iaeme.com International Journal of Civil Engineering and Technology (IJCIET) Volume 10, Issue 02, February 2019, pp. 854–864, Article ID: IJCIET_10_02_082 Available online at http://www.iaeme.com/ijciet/issues.asp?JType=IJCIET&VType=10&IType=2 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 ©IAEME Publication Scopus Indexed ANALYSIS OF AFFECTED FACTORS ON CONSTRUCTION PRODUCTIVITY IN VIETNAM Dinh Tuan Hai Faculty of Urban Management, Hanoi Architectural University Km 10, Nguyen Trai Road, Thanh Xuan District, Ha Noi City, Vietnam Nguyen Van Tam Faculty of Construction Economics and Management, National University of Civil Engineering, Vietnam ABSTRACT Labor productivity of Vietnamese economy in general and Vietnamese construction industry in particular is low in comparison with other countries. There are many reason causing this low productivity in Vietnam. Boosting labor productivity is becoming an urgency and is attracting much attention from both domestic and foreign researchers. This paper focuses on a series of factors affecting labour productivity on construction sites in Vietnam. The research aims to evaluate and rate the extent of impact of each factor on labour productivity in Vietnam. The Relative Importance Index (RII) is used to measure the impact of these factors on labor productivity of construction workers on site in Vietnam based on the results of a survey collected all the necessary data. Totally, 43 factors are identified and classified into eight groups affecting the labor productivity of construction workers on sites in Vietnam while ten most influential factors have been determined that will provide the basis for the construction firms to provide effective solutions to achieve and increase the productivity of construction workers. By referring to the outcomes of this study, Vietnamese construction contractors will be able to come up with workable solutions which will contribute towards a better performance of construction workers. On that basis, the productivity of construction firms and national economy will be improved correspondingly. Key words: Construction, Factors, Labor, Productivity, Vietnam. Cite this Article: Dinh Tuan Hai, Nguyen Van Tam, Analysis of Affected Factors on Construction Productivity in Vietnam, International Journal of Civil Engineering and Technology (IJCIET) 10(2), 2019, pp. 854–864. http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=10&IType=2
  • 2. Dinh Tuan Hai, Nguyen Van Tam http://www.iaeme.com/IJCIET/index.asp 855 editor@iaeme.com 1. INTRODUCTION In the context of increasingly widening international integration, labour productivity is one of the most important factors affecting the competitive capacity of national economy in general and of each business in particular. Although Vietnamese labour productivity has recently beenimproved, it is still lower than other countries in ASEAN. According to Seminars “Boosting productivity in the context of industrialisation”, Vietnam’s labour productivity is approximately equivalent to 7% that of Singapore, 17.6% of Malaysia, 36.5% of Thailand, 42.3% of Indonesia [1], 56.7% of Phillippines, especially 87.4% of Laos [2]. In recent years, although there have been great scientific and techonologicaldevelopments, they have not yet been exploited by Vietnamese construction firms. Specifically, labour productivity in construction is only equal to 85% of those obtained in other industries.The growth rate of productivity reachs about 10%, which is lower than average annual growth rate of about 16% [3]. One of the causes is the lack of applying advanced technology, heavy equipment and machine. Construction labour productivity, therefore, is one of the most important factors to productivity of business, which has a direct effect on labour productivity in construction field and national economy. Studying factors affecting construction labour productivity contributes to appraising effect level of each factor at its true worth, and then proposing effective solution for construction business. 