SlideShare a Scribd company logo
1 of 19
Hassan Z. Harraz
hharraz2006@yahoo.com
2014- 2015
This material is intended for use in lectures, presentations and as
handouts to students, and is provided in Power point format so as to
allow customization for the individual needs of course instructors.
Permission of the author and publisher is required for any other usage.
Please see hharraz2006@yahoo.com for contact details.
Topic 5: Underground Mining Methods
 Shrinkage stoping
 Vertical Crater Retreat stoping
Prof. Dr. H.Z. Harraz Presentation
Shrinkage & VCR stoping
Outline of Topic 5:
 Shrinkage stoping
 Ascending method of mining
 Advantages and Disadvantages
 Vertical Crater Retreat stoping
 Introduction
 Application
 Developmental sequence of stopes
 Production
 How Cratering Works
Prof. Dr. H.Z. Harraz Presentation
Shrinkage & VCR stoping
2
We will explore all of the above in Topic 5.
Method stopes
configuration in which the
ore is removed at horizontal
slices from bottom to top.
Of the ore is left detonated
accumulated until the stope
is completely mined. The
fragmented ore is then
totally removed.
Shrinkage stoping
3
Shrinkage
4
Shrinkage
5
Ascending method of mining
 The ore is dismantled temporarily used as filler to support the walls
of the stope and working platform for the miners.
 Overall the drilling is done on the ore disassembled using hand
drills (jacklegs).
 The ore dismantled remains within the block until it reaches its
upper limit. Because of blistering, 30-40% should be removed by
kicking or drawpoints to make room for the next disassemble.
 The space between the ceiling and ore dismantled dismantling is
1.8m to 2.2 m.
 The Shrinkage is typically used in vertical or subvertical bodies
with a thickness between 2 and 20 m. The bodies of higher power,
the blocks can be arranged transversely.
 The entries are made for miners from side to block chimneys.
 Depending on the mechanical properties of the rock, the distance
between levels ranging from 30 to 90 m 30-100 m between side
pillars. The drawpoints are arranged every 7-10 m.
Prof. Dr. H.Z. Harraz Presentation
Shrinkage stoping
6
Advantages:
 Allows plowing narrow bodies.
 Low cost of development
 Simple equipment for drilling and loading.
Disadvantages:
 Ore disassembled remains the filler.
 The control of ore grade can be difficult.
 It is a method for high production.
 Security problems of staff working within the stope.
Prof. Dr. H.Z. Harraz Presentation
Shrinkage stoping
7
6) Vertical Crater Retreat (VCR) stoping
8
VCR - Vertical Crater Retreat
 Vertical Crater Retreat (VCR) or Vertical Retreat Stoping:
configuration method in stopes where drilling large diameter is used to
detonate horizontal slices of ore, leading them to the base of the block
being mined. The method progresses vertically, as successive slices
of ore are detonated.
 Vertical Crater Retreat (VCR) uses parallel, vertical, descending and
spherical concentrated loads to fragment the ore (disassemble by
cratering) drilling;
 The advance of the stope is disassemble from the bottom up;
 The ore is recovered at the bottom of the block;
 Part of the mineral remains in walk through serving as stope support.;
Introduction
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
10
Application
 Sharp dip in bodies (same conditions as those
considered for Sublevel Stoping method).
 Requires less stability of the host rock;
 Stopes may receive the backfill after extraction.
Developmental sequence of stopes...
 Galleries transport are dug along the ore body
at the level of drawpoints;
 Arrangement drawpoints is created in the
lower portion of the stope;
 Stope is highlighted (undercut);
 Top Access (overcut) is excavated to allow
drilling and loading of explosives.
11
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
Production
 Drilling from the top level.
 The detonation dismantle slices upward from the bottom of the block.
 It is enough removed to make room for the next disassemble ore.
 Geometry of the explosive charge:
L: D ≤ 6: 1 (length: diameter)
 Drilling is large diameter (DTH or top hammer - 100 to 165mm) and preferably vertical;
 The method enables a reduction in development compared to SLS
 do not need to slot the initial stope
 Longer drilling
 The charge ratio fragmentation of ore and are larger than the blasthole stoping
12
 High production rates; good recovery.
 Appropriate mechanization.
 Safe method with good ventilation.
Advantages
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
The technique of vertical cratering (VCR) might be used to:
 Create initial slot in SLS;
 Fabricate raises;
 recover pillars
13
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
VCR - How It Works
 Uses cratering theory:
 Developed by Livingston 1962
 Charges 1 to 6 x hole diameter
 Placed at optimum distance from surface
 Loaded from top of hole
 Gravity moves rock down:
 Away from hole
 Providing a new face
 Holes drilled form development
heading(s) down to development
 Large diameter
 Accurate
 Blasting progresses upwards in layers
14
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
How Cratering Works
N = E W1/3
Where:
N is the critical distance
(maximum for cratering);
E is a constant for a given
explosive-rock combination;
W is the weight of the explosive
charge.
15
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
Best Efficiency at 0.58 N.
16
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
Loading
• Lower plug and tie off
• Drop rock to seal plug
• Sand stemming
• Load explosive
• Sand stemming above
 Drops out of hole
after blast
• Alternate use water
above
17
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
Luosavaara Mine Example
165 mm Holes 100 m depth max deviation 1m.
ANFO 3.3 x 4 m staggered pattern
Max size required 0.75 m ; K50 12-14 cm
18
Prof. Dr. H.Z. Harraz Presentation
VCR stoping
Luossavaara Tests
19Prof. Dr. H.Z. Harraz Presentation
VCR stoping

