CONTENTS



1. Introduction

2. Vision

3. Objectives

4. Functional Features

5. Technical Architecture

6. Deployment Features

7. Security Infrastructure

8. Operational Features

9. Implementation Methodology

10.Business Model

11.Institutional Structure

12.Service Level Metrics

13.Current Status of Project




                                        3
1. Introduction

        The Government of Chhattisgarh’s annual public procurement expenditure is
about Rs. 4000 Crores. The volume of expenditure is expected to increase in the
forthcoming years since the state is undergoing a rapid development. Acknowledging the
importance of public procurement, the Government has undertaken efforts to reform
procurement practices in the last three years. The notable of the efforts are reform of
public works manual and issuance of a Government Order (G.O.) by the Chief Secretary
– 196/CS/2004 – directing departments to implement e-Tendering. Through e-Tendering
the Government expects to increase transparency and efficiency in public procurement.
The Public Works Department (PWD) was the first department to implement e-Tendering
system. At this juncture, the Government has taken efforts to consolidate the existing e-
Tendering solutions and implement an end-to-end e-Procurement solution across all
agencies in the State. The Government has selected M/s Wipro Ltd. (in consortium with
M/s NexTenders India Pvt. Ltd.) as the Implementation Partner to implement e-
Procurement on Public Private Partnership (PPP) model and deploy the solution on
Build-Own-Operate (BOO) basis for a period of 5 years.


2. Vision


        The Vision of the e-Procurement Project is to enhance the efficiency and
transparency in public procurement through the implementation of a comprehensive e-
Procurement solution to be used by all Government organizations in the State, including
the Public Sector Undertakings (PSUs).


3. Objectives
GoC aims to achieve the following objectives with the implementation of e-Procurement:

  i.    Transparency: Introduce the maximum extent of transparency in the public
        procurement by making the required information available on the Internet.
  ii.   Cost Savings through higher competition: A result of wider publicity to
        Government procurement opportunities


                                                                                       4
iii.   Cost Savings through demand aggregation: The ability to aggregate Government
        departments’ demand to leverage buying power with the supply market.
 iv.    Reduced inventory costs: Improved planning and management of inventory
        leading to lower levels of inventory
  v.    Internal arbitrage: Ensuring consistency in goods and services costs at the best
        price across all Departments at item level.
 vi.    Consistent and sustainable contractor development: Enabling pre-qualified
        vendors the opportunity to access of other government departments.
 vii.   Transactional effectiveness: Eliminating or automating non-value adding steps
        within the procurement to enable efficient and effective processes.
viii.   Reduced Total cost of ownership: Understanding the supply chain and life cycle
        costs in procurement to establish value adding supply relationships leading to
        reduced cost of doing business for both government and industry
 ix.    Effective tender processing: Use of different types of e-Auctions to get better
        prices for GoC.
  x.    Open platform: Level playing field and “fair” competitive platform for the
        suppliers.
 xi.    Disposals: Accessing a wider customer base when disposing of redundant assets
 xii.   Smart governance: Increased transparency,            monitoring   and control of
        procurement process


4. Functional Features
           The development of e-Procurement in the State of Chhattisgarh has been
categorised into various functional modules which would automate the complete
procurement cycle from crade-to-grave. The following are the functional modules as
implemented in the State of Chhattisgarh.


   i.   Centralized Registration of Suppliers/ Contractors
  ii.   Indent management
 iii.   e-Tendering
 iv.    e-Auction


                                                                                        5
v.    Contract management
 vi.    Catalogue management
vii.    e-Payments
viii.   Accounting
 ix.    Management Information Systems (MIS)


Centralised Supplier Registration
        The Centralised Supplier Registation module provides a single window wherein
all suppliers / contractors can submit their applications online for registration in various
departments. The request for registration is made online through the eProcurement portal
and the same gets subsequently routed to the concerned officials of the various
departments. The workflow of the Centralised Supplier Registration Module is as
follows.


Step-1: Suppliers / Contractors apply online for registration through the eProcurement
           Portal.
Step-2: The Application is routed online to the concerned official of the department(s).
Step-3: The Supplier / Contractor is verified on various registration criteria either
           online or physically
Step-4: The concerned official approves the registration of the Supplier / Contractor
           online using Digital Signature


        The Centralised Supplier Registration Module also provide a view of the Bid
Capacity of each Contractor / Supplier to facilitate departments in estimating the strength
of the Contractor / Supplier.


Indent Management


        The Indent Management Module involves in framing purchase / work proposal,
review of proposal, internal approvals, technical approvals, administrative approvals,
preparation of tender document and preparation of Notice Inviting Tender. The Module



                                                                                           6
automates the workflow of the department wherein the approvals are given using Digital
Signature Certificates.


e-Tendering


          The e-Tendering Module involves in advertisement of tender, downloading of
tender documents, online submission of bids, online bid evaluation and award of contract.
The bids are submitted by bidders using their Digital Signature Certificate and the bids
are opened using the Digital Signature Certificates of the Bid Evaluation Committee. The
system generates an automated bid evaluation chart which serves as a basis to finalise the
award of contract.


e-Auction


          The auction module is a facility that allows suppliers to dynamically out-bid their
competitors within a time-frame specified by a buying agency. The auction module has
facilities for both buying (reverse auction) and selling (forward auction) of goods, works
and services. In reverse auction, suppliers quote a price lower than their competitors to
undertake a task, implying in a two-dimensional graph, the arc representing price goes on
the reverse as quoted price gets lower. Forward auction is used to sell off excess items
held by government. The suppliers keen on purchasing the items quote higher than their
competitors, which results in the price curve moving in upwards/forward direction. Both
the auction types allow suppliers to participate in the bidding activity as anonymous
actors.


Contract Management


          The Contract Management Module involves in the processes between issuance of
work order and completion of the work which are electronically handled. The Contract
Management module enables the Government to maintain an overview of the works in
progress. Once a part of a work is completed, then payment to the supplier is quickly



                                                                                           7
arranged as bills associated with the work are processed in an automated system. Once
the bills are approved, arrangements can be made to have the payment transferred
automatically from government’s bank account to that of the suppliers’ account. When in
place for a period of time, the system collects a repository of knowledge that can be used
to measure the performance of a contractor.


Catalogue Management


        In the catalogue management module, the information about rate contracts
negotiated by the government is hosted in an online environment enabling the
departments to use the negotiated rate contracts and directly place orders for goods and
services with the supplier community. The module automatically checks for
authorization, handles accounting formalities, generates usage reports and forwards
delivery information. Since access to rate contract information is made easier with the
module, the utilization of rate contracts by the end users will increase. The MIS reports
generated by the module help purchasing officers in estimating the demand for a product
or a service.


e-Payment


    The e-Payments module facilitates online transfer of funds – both inflows and
outflows – happening during the course of public procurement activity. The online
transfer facility has been featured in multiple ways such as through Credit Cards,
Purchasing Cards and Internet Banking applications. In the public procurement context,
the e-payment module involves during sale of tender documents, online transfer of EMD
and payment to suppliers/contractors for purchase of goods and completion of works. The
implementation partner integrates the e-Procurement application with the Banks as
decided by the Government.




                                                                                        8
Accounting


       The accounting module calculates payments made to contractors for completion
of works and for purchase of goods. For works procurement, the system automatically
calculates the payment due to a contractor based on information available in the
measurement book and rates quoted by the contractor for undertaking the Work. For
goods procurement, the system maintains data on the extent to which negotiated rate
contracts have been used. The system also generates reports on the time taken to process
tenders, number of bids received in response to a tender, time taken to complete a work
and purchase goods. In summary, the system intelligently accounts key aspects of the
public procurement activity.


Management Information System (MIS)


       The MIS module is a critical component, which collects, records, stores and
processes data collected from all the departments in an integrated manner. The module is
tightly integrated with the rest of the modules and provides functional support, decision
support and performance monitoring.


5. Technical Architecture


       The core eProcurement solution of GoC comprises of the modules such as Tender
management, auction management etc addressing the functional requirements along with
the Registration and Authentication module, which facilitates user registration,
authentication and personalization services. The system topology for eProcurement
solution implemented in the State of Chhattisgarh is illustrated in Figure 1. This
architecture enables both suppliers and buyers (department users) to use the same
platform for submission of purchase requisitions, processing of purchase orders, creation
of tender notifications, submission of tender responses, evaluation of tender responses
and award of contract etc. The solution components depicted in the diagram below are
deployed on separate servers. However, the solution offered by the vendors does not


                                                                                       9
compromise the performance or security of the overall solution through such aggregation
of the solution components on to a single server. The onus of the security and
performance of the solution completely rests with the implementation partner with
critical administrator rights being controlled by the Government.


                         Figure 1: e-Procurement System Topology
                                                                                  Application Serverfarm
                                                                       Tender        Auctions   Catalogue
                                              Intrusion Detection
                            Web server farm         System           management     management management
                                                                       system         system     system



                                                                                                           Netwok Attached
                                                                                                               Storage

                          DMZ                            Secured Network
    Internet      FW 1                           FW 2




                             LDAP/ User DB
                                                                    Database Serverfarm




6. Deployment Features


         e-Procurement solution is deployed on n-tiered architecture with web, application
and database server farms. Each tier is scaled independently, both vertically and
horizontally, to address the performance and scalability requirements. Figure 2 illustrates
the infrastructure components of the eProcurement solution implemented in the State of
Chhattisgarh.