2. FACTORS AFFECTING LABOR PRODUCTIVITY ON CONSTRUCTION WORKERS Construction process has unique characteristics such as: long executiontime, a large number of stages and stakeholders, labour productivity is consequently affected by differents factors [4]. By referencing literature and consideringpractices on construction site in Hanoi, authors sutilise 43 factors and divide into eight groups (Table 1). Of which, some are referenced from literature whilst the remains are proposed by authors. Table 1 Factors affecting labor productivity of construction workers Factors Factors A Factors relevant to construction worker [5] E Factors relevant to working time 1 Age[6,7] 1 Break time 2 Experiences of workers [2,8,9] 2 Delay time [7,24] 3 Gender 3 Number of working hours [15] 4 Labor discipline [10] 4 Operating time [7] 5 Labor intensity 5 Preparing and finalizing time 6 Level of training [11,12] 6 Working mode [25] 7 Physical ability F Factors relevant to labor condition [3,28] 8 Psychophysiology ability [7] 1 Exposure to toxic substances [28] B Factors relevant to operation and management on construction site [12,13,14,15] 2 Height of working place [7] 1 Ability to organize production 3 Intensity of lighting, ventilation 2 Application of technology [16] 4 Noise 3 Attitude towards employees [12,17,18] 5 Working in hazardous areas [29] 4 The manager's experience [19] G Factors relevant to labor safety [9,11] C Factors relevant to motivation [20] 1 Arrangement of safety staff 1 Initiative at work 2 Occupational accidents [30] 2 Reward mechanism [17,21] 3 Regulations on labor safety 3 Spiritual life 4 Safety equipment 4 Staff support 5 Safety signs [4,11] 5 Training and improving skills [22] 6 The sense of observance of regulations by laborers
  • 3. Analysis of Affected Factors on Construction Productivity in Vietnam http://www.iaeme.com/IJCIET/index.asp 856 editor@iaeme.com Factors Factors [31] 6 Types of salary payment [17,20,23] 7 Training on labor safety D Factors relevant to tools and subject of labor H Factors relevant to natural environment and society [4,32,33] 1 Complexity of works 1 Geological and hydrological conditions 2 Material transport methods 2 Regulations, laws on construction [33] 3 Quality of building materials [7,26] 3 Weather conditions [4,9,11] 4 Quality of working tools [27] 3. RESEARCH METHODOLOGY 3.1. Method of measuring the influence of factors Within the scope of the study, the authors used the method of The Relative Importance Index (RII) to measure the impact of these factors on labor productivity of construction workers on site in Vietnam based on the results of a survey collected all the necessary data. The RII method uses an ordinal scale of 1 to 5 to determine the impact of each factor (1 - No impact, 2 - Low impact, 3 - Moderate impact, 4 - High impact, 5 - Very high impact). For the analysis of the level of influence, the RII method [26] uses the following equation: RII = ∑ ∑ (1) Where:Wi isthe rating given to each factor by the respondents ranging from 1 to 5; Xi is the percentage of respondents scoring; i is the order score ranging from 1 to 5. The influence of factors thereby is expressed through the following scale [26]: - 1.0 ≤ RII< 1.8: No impact; - 1.8 ≤ RII < 2.6: Low impact; - 2.6 ≤ RII < 3.4: Moderate impact; - 3.4 ≤RII <4.2: High impact; - 4.2 ≤ RII < 5.0: Very high impact. To obtain the data used to identify RII, the authors designed a questionnaire to survey the opinions of those working in the construction industry on the impact of factors on labor productivity of construction workers. The sample size was determined according to the following formula (Hogg and Tannis, 1997) [34]with a reliability of 95%: m = (2) n = (3) Where: n -sample size of limited population; m -sample size of unlimited population; P - degree of variance between the elements of population (usually P = 0.5); - tolerance (± 3%, ± 4%, ± 5 %,...); z - distribution value corresponding to the reliability of choice (95% confidence, the z value is 1.96); N -is the total number of responses collected. 3.2. The plan of survey The author conducted a survey to collect data to determine the level of impact (5 levels) of 43 factors in eight groups of factors affecting labor productivity of construction workers. By using direct interview questionnaires, interviewees were construction workers on sites in Hanoi. 200 samples were sent. Determine the sample size needed through following formula in which z = 1.96; N = 200 ; P = 0.5; pick = 0.04 (4%). By using formulas (2) and (3) with value m = 600 and N = 200, the number of samples needed is 150.