More Related Content

What's hot

Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methods
Tayyab Anwar
 
Inundation
InundationInundation
Inundation
VR M
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
VR M
 
Lecture 2 basic surface mining practise-2
Lecture 2  basic surface mining practise-2Lecture 2  basic surface mining practise-2
Lecture 2 basic surface mining practise-2
IDHAMUKI
 

What's hot (20)

Open pit mining
Open pit miningOpen pit mining
Open pit mining
 
Square set stoping
Square set stopingSquare set stoping
Square set stoping
 
Cut and Fill mining
Cut and Fill miningCut and Fill mining
Cut and Fill mining
 
Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methods
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
 
Lectures on metal mining
Lectures on metal miningLectures on metal mining
Lectures on metal mining
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
 
Mine planning
Mine planning Mine planning
Mine planning
 
Cut and Fill Stoping
Cut and Fill StopingCut and Fill Stoping
Cut and Fill Stoping
 
Inundation
InundationInundation
Inundation
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
Lecture 2 basic surface mining practise-2
Lecture 2  basic surface mining practise-2Lecture 2  basic surface mining practise-2
Lecture 2 basic surface mining practise-2
 
Sublevel open stopping assignment
Sublevel open stopping assignmentSublevel open stopping assignment
Sublevel open stopping assignment
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
Underground mining system
Underground mining systemUnderground mining system
Underground mining system
 
Underground mining method natural support and caving
Underground mining method natural support and cavingUnderground mining method natural support and caving
Underground mining method natural support and caving
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Blasting
BlastingBlasting
Blasting
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 

Similar to Shrinkage and Vertical Crater Retreat Stoping

ROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blastingROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blasting
Jignesh Ruperi
 
Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1
John Latilla
 

Similar to Shrinkage and Vertical Crater Retreat Stoping (20)

Room and Pillar Mining Method
Room and Pillar Mining MethodRoom and Pillar Mining Method
Room and Pillar Mining Method
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
UMM- Sublevel Stoping of underground metal mine
UMM- Sublevel Stoping  of underground metal mineUMM- Sublevel Stoping  of underground metal mine
UMM- Sublevel Stoping of underground metal mine
 
ROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blastingROCK FRAGMENTATION short_delay_blasting
ROCK FRAGMENTATION short_delay_blasting
 