                                                                                                                             10
Fig 2: Deployment Features of eProcurement Solution

     Client Tier                  Web Server Tier                             Application Server Tier                 Database Server Tier




               - HTTP, HTTPS,                       - Servelt/ASP for round
               - Load balancing                       robin load balancing                                  - LAN
                  - LAN, WAN                           - HTTP over LAN                                  - JDBC/ODBC



                                                                                 - Buyer Management
                                                                               - Supplier Management
                                                                                - Tender Management
                                                                               - Auctions Management
                                                                              - Catalogue Management



                        Client Tier
The client tier runs on a browser and uses html for presentation. The client communicates
with the web server tier using http.


                        Web Server Tier
The web server manages static images and pages and passes client requests from the
browsers to the application server tier using http.


                        Application Server Tier
The application servers (buyer management, supplier management etc) are multi-threaded
applications with two main areas of logical functionality:
   a. Handling client requests and generating html as a response, and
   b. Managing and supplying object data, including database interaction.


                        Database Tier
The eProcurement solution uses standard relational database platform for object
persistence and all business object data is stored in a database.




                                                                                                                                             11
7. Security Infrastructure

Public Key Infrastructure

        e-Procurement solution has become an interface between suppliers / contractors
and department through the open internet channel, which is susceptible to hacking and
other unauthorized activities. To enable secured and reliable communication, the
eProcurement system implemented in the State of Chhattisgarh has deployed the use of
Digital Signature Certificates for user identification, authorization and encryption
functionality. The Public Key Infrastructure (PKI) using digital certificates establishes a
reliable and secured e-transaction platform between buyers and suppliers. While all the
pre-tendering and post tendering activities internal to the department are approved using
the Digital Signature Certificates of the concerned officials, the e-tendering activity is
operated through the private key and public key of the bidders and the government
officials.


        The bidders use their public key for data encryption while submitting the hash of
the bid. The authorised government officials use their public key to generate the super
hash of the bids followed by the bidder authorising the government officials in using the
public key of the bidders to decrypt the bids. At every stage, the hashes and the super
hashes are matched in order to maintain the integrity and transparency. The bids are
subsequently opened using the Digital Signature Certificates of the committee members.
The submitted tenders cannot be seen or read by any person as they would be encrypted
form and can only be decrypted using the private keys of the bidders, which are in strict
possession of the bidders.


Firewall


        The Firewall Solution for eProcurement solution provides robust security features
to secure the solution Infrastructure from unauthorized access and use. Following outlines
the broad specifications of the firewall solution deployed for the eProcurement solution.




                                                                                        12
No.      Feature                               Requirement
      Concurrent       Supports at least 1000 concurrent connections with at least 1.5
 1
      Connections      Gbps throughput
      Gigabit          The firewall solution supports the gigabit Ethernet ports
 2
      Ethernet ports
                       Supports destination URL policy management
                       Denial-of-service (DoS) detection and prevention
                       Dynamic port mapping; Java applet blocking
                       VPN QoS support; real-time alerts
                       Supports the basic network protocols services such as
                       VLAN’s, DHCP, BOOTP, OSPF, RIP, TFTP, etc.
                       Audit trails
          Other
                       Policy-based multi-interface support
 3       Features
                       Network Address Translation (NAT); bidirectional NAT; dual
                       NAT
                       Time-based access lists
                       Authentication, authorization, and accounting (AAA)
                       Dynamic, per-user authentication and authorization
                       Supports ‘stateful inspection fire-walling’ as well as
                       ‘application and protocol inspection’
                       Provides VPN services including site to site VPN connectivity

Network Intrusion Detection System

No.      Feature                               Requirement
                       Facilitates to detect, report, and terminate any unauthorized
                       activity in the eProcurement solution network.
                       Minimum inspection rate of 500 Mbps;
                       Transparent to legitimate traffic/network usage
                       Responds to unauthorized activity to block offenders from
 1       Features
                       accessing the network or terminate offending sessions
                       Maintains a comprehensive attack signature list to detect
                       content-based and context-based attacks
                       Supports Alarms to include attacker and destination IP
                       addresses, destination port, and attack description
                           - CGI Scripts
                           - Web Server Attacks, Web Browser Attacks
                           - IP Spoofing
        Secured            - SMURF, TCP Sequence Number prediction
 2
      Environment          - Buffer over flows
                           - DNS Attacks, PING Sweeps, TCP Scans, UDP Scans,
                               OS Identification, Account Scans, DOS Attacks etc




                                                                                         13
8. Operational Features

       In order to kick-start the implementation of e-Procurement project in the State of
Chhattisgarh and subsequently sustain it, the Government has made the implementation
partner mandatory to provide training to government users & vendor community, provide
help desk operating for 12 hours every day and deploy 200 desktops at locations decided
by the departments.

Training

       Since the e-Procurement system brings about a new way of working for
departmental end users and the supplier community, a high priority has been given to
training component. Training facilitates two-way interactions between the user
community and the implementation partner, based on which the implementation partner
can customize the system to better suit the requirements of the government. The training
programme comprises of 1 day workshop at district level to provide awareness to
government officials and vendor community followed by detailed and in-depth training
on various modules. The departments would identify the concerned officials on module
level and accordingly ensure that the officials are trained. The training manual, prepared
in Hindi and English, is being given to the participants in order to provide ready
reference.


Helpdesk Services


       In order to facilitate the smooth functioning of the e-Procurement system, a well-
functioning help desk service has been set up by the implementation partner. The help
desk is accessible on a 12 x 7 basis ( 9 AM to 9 PM ) and those help desk operators are
capable of communicating fluently in Hindi and English. The help desk operators are
well-acquainted with the e-Procurement system both function-wise and technical-wise in
order to resolve the queries in an expeditious manner.




                                                                                       14
Deployment and Maintenance of Desktops

     To ensure the successful uptake of e-Procurement, the implementation partner is
deploying 200 desktop computers as part of the Agreement. The desktops are being
deployed as per the requirement of the departments and is maintained by the partner for
the full contract period.


9. Implementation Methodology


       The implementation of e-Procurement is done in two phases: pilot and roll-out.
The pilot phase lasted for a six-month period, during which time, the implementation
partner is asked to deploy all the required modules on a test basis.


       The State of Chhattisgarh had identified five departments viz., Public Works
Department, Water Resources Department, Public Health & Engineering Department,
Health Department and Chhattisgarh State Industrial Development Corporation where the
e-Procurement solution was implemented on pilot basis. Initially, all tenders worth Rs. 50
lakh and above was to be processed through the e-procurement system. Subsequently, the
slab has been reduced to include all tenders worth Rs.10 lakh and above. As on date, 24
departments have successfully adopted the eProcurement system


       The performance of the implementation partner is evaluated at the end of the pilot
phase. If the system performs to the expectations, then the Government permits the
implementation partner to roll-out the system across departments in the State. During the
roll-out phase, the implementation partner deploys all the modules across departments in
the State as per the Service Level Agreement (SLA). The roll-out phase will last for five
years in addition to the six months allocated for the pilot phase.


At the end of the five years, the Government will review the situation and decide on the
out-right purchase of the system – (i.e.) perpetual license for the e-Procurement
application and systems software and transfer of hardware assets on which the application
is deployed - as against a renewal of the partnership and exiting the partnership.


                                                                                       15
10. Business Model


       The Government of Chhattisgarh (GoC) is implementing the e-Procurement solution
on a Private-Public-Partnership (PPP) mode wherein the private partner is required to
provide e-Procurement as a service and engage on a Build-Own-Operate (BOO) basis with
Transfer – BOO (T) – as an option. The private partner customizes, deploys and maintains
the e-Procurement infrastructure setup during the course of implementation. The partnership
is for a five-year period in addition to the six months allocated for the pilot phase provided
the Service Level Metrics as mentioned in the Agreement are adhered to.




         The private partner is remunerated for the services rendered on a “transaction fee”
model. The transaction fees paid to the Vendor is calculated at the module level. Some of
the nine modules have been clubbed together and termed as a unit for transaction fee
calculation purposes. A payment mechanism is not specifically devised for modules on e-
Payments, Accounting and MIS, since they are an integral part of the rest of the modules.
The clubbing of the modules has resulted in six units, for each of which a method is
prescribed for calculating the transaction fee.


         An example of the method is “fixed fee per bid received”. In the fixed fee model, a
sum of money – say Rs. 500 – is paid for each bid submitted in response to a tender. Other
examples of the methods used for transaction fee calculation are “Percentage of Estimated
Contract Value (ECV) of a tender” and “Percentage of order value”. Looking at the business
model holistically, a combination of methods (hybrid business model) has been adopted to
calculate the pay-outs made to the private partner for provision of the different services of e-
Procurement system. Since e-Procurement is a commercial activity, the transaction fee shall
be paid by the supplier/contractor organizations responding to the government procurement
requirements. In a few instances, the Government has defined a cap or ceiling on the fee the
private partner can charge for provision of the services of a module. Such a cap/ ceiling has
been defined as a measure to protect the interests of the suppliers/ contractors and to ensure
that unduly high rates charged for such services would not adversely affect the growth of the


                                                                                          16
usage of the e-Procurement system. The Government has imposed such a cap as a de-risking
measure to ensure that the uptake of certain e-Procurement modules is not adversely affected
due to high rates the Vendors may quote.


