SlideShare ist ein Scribd-Unternehmen logo
1 von 36
Downloaden Sie, um offline zu lesen
ANNUAL
DEVELOPMENT
PROGRAMME
2014-15
ARCHAEOLOGY, SPORTS, TOURISM & YOUTH
AFFAIRS
ADP 2014-15 (Rs.in Million)
Sector
Ongoing
Scheme
Original
Allocation New
Schemes
Original
Allocation Total
Schemes
Original
Total
Allocation
Ongoing New
Archaeology 9
62.395
3 13.001 12 75.396
Sports 12
852.599
5 155.000 17 1,007.599
Tourism 9 112.005 5 111.000 14 223.005
Youth Affairs 1 19.000 1 19.000
Total 31 1045.999 13 279.00 44 1325
ONGOING
Schemes Of
Archaeology
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Archaeology:
1013-
100169
Conservation of Nicholson
House at Bannu. DDWP
24-9-2011
1014-
90187
Restoration &
Rehabilitation of Fire
Brigade Building at Gor-
Khattree Peshawar DDWP
31-3-10 & 28-11-11
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 19%
100% 35%
Code Scheme Name Remarks
Work in progress
Work in progress
but slow due
technical
problems.
Release Expenditure
7.600
6.200
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Archaeology:
1015-
100166
Institution / Capacity
Building of Directorate of
Archaeology & Museums
Peshawar DDWP 17-3-2011
1016-
130037
Preservation &
Revitalization of Eastern &
Western Gateways of
Gorkhatree Pesawar
PDWP 29/01/2013
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 41%
Code Scheme Name Remarks
Work in progress
PC-II perpared by C&W
and approved by PDWP
on 5-12-2013 and
progress to be conveyed
by C&W Department on
15/10/2014
Release Expenditure
6.08
- -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Archaeology:
1017-
110093
Development ,
Improvement and
projection of Peshawar
and Swat Museums (A)
DDWP 25/1/2012
1018-
110092
Conservation &
Rehabilitation of heritage
sites and provision of
facilities/ infrastructure
and installation of sign
boards/milestones for key
archaeological sites.(A)
DDWP 24/9/11
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 21%
100% 30%
Code Scheme Name Remarks
Work in progress
Work in progress
Release Expenditure
5.000
4.657 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Archaeology:
1019-
110094
Promotion of
Archaeological activities
in the Province. (A) DDWP
25/1/2012
1020-
120087
Conservation &
Development of World
Heritage Sites of Khyber
Pakhtunkhwa DDWP
30-8-2012
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 65%
100% 5%
Code Scheme Name Remarks
Work in progress
Envisaged targets are
expected to be
achieved.
Release Expenditure
3.200
5.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise
progress
Ongoing Schemes Of Archaeology:
1021-
120891
Preservation /
Conservation &
Improvement of 91
Devolved Archaeological
Sites in Khyber
Pakhtunkhwa.
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 2%
Code Scheme Name Remarks
Action plan firmed up for
smooth implementation.
Release Expenditure
2.500
No. of Ongoing 9 Schemes having allocation
of Rs. 62.395 with 15% utilization.
NEW
Schemes Of
Archaeology
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise
progress
New Schemes Of Archaeology:
1022
140041
F/S and Master Planning
for Establishment of
Museums at D.I. Khan,
Hazara and Kohat
Divisions. (B )DDWP / /
1023
140387
Conservation &
Development of Ali
Mardan Khan Villa at HQ
11 Corps Peshawar Cantt.
(B)DDWP / /
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
DDWP convened on 16-
10-2014
Directorate of
Archaeology and ENGG
Corp of 11 Corp are
working on the PC-II/PC-I
Release Expenditure
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise
progress
1024
140722
Archaeology - Community
- Tourism Field School
Project. Phase-II. (A) PDWP
8/8/2014
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
the Scheme was approved
on 8/8/2014 and an amount
of Rs. 52.532 M to be
provided from PIDSA or
Italian Debt Swap.
Release Expenditure
New Schemes Of Archaeology:
No. of New 3 Schemes having allocation
of Rs. 13 million and the PC-1/PC-2 are under
preparation/approval process.
ONGOING
Schemes Of
Sports
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Sports:
1025-
100230
Rehabilitation of
Hayatabad Sports
Complex.(Presentation to
PDWP) (A) DDWP 24/9/11
(A) PDWP 27/12/2012
1026-
110562
Establishment of Water
Sports re-creational
facilities in Peshawar (A)
DDWP 28/11/2011
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 40%
100% 30%
Code Scheme Name Remarks
Hockey ground restored.
Indoor games hall is yet
to be rehabilitated.
Issues of demarcation of
boundary wall has to be
resolved with PDA.
Work needs to be
expidtired and
completed
Release Expenditure
69.95
28.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Sports:
1027-
120209
Reconstruction of old
Pavillion at Qayyum
Stadium, Peshawar
( Phase-II) (A) PDWP
27/12/2012
1028-
130054
Extension and
Rehabilitation of Existing
male/female Hostel in