  • 4. Dinh Tuan Hai, Nguyen Van Tam http://www.iaeme.com/IJCIET/index.asp 857 editor@iaeme.com 4. DATA ANALYSIS One of the most important stages was to collect accurate data, the total number of questionnaires sent was 200, the number of responses received and validated was 185. This figure is greater than the required sample size, so the data obtained satisfies the quality requirements.The results of the survey were synthesized by the author and evaluated the impact of 43 factors, which are divided into seven groups of factors affecting the labor productivity of construction workers on sites in Vetnam as follows (Table 2). 4.1. Group 1: factors relevant to construction workersthemselves According to the interviewed participants, the experience of construction workers was the leading factor among the influencing factors in the group of factors of the workers themselves, with RII = 4.31. The results coincide with previous studies[35,36], which found that workers' experience greatly influenced labor productivity. Labor discipline was ranked second with RII = 4.28, physical ability with RII = 4.20 was ranked third in this group. Factors such as physiological ability, labor intensity, and age were in the greatly influential factors, with RIIs of 3.74, 3.53 and 3.52 respectively. This result is somewhat predictable because high professional qualifications correspond to skilled workers or high ranks should increase productivity. The lower the labor intensity, the lower the labor productivity, the physiological psychological problems of people will affect the efficiency of work thus affecting the labor productivity. The higher the age, the more accumulated experience, but the physical strength can be reduced, thus greatly affecting labor productivity. Gender and level of training are two factors ranked 8th and 9th with RIIs of 3.22 and 3.08 respectively, which means that the moderate influence. This proves that, although the job of construction workers is strenuous, but this does not significantly affect the increase or decrease labor productivity.Education, likewise,has the low impact on productivity of construction workers on sites in Hanoi. Table 2 Ranking of factors on workers themselves Factors RII Impact Ranking Experiences of workers 4.31 Very high 1 Labor discipline 4.28 Very high 2 Physical ability 4.20 Very high 3 Psychophysiology ability 3.74 High 4 Labor intensity 3.53 High 5 Age 3.52 High 6 Gender 3.22 Moderate 7 Level of training 3.08 Moderate 8 4.2. Group 2: factors relevant to operation and management on construction site This is the group with the highest number of influencing factors, ranked as follows on Table 3: Table 3 Ranking of operational and managerial factors Factors RII Impact Ranking Ability to organize production 4.25 Very high 1 Construction supervision 4.23 Very high 2 Application of technology 3.95 High 3 Workers’ arrangement 3.74 High 4
  • 5. Analysis of Affected Factors on Construction Productivity in Vietnam http://www.iaeme.com/IJCIET/index.asp 858 editor@iaeme.com The results in Table 3 show that the ability to organize production is the leading factor in the group affecting labor productivity with RII = 4.25, ranking second is the organization of construction supervision with RII = 4.23. It can be seen that the ability to organize and supervise the construction of contractors, especially the site manager will decide the management and organization. Manufacture is direct construction on the site. These have a direct impact and greatly affect the increase or decrease of labor productivity.With RIIs being 3.74 and 3.95, the factors to be assessed with a high degree of influence are the application of technology andworker’s arrangement. That is to say, under workers’ perspective, technology and labour’s arrangement significantly contribute to their performance 4.3. Group 3: factors relevant to motivation According to research results (Table 4), the form of salary payment is a factor that has a very high impact on labor productivity ranked first with RII = 4.28. Income is the legitimate purpose. Monetary incentive therefore is the goal that every construction worker aiming for. High levels of welfare were the welfare, incentive, and spiritual well-being factors that RII is 4.08, 3.96 and 3.82 respectively.These factors will directly affect the motivation of employees, good motivation will relieve unnecessary stress, enhance the attractiveness of pay, bonus. The workers will be eager to work, stick with the organization, willing to devote themselves for the organization. Professional training, skills upgrading and innovations in labor are factors that have high impact on labor productivity. These factors directly influence the motivation of employees, bring satisfaction and sense of responsibility of