        For the purpose of calculation of transaction fee, government procurement is
conceptually divided into two types:
   i.      Procurements with Estimated Contract Value (ECV) - designed for Works
  ii.      Procurements without ECV - designed for Goods




        The e-Procurement system comprises of the following five units, for each of which a
method for calculation of Service Charge is defined:


   i.      Indent management, e-Tendering and e-Auction modules for ECV procurement
  ii.      Contract management module
 iii.      Indent management, e-Tendering and e-Auction modules for non-ECV procurement
 iv.       Catalogue-based purchase management module
  v.       Centralized supplier registration module


Indent Management, e-Tendering and e-Auctions modules for ECV procurement


                 Contract Value (Rs.)        Fixed Transactional fee per bid
                                                         (Rs.)
                Upto 10 lakhs                             120
                10 – 50 lakhs                             360
                50 – 100 lakhs                           1040
                1 – 10 cr.                               1440
                More than 10 cr.                         4000




                                                                                      17
Contract Management module
Percentage of Contract Value: 0.02 %

              Contract Value (Rs.)                Cap Value (Rs.)
            Upto 10 lakhs                                ---
            10 – 50 lakhs                               360
            50 – 100 lakhs                             1040
            1 – 10 cr.                                 1440
            More than 10 cr.                           4000



Indent management, e-Tendering and e-Auction modules for non-ECV procurement


Fixed Transactional Fee per bid (all slabs): Rs. 240


Catalogue Management Module
Percentage of Contract Value: 0.25 %
Minimum Transactional Fee per Order: Rs. 50

            Order Value (Rs.)          Cap Value (Rs.)
            5,000 – 25,000                               50
            25,000 – 50,000                              75
            50,000 – 1lakh                               90
            1 – 10 lakhs                                700
            More than 10 lakhs                         15,000

Centralized Supplier Registration module
One-time Registration Fee per Supplier: Rs. 500
Yearly Maintenance Fee per Supplier:    Rs. 100

11. Institutional Structure

       The State of Chhattisgarh has institutionalised the implementation of e-
Procurement by constituting Empowered Committee and Task Force, nominating the
Secretary, PWD as the State Nodal Officer and engaging Chhattisgarh infotech & biotech
Promotion Society (CHiPS) as the nodal agency to assist the State in successfully
implementing the e-Procurement project. Each department has been directed to appoint



                                                                                   18
their nodal officers who would be involved during the implementation of the project and
would also serve as a one point contact to CHiPS and the implementation partner in
providing the necessary information.

       The Institutional Structure set up by the State of Chhattisgarh for the
implementation of e-Procurement project is illustrated in Figure 3 below.




                        Figure 3: Institutional Structure


                                                          •Chief Secretary, Chairman
                                                          • Secretary, IT
                                                          • Secretary, WRD
                                  Empowered               •Secretary, PWD
                                   Committee              •Secretary, Health
                                         PHED             •Secretary, Finance
                                                          •Secretary, Public Relations
                                                          •Secretary, Energy
                                                          •Secretary, P&RD
                  CHiPS
                                                          •Secretary, School Education
                                                          •MD,CSIDC
                                                          •CEO, CHiPS Member Secretary

                                       State                      TASK
                                    Nodal Officer                FORCE


                                       Nodal Officer
Role of GovernmentNodal Officer
  Nodal Officer                                          Nodal Officer      Nodal Officer




The PWD and responsibilities of the Government in implementing the project are as
    roles          WRD                               CSIDC            Health

follows:


  i.   Constituted an eProcurement Cell which governs the implementation effort. The
       e-Procurement Cell is a part of CHiPS, which is the State Nodal Agency for the
       implemenation of e-Procurement.
 ii.   Evaluate the bids received in response to this RFP and select the implementation
       partner



                                                                                         19
iii.   Finalization of the Agreement and the SLA with the implementation partner
 iv.    Provide office space for placing the hardware where the application is hosted and
        data is stored
  v.    Develop IT and networking infrastructure at the departmental level as required
 vi.    Prepare the list of personnel (government users and contractors) who shall be
        trained and issue communication to the trainees regarding the time and venue
        where the training activity is held
vii.    Provide office space required for conducting training programs
viii.   Framing of suitable procedures to ensure that the payment that is due for the
        services rendered is paid on-time in terms of the SLA/Agreement conditions
 ix.    Act pro-actively to reform procurement processes
  x.    Acquiring total ownership of the data generated through eProcurement system
 xi.    Tie-up with one or more Banking or Financial institutions to facilitate e-Payment.
xii.    Create a mechanism for resolution of disputes that may arise between the
        Implementation Partner and the Government
xiii.   Implement policy reforms and amendments as required for implementation of the
        project.




Role of CHiPS


The roles and responsibilities of CHiPS in implementing the project are as follows:


   i.   Co-ordinate with the departments and agencies implementing the project to ensure
        their participation in the e-Procurement initiative.
  ii.   Facilitate setting-up of a project management team which would meet once every
        two weeks to take stock of the progress of the project, resolve issues and suggest
        relevant policies and guidelines with respect to change in existing procurement
        process, template of the tender document, etc


                                                                                         20
iii.   Finalization of project implementation plan along with the timelines and
        deliverables in consultation with the implementation partner
 iv.    Monitor the performance of implementation partner using SLA criteria specified
        in the RFP
  v.    Select a reputed Third Party Testing Agency to test the e-Procurement solution on
        various pilot and rollout service level metrics.
 vi.    Select a reputed Third Party as the agency for conducting security audit of the e-
        Procurement system
vii.    Issuance of Digital Signature Certificates to Government officials.


Role of Implementation Partner


        Since the e-Procurement initiative is implemented on a Private-Public-Partnership
(PPP) basis, the implementation partner is expected to enthusiastically partake in the
implementation effort. The roles and responsibilities of the implementation partner are as
follows.

Project Planning

   i.   Appoint a full-time project manager to overlook the implementation of the e-
        procurement solution and the subsequent operations.
  ii.   Install a project implementation team of programmers and system analysts to aid
        in the process
 iii.   Prepare a detailed project plan based on the approved rollout plan of departments
        and functionality to be implemented. The plan should indicate:
           a. Availability of resources
           b. Sequence of activities, timelines and dependencies
 iv.    Ensure coordination with the nodal agency in terms of reporting, decisions to be
        taken, and other Government formalities to be completed.
  v.    Identify and highlight risks and issues in a timely manner. Communicate the same
        to the Project Management Team and the Task Force
 vi.    Assess and plan for training requirements



                                                                                       21
Solution Design

  i.   Meet the functional and technical specifications as mentioned in the RFP
 ii.   Ensure complete understanding of the same by the Development and
       Implementation teams
iii.   Design electronic forms as applicable to Government work
 iv.   Suggest to the State any improvements in the process required for better service
       delivery
 v.    Install a mechanism for the continuous improvement of the e-procurement
       functionality in view of the international best practices.

Solution Development

  i.   Build and manage catalogues
 ii.   Configure and customize the e-Procurement application to fit the requirements
iii.   Make the system inter-operable with the banking/financial institutions with which
       Government has tied-up for e-Payment
 iv.   Conduct requirements analysis and prepare To-Be scenarios
 v.    Provide Government with the latest updates on the application
 vi.   Appoint a full-time Quality Assurance (QA) manager to overlook the
       development/customization effort.

Project Implementation

  i.   Install, test and manage a secure and scalable e-Procurement application adopting
       open and inter-operable standards
 ii.   Develop and maintain IT and networking infrastructure required for the provision
       of training
iii.   Provide timely training to the government officials and the vendor community
       with supporting literature / documentation.




                                                                                       22
iv.    Partner with Government in effecting overall co-ordination with all the
        participating departments/agencies to achieve successful launch within the
        prescribed time
  v.    Install, test and manage the hardware required for hosting the application
 vi.    Set-up the Disaster Recovery Center (DRC) operations

O&M

   i.   Adhere to the SLAs stated in the RFP
  ii.   Provide helpdesk services
 iii.   Periodically (as agreed upon with the State) furnish data about the functioning of
        the system, especially in relation to the security aspects
 iv.    Conduct periodic meetings with the State Project Implementation Team to discuss
        progress and any issues encountered during the operations.
  v.    Set-up the digital signature / PKI related process and issuance of Digital
        Certificates in conformance with guidelines as in IT Act 2000, either directly or in
        collaboration with partners; and also establish the issuance process in such a
        manner as to enable government employees and contractors to procure such
        digital certificates from any vendor confirming to the stipulations
 vi.    Design Security Policy and Operational Documents


12. Service Level Metrics

Pilot Project SLA's

Service Metrics Parameters          Basis of Measurement             Remarks
                                   Equivalent of capacity to
Capacity of the Application                                          Simulating the stated
                                  handle 5000 transactions per
and Database Server                                                  loads and testing the
                                             hour
Concurrent     connects to                                           system performance
                                               1000                  using     load-testing
Application Server
                                                                     tools
Concurrent number of users
                                               2000
connected to the system




                                                                                              23
Deployment SLA's


                                               Low
 Parameter       Target     Deductions                    Deductions       Breach      Deduction
                                           Performance
Deployment
                                                          Rs. 30000       > 10      Rs. 50000
of e-           8 weeks       None         8-10 weeks
                                                          each week       weeks     each week
Tendering
Deployment
                10                                        Rs. 15000       >12       Rs. 30000
of Contract                   None         10-12 weeks
                weeks                                     each week       weeks     each week
Mgmt
Deployment
                                                          Rs. 10000       > 10      Rs. 15000
of Indent       8 weeks       None         8-10 weeks
                                                          each week       weeks     each week
Mgmt
Deployment
                10                                        Rs. 15000       >12       Rs. 30000
of Catalogue                  None         10-12 weeks
                weeks                                     each week       weeks     each week
Mgmt.