Qayyum Stadium.(B)
DDWP
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 2%
100% 2%
Code Scheme Name Remarks
C&W has forwarded PC-I
(revised) for approval of
PDWP
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013 Financial
Proposals opened on 21-
03-2014. C&W Deptt will
intimate the progress by
15/10/2014
Release Expenditure
20.000
10.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Sports:
1029-
100222
Khan Abdul Wali Khan
Sports Complex
Charsadda. (A)PDWP
21/7/11 DDWP 24/9/2011
& PDWP 28-08-2012
1030-
130569
Construction of sports
stadium at District Swabi.
(PC-II approved) (B)
PDWP
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 75%
100% 5%
Code Scheme Name Remarks
Work is in progress and
C&W Deptt will intimate
the progress by
15/10/2014
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013. Financial
Bid Opened on 27-02-
2014. C&W Deptt will
intimate the progress by
15/10/2014
Release Expenditure
77.649
0.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Sports:
1031-
130053
Establishment of
International standard
multipurpose Gymnasium
at Abbottabad (B) PDWP
1032-
130068
Up-gradation of Curtis
stadium Haripur Phase II.
(PC-II Approved) (B)
DDWP
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013 Technical
Proposals opened on 21-
03-2014. C&W Deptt will
intimate the progress by
15/10/2014
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013. Request for
Proposals invited
Release Expenditure
0.000
0.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Sports:
1033-
130051
Promotion of Sports
Activities Phase III. (A)
DDWP 22/10/2013
1034-
130059
Acquisition of land and
creation of Playground at
Chitral and civil work at
Tank ( PC-II Approved). (B)
DDWP
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 0%
100% 2%
Code Scheme Name Remarks
Activities plan for CFY in
process of finalization
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013 Financial
Proposals opened on 21-
03-2014 and progress to
be shared by 15/10/2014
by C&W Deptt:
Release Expenditure
25.000
0.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
Ongoing Schemes Of Sports:
1035-
130061
Establishment of
Playgrounds in Khyber
Pakhtunkhwa on need
basis (A) PDWP 9/10/2013
1036-
130435
Establishment of Sports
Academies for the
Talented youth of Khyber
Pakhtunkhwa (B) PDWP
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 15%
100% 2%
Code Scheme Name Remarks
Acquisition of land in D.IKhan =
Paharpur (8,840,390), Poroa
(4,404,611) & Daraban (6,595,00)
State lands = D.I.Khan- Kulachi,
Karak - Banda Daud Shah,
Charsadda- Tangi, Chitral-
Mastuj & Dir Lower Samar Bagh
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013. Request for
Proposals invited
Release Expenditure
253.500
0.000 -
No. of Ongoing 12 Schemes of Sports having allocation
of Rs. 852.5 with 10% utilization.
NEW
Schemes Of
Sports
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
New Schemes Of Sports:
1037
140048
Completion of incomplete
Boxing Gymnasium at
Peshawar and Sports
Complex D. I. Khan (PSDP
Devolved Projects)
(B) PDWP / /
1038
140622
Construction of Sports
Complex at Sub-Tehsil
Rustam District Mardan.
(B )PDWP / /
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 2%
100% 2%
Code Scheme Name Remarks
PC-I / PC-II under
preparation and would
be submitted to DDWP /
PDWP by the end of this
month
-do-
Release Expenditure
0.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise
progress
New Schemes Of Sports:
1039
140049
Talent Hunt Program for all
Sports in Khyber
Pakhtunkhwa (B )DDWP / /
1040
140717
Purchase of Sports
Equipment (B )DDWP / /
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 0%
100% 0%
Code Scheme Name Remarks
PC-I / PC-II under
preparation and would
be submitted to DDWP /
PDWP
-do-
Release Expenditure
0.000 -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
New Schemes Of Sports:
1041
140745
Improvement, Restoration
& Rehabilitation of Existing
Sports facilities in Khyber
Pakhtunkhwa. (B )PDWP /
/
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
PC-I / PC-II under
preparation and would
be submitted to DDWP /
PDWP
Release Expenditure
No. of New 5 Schemes having allocation
of Rs. 155 million and the PC-1/PC-2 are under
preparation/approval process.
ONGOING
Schemes Of
Tourism
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1042-
110090
Culture Tourism Centre/
Artisan Village at Gor
Khauttree (A) PDWP
22/12/2011
1043-
130033
Kund Pedestrian, Wooden
Bridge (B) DDWP / /.
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 60%
100% 2%
Code Scheme Name Remarks
The Cells for artisans in
place, Artisans are being
trained. The wall towards
eastern gate restored.
Lights and electrification
with generator is in
place. The greenery has
also been restored.
PC-II prepared by C&W