construction workers to the work. Table 4 Ranking of factors that motivate employees Factors RII Impact Ranking Types of salary payment 4.28 Very high 1 Staff support 4.08 High 2 Reward mechanism 3.96 High 3 Spiritual life 3.82 High 4 Training and improving skills 3.38 Moderate 5 Initiative at work 3.19 Moderate 6 4.4. Group 4: factors relevant to tools and objects of labour Table 5 shows the impact of these factors of working tools and objects onvariation in labor productivity. Quality of building materials is the leading factor with RII = 4.26, ranked second factor is quality of working tools with RII = 4.25. It can be seen that if a good bricklayers do not have built-in tools, the quality of bricks or mortar is poor, so the performance of building walls can not be high. Table 5 Ranking of factors of working tools and objects Factors RII Impact Ranking Quality of building materials 4.26 Very high 1 Quality of working tools 4.25 Very high 2 Complexity of works 3.89 High 3 Material transport methods 3.27 Moderate 4 High-impact factor is the complexity of the work with RII = 3.89 and factor of material transport methodswith RII = 3.27. These factors affect the performance of the work that will also affect labor productivity as reported by Thomas and Sanders (1991) [37]. In order to ensure the achievement and growth of labor productivity, organisations need to utilise
  • 6. Dinh Tuan Hai, Nguyen Van Tam http://www.iaeme.com/IJCIET/index.asp 859 editor@iaeme.com machines, equipments and tools which must be suitable with products and technologies; ensure routinereadiness and operation throughout the working shift; ensureraw materials, semi-finished products putting into production must have evident origin and qualification. 4.5. Group 5: factors relevant to working time The total working time and finishing product time of construction workers will determine their productivity is high or low. Operating time; working hours in shift; preparing and finishing time; Break time and delaying time are factors that have a high impact on labor productivity. In which, the operating time is the leading factor in the group with RII = 3.90, secondly the factor of working hours with RII = 3.78 (Table 6). The working mode factor is the factor with moderate impact and ranked at the bottom of the group with RII = 3.29. In order to increase labor productivity, construction firms should take measures to reduce wasted time and increase value-added time, thereby increasing the efficiency of the squad of workers. Table 6 Ranking of factors relevant to working time Factors RII Impact Ranking Operating time 3.90 High 1 Number of working hours 3.78 High 2 Break time 3.71 High 3 Preparing and finalizing time 3.53 High 4 Delay time 3.50 High 5 Working mode 3.29 Moderate 6 4.6. Group 6: factors relevant to labour condition Table 7 Ranking of factors of labor conditions Factors RII Impact Ranking Height of working place 4.20 Very high 1 Working in hazardous areas 4.13 High 2 Exposure to toxic substances 3.80 High 3 Noise 3.74 High 4 Intensity of lighting, ventilation 3.16 Moderate 5 Research results show that with RII = 4.20, the factor of height has a great influence on labor productivity and ranked first in this group. This is perfectly suited to the fact that the higher the level of construction work, the more likely it is that the construction worker will suffer the effects of natural factors and the more difficult work done for the type of work. At civil construction having high elevation, this factor has a greater affect on labor productivity, so the system of norms in Vietnam is currently according to the heights, i.e. ≤ 4m; ≤ 16 m; ≤ 50m and> 50m. The second highest risk factor is working in hazardous areas with RII = 4.13, which has the same high impact with exposure to toxic substances and noise levels having 3.80 and 3.74, respectively. The factor having amoderate impact is the intensity of lighting, ventilation with RII = 3.16. Places with poor working conditions such as too bright or too dark will affect the eyes and vision of the workers, reducing their working capacity as a result. The contaminated and unsafe workplaces, without a doubt,have possibility to affect the health of workers. Moreover, it makes workers feel not assured, so they do not concentrate on work, thereby reducing labor productivity.