Operational SLA's

                                                       Low
    Parameter             Target         Credits                 Credits      Breach      Credits
                                                   Performance
Availability of
agreed services           99.00%           11       99.0-97%          6      <97.0%           -5
over Internet
Average e-
Procurement Portal        < 7sec           6        8-15 Sec          3      >15 sec          -2
page loading
Resolution of
                                                                               >7
Critical faults in      <5 working                 5-7 working
                                           7                          4      working          -2
the e-Procurement          hours                      hours
                                                                              hours
system



                                                                                         24
Resolution of non-
critical faults in the                                                     >72
                         <48 hours      4      48-72 hours       2                        -1
e-Procurement                                                             hours
system
Growth rate of
                         10% over                6% over
registration of                                                          Below
                         previous       2        previous        1                        0
suppliers measured                                                        6%
                          quarter                 quarter
quarterly
Growth rate of
                         10% over                6% over
transactions                                                             Below
                         previous       2        previous        1                        0
measured quarterly                                                        6%
                          quarter                 quarter
                                                                         Below
                            >70%                 60-70%                   60%
Training                                8                        4                        0
                         satisfaction          satisfaction             satisfacti
                                                                            on
      TOTAL                             40                      21                    -10


13. Current Status of the Project


       The e-Procurement project has been formally inaugurated by the Hon'ble Chief
Minister of Chhattisgarh on 14th August 2007 with the Water Resources Department
successfully processing a tender. 20 departments have successfully adopted the
eProcurement system which is evident from the fact that 13578 tenders worth
Rs.31821.37 crores have been processed and 4275 vendors have been registered till date
from 2007. Details are:
     Department        Tenders processed Total value      (in
                                                Crore)
        PWD                  6375              17927.93
        WRD                  2290               7281.95
       PHED                   444                529.96
       Health                 148               1850.85
       CSIDC                  267                RC**
       P&RD                  1530               2386.78
     Urban Dev.              2134               1536.03
Animal Hus & Diary             16                 45.55
   Social Welfare               2                  2.91
      CG RES                  285                141.55
  CG Minor Forest               2                  24.1
  CG Civil Supplies             1                RC**
    CG Handicraft               1                  1.88
   CG Warehouse                72                 78.03
   CG Power Gen.                2                  NA
   Food and Drug                2                    6


                                                                                     25
Mandi Board               7                  7.86
  Total                 13578              31821.37


This has been possible due to constant follow-up and periodic reviews. Software
testing has been done through STQC. System has been integrated with NSDL
payment gateway. The State is saving around 10 – 15 % on its procurement
expenditure by implementing eProcurement apart from having a transparent and
effective system of working. The project has bagged CSI Nihilent Best eGovernance
Project Award 2008 and Information Week EDGE Award 2011




                                                                              26

More Related Content

What's hot

B2B eProcurement Advantages
B2B eProcurement AdvantagesB2B eProcurement Advantages
B2B eProcurement AdvantagesAvinash Baoker
 
E Procurement
E ProcurementE Procurement
E Procurementacheerla
 
Proposal for e-Procurement System for Developing Country
Proposal for e-Procurement System for Developing CountryProposal for e-Procurement System for Developing Country
Proposal for e-Procurement System for Developing CountryGuisun Han
 
Ge pnic ppt_november_2017
Ge pnic ppt_november_2017Ge pnic ppt_november_2017
Ge pnic ppt_november_2017Praveen Rawat
 
Taxonomy of an Electronic procurement system
Taxonomy of an Electronic procurement systemTaxonomy of an Electronic procurement system
Taxonomy of an Electronic procurement systemmybestluxe.com
 
E Procurement Space Maturity Assessment Srm+ Ver
E Procurement Space Maturity Assessment   Srm+ VerE Procurement Space Maturity Assessment   Srm+ Ver
E Procurement Space Maturity Assessment Srm+ Verscottcwalls
 
Leveraging iProcurement to Increase Cash Flow
Leveraging iProcurement to Increase Cash FlowLeveraging iProcurement to Increase Cash Flow
Leveraging iProcurement to Increase Cash FlowBaker Khader Abdallah, PMP
 
E bidding presentation
E bidding presentationE bidding presentation
E bidding presentationPrabin Tandan
 
Oracle SLM : What's New in Supplier Onboarding through Oracle.
Oracle SLM : What's New in Supplier Onboarding through Oracle.Oracle SLM : What's New in Supplier Onboarding through Oracle.
Oracle SLM : What's New in Supplier Onboarding through Oracle.Abhilash K
 
E procurement
E procurementE procurement
E procurementamusa1973
 
E procurement
E procurementE procurement
E procurementRaghav Jha
 
Procurement Management Information System (PMIS) for Improving Public Procure...
Procurement Management Information System (PMIS) for Improving Public Procure...Procurement Management Information System (PMIS) for Improving Public Procure...
Procurement Management Information System (PMIS) for Improving Public Procure...Shree Ram Dhakal
 
E - Procurement
E - ProcurementE - Procurement
E - ProcurementDisha Bedi
 
Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...
Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...
Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...Nuth Otanasap
 

What's hot (20)

B2B eProcurement Advantages
B2B eProcurement AdvantagesB2B eProcurement Advantages
B2B eProcurement Advantages
 
E-Procurement
E-Procurement E-Procurement
E-Procurement
 
E Procurement
E ProcurementE Procurement
E Procurement
 
Proposal for e-Procurement System for Developing Country
Proposal for e-Procurement System for Developing CountryProposal for e-Procurement System for Developing Country
Proposal for e-Procurement System for Developing Country
 
Ge pnic ppt_november_2017
Ge pnic ppt_november_2017Ge pnic ppt_november_2017
Ge pnic ppt_november_2017
 
Taxonomy of an Electronic procurement system
Taxonomy of an Electronic procurement systemTaxonomy of an Electronic procurement system
Taxonomy of an Electronic procurement system
 
E Procurement Space Maturity Assessment Srm+ Ver
E Procurement Space Maturity Assessment   Srm+ VerE Procurement Space Maturity Assessment   Srm+ Ver
E Procurement Space Maturity Assessment Srm+ Ver
 
Oracle iProcurement
Oracle iProcurementOracle iProcurement
Oracle iProcurement
 
Oracle Internet Procurement
Oracle Internet ProcurementOracle Internet Procurement
Oracle Internet Procurement
 
Leveraging iProcurement to Increase Cash Flow
Leveraging iProcurement to Increase Cash FlowLeveraging iProcurement to Increase Cash Flow
Leveraging iProcurement to Increase Cash Flow
 
E bidding presentation
E bidding presentationE bidding presentation
E bidding presentation
 
E procurement
E procurementE procurement
E procurement
 
Oracle SLM : What's New in Supplier Onboarding through Oracle.
Oracle SLM : What's New in Supplier Onboarding through Oracle.Oracle SLM : What's New in Supplier Onboarding through Oracle.
Oracle SLM : What's New in Supplier Onboarding through Oracle.
 
E procurement
E procurementE procurement
E procurement
 
E procurement
E procurementE procurement
E procurement
 
Procurement Management Information System (PMIS) for Improving Public Procure...
Procurement Management Information System (PMIS) for Improving Public Procure...Procurement Management Information System (PMIS) for Improving Public Procure...
Procurement Management Information System (PMIS) for Improving Public Procure...
 
iSupplier
iSupplieriSupplier
iSupplier
 
PCS iProcurement
PCS iProcurement PCS iProcurement
PCS iProcurement
 
E - Procurement
E - ProcurementE - Procurement
E - Procurement
 
Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...
Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...
Ec2009 ch06 company centric b2-b and e-procurement public b2b exchanges and p...
 