and approved by PDWP
on 5-12-2013 and
progress to be shared by
C&W Department on
15/10/2014
Release Expenditure
0.001 -
- -
Ongoing Schemes Of Tourism:
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1044-
130030
Water Sports Tourism
facilities at Khanpur (A)
DDWP 12/11/2013
1045-
110088
Establishment of
Engineering Wing for
Sports Culture,
Archaeology, Museums,
Tourism and Youth Affairs
(A) PDWP 18/11/2011
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 70%
100% 70%
Code Scheme Name Remarks
The scheme has been
operationalized with bauble
deck boat and JT from TCKP
own resources. The locals
have approach the Court
that the land measuring 450
kanal leased out from
WAPDA belong to them.
The Engineering Wing
has only salary
component to be paid
upto 30-06-2015.
Release Expenditure
5.000 1.000
0.001 -
Ongoing Schemes Of Tourism:
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1046-
120092
Capacity Building of
Tourist Services Wing,
Khyber Pakhtunkhwa (A)
DDWP 30/8/2012
1047-
120647
Development and
Restoration of properties
transferred by the
Provincial Govt. to the
TCKP for the tourists. (A)
DDWP 9/10/2012
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 25%
100% 50%
Code Scheme Name Remarks
Vehicles and Motor
Cycles procured.
Appointment of staff and
establishing of offices at
Kohat and Abbottabad
are being finalized.
work is in progress on
Rehabilitation of Rest House and
Construction of cottages at
Batakundi, Naran, Construction
of Rest House at Nathya Gali,
Rehabilitation of Rest House at
Thandyani and Rehabilitation of
Rest House & Children Park at
Bahrain.
Release Expenditure
1.000 -
0.001 -
Ongoing Schemes Of Tourism:
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1048-
120890
Public Private Partnership
for development of tourists
facilities in Chitral, Galyat,
Naran, Kaghan and
Kohistan. (A) PDWP
2/4/2013
1049-
130031
Holding of Traditional &
Tourism festivals, Broghal,
Shandur, Kalash, Food
Festivals and Khanpur
Festival. (A) DDWP
22/10/2013
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 50%
100% 50%
Code Scheme Name Remarks
Work is in progress on facility
at family Cottages at Batta
Kundi Narran, Rest House in
Bata Kundi & Naran and
Rehabilitation of Chitral Rest
House at Garam Chasma.
World Tourism Day,
Broghal held and Food &
Cultural Festival in
pipeline.
Release Expenditure
0.001 -
15.000 -
Ongoing Schemes Of Tourism:
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1050-
130649
Tourism Policy – New
Initiatives, (A) PDWP
9/10/2013
Physical Progress
(Quantitative Terms)
Targets Achievements
100% 5%
Code Scheme Name Remarks
PC-II prepared by C&W
and approved by DDWP
on 13-1-2014. C&W
Department to intimate
progress on 15/10/2014.
Release Expenditure
40.000
No. of Ongoing 9 Schemes having allocation
of Rs. 112 million and utilization is not more than10%.
Ongoing Schemes Of Tourism:
NEW
Schemes Of
Tourism
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
New Schemes Of Tourism:
1051
140036
Establishment of Picnic
Spots at suitable Places in
Malam Jaba, District Swat.
(B )DDWP / /
1052
140039
F/S for Development of
Sum Elahi Mung Manshera
as Tourist Resort. (B )DDWP
/ /
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
PC-I / PC-II under
preparation
PC-I / PC-II almost ready,
the DDWP expected in
3rd week of October
Release Expenditure
- -
- -
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1053
140037
Establishment of Network
of Tourist Information
Centers. (B )DDWP / /
1054
140040
Holding of Traditional,
Local, National and
International Events. (B
)DDWP / /
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
PC-I / PC-II under
preparation
PC-I / PC-II almost ready,
the DDWP expected in
3rd week of October
Release Expenditure
- -
- -
New Schemes Of Tourism:
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1055
140388
Counterpart funding for
Tourism projects to be
executed through Public
Private Partnership (PPP)
(B )PDWP / /
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
PC-I / PC-II under
preparation
That will include cost of
land after section-4 of
the schemes of Tourism
under consideration of
BOIT
Release Expenditure
No. of New 5 Schemes having allocation
of Rs. 111 million and the PC-1/PC-2 are under
preparation/approval process.
New Schemes Of Tourism:
NEW
Scheme Of
Youth
ANNUAL DEVELOPMENT PROGRAMME 2014-
15 Scheme wise progress
1021-
130080
Block Allocation for youth
promotional activities in
the province (A) PDWP
13/1/2014.
Physical Progress
(Quantitative Terms)
Targets AchievementsCode Scheme Name Remarks
Hiring of consulting firm
has been published in
first week of October
2014
Release Expenditure
19.000
Ongoing Scheme Of Youth:
No. of Ongoing 1 Scheme having allocation and release
of Rs. 19 million.
THANK
YOU