  • 7. Analysis of Affected Factors on Construction Productivity in Vietnam http://www.iaeme.com/IJCIET/index.asp 860 editor@iaeme.com 4.7. Group 7: factors relevant to labour safety Not only the construction industry, but for all kinds of occupations, the safety of people, safety of machinery, safety of products are placed on top of priority. According to the survey results, the factor of occupational safety equipment has the highest effect on the construction workers with RII = 4.23 (Table 8). Construction workers often work in dangerous environment, so that the firms having adequate protection and safety equipment is essential to prevent occupational accidents and help the workers peace of mind. On that basis, increasing productivity is achievable. Factors of RII from 3.54 to 3.81 are rated as having a high impact including employees' sense of compliance; safety signs; occupational accidents; regulations on labor safety andarrangement of safety staff. According to Thomas and Sanders (1991) [37], accidents have a significant impact on occupational accidents with three types comprising fatal accidents will cause the construction process to interrupt for a number of days; accidents causing injured construction workers to be hospitalized for at least 24 hours will adversely affect the performance of such work; the remaining minor accidents affect the labor productivity in certain cases. However, the respondents propose that the factor of training on occupational safety has a moderate impact on labor productivity with RII = 3.24. These factors affect the worker's psychology and working processes that affect labor productivity, in order to ensure occupational safety Table 8 Ranking of factors of ooccupational safety Factors RII Impact Ranking Safety equipment 4.23 Very high 1 The sense of observance of regulations by laborers 3.81 High 2 Safety signs 3.79 High 3 Occupational accidents 3.78 High 4 Regulations on labor safety 3.62 High 5 Arrangement of safety staff 3.58 High 6 Training on labor safety 3.31 Moderate 7 and reduce occupational accidents and diseases during the construction process. 4.8. Group 8: factor relevant to natural enviroment and society Table 9 Ranking of natural environmental factors Factors RII Impact Ranking Weather conditions 3.84 High 1 Regulations, laws on construction 3.52 High 2 Geological and hydrological conditions 3.39 High 3 Weather factor is a factor that has a high impact on labor productivity and is ranked first with RII of 3.84 (Table 9). Most construction works are built in natural spaces, where are affected directly by the weather.The weather not supporting or sometimes becoming severe has a not small impact on labor productivity. The role of natural conditions for labor productivity is objective and unavoidable. Therefore, to ensure the achievement and increase productivity, construction firms need to anticipate the difficulties arising due to natural environment conditions to mitigate risks in the production process. The second most influential factor is the factor of regulations on construction with RII = 3.52. Regulations and national policies that influence the goals and direction of the production of the construction
  • 8. Dinh Tuan Hai, Nguyen Van Tam http://www.iaeme.com/IJCIET/index.asp 861 editor@iaeme.com firms, affecting the organisational policies for workerson wages, investment in science and technology, so on, thus affecting productivity. 4.9. Rank the impact of factor groups According to the research results, the construction workers themselves are the most influential factor in labor productivity of construction workers with RII = 4.32. This result is consistent with the fact that labor is the first and most important factor affecting labor productivity. Ranking second with RII = 4.03 is the motivating factor for construction workers, so construction workers argue that when the firm has motivational policies, the workers will try their best to work to increase productivity. Furthermore, thanks to it, workers will stick together and ready to dedicate themselves to the organization. The group of natural-social environment factors is highly influenced but ranked in groups with RII = 3.49 only (Table 10). Table 10 Ranking of groups of factor Factors RII Impact Ranking The construction workers themselves 4.32 Very high 1 Motivating for construction workers 4.03 High 2 Working tools and objects of labor 3.91 High 3 Organization and management of production on site 3.86 High 4 Labor safety 3.72 High 5 Working time 3.61 High 6 Working condition 3.58 High 7 Natural environment and society 3.49 High 8 4.10. Summary of ranking factors affecting labor productivity The result shows that the factor of experience of the employees is the highest impact factor among the 43 factors that affect the labor productivity of the construction workers (Tablr 11). There are ten factors that are highly influential: employee experience; labor discipline; pay forms; quality of construction materials; ability to organize production; quality of tools and tools; organization of construction supervision; strength and heights. At the same time, 25factors have high impact and 8factors have a moderate impact on the labor productivity of construction workers at the