Viewers also liked

eProcurement
eProcurementeProcurement
eProcurementdoba2007
 
Implementation of multiple MIS & e-working in SECR by Lokesh Vishnoi
Implementation of multiple MIS & e-working in SECR by Lokesh VishnoiImplementation of multiple MIS & e-working in SECR by Lokesh Vishnoi
Implementation of multiple MIS & e-working in SECR by Lokesh VishnoiIndian Railways
 
Business To Consumer Marketing (B2 C)
Business To Consumer Marketing (B2 C)Business To Consumer Marketing (B2 C)
Business To Consumer Marketing (B2 C)Aaron Wynn
 
Business to Business Electronic Commerce
Business to Business Electronic Commerce Business to Business Electronic Commerce
Business to Business Electronic Commerce Nurhazman Abdul Aziz
 
B2C Business models
B2C Business modelsB2C Business models
B2C Business modelsshynajain
 
Business to business marketing ppt
Business to business marketing  pptBusiness to business marketing  ppt
Business to business marketing pptSukriti Mal
 
Role of e-commerce e-procurement in B2B
Role of e-commerce e-procurement in B2BRole of e-commerce e-procurement in B2B
Role of e-commerce e-procurement in B2BLove Suryavanshi
 
PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING pter 007 instru...
PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING  pter 007 instru...PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING  pter 007 instru...
PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING pter 007 instru...Zamri Yahya
 

Viewers also liked (13)

eProcurement
eProcurementeProcurement
eProcurement
 
Implementation of multiple MIS & e-working in SECR by Lokesh Vishnoi
Implementation of multiple MIS & e-working in SECR by Lokesh VishnoiImplementation of multiple MIS & e-working in SECR by Lokesh Vishnoi
Implementation of multiple MIS & e-working in SECR by Lokesh Vishnoi
 
E procurement
E procurementE procurement
E procurement
 
Ppt
PptPpt
Ppt
 
Business To Consumer Marketing (B2 C)
Business To Consumer Marketing (B2 C)Business To Consumer Marketing (B2 C)
Business To Consumer Marketing (B2 C)
 
Business to Business Electronic Commerce
Business to Business Electronic Commerce Business to Business Electronic Commerce
Business to Business Electronic Commerce
 
B2B Marketing Strategy
B2B Marketing StrategyB2B Marketing Strategy
B2B Marketing Strategy
 
E-Commerce PPT
E-Commerce PPTE-Commerce PPT
E-Commerce PPT
 
B2C Business models
B2C Business modelsB2C Business models
B2C Business models
 
Business to business marketing ppt
Business to business marketing  pptBusiness to business marketing  ppt
Business to business marketing ppt
 
Role of e-commerce e-procurement in B2B
Role of e-commerce e-procurement in B2BRole of e-commerce e-procurement in B2B
Role of e-commerce e-procurement in B2B
 
E Procurement
E ProcurementE Procurement
E Procurement
 
PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING pter 007 instru...
PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING  pter 007 instru...PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING  pter 007 instru...
PURCHASING PROCEDURES, E-PROCUREMENT, AND SYSTEM CONTRACTING pter 007 instru...
 

Similar to Report on e procurement

Electronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) BangladeshElectronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) BangladeshFahad Aziz
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement applicationEst
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement applicationEst
 
1684040012460_Government E-Procurement Electronic Tendering System in the Hon...
1684040012460_Government E-Procurement Electronic Tendering System in the Hon...1684040012460_Government E-Procurement Electronic Tendering System in the Hon...
1684040012460_Government E-Procurement Electronic Tendering System in the Hon...UmairZaman13
 
The Contract And Procurement Management Process
The Contract And Procurement Management ProcessThe Contract And Procurement Management Process
The Contract And Procurement Management ProcessPamela Wright
 
Muehle ochieng 6ippc_p2p_presentation
Muehle ochieng 6ippc_p2p_presentationMuehle ochieng 6ippc_p2p_presentation
Muehle ochieng 6ippc_p2p_presentationDr. Paul Davis
 
IT_in_delhi_govt
IT_in_delhi_govtIT_in_delhi_govt
IT_in_delhi_govtRaavi Agarwal
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahidashahida quraishi
 
Ict enabled municipal initiative
Ict enabled municipal initiativeIct enabled municipal initiative
Ict enabled municipal initiativepcmcindia
 
Operations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleOperations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleIRJET Journal
 
KRISHNA_PROOOOO-2.docx
KRISHNA_PROOOOO-2.docxKRISHNA_PROOOOO-2.docx
KRISHNA_PROOOOO-2.docxswapnonilmondal
 
E-markiting.pptx
E-markiting.pptxE-markiting.pptx
E-markiting.pptxMSameerAsadi1
 
TenderSearch - Services
TenderSearch - ServicesTenderSearch - Services
TenderSearch - ServicesPatrick Harris
 
"SATchain" - A Blockchain based solution for invoicing in Mexico
"SATchain" - A Blockchain based solution for invoicing in Mexico "SATchain" - A Blockchain based solution for invoicing in Mexico
"SATchain" - A Blockchain based solution for invoicing in Mexico Mayank Mudgal
 
Procurement of enterprise resource planning systems v6 final
Procurement of enterprise resource planning systems v6   finalProcurement of enterprise resource planning systems v6   final
Procurement of enterprise resource planning systems v6 finalAhmad Azwadi Ameruddin CA(M)
 
Supply Chain Optimization of Hyperlocal Delivery Startups
Supply Chain Optimization of Hyperlocal Delivery StartupsSupply Chain Optimization of Hyperlocal Delivery Startups
Supply Chain Optimization of Hyperlocal Delivery StartupsIRJET Journal
 
The Ultimate Guide to The Digital Procurement Management
The Ultimate Guide to The Digital Procurement ManagementThe Ultimate Guide to The Digital Procurement Management
The Ultimate Guide to The Digital Procurement ManagementDanitKellmer1
 

Similar to Report on e procurement (20)

Electronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) BangladeshElectronic Government Procurement (e-gp) Bangladesh
Electronic Government Procurement (e-gp) Bangladesh
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement application
 
CSCM The impact of e procurement application
CSCM The impact of e procurement applicationCSCM The impact of e procurement application
CSCM The impact of e procurement application
 
1684040012460_Government E-Procurement Electronic Tendering System in the Hon...
1684040012460_Government E-Procurement Electronic Tendering System in the Hon...1684040012460_Government E-Procurement Electronic Tendering System in the Hon...
1684040012460_Government E-Procurement Electronic Tendering System in the Hon...
 
MAB07.docx
MAB07.docxMAB07.docx
MAB07.docx
 
The Contract And Procurement Management Process
The Contract And Procurement Management ProcessThe Contract And Procurement Management Process
The Contract And Procurement Management Process
 
Muehle ochieng 6ippc_p2p_presentation
Muehle ochieng 6ippc_p2p_presentationMuehle ochieng 6ippc_p2p_presentation
Muehle ochieng 6ippc_p2p_presentation
 
IT_in_delhi_govt
IT_in_delhi_govtIT_in_delhi_govt
IT_in_delhi_govt
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahida
 
Ict enabled municipal initiative
Ict enabled municipal initiativeIct enabled municipal initiative
Ict enabled municipal initiative
 
Eprocurement
EprocurementEprocurement
Eprocurement
 
E-Goverment Procurement Presentation - MoFPS
E-Goverment Procurement Presentation - MoFPSE-Goverment Procurement Presentation - MoFPS
E-Goverment Procurement Presentation - MoFPS
 
Operations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleOperations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) Cycle
 
KRISHNA_PROOOOO-2.docx
KRISHNA_PROOOOO-2.docxKRISHNA_PROOOOO-2.docx
KRISHNA_PROOOOO-2.docx
 
E-markiting.pptx
E-markiting.pptxE-markiting.pptx
E-markiting.pptx
 
TenderSearch - Services
TenderSearch - ServicesTenderSearch - Services
TenderSearch - Services
 
"SATchain" - A Blockchain based solution for invoicing in Mexico
"SATchain" - A Blockchain based solution for invoicing in Mexico "SATchain" - A Blockchain based solution for invoicing in Mexico
"SATchain" - A Blockchain based solution for invoicing in Mexico
 
Procurement of enterprise resource planning systems v6 final
Procurement of enterprise resource planning systems v6   finalProcurement of enterprise resource planning systems v6   final
Procurement of enterprise resource planning systems v6 final
 
Supply Chain Optimization of Hyperlocal Delivery Startups
Supply Chain Optimization of Hyperlocal Delivery StartupsSupply Chain Optimization of Hyperlocal Delivery Startups
Supply Chain Optimization of Hyperlocal Delivery Startups
 
The Ultimate Guide to The Digital Procurement Management
The Ultimate Guide to The Digital Procurement ManagementThe Ultimate Guide to The Digital Procurement Management
The Ultimate Guide to The Digital Procurement Management
 

Recently uploaded

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Recently uploaded (20)