Weitere ähnliche Inhalte

Andere mochten auch

Cultural heritage youth etc(1)
Cultural heritage youth etc(1)Cultural heritage youth etc(1)
Cultural heritage youth etc(1)hayat alishah
 
Kona\'s CV
Kona\'s CVKona\'s CV
Kona\'s CVKona Ke
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportshayat alishah
 
IEEE IRI 16 - Clustering Web Pages based on Structure and Style Similarity
IEEE IRI 16 - Clustering Web Pages based on Structure and Style SimilarityIEEE IRI 16 - Clustering Web Pages based on Structure and Style Similarity
IEEE IRI 16 - Clustering Web Pages based on Structure and Style SimilarityThamme Gowda
 
Trinetra Focus Communications - Credentials
Trinetra Focus Communications - CredentialsTrinetra Focus Communications - Credentials
Trinetra Focus Communications - CredentialsHarsh Wardhan Dave
 
Контекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWordsКонтекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWordsVladyslava Rykova
 
To rs for consultancy environment firm tourism projects
To rs for consultancy environment firm tourism projectsTo rs for consultancy environment firm tourism projects
To rs for consultancy environment firm tourism projectshayat alishah
 
Продвижение интернет-магазина
Продвижение интернет-магазинаПродвижение интернет-магазина
Продвижение интернет-магазинаVladyslava Rykova
 
Kona’s Picture at GCH
Kona’s Picture at GCHKona’s Picture at GCH
Kona’s Picture at GCHKona Ke
 
Прайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работыПрайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работыVladyslava Rykova
 
Project theme adventure park galiyat
Project theme adventure park galiyatProject theme adventure park galiyat
Project theme adventure park galiyathayat alishah
 
Как стать копирайтером?
Как стать копирайтером?Как стать копирайтером?
Как стать копирайтером?Vladyslava Rykova
 
12 сервисов для увеличения продаж в интернет-магазине
12 сервисов для увеличения продаж в интернет-магазине12 сервисов для увеличения продаж в интернет-магазине
12 сервисов для увеличения продаж в интернет-магазинеVladyslava Rykova
 
Русский север, наследие (2010 год)
Русский север, наследие (2010 год)Русский север, наследие (2010 год)
Русский север, наследие (2010 год)Балтийская Муза
 

Andere mochten auch (20)

Cultural heritage youth etc(1)
Cultural heritage youth etc(1)Cultural heritage youth etc(1)
Cultural heritage youth etc(1)
 
Kona\'s CV
Kona\'s CVKona\'s CV
Kona\'s CV
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sports
 
IEEE IRI 16 - Clustering Web Pages based on Structure and Style Similarity
IEEE IRI 16 - Clustering Web Pages based on Structure and Style SimilarityIEEE IRI 16 - Clustering Web Pages based on Structure and Style Similarity
IEEE IRI 16 - Clustering Web Pages based on Structure and Style Similarity
 
Ped brochure
Ped brochurePed brochure
Ped brochure
 
Retailing
RetailingRetailing
Retailing
 
Trinetra Focus Communications - Credentials
Trinetra Focus Communications - CredentialsTrinetra Focus Communications - Credentials
Trinetra Focus Communications - Credentials
 
Контекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWordsКонтекстная реклама. Основы AdWords
Контекстная реклама. Основы AdWords
 
To rs for consultancy environment firm tourism projects
To rs for consultancy environment firm tourism projectsTo rs for consultancy environment firm tourism projects
To rs for consultancy environment firm tourism projects
 
Torneio 3
Torneio 3Torneio 3
Torneio 3
 
Продвижение интернет-магазина
Продвижение интернет-магазинаПродвижение интернет-магазина
Продвижение интернет-магазина
 
Smd seminar
Smd seminarSmd seminar
Smd seminar
 
Kona’s Picture at GCH
Kona’s Picture at GCHKona’s Picture at GCH
Kona’s Picture at GCH
 
Ankit testing 17july (1)
Ankit testing 17july (1)Ankit testing 17july (1)
Ankit testing 17july (1)
 
Прайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работыПрайс-агрегаторы: правила эффективной работы
Прайс-агрегаторы: правила эффективной работы
 
Project theme adventure park galiyat
Project theme adventure park galiyatProject theme adventure park galiyat
Project theme adventure park galiyat
 
נוגע בקיר
נוגע בקירנוגע בקיר
נוגע בקיר
 
Как стать копирайтером?
Как стать копирайтером?Как стать копирайтером?
Как стать копирайтером?
 