BLOCK CAVING ATRI.ppt
BLOCK CAVING ATRI.pptBLOCK CAVING ATRI.ppt
BLOCK CAVING ATRI.ppt
 
A poster presentation on raise boring machine
A poster presentation on raise boring machineA poster presentation on raise boring machine
A poster presentation on raise boring machine
 
Surface mining planning and design of open pit mining
Surface mining planning and design of open pit miningSurface mining planning and design of open pit mining
Surface mining planning and design of open pit mining
 
SHORT DELAY BLASTING BY BALU MADASU
SHORT DELAY BLASTING BY BALU MADASUSHORT DELAY BLASTING BY BALU MADASU
SHORT DELAY BLASTING BY BALU MADASU
 
SHORT DELAY BLASTING
SHORT DELAY BLASTINGSHORT DELAY BLASTING
SHORT DELAY BLASTING
 
Blast Design-2.pdf
Blast Design-2.pdfBlast Design-2.pdf
Blast Design-2.pdf
 
Block caving method
Block caving methodBlock caving method
Block caving method
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blasting
 
Shaft boring methods
Shaft boring methodsShaft boring methods
Shaft boring methods
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G TaylorThe Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
 
Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1
 
PDF document lecture 3.pdf
PDF document lecture 3.pdfPDF document lecture 3.pdf
PDF document lecture 3.pdf
 
Cut & fill mining method
Cut & fill mining methodCut & fill mining method
Cut & fill mining method
 
Brochure - Slim Boring 2016
Brochure - Slim Boring 2016Brochure - Slim Boring 2016
Brochure - Slim Boring 2016
 

More from Geology Department, Faculty of Science, Tanta University

Magnetization Roasting of Refractory Iron.pdf
Magnetization Roasting of Refractory Iron.pdfMagnetization Roasting of Refractory Iron.pdf
Magnetization Roasting of Refractory Iron.pdf
Geology Department, Faculty of Science, Tanta University
 
Direct Reduced Iron-Production.pdf
Direct Reduced Iron-Production.pdfDirect Reduced Iron-Production.pdf
A REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdf
A REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdfA REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdf
A REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdf
Geology Department, Faculty of Science, Tanta University
 
ENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdf
ENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdfENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdf
ENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdf
Geology Department, Faculty of Science, Tanta University
 
Processes for phosphorus removal from iron ore -.pdf
Processes for phosphorus removal from iron ore -.pdfProcesses for phosphorus removal from iron ore -.pdf
Processes for phosphorus removal from iron ore -.pdf
Geology Department, Faculty of Science, Tanta University
 

More from Geology Department, Faculty of Science, Tanta University (20)

ESSENTIALS OF IRON ORE DEPOSITS and INDUSTRIES.pdf
ESSENTIALS OF IRON ORE DEPOSITS and INDUSTRIES.pdfESSENTIALS OF IRON ORE DEPOSITS and INDUSTRIES.pdf
ESSENTIALS OF IRON ORE DEPOSITS and INDUSTRIES.pdf
 
Minerals phase transformation by hydrogen reduction.pdf
Minerals phase transformation by hydrogen reduction.pdfMinerals phase transformation by hydrogen reduction.pdf
Minerals phase transformation by hydrogen reduction.pdf
 
Magnetization Roasting of Refractory Iron.pdf
Magnetization Roasting of Refractory Iron.pdfMagnetization Roasting of Refractory Iron.pdf
Magnetization Roasting of Refractory Iron.pdf
 
GLOBAL IRON ORE.pdf
GLOBAL IRON ORE.pdfGLOBAL IRON ORE.pdf
GLOBAL IRON ORE.pdf
 
Ferrous Scrap FUTURE.pdf
Ferrous Scrap  FUTURE.pdfFerrous Scrap  FUTURE.pdf
Ferrous Scrap FUTURE.pdf
 
Pelletizing Process.pdf
Pelletizing Process.pdfPelletizing Process.pdf
Pelletizing Process.pdf
 