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 

Report on e procurement

  • 1. Government of Chhattisgarh eProcurement Project by CHiPS
  • 2. Government of Chhattisgarh eProcurement in Chhattisgarh - A Report Prepared by Chhattisgarh i nfotech & biotech Promotion Society 2
  • 3. CONTENTS 1. Introduction 2. Vision 3. Objectives 4. Functional Features 5. Technical Architecture 6. Deployment Features 7. Security Infrastructure 8. Operational Features 9. Implementation Methodology 10.Business Model 11.Institutional Structure 12.Service Level Metrics 13.Current Status of Project 3
  • 4. 1. Introduction The Government of Chhattisgarh’s annual public procurement expenditure is about Rs. 4000 Crores. The volume of expenditure is expected to increase in the forthcoming years since the state is undergoing a rapid development. Acknowledging the importance of public procurement, the Government has undertaken efforts to reform procurement practices in the last three years. The notable of the efforts are reform of public works manual and issuance of a Government Order (G.O.) by the Chief Secretary – 196/CS/2004 – directing departments to implement e-Tendering. Through e-Tendering the Government expects to increase transparency and efficiency in public procurement. The Public Works Department (PWD) was the first department to implement e-Tendering system. At this juncture, the Government has taken efforts to consolidate the existing e- Tendering solutions and implement an end-to-end e-Procurement solution across all agencies in the State. The Government has selected M/s Wipro Ltd. (in consortium with M/s NexTenders India Pvt. Ltd.) as the Implementation Partner to implement e- Procurement on Public Private Partnership (PPP) model and deploy the solution on Build-Own-Operate (BOO) basis for a period of 5 years. 2. Vision The Vision of the e-Procurement Project is to enhance the efficiency and transparency in public procurement through the implementation of a comprehensive e- Procurement solution to be used by all Government organizations in the State, including the Public Sector Undertakings (PSUs). 3. Objectives GoC aims to achieve the following objectives with the implementation of e-Procurement: i. Transparency: Introduce the maximum extent of transparency in the public procurement by making the required information available on the Internet. ii. Cost Savings through higher competition: A result of wider publicity to Government procurement opportunities 4
  • 5. iii. Cost Savings through demand aggregation: The ability to aggregate Government departments’ demand to leverage buying power with the supply market. iv. Reduced inventory costs: Improved planning and management of inventory leading to lower levels of inventory v. Internal arbitrage: Ensuring consistency in goods and services costs at the best price across all Departments at item level. vi. Consistent and sustainable contractor development: Enabling pre-qualified vendors the opportunity to access of other government departments. vii. Transactional effectiveness: Eliminating or automating non-value adding steps within the procurement to enable efficient and effective processes. viii. Reduced Total cost of ownership: Understanding the supply chain and life cycle costs in procurement to establish value adding supply relationships leading to reduced cost of doing business for both government and industry ix. Effective tender processing: Use of different types of e-Auctions to get better prices for GoC. x. Open platform: Level playing field and “fair” competitive platform for the suppliers. xi. Disposals: Accessing a wider customer base when disposing of redundant assets xii. Smart governance: Increased transparency, monitoring and control of procurement process 4. Functional Features The development of e-Procurement in the State of Chhattisgarh has been categorised into various functional modules which would automate the complete procurement cycle from crade-to-grave. The following are the functional modules as implemented in the State of Chhattisgarh. i. Centralized Registration of Suppliers/ Contractors ii. Indent management iii. e-Tendering iv. e-Auction 5
  • 6. v. Contract management vi. Catalogue management vii. e-Payments viii. Accounting ix. Management Information Systems (MIS) Centralised Supplier Registration The Centralised Supplier Registation module provides a single window wherein all suppliers / contractors can submit their applications online for registration in various departments. The request for registration is made online through the eProcurement portal and the same gets subsequently routed to the concerned officials of the various departments. The workflow of the Centralised Supplier Registration Module is as follows. Step-1: Suppliers / Contractors apply online for registration through the eProcurement Portal. Step-2: The Application is routed online to the concerned official of the department(s). Step-3: The Supplier / Contractor is verified on various registration criteria either online or physically Step-4: The concerned official approves the registration of the Supplier / Contractor online using Digital Signature The Centralised Supplier Registration Module also provide a view of the Bid Capacity of each Contractor / Supplier to facilitate departments in estimating the strength of the Contractor / Supplier. Indent Management The Indent Management Module involves in framing purchase / work proposal, review of proposal, internal approvals, technical approvals, administrative approvals, preparation of tender document and preparation of Notice Inviting Tender. The Module 6
  • 7. automates the workflow of the department wherein the approvals are given using Digital Signature Certificates. e-Tendering The e-Tendering Module involves in advertisement of tender, downloading of tender documents, online submission of bids, online bid evaluation and award of contract. The bids are submitted by bidders using their Digital Signature Certificate and the bids are opened using the Digital Signature Certificates of the Bid Evaluation Committee. The system generates an automated bid evaluation chart which serves as a basis to finalise the award of contract. e-Auction The auction module is a facility that allows suppliers to dynamically out-bid their competitors within a time-frame specified by a buying agency. The auction module has facilities for both buying (reverse auction) and selling (forward auction) of goods, works and services. In reverse auction, suppliers quote a price lower than their competitors to undertake a task, implying in a two-dimensional graph, the arc representing price goes on the reverse as quoted price gets lower. Forward auction is used to sell off excess items held by government. The suppliers keen on purchasing the items quote higher than their competitors, which results in the price curve moving in upwards/forward direction. Both the auction types allow suppliers to participate in the bidding activity as anonymous actors. Contract Management The Contract Management Module involves in the processes between issuance of work order and completion of the work which are electronically handled. The Contract Management module enables the Government to maintain an overview of the works in progress. Once a part of a work is completed, then payment to the supplier is quickly 7
  • 8. arranged as bills associated with the work are processed in an automated system. Once the bills are approved, arrangements can be made to have the payment transferred automatically from government’s bank account to that of the suppliers’ account. When in place for a period of time, the system collects a repository of knowledge that can be used to measure the performance of a contractor. Catalogue Management In the catalogue management module, the information about rate contracts negotiated by the government is hosted in an online environment enabling the departments to use the negotiated rate contracts and directly place orders for goods and services with the supplier community. The module automatically checks for authorization, handles accounting formalities, generates usage reports and forwards delivery information. Since access to rate contract information is made easier with the module, the utilization of rate contracts by the end users will increase. The MIS reports generated by the module help purchasing officers in estimating the demand for a product or a service. e-Payment The e-Payments module facilitates online transfer of funds – both inflows and outflows – happening during the course of public procurement activity. The online transfer facility has been featured in multiple ways such as through Credit Cards, Purchasing Cards and Internet Banking applications. In the public procurement context, the e-payment module involves during sale of tender documents, online transfer of EMD and payment to suppliers/contractors for purchase of goods and completion of works. The implementation partner integrates the e-Procurement application with the Banks as decided by the Government. 8
  • 9. Accounting The accounting module calculates payments made to contractors for completion of works and for purchase of goods. For works procurement, the system automatically calculates the payment due to a contractor based on information available in the measurement book and rates quoted by the contractor for undertaking the Work. For goods procurement, the system maintains data on the extent to which negotiated rate contracts have been used. The system also generates reports on the time taken to process tenders, number of bids received in response to a tender, time taken to complete a work and purchase goods. In summary, the system intelligently accounts key aspects of the public procurement activity. Management Information System (MIS) The MIS module is a critical component, which collects, records, stores and processes data collected from all the departments in an integrated manner. The module is tightly integrated with the rest of the modules and provides functional support, decision support and performance monitoring. 5. Technical Architecture The core eProcurement solution of GoC comprises of the modules such as Tender management, auction management etc addressing the functional requirements along with the Registration and Authentication module, which facilitates user registration, authentication and personalization services. The system topology for eProcurement solution implemented in the State of Chhattisgarh is illustrated in Figure 1. This architecture enables both suppliers and buyers (department users) to use the same platform for submission of purchase requisitions, processing of purchase orders, creation of tender notifications, submission of tender responses, evaluation of tender responses and award of contract etc. The solution components depicted in the diagram below are deployed on separate servers. However, the solution offered by the vendors does not 9
  • 10. compromise the performance or security of the overall solution through such aggregation of the solution components on to a single server. The onus of the security and performance of the solution completely rests with the implementation partner with critical administrator rights being controlled by the Government. Figure 1: e-Procurement System Topology Application Serverfarm Tender Auctions Catalogue Intrusion Detection Web server farm System management management management system system system Netwok Attached Storage DMZ Secured Network Internet FW 1 FW 2 LDAP/ User DB Database Serverfarm 6. Deployment Features e-Procurement solution is deployed on n-tiered architecture with web, application and database server farms. Each tier is scaled independently, both vertically and horizontally, to address the performance and scalability requirements. Figure 2 illustrates the infrastructure components of the eProcurement solution implemented in the State of Chhattisgarh. 10