construction sites in Hanoi. As a result, construction firms wishing to increase labor productivity must offer solutions that address the most influential factors or the ten factors identified by the study. Table 11 Summary of ranking factors affecting labor productivity Factors RII Impact Ranking Experiences of workers 4.31 Very high 1 Labor discipline 4.28 Very high 2 Types of salary payment 4.28 Very high 3 Quality of building materials 4.26 Very high 4 Ability to organize production 4.25 Very high 5 Quality of working tools 4.25 Very high 6 Construction supervision 4.23 Very high 7 Safety equipment 4.23 Very high 8 Physical ability 4.20 Very high 9 Height of working place 4.20 Very high 10 Working in hazardous areas 4.13 High 11 Staff support 4.08 High 12 Reward mechanism 3.96 High 13 Application of technology 3.95 High 14
  • 9. Analysis of Affected Factors on Construction Productivity in Vietnam http://www.iaeme.com/IJCIET/index.asp 862 editor@iaeme.com Factors RII Impact Ranking Operating time 3.90 High 15 Complexity of works 3.89 High 16 Weather conditions 3.84 High 17 Spiritual life 3.82 High 18 The sense of observance of regulations by laborers 3.81 High 19 Exposure to toxic substances 3.80 High 20 Safety signs 3.79 High 21 Number of working hours 3.78 High 22 Occupational accidents 3.78 High 23 Psychophysiology ability 3.74 High 24 Workers’ arrangement 3.74 High 25 Noise 3.74 High 26 Break time 3.71 High 27 Regulations on labor safety 3.62 High 28 Arrangement of safety staff 3.58 High 29 Labor intensity 3.53 High 30 Preparing and finalizing time 3.53 High 31 Age 3.52 High 32 Regulations, laws on construction 3.52 High 33 Delay time 3.50 High 34 Geological and hydrological conditions 3.39 High 35 Training and improving skills 3.38 Moderate 36 Training on labor safety 3.31 Moderate 37 Working mode 3.29 Moderate 38 Material transport methods 3.27 Moderate 39 Gender 3.22 Moderate 40 Initiative at work 3.19 Moderate 41 Intensity of lighting, ventilation 3.16 Moderate 42 Level of training 3.08 Moderate 43 5. CONCLUSIONS Labor productivity plays an absolutely important role in economic growth and improving the competitiveness of each business as well as in each country. The research has identified 43 factors that are classified into eight groups affecting the labor productivity of construction workers on site in Vietnam. Through the survey responded by construction workers who are working on site in Vietnam, the author has used the RII relative importance index method to evaluate and rank the impact of these 43 factors. Ten most influential factors have been determined that will provide the basis for the construction firms to provide effective solutions to achieve and increase the productivity of construction workers. REFERENCES [1] General Statistics Office of Vietnam (2017), Vietnamese productivity is lower than Laos, by 7% Singapore, VnEconomy. [2] Tuan, N.V. (2018), Improving Productivity in State-owned Enterprises, Seminar on Improving productivity in industrialized context, Vietnam Economic Forum II: Towards a more rapid and sustainable growth of Vietnam’s economy, 11 January 2018, Hanoi. [3] Anh, V. (2017), Raising productivity in construction sector, Bidding Newspaper. [4] Thanh, N. H. (2016), Lecture Organizing the implementation of construction investment projects, National University of Civil Engineering, Hanoi. [5] Vu, N.T. (2015), Research on factors influencing human resource development of Tien Giang garment enterprises, PhD thesis in Economics, University of Economics, Ho Chi Minh,
  • 10. Dinh Tuan Hai, Nguyen Van Tam http://www.iaeme.com/IJCIET/index.asp 863 editor@iaeme.com [6] Clarkson, H. O., Henry, W. P., Gregory, A. H., (1989), Productivity Improvement in Construction. McGraw-Hill. [7] Vy, N. B., Yem, B.V.(2007), Textbook of Building construction norm, Construction Publishing House, Hanoi. [8] Sanders, S. R.,Thomas, H. R. (1991), Factors Affecting Masonry-Labor Productivity, Journal of Construction Engineering and Management. 117(4), pp. 626-644. [9] Adnan Enshassi, Sherif Mohamed, Ziad Abu Mustafa, Peter Eduard Mayer (2007), Factors affecting labour productivity in building projects in the Gaza strip, Journal of Civil Engineering and Management. Volume 12, pp. 245–254. [10] Thomas, H. R., Riley, D. R.,Sanvido, V. E. (1999), Loss of Labor Productivity due to Delivery Methods and Weather, Journal of Construction Engineering and Management. 125(1), pp. 39-46. [11] Makulsawatudom, Arun, Emsley, Margaret, and Sinthawanarong, Kuldej (2004), "Critical factors influencing construction productivity in Thailand", The Journal of KMITNB. 