Diese Präsentation wurde erfolgreich gemeldet.
Die SlideShare-Präsentation wird heruntergeladen. ×

ROAD BED CONSTRUCTION IN METRO MANILA SKY WAY (STAGE 2)

Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Nächste SlideShare
Hrm raw ppt
Hrm raw ppt
Wird geladen in …3
×

Hier ansehen

1 von 9 Anzeige
Anzeige

Weitere Verwandte Inhalte

Diashows für Sie (20)

Ähnlich wie ROAD BED CONSTRUCTION IN METRO MANILA SKY WAY (STAGE 2) (20)

Anzeige

Weitere von haroldtaylor1113 (20)

Aktuellste (20)

Anzeige

ROAD BED CONSTRUCTION IN METRO MANILA SKY WAY (STAGE 2)

  1. 1. PRESENTED TO: Dr. Tomas U. Ganiron Jr PRESENTED BY: Peter Kha Bang Joyce D. Danila Samantha Jacinto Henry Lyn Romero Adrian Bryan Estember
  2. 2. • DM Consunji, Inc. (DMCI) – the lead contractor for the Metro Manila Skyway Stage 2. • Citra Metro Manila Tollways Corporation (CMMTC) – the proponent for the Skyway Project.
  3. 3. • April 2009 Citra announced the construction on the second stage. • By May 2010, rotating the highest pierhead in the Sucat area. • By July, concreting 134 of the required 238 spans and started pouring the Asphalt overlay.
  4. 4. • Started mobilization in May 2009 and finishing in March 2011. • On December 15, 2010, The Bicutan-to-Sucat portion of Stage 2 opened to the public. • April 2011 – opened to public.
  5. 5. • STAGE 2 involved the construction of a 6.88km-long expressway from BICUTAN to ALABANG. • Accommodates an estimated of 300,000 vehicles per day
  6. 6. • 6-lane elevated toll way to the public from Bicutan to Alabang.
  7. 7. • Total Project Cost: 2 Billion Pesos • Minimum Speed : 60kph • Maximum Speed : 100kph for Class 1 Vehicles 80kph for buses and trucks
  8. 8. • The project aims to provide a vital link between ALABANG AND BICUTAN through elevated expressway system. • It also aimed at helping decongest Metro Manila’s major road system • The project is also to boost the conduct of trade and commercial activities
  9. 9. ISSUE • Worsening traffic condition in Metro Manila SOLUTION • The government proposed to build the Skyway Stage3.

×