  • 11. Fig 2: Deployment Features of eProcurement Solution Client Tier Web Server Tier Application Server Tier Database Server Tier - HTTP, HTTPS, - Servelt/ASP for round - Load balancing robin load balancing - LAN - LAN, WAN - HTTP over LAN - JDBC/ODBC - Buyer Management - Supplier Management - Tender Management - Auctions Management - Catalogue Management Client Tier The client tier runs on a browser and uses html for presentation. The client communicates with the web server tier using http. Web Server Tier The web server manages static images and pages and passes client requests from the browsers to the application server tier using http. Application Server Tier The application servers (buyer management, supplier management etc) are multi-threaded applications with two main areas of logical functionality: a. Handling client requests and generating html as a response, and b. Managing and supplying object data, including database interaction. Database Tier The eProcurement solution uses standard relational database platform for object persistence and all business object data is stored in a database. 11
  • 12. 7. Security Infrastructure Public Key Infrastructure e-Procurement solution has become an interface between suppliers / contractors and department through the open internet channel, which is susceptible to hacking and other unauthorized activities. To enable secured and reliable communication, the eProcurement system implemented in the State of Chhattisgarh has deployed the use of Digital Signature Certificates for user identification, authorization and encryption functionality. The Public Key Infrastructure (PKI) using digital certificates establishes a reliable and secured e-transaction platform between buyers and suppliers. While all the pre-tendering and post tendering activities internal to the department are approved using the Digital Signature Certificates of the concerned officials, the e-tendering activity is operated through the private key and public key of the bidders and the government officials. The bidders use their public key for data encryption while submitting the hash of the bid. The authorised government officials use their public key to generate the super hash of the bids followed by the bidder authorising the government officials in using the public key of the bidders to decrypt the bids. At every stage, the hashes and the super hashes are matched in order to maintain the integrity and transparency. The bids are subsequently opened using the Digital Signature Certificates of the committee members. The submitted tenders cannot be seen or read by any person as they would be encrypted form and can only be decrypted using the private keys of the bidders, which are in strict possession of the bidders. Firewall The Firewall Solution for eProcurement solution provides robust security features to secure the solution Infrastructure from unauthorized access and use. Following outlines the broad specifications of the firewall solution deployed for the eProcurement solution. 12
  • 13. No. Feature Requirement Concurrent Supports at least 1000 concurrent connections with at least 1.5 1 Connections Gbps throughput Gigabit The firewall solution supports the gigabit Ethernet ports 2 Ethernet ports Supports destination URL policy management Denial-of-service (DoS) detection and prevention Dynamic port mapping; Java applet blocking VPN QoS support; real-time alerts Supports the basic network protocols services such as VLAN’s, DHCP, BOOTP, OSPF, RIP, TFTP, etc. Audit trails Other Policy-based multi-interface support 3 Features Network Address Translation (NAT); bidirectional NAT; dual NAT Time-based access lists Authentication, authorization, and accounting (AAA) Dynamic, per-user authentication and authorization Supports ‘stateful inspection fire-walling’ as well as ‘application and protocol inspection’ Provides VPN services including site to site VPN connectivity Network Intrusion Detection System No. Feature Requirement Facilitates to detect, report, and terminate any unauthorized activity in the eProcurement solution network. Minimum inspection rate of 500 Mbps; Transparent to legitimate traffic/network usage Responds to unauthorized activity to block offenders from 1 Features accessing the network or terminate offending sessions Maintains a comprehensive attack signature list to detect content-based and context-based attacks Supports Alarms to include attacker and destination IP addresses, destination port, and attack description - CGI Scripts - Web Server Attacks, Web Browser Attacks - IP Spoofing Secured - SMURF, TCP Sequence Number prediction 2 Environment - Buffer over flows - DNS Attacks, PING Sweeps, TCP Scans, UDP Scans, OS Identification, Account Scans, DOS Attacks etc 13
  • 14. 8. Operational Features In order to kick-start the implementation of e-Procurement project in the State of Chhattisgarh and subsequently sustain it, the Government has made the implementation partner mandatory to provide training to government users & vendor community, provide help desk operating for 12 hours every day and deploy 200 desktops at locations decided by the departments. Training Since the e-Procurement system brings about a new way of working for departmental end users and the supplier community, a high priority has been given to training component. Training facilitates two-way interactions between the user community and the implementation partner, based on which the implementation partner can customize the system to better suit the requirements of the government. The training programme comprises of 1 day workshop at district level to provide awareness to government officials and vendor community followed by detailed and in-depth training on various modules. The departments would identify the concerned officials on module level and accordingly ensure that the officials are trained. The training manual, prepared in Hindi and English, is being given to the participants in order to provide ready reference. Helpdesk Services In order to facilitate the smooth functioning of the e-Procurement system, a well- functioning help desk service has been set up by the implementation partner. The help desk is accessible on a 12 x 7 basis ( 9 AM to 9 PM ) and those help desk operators are capable of communicating fluently in Hindi and English. The help desk operators are well-acquainted with the e-Procurement system both function-wise and technical-wise in order to resolve the queries in an expeditious manner. 14
  • 15. Deployment and Maintenance of Desktops To ensure the successful uptake of e-Procurement, the implementation partner is deploying 200 desktop computers as part of the Agreement. The desktops are being deployed as per the requirement of the departments and is maintained by the partner for the full contract period. 9. Implementation Methodology The implementation of e-Procurement is done in two phases: pilot and roll-out. The pilot phase lasted for a six-month period, during which time, the implementation partner is asked to deploy all the required modules on a test basis. The State of Chhattisgarh had identified five departments viz., Public Works Department, Water Resources Department, Public Health & Engineering Department, Health Department and Chhattisgarh State Industrial Development Corporation where the e-Procurement solution was implemented on pilot basis. Initially, all tenders worth Rs. 50 lakh and above was to be processed through the e-procurement system. Subsequently, the slab has been reduced to include all tenders worth Rs.10 lakh and above. As on date, 24 departments have successfully adopted the eProcurement system The performance of the implementation partner is evaluated at the end of the pilot phase. If the system performs to the expectations, then the Government permits the implementation partner to roll-out the system across departments in the State. During the roll-out phase, the implementation partner deploys all the modules across departments in the State as per the Service Level Agreement (SLA). The roll-out phase will last for five years in addition to the six months allocated for the pilot phase. At the end of the five years, the Government will review the situation and decide on the out-right purchase of the system – (i.e.) perpetual license for the e-Procurement application and systems software and transfer of hardware assets on which the application is deployed - as against a renewal of the partnership and exiting the partnership. 15
  • 16. 10. Business Model The Government of Chhattisgarh (GoC) is implementing the e-Procurement solution on a Private-Public-Partnership (PPP) mode wherein the private partner is required to provide e-Procurement as a service and engage on a Build-Own-Operate (BOO) basis with Transfer – BOO (T) – as an option. The private partner customizes, deploys and maintains the e-Procurement infrastructure setup during the course of implementation. The partnership is for a five-year period in addition to the six months allocated for the pilot phase provided the Service Level Metrics as mentioned in the Agreement are adhered to. The private partner is remunerated for the services rendered on a “transaction fee” model. The transaction fees paid to the Vendor is calculated at the module level. Some of the nine modules have been clubbed together and termed as a unit for transaction fee calculation purposes. A payment mechanism is not specifically devised for modules on e- Payments, Accounting and MIS, since they are an integral part of the rest of the modules. The clubbing of the modules has resulted in six units, for each of which a method is prescribed for calculating the transaction fee. An example of the method is “fixed fee per bid received”. In the fixed fee model, a sum of money – say Rs. 500 – is paid for each bid submitted in response to a tender. Other examples of the methods used for transaction fee calculation are “Percentage of Estimated Contract Value (ECV) of a tender” and “Percentage of order value”. Looking at the business model holistically, a combination of methods (hybrid business model) has been adopted to calculate the pay-outs made to the private partner for provision of the different services of e- Procurement system. Since e-Procurement is a commercial activity, the transaction fee shall be paid by the supplier/contractor organizations responding to the government procurement requirements. In a few instances, the Government has defined a cap or ceiling on the fee the private partner can charge for provision of the services of a module. Such a cap/ ceiling has been defined as a measure to protect the interests of the suppliers/ contractors and to ensure that unduly high rates charged for such services would not adversely affect the growth of the 16