Direct Reduced Iron-Production.pdf
Direct Reduced Iron-Production.pdfDirect Reduced Iron-Production.pdf
Direct Reduced Iron-Production.pdf
 
A REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdf
A REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdfA REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdf
A REVIEW OF IRONMAKING BY DIRECT REDUCTION PROCESSES.pdf
 
IRONWORKS.pdf
IRONWORKS.pdfIRONWORKS.pdf
IRONWORKS.pdf
 
ENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdf
ENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdfENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdf
ENRICHMENT IRON BY REDUCTION ROASTING-MAGNETIC SEPARATION.pdf
 
Processes for phosphorus removal from iron ore -.pdf
Processes for phosphorus removal from iron ore -.pdfProcesses for phosphorus removal from iron ore -.pdf
Processes for phosphorus removal from iron ore -.pdf
 
Iron Types-HBI-DRI.pdf
Iron Types-HBI-DRI.pdfIron Types-HBI-DRI.pdf
Iron Types-HBI-DRI.pdf
 
IRON ORE DEPOSITS.pdf
IRON ORE DEPOSITS.pdfIRON ORE DEPOSITS.pdf
IRON ORE DEPOSITS.pdf
 
STEEL INDUSTRY IN EGYPT-Companies and Markets.pdf
STEEL INDUSTRY IN EGYPT-Companies and Markets.pdfSTEEL INDUSTRY IN EGYPT-Companies and Markets.pdf
STEEL INDUSTRY IN EGYPT-Companies and Markets.pdf
 
Cv english-harraz
Cv english-harrazCv english-harraz
Cv english-harraz
 
Rodruin prospecting area conf
Rodruin prospecting area confRodruin prospecting area conf
Rodruin prospecting area conf
 
Crusher; Crushing; and Classification Equipment
Crusher; Crushing; and Classification EquipmentCrusher; Crushing; and Classification Equipment
Crusher; Crushing; and Classification Equipment
 
The garnet group
The garnet groupThe garnet group
The garnet group
 
Hydrothermal alterations
Hydrothermal alterationsHydrothermal alterations
Hydrothermal alterations
 
Lecture 10 textures of ore deposits and associated features
Lecture 10 textures of ore deposits and associated featuresLecture 10 textures of ore deposits and associated features
Lecture 10 textures of ore deposits and associated features
 

Recently uploaded

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Shrinkage and Vertical Crater Retreat Stoping