12 сервисов для увеличения продаж в интернет-магазине
12 сервисов для увеличения продаж в интернет-магазине12 сервисов для увеличения продаж в интернет-магазине
12 сервисов для увеличения продаж в интернет-магазине
 
Русский север, наследие (2010 год)
Русский север, наследие (2010 год)Русский север, наследие (2010 год)
Русский север, наследие (2010 год)
 

Ähnlich wie Presentation muhammadalishahzada110620141930hours

Ddwp minutes 16 10-2014
Ddwp minutes 16 10-2014Ddwp minutes 16 10-2014
Ddwp minutes 16 10-2014hayat alishah
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxsheikhInayat5
 
Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14hayat alishah
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportshayat alishah
 
Annual report 2015 edited
Annual report 2015 editedAnnual report 2015 edited
Annual report 2015 editedValerie Alarcon
 
Pc i khan pur fery project 12 m
Pc i khan pur fery project 12 mPc i khan pur fery project 12 m
Pc i khan pur fery project 12 mhayat alishah
 
Philippine AE Road Map.pptx
Philippine AE Road Map.pptxPhilippine AE Road Map.pptx
Philippine AE Road Map.pptxVonQuidor
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
 
Tata Projects Ltd. 39th annual report 2017-18
Tata Projects Ltd. 39th annual report 2017-18Tata Projects Ltd. 39th annual report 2017-18
Tata Projects Ltd. 39th annual report 2017-18mukeshbhatt39
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation finalHazratKhan11
 
summer training report on multistorey residential buildings
summer training report on multistorey residential buildingssummer training report on multistorey residential buildings
summer training report on multistorey residential buildingsGaurav Shukla
 
Working paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanWorking paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanhayat alishah
 

Ähnlich wie Presentation muhammadalishahzada110620141930hours (20)

Ddwp minutes 16 10-2014
Ddwp minutes 16 10-2014Ddwp minutes 16 10-2014
Ddwp minutes 16 10-2014
 
Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
Mp surface water
Mp surface waterMp surface water
Mp surface water
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
Cwc
CwcCwc
Cwc
 
Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14Engineering wing cs notes 9 12-14
Engineering wing cs notes 9 12-14
 
Puducherry
Puducherry Puducherry
Puducherry
 
Q2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sportsQ2 adp 2015-16 sectoral format for sports
Q2 adp 2015-16 sectoral format for sports
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
RDP Chapter 19
 
Annual report 2015 edited
Annual report 2015 editedAnnual report 2015 edited
Annual report 2015 edited
 
Pc i khan pur fery project 12 m
Pc i khan pur fery project 12 mPc i khan pur fery project 12 m
Pc i khan pur fery project 12 m
 
Philippine AE Road Map.pptx
Philippine AE Road Map.pptxPhilippine AE Road Map.pptx
Philippine AE Road Map.pptx
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
Tata Projects Ltd. 39th annual report 2017-18
Tata Projects Ltd. 39th annual report 2017-18Tata Projects Ltd. 39th annual report 2017-18
Tata Projects Ltd. 39th annual report 2017-18
 
PPT to BPC.pptx
PPT to BPC.pptxPPT to BPC.pptx
PPT to BPC.pptx
 
TC Presentation_M&E Team_May25.pptx
TC Presentation_M&E Team_May25.pptxTC Presentation_M&E Team_May25.pptx
TC Presentation_M&E Team_May25.pptx
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
 
summer training report on multistorey residential buildings
summer training report on multistorey residential buildingssummer training report on multistorey residential buildings
summer training report on multistorey residential buildings
 
Working paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatanWorking paper picnic spots gabeen jabba sulatan
Working paper picnic spots gabeen jabba sulatan
 

Mehr von hayat alishah

1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copyhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updatedhayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucathayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreporthayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism departmenthayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdfhayat alishah
 

Mehr von hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Presentation muhammadalishahzada110620141930hours