  • 17. usage of the e-Procurement system. The Government has imposed such a cap as a de-risking measure to ensure that the uptake of certain e-Procurement modules is not adversely affected due to high rates the Vendors may quote. For the purpose of calculation of transaction fee, government procurement is conceptually divided into two types: i. Procurements with Estimated Contract Value (ECV) - designed for Works ii. Procurements without ECV - designed for Goods The e-Procurement system comprises of the following five units, for each of which a method for calculation of Service Charge is defined: i. Indent management, e-Tendering and e-Auction modules for ECV procurement ii. Contract management module iii. Indent management, e-Tendering and e-Auction modules for non-ECV procurement iv. Catalogue-based purchase management module v. Centralized supplier registration module Indent Management, e-Tendering and e-Auctions modules for ECV procurement Contract Value (Rs.) Fixed Transactional fee per bid (Rs.) Upto 10 lakhs 120 10 – 50 lakhs 360 50 – 100 lakhs 1040 1 – 10 cr. 1440 More than 10 cr. 4000 17
  • 18. Contract Management module Percentage of Contract Value: 0.02 % Contract Value (Rs.) Cap Value (Rs.) Upto 10 lakhs --- 10 – 50 lakhs 360 50 – 100 lakhs 1040 1 – 10 cr. 1440 More than 10 cr. 4000 Indent management, e-Tendering and e-Auction modules for non-ECV procurement Fixed Transactional Fee per bid (all slabs): Rs. 240 Catalogue Management Module Percentage of Contract Value: 0.25 % Minimum Transactional Fee per Order: Rs. 50 Order Value (Rs.) Cap Value (Rs.) 5,000 – 25,000 50 25,000 – 50,000 75 50,000 – 1lakh 90 1 – 10 lakhs 700 More than 10 lakhs 15,000 Centralized Supplier Registration module One-time Registration Fee per Supplier: Rs. 500 Yearly Maintenance Fee per Supplier: Rs. 100 11. Institutional Structure The State of Chhattisgarh has institutionalised the implementation of e- Procurement by constituting Empowered Committee and Task Force, nominating the Secretary, PWD as the State Nodal Officer and engaging Chhattisgarh infotech & biotech Promotion Society (CHiPS) as the nodal agency to assist the State in successfully implementing the e-Procurement project. Each department has been directed to appoint 18
  • 19. their nodal officers who would be involved during the implementation of the project and would also serve as a one point contact to CHiPS and the implementation partner in providing the necessary information. The Institutional Structure set up by the State of Chhattisgarh for the implementation of e-Procurement project is illustrated in Figure 3 below. Figure 3: Institutional Structure •Chief Secretary, Chairman • Secretary, IT • Secretary, WRD Empowered •Secretary, PWD Committee •Secretary, Health PHED •Secretary, Finance •Secretary, Public Relations •Secretary, Energy •Secretary, P&RD CHiPS •Secretary, School Education •MD,CSIDC •CEO, CHiPS Member Secretary State TASK Nodal Officer FORCE Nodal Officer Role of GovernmentNodal Officer Nodal Officer Nodal Officer Nodal Officer The PWD and responsibilities of the Government in implementing the project are as roles WRD CSIDC Health follows: i. Constituted an eProcurement Cell which governs the implementation effort. The e-Procurement Cell is a part of CHiPS, which is the State Nodal Agency for the implemenation of e-Procurement. ii. Evaluate the bids received in response to this RFP and select the implementation partner 19
  • 20. iii. Finalization of the Agreement and the SLA with the implementation partner iv. Provide office space for placing the hardware where the application is hosted and data is stored v. Develop IT and networking infrastructure at the departmental level as required vi. Prepare the list of personnel (government users and contractors) who shall be trained and issue communication to the trainees regarding the time and venue where the training activity is held vii. Provide office space required for conducting training programs viii. Framing of suitable procedures to ensure that the payment that is due for the services rendered is paid on-time in terms of the SLA/Agreement conditions ix. Act pro-actively to reform procurement processes x. Acquiring total ownership of the data generated through eProcurement system xi. Tie-up with one or more Banking or Financial institutions to facilitate e-Payment. xii. Create a mechanism for resolution of disputes that may arise between the Implementation Partner and the Government xiii. Implement policy reforms and amendments as required for implementation of the project. Role of CHiPS The roles and responsibilities of CHiPS in implementing the project are as follows: i. Co-ordinate with the departments and agencies implementing the project to ensure their participation in the e-Procurement initiative. ii. Facilitate setting-up of a project management team which would meet once every two weeks to take stock of the progress of the project, resolve issues and suggest relevant policies and guidelines with respect to change in existing procurement process, template of the tender document, etc 20
  • 21. iii. Finalization of project implementation plan along with the timelines and deliverables in consultation with the implementation partner iv. Monitor the performance of implementation partner using SLA criteria specified in the RFP v. Select a reputed Third Party Testing Agency to test the e-Procurement solution on various pilot and rollout service level metrics. vi. Select a reputed Third Party as the agency for conducting security audit of the e- Procurement system vii. Issuance of Digital Signature Certificates to Government officials. Role of Implementation Partner Since the e-Procurement initiative is implemented on a Private-Public-Partnership (PPP) basis, the implementation partner is expected to enthusiastically partake in the implementation effort. The roles and responsibilities of the implementation partner are as follows. Project Planning i. Appoint a full-time project manager to overlook the implementation of the e- procurement solution and the subsequent operations. ii. Install a project implementation team of programmers and system analysts to aid in the process iii. Prepare a detailed project plan based on the approved rollout plan of departments and functionality to be implemented. The plan should indicate: a. Availability of resources b. Sequence of activities, timelines and dependencies iv. Ensure coordination with the nodal agency in terms of reporting, decisions to be taken, and other Government formalities to be completed. v. Identify and highlight risks and issues in a timely manner. Communicate the same to the Project Management Team and the Task Force vi. Assess and plan for training requirements 21
  • 22. Solution Design i. Meet the functional and technical specifications as mentioned in the RFP ii. Ensure complete understanding of the same by the Development and Implementation teams iii. Design electronic forms as applicable to Government work iv. Suggest to the State any improvements in the process required for better service delivery v. Install a mechanism for the continuous improvement of the e-procurement functionality in view of the international best practices. Solution Development i. Build and manage catalogues ii. Configure and customize the e-Procurement application to fit the requirements iii. Make the system inter-operable with the banking/financial institutions with which Government has tied-up for e-Payment iv. Conduct requirements analysis and prepare To-Be scenarios v. Provide Government with the latest updates on the application vi. Appoint a full-time Quality Assurance (QA) manager to overlook the development/customization effort. Project Implementation i. Install, test and manage a secure and scalable e-Procurement application adopting open and inter-operable standards ii. Develop and maintain IT and networking infrastructure required for the provision of training iii. Provide timely training to the government officials and the vendor community with supporting literature / documentation. 22
  • 23. iv. Partner with Government in effecting overall co-ordination with all the participating departments/agencies to achieve successful launch within the prescribed time v. Install, test and manage the hardware required for hosting the application vi. Set-up the Disaster Recovery Center (DRC) operations O&M i. Adhere to the SLAs stated in the RFP ii. Provide helpdesk services iii. Periodically (as agreed upon with the State) furnish data about the functioning of the system, especially in relation to the security aspects iv. Conduct periodic meetings with the State Project Implementation Team to discuss progress and any issues encountered during the operations. v. Set-up the digital signature / PKI related process and issuance of Digital Certificates in conformance with guidelines as in IT Act 2000, either directly or in collaboration with partners; and also establish the issuance process in such a manner as to enable government employees and contractors to procure such digital certificates from any vendor confirming to the stipulations vi. Design Security Policy and Operational Documents 12. Service Level Metrics Pilot Project SLA's Service Metrics Parameters Basis of Measurement Remarks Equivalent of capacity to Capacity of the Application Simulating the stated handle 5000 transactions per and Database Server loads and testing the hour Concurrent connects to system performance 1000 using load-testing Application Server tools Concurrent number of users 2000 connected to the system 23
  • 24. Deployment SLA's Low Parameter Target Deductions Deductions Breach Deduction Performance Deployment Rs. 30000 > 10 Rs. 50000 of e- 8 weeks None 8-10 weeks each week weeks each week Tendering Deployment 10 Rs. 15000 >12 Rs. 30000 of Contract None 10-12 weeks weeks each week weeks each week Mgmt Deployment Rs. 10000 > 10 Rs. 15000 of Indent 8 weeks None 8-10 weeks each week weeks each week Mgmt Deployment 10 Rs. 15000 >12 Rs. 30000 of Catalogue None 10-12 weeks weeks each week weeks each week Mgmt. Operational SLA's Low Parameter Target Credits Credits Breach Credits Performance Availability of agreed services 99.00% 11 99.0-97% 6 <97.0% -5 over Internet Average e- Procurement Portal < 7sec 6 8-15 Sec 3 >15 sec -2 page loading Resolution of >7 Critical faults in <5 working 5-7 working 7 4 working -2 the e-Procurement hours hours hours system 24
  • 25. Resolution of non- critical faults in the >72 <48 hours 4 48-72 hours 2 -1 e-Procurement hours system Growth rate of 10% over 6% over registration of Below previous 2 previous 1 0 suppliers measured 6% quarter quarter quarterly Growth rate of 10% over 6% over transactions Below previous 2 previous 1 0 measured quarterly 6% quarter quarter Below >70% 60-70% 60% Training 8 4 0 satisfaction satisfaction satisfacti on TOTAL 40 21 -10 13. Current Status of the Project The e-Procurement project has been formally inaugurated by the Hon'ble Chief Minister of Chhattisgarh on 14th August 2007 with the Water Resources Department successfully processing a tender. 20 departments have successfully adopted the eProcurement system which is evident from the fact that 13578 tenders worth Rs.31821.37 crores have been processed and 4275 vendors have been registered till date from 2007. Details are: Department Tenders processed Total value (in Crore) PWD 6375 17927.93 WRD 2290 7281.95 PHED 444 529.96 Health 148 1850.85 CSIDC 267 RC** P&RD 1530 2386.78 Urban Dev. 2134 1536.03 Animal Hus & Diary 16 45.55 Social Welfare 2 2.91 CG RES 285 141.55 CG Minor Forest 2 24.1 CG Civil Supplies 1 RC** CG Handicraft 1 1.88 CG Warehouse 72 78.03 CG Power Gen. 2 NA Food and Drug 2 6 25
  • 26. Mandi Board 7 7.86 Total 13578 31821.37 This has been possible due to constant follow-up and periodic reviews. Software testing has been done through STQC. System has been integrated with NSDL payment gateway. The State is saving around 10 – 15 % on its procurement expenditure by implementing eProcurement apart from having a transparent and effective system of working. The project has bagged CSI Nihilent Best eGovernance Project Award 2008 and Information Week EDGE Award 2011 26