14(3), pp. 1-6. [12] Lam, V.Q. (2010), Analysis of Factors Affecting Public Investment Project Management - Case Study in Ho Chi Minh City, Thesis of Economics, University of Economics in Ho Chi Minh City. [13] Lim, E. C., Alum, J. (1995), Construction Productivity: issues encountered by contractors in Singapore, International Journal of Project Management. 13(1), pp. 51 - 58. [14] Lema, N.M. (1995), Construction of labour productivity modeling, University of Dar Elsalaam. 1. [15] Hanna, A. S., Taylor, C. S., Sullivan, K.T. (2005), Impact of Extended Overtime on Construction Labor Productivity, Journal of Construction Engineering and Management. 131(6), pp. 734-739. [16] Junbok Lee, Young-Jin Park,Chang-Hoon Choi, Choong-Hee Han2017), BIM-assisted labor productivity measurement method for structural formwork, Automation in Construction Journal. Volume 84, pp. 121-132. [17] Langford D, Hancock MR, Fellows R, Gale AW(1995), Human Resources Management in Construction, Longman Scientific & Technical. [18] Hung, L.V. (2016), Factors affecting labor productivity in Vietnam, PhD thesis in Economics, Vietnam Academy of Social Sciences. [19] Farnad, N., Pouya, N. (2013), Dynamic modeling of labor productivity in construction projects, International Journal of Project Management. 31(6), pp. 903-911. [20] Kazaz, A., Manisali, E., Ulubeyli, S. (2008), Effect of Basic Motivational Factors on Construction Workforce Productivity in Turkey, Journal of Civil Engineering and Management. 14(2), pp. 95-106. [21] Soekiman, A. (2009), Quality of Work Life as an Alternative Strategy for Managing Human Resource in Construction Industry, Proceeding of the 1st International Conference on Engineering, Environment, Economic, Safety & Health (1st CONVEEESH- 2009), B-III-2 pp. 1-7, Manado, Indonesia. [22] Olomolaiye, P., Jayawardane, A., Harris, F. (1988), Construction Productivity Management, Chartered Institute of Building, UK. [23] Loan, T.T.K., Hung, B.N.(2009), Research on management factors affecting productivity of garment enterprises, Science and Technology Development Review, National University of Ho Chi Minh City. 12 (1), pp. 60 - 70
  • 11. Analysis of Affected Factors on Construction Productivity in Vietnam http://www.iaeme.com/IJCIET/index.asp 864 editor@iaeme.com [24] Thomas, H. R. (1992), Effects of Schedule Overtime on Labor Productivity, Journal of Construction Engineering and Management. 118(1), pp. 60-76. [25] Hanna AS, Chang CK, Sullivan KT, Lackney JA (2008), Impact of Shift Work on Labor Productivity for Labor Intensive Contractor, Journal of Construction Engineering and Management 134(3), pp. 197-204. [26] A. Soekiman, K.S. Pribadi, B.W. Soemardi, R.D. Wirahadikusumah, (2011), Factors Relating to Labor Productivity Affecting the Project Schedule Performance in Indonesia, The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction. Volume 14, pp. Pages 865-873. [27] Loi, D.N., Khanh, N.N.(2016), Research on solutions to improve the quality of technical workers in construction enterprises, University-level scientific research projects, NationalUniversity of Civil Engineering. [28] Mostafa, E. S., Khaled, M. E. (2011), Towards improving construction labor productivity and projects’ performance, Alexandria Engineering Journal. 50(4), pp. 321-330. [29] Lowe, G. (1987), The Measurement of Productivity in the Construction Industry, Construction Management and Economics. 5, pp. 101-113. [30] Ministry of Construction (2016), Final report of the Ministry of Construction on the implementation of the five-year plan, 2011-2015. [31] Kaming PF, Olomolaiye P, Holt GD, Harris FC, (1997), Factors Influencing Craftmen’s Productivity in Indonesia, International Journal of Project Management. 15(1), pp. 21– 30. [32] Xiaodong Li, Kwan Hang Chow, Yimin Zhu, Ying Lin (2016), Evaluating the impacts of high-temperature outdoor working environments on construction laborproductivity in China: A case study of rebar workers, Building and Environment. 95, pp. 42-52. [33] Cu, L.V., Long, L.V., Thuy, P. N., Ngoc, H. K,. (2017), Mechanisms and policies to improve the productivity of the construction industry: the status quo and recommendation, Research by Ministry of Construction, Hanoi. [34] Hogg, R. V. Tannis, E. A. (1997), Probability and statistical inferences, Prentice Hall. [35] Paulson Jr, Boyd C (1975), "Estimation and control of construction labor costs", Journal of the Construction Division. 101 (ASCE# 11579 Proceeding). [36] Heizer, Jay and Render, Barry (1996), "Production and operation management: strategic and tactical decisions", New Jersey. [37] Sanders SR and Thomas HR (1991), "Factors Affecting Masonry-Labor Productivity", Journal of Construction Engineering and Management. 117(4), pp. 626-644. [38] Saurav Dixit, Amit Kumar Pandey, Satya N Mandal And Sanjeev Bansal A Study of Enabling Factors Affecting Construction Productivity: Indian Scnerio, International Journal of Civil Engineering and Technology, 8(6), 2017, pp. 741–758