  • 2. ADP 2014-15 (Rs.in Million) Sector Ongoing Scheme Original Allocation New Schemes Original Allocation Total Schemes Original Total Allocation Ongoing New Archaeology 9 62.395 3 13.001 12 75.396 Sports 12 852.599 5 155.000 17 1,007.599 Tourism 9 112.005 5 111.000 14 223.005 Youth Affairs 1 19.000 1 19.000 Total 31 1045.999 13 279.00 44 1325
  • 4. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Archaeology: 1013- 100169 Conservation of Nicholson House at Bannu. DDWP 24-9-2011 1014- 90187 Restoration & Rehabilitation of Fire Brigade Building at Gor- Khattree Peshawar DDWP 31-3-10 & 28-11-11 Physical Progress (Quantitative Terms) Targets Achievements 100% 19% 100% 35% Code Scheme Name Remarks Work in progress Work in progress but slow due technical problems. Release Expenditure 7.600 6.200
  • 5. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Archaeology: 1015- 100166 Institution / Capacity Building of Directorate of Archaeology & Museums Peshawar DDWP 17-3-2011 1016- 130037 Preservation & Revitalization of Eastern & Western Gateways of Gorkhatree Pesawar PDWP 29/01/2013 Physical Progress (Quantitative Terms) Targets Achievements 100% 41% Code Scheme Name Remarks Work in progress PC-II perpared by C&W and approved by PDWP on 5-12-2013 and progress to be conveyed by C&W Department on 15/10/2014 Release Expenditure 6.08 - -
  • 6. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Archaeology: 1017- 110093 Development , Improvement and projection of Peshawar and Swat Museums (A) DDWP 25/1/2012 1018- 110092 Conservation & Rehabilitation of heritage sites and provision of facilities/ infrastructure and installation of sign boards/milestones for key archaeological sites.(A) DDWP 24/9/11 Physical Progress (Quantitative Terms) Targets Achievements 100% 21% 100% 30% Code Scheme Name Remarks Work in progress Work in progress Release Expenditure 5.000 4.657 -
  • 7. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Archaeology: 1019- 110094 Promotion of Archaeological activities in the Province. (A) DDWP 25/1/2012 1020- 120087 Conservation & Development of World Heritage Sites of Khyber Pakhtunkhwa DDWP 30-8-2012 Physical Progress (Quantitative Terms) Targets Achievements 100% 65% 100% 5% Code Scheme Name Remarks Work in progress Envisaged targets are expected to be achieved. Release Expenditure 3.200 5.000 -
  • 8. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Archaeology: 1021- 120891 Preservation / Conservation & Improvement of 91 Devolved Archaeological Sites in Khyber Pakhtunkhwa. Physical Progress (Quantitative Terms) Targets Achievements 100% 2% Code Scheme Name Remarks Action plan firmed up for smooth implementation. Release Expenditure 2.500 No. of Ongoing 9 Schemes having allocation of Rs. 62.395 with 15% utilization.
  • 10. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress New Schemes Of Archaeology: 1022 140041 F/S and Master Planning for Establishment of Museums at D.I. Khan, Hazara and Kohat Divisions. (B )DDWP / / 1023 140387 Conservation & Development of Ali Mardan Khan Villa at HQ 11 Corps Peshawar Cantt. (B)DDWP / / Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks DDWP convened on 16- 10-2014 Directorate of Archaeology and ENGG Corp of 11 Corp are working on the PC-II/PC-I Release Expenditure
  • 11. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1024 140722 Archaeology - Community - Tourism Field School Project. Phase-II. (A) PDWP 8/8/2014 Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks the Scheme was approved on 8/8/2014 and an amount of Rs. 52.532 M to be provided from PIDSA or Italian Debt Swap. Release Expenditure New Schemes Of Archaeology: No. of New 3 Schemes having allocation of Rs. 13 million and the PC-1/PC-2 are under preparation/approval process.
  • 13. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Sports: 1025- 100230 Rehabilitation of Hayatabad Sports Complex.(Presentation to PDWP) (A) DDWP 24/9/11 (A) PDWP 27/12/2012 1026- 110562 Establishment of Water Sports re-creational facilities in Peshawar (A) DDWP 28/11/2011 Physical Progress (Quantitative Terms) Targets Achievements 100% 40% 100% 30% Code Scheme Name Remarks Hockey ground restored. Indoor games hall is yet to be rehabilitated. Issues of demarcation of boundary wall has to be resolved with PDA. Work needs to be expidtired and completed Release Expenditure 69.95 28.000 -
  • 14. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Sports: 1027- 120209 Reconstruction of old Pavillion at Qayyum Stadium, Peshawar ( Phase-II) (A) PDWP 27/12/2012 1028- 130054 Extension and Rehabilitation of Existing male/female Hostel in Qayyum Stadium.(B) DDWP Physical Progress (Quantitative Terms) Targets Achievements 100% 2% 100% 2% Code Scheme Name Remarks C&W has forwarded PC-I (revised) for approval of PDWP PC-II prepared by C&W and approved by PDWP on 5-12-2013 Financial Proposals opened on 21- 03-2014. C&W Deptt will intimate the progress by 15/10/2014 Release Expenditure 20.000 10.000 -