  • 1. Hassan Z. Harraz hharraz2006@yahoo.com 2014- 2015 This material is intended for use in lectures, presentations and as handouts to students, and is provided in Power point format so as to allow customization for the individual needs of course instructors. Permission of the author and publisher is required for any other usage. Please see hharraz2006@yahoo.com for contact details. Topic 5: Underground Mining Methods  Shrinkage stoping  Vertical Crater Retreat stoping Prof. Dr. H.Z. Harraz Presentation Shrinkage & VCR stoping
  • 2. Outline of Topic 5:  Shrinkage stoping  Ascending method of mining  Advantages and Disadvantages  Vertical Crater Retreat stoping  Introduction  Application  Developmental sequence of stopes  Production  How Cratering Works Prof. Dr. H.Z. Harraz Presentation Shrinkage & VCR stoping 2 We will explore all of the above in Topic 5.
  • 3. Method stopes configuration in which the ore is removed at horizontal slices from bottom to top. Of the ore is left detonated accumulated until the stope is completely mined. The fragmented ore is then totally removed. Shrinkage stoping 3
  • 6. Ascending method of mining  The ore is dismantled temporarily used as filler to support the walls of the stope and working platform for the miners.  Overall the drilling is done on the ore disassembled using hand drills (jacklegs).  The ore dismantled remains within the block until it reaches its upper limit. Because of blistering, 30-40% should be removed by kicking or drawpoints to make room for the next disassemble.  The space between the ceiling and ore dismantled dismantling is 1.8m to 2.2 m.  The Shrinkage is typically used in vertical or subvertical bodies with a thickness between 2 and 20 m. The bodies of higher power, the blocks can be arranged transversely.  The entries are made for miners from side to block chimneys.  Depending on the mechanical properties of the rock, the distance between levels ranging from 30 to 90 m 30-100 m between side pillars. The drawpoints are arranged every 7-10 m. Prof. Dr. H.Z. Harraz Presentation Shrinkage stoping 6
  • 7. Advantages:  Allows plowing narrow bodies.  Low cost of development  Simple equipment for drilling and loading. Disadvantages:  Ore disassembled remains the filler.  The control of ore grade can be difficult.  It is a method for high production.  Security problems of staff working within the stope. Prof. Dr. H.Z. Harraz Presentation Shrinkage stoping 7
  • 8. 6) Vertical Crater Retreat (VCR) stoping 8
  • 9. VCR - Vertical Crater Retreat
  • 10.  Vertical Crater Retreat (VCR) or Vertical Retreat Stoping: configuration method in stopes where drilling large diameter is used to detonate horizontal slices of ore, leading them to the base of the block being mined. The method progresses vertically, as successive slices of ore are detonated.  Vertical Crater Retreat (VCR) uses parallel, vertical, descending and spherical concentrated loads to fragment the ore (disassemble by cratering) drilling;  The advance of the stope is disassemble from the bottom up;  The ore is recovered at the bottom of the block;  Part of the mineral remains in walk through serving as stope support.; Introduction Prof. Dr. H.Z. Harraz Presentation VCR stoping 10 Application  Sharp dip in bodies (same conditions as those considered for Sublevel Stoping method).  Requires less stability of the host rock;  Stopes may receive the backfill after extraction.
  • 11. Developmental sequence of stopes...  Galleries transport are dug along the ore body at the level of drawpoints;  Arrangement drawpoints is created in the lower portion of the stope;  Stope is highlighted (undercut);  Top Access (overcut) is excavated to allow drilling and loading of explosives. 11 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 12. Production  Drilling from the top level.  The detonation dismantle slices upward from the bottom of the block.  It is enough removed to make room for the next disassemble ore.  Geometry of the explosive charge: L: D ≤ 6: 1 (length: diameter)  Drilling is large diameter (DTH or top hammer - 100 to 165mm) and preferably vertical;  The method enables a reduction in development compared to SLS  do not need to slot the initial stope  Longer drilling  The charge ratio fragmentation of ore and are larger than the blasthole stoping 12  High production rates; good recovery.  Appropriate mechanization.  Safe method with good ventilation. Advantages Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 13. The technique of vertical cratering (VCR) might be used to:  Create initial slot in SLS;  Fabricate raises;  recover pillars 13 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 14. VCR - How It Works  Uses cratering theory:  Developed by Livingston 1962  Charges 1 to 6 x hole diameter  Placed at optimum distance from surface  Loaded from top of hole  Gravity moves rock down:  Away from hole  Providing a new face  Holes drilled form development heading(s) down to development  Large diameter  Accurate  Blasting progresses upwards in layers 14 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 15. How Cratering Works N = E W1/3 Where: N is the critical distance (maximum for cratering); E is a constant for a given explosive-rock combination; W is the weight of the explosive charge. 15 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 16. Best Efficiency at 0.58 N. 16 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 17. Loading • Lower plug and tie off • Drop rock to seal plug • Sand stemming • Load explosive • Sand stemming above  Drops out of hole after blast • Alternate use water above 17 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 18. Luosavaara Mine Example 165 mm Holes 100 m depth max deviation 1m. ANFO 3.3 x 4 m staggered pattern Max size required 0.75 m ; K50 12-14 cm 18 Prof. Dr. H.Z. Harraz Presentation VCR stoping
  • 19. Luossavaara Tests 19Prof. Dr. H.Z. Harraz Presentation VCR stoping