  • 15. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Sports: 1029- 100222 Khan Abdul Wali Khan Sports Complex Charsadda. (A)PDWP 21/7/11 DDWP 24/9/2011 & PDWP 28-08-2012 1030- 130569 Construction of sports stadium at District Swabi. (PC-II approved) (B) PDWP Physical Progress (Quantitative Terms) Targets Achievements 100% 75% 100% 5% Code Scheme Name Remarks Work is in progress and C&W Deptt will intimate the progress by 15/10/2014 PC-II prepared by C&W and approved by PDWP on 5-12-2013. Financial Bid Opened on 27-02- 2014. C&W Deptt will intimate the progress by 15/10/2014 Release Expenditure 77.649 0.000 -
  • 16. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Sports: 1031- 130053 Establishment of International standard multipurpose Gymnasium at Abbottabad (B) PDWP 1032- 130068 Up-gradation of Curtis stadium Haripur Phase II. (PC-II Approved) (B) DDWP Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks PC-II prepared by C&W and approved by PDWP on 5-12-2013 Technical Proposals opened on 21- 03-2014. C&W Deptt will intimate the progress by 15/10/2014 PC-II prepared by C&W and approved by PDWP on 5-12-2013. Request for Proposals invited Release Expenditure 0.000 0.000 -
  • 17. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Sports: 1033- 130051 Promotion of Sports Activities Phase III. (A) DDWP 22/10/2013 1034- 130059 Acquisition of land and creation of Playground at Chitral and civil work at Tank ( PC-II Approved). (B) DDWP Physical Progress (Quantitative Terms) Targets Achievements 100% 0% 100% 2% Code Scheme Name Remarks Activities plan for CFY in process of finalization PC-II prepared by C&W and approved by PDWP on 5-12-2013 Financial Proposals opened on 21- 03-2014 and progress to be shared by 15/10/2014 by C&W Deptt: Release Expenditure 25.000 0.000 -
  • 18. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress Ongoing Schemes Of Sports: 1035- 130061 Establishment of Playgrounds in Khyber Pakhtunkhwa on need basis (A) PDWP 9/10/2013 1036- 130435 Establishment of Sports Academies for the Talented youth of Khyber Pakhtunkhwa (B) PDWP Physical Progress (Quantitative Terms) Targets Achievements 100% 15% 100% 2% Code Scheme Name Remarks Acquisition of land in D.IKhan = Paharpur (8,840,390), Poroa (4,404,611) & Daraban (6,595,00) State lands = D.I.Khan- Kulachi, Karak - Banda Daud Shah, Charsadda- Tangi, Chitral- Mastuj & Dir Lower Samar Bagh PC-II prepared by C&W and approved by PDWP on 5-12-2013. Request for Proposals invited Release Expenditure 253.500 0.000 -
  • 19. No. of Ongoing 12 Schemes of Sports having allocation of Rs. 852.5 with 10% utilization.
  • 21. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress New Schemes Of Sports: 1037 140048 Completion of incomplete Boxing Gymnasium at Peshawar and Sports Complex D. I. Khan (PSDP Devolved Projects) (B) PDWP / / 1038 140622 Construction of Sports Complex at Sub-Tehsil Rustam District Mardan. (B )PDWP / / Physical Progress (Quantitative Terms) Targets Achievements 100% 2% 100% 2% Code Scheme Name Remarks PC-I / PC-II under preparation and would be submitted to DDWP / PDWP by the end of this month -do- Release Expenditure 0.000 -
  • 22. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress New Schemes Of Sports: 1039 140049 Talent Hunt Program for all Sports in Khyber Pakhtunkhwa (B )DDWP / / 1040 140717 Purchase of Sports Equipment (B )DDWP / / Physical Progress (Quantitative Terms) Targets Achievements 100% 0% 100% 0% Code Scheme Name Remarks PC-I / PC-II under preparation and would be submitted to DDWP / PDWP -do- Release Expenditure 0.000 -
  • 23. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress New Schemes Of Sports: 1041 140745 Improvement, Restoration & Rehabilitation of Existing Sports facilities in Khyber Pakhtunkhwa. (B )PDWP / / Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks PC-I / PC-II under preparation and would be submitted to DDWP / PDWP Release Expenditure No. of New 5 Schemes having allocation of Rs. 155 million and the PC-1/PC-2 are under preparation/approval process.
  • 25. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1042- 110090 Culture Tourism Centre/ Artisan Village at Gor Khauttree (A) PDWP 22/12/2011 1043- 130033 Kund Pedestrian, Wooden Bridge (B) DDWP / /. Physical Progress (Quantitative Terms) Targets Achievements 100% 60% 100% 2% Code Scheme Name Remarks The Cells for artisans in place, Artisans are being trained. The wall towards eastern gate restored. Lights and electrification with generator is in place. The greenery has also been restored. PC-II prepared by C&W and approved by PDWP on 5-12-2013 and progress to be shared by C&W Department on 15/10/2014 Release Expenditure 0.001 - - - Ongoing Schemes Of Tourism:
  • 26. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1044- 130030 Water Sports Tourism facilities at Khanpur (A) DDWP 12/11/2013 1045- 110088 Establishment of Engineering Wing for Sports Culture, Archaeology, Museums, Tourism and Youth Affairs (A) PDWP 18/11/2011 Physical Progress (Quantitative Terms) Targets Achievements 100% 70% 100% 70% Code Scheme Name Remarks The scheme has been operationalized with bauble deck boat and JT from TCKP own resources. The locals have approach the Court that the land measuring 450 kanal leased out from WAPDA belong to them. The Engineering Wing has only salary component to be paid upto 30-06-2015. Release Expenditure 5.000 1.000 0.001 - Ongoing Schemes Of Tourism:
  • 27. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1046- 120092 Capacity Building of Tourist Services Wing, Khyber Pakhtunkhwa (A) DDWP 30/8/2012 1047- 120647 Development and Restoration of properties transferred by the Provincial Govt. to the TCKP for the tourists. (A) DDWP 9/10/2012 Physical Progress (Quantitative Terms) Targets Achievements 100% 25% 100% 50% Code Scheme Name Remarks Vehicles and Motor Cycles procured. Appointment of staff and establishing of offices at Kohat and Abbottabad are being finalized. work is in progress on Rehabilitation of Rest House and Construction of cottages at Batakundi, Naran, Construction of Rest House at Nathya Gali, Rehabilitation of Rest House at Thandyani and Rehabilitation of Rest House & Children Park at Bahrain. Release Expenditure 1.000 - 0.001 - Ongoing Schemes Of Tourism:
  • 28. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1048- 120890 Public Private Partnership for development of tourists facilities in Chitral, Galyat, Naran, Kaghan and Kohistan. (A) PDWP 2/4/2013 1049- 130031 Holding of Traditional & Tourism festivals, Broghal, Shandur, Kalash, Food Festivals and Khanpur Festival. (A) DDWP 22/10/2013 Physical Progress (Quantitative Terms) Targets Achievements 100% 50% 100% 50% Code Scheme Name Remarks Work is in progress on facility at family Cottages at Batta Kundi Narran, Rest House in Bata Kundi & Naran and Rehabilitation of Chitral Rest House at Garam Chasma. World Tourism Day, Broghal held and Food & Cultural Festival in pipeline. Release Expenditure 0.001 - 15.000 - Ongoing Schemes Of Tourism:
  • 29. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1050- 130649 Tourism Policy – New Initiatives, (A) PDWP 9/10/2013 Physical Progress (Quantitative Terms) Targets Achievements 100% 5% Code Scheme Name Remarks PC-II prepared by C&W and approved by DDWP on 13-1-2014. C&W Department to intimate progress on 15/10/2014. Release Expenditure 40.000 No. of Ongoing 9 Schemes having allocation of Rs. 112 million and utilization is not more than10%. Ongoing Schemes Of Tourism:
  • 31. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress New Schemes Of Tourism: 1051 140036 Establishment of Picnic Spots at suitable Places in Malam Jaba, District Swat. (B )DDWP / / 1052 140039 F/S for Development of Sum Elahi Mung Manshera as Tourist Resort. (B )DDWP / / Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks PC-I / PC-II under preparation PC-I / PC-II almost ready, the DDWP expected in 3rd week of October Release Expenditure - - - -
  • 32. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1053 140037 Establishment of Network of Tourist Information Centers. (B )DDWP / / 1054 140040 Holding of Traditional, Local, National and International Events. (B )DDWP / / Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks PC-I / PC-II under preparation PC-I / PC-II almost ready, the DDWP expected in 3rd week of October Release Expenditure - - - - New Schemes Of Tourism:
  • 33. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1055 140388 Counterpart funding for Tourism projects to be executed through Public Private Partnership (PPP) (B )PDWP / / Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks PC-I / PC-II under preparation That will include cost of land after section-4 of the schemes of Tourism under consideration of BOIT Release Expenditure No. of New 5 Schemes having allocation of Rs. 111 million and the PC-1/PC-2 are under preparation/approval process. New Schemes Of Tourism:
  • 35. ANNUAL DEVELOPMENT PROGRAMME 2014- 15 Scheme wise progress 1021- 130080 Block Allocation for youth promotional activities in the province (A) PDWP 13/1/2014. Physical Progress (Quantitative Terms) Targets AchievementsCode Scheme Name Remarks Hiring of consulting firm has been published in first week of October 2014 Release Expenditure 19.000 Ongoing Scheme Of Youth: No. of Ongoing 1 Scheme having allocation and release of Rs. 19 million.