SlideShare a Scribd company logo
1 of 11
Importance of a BIM Model in
Quality Management of a
Construction Project
Haitham Sarsam
Email: hsarsam@obriencc.com
Number: 248.320.9006
https://www.linkedin.com/in/sarsam/
Haitham A. Sarsam
• MCEM,
• DBIA,
• LEED AP (BD+C)
• More than 20 years in the Construction Industry
• PASSSION FOR QUALITY IMPROVEMENT
• Director of Construction at O’Brien Construction
• Adjust Professor at Lawrence Technological University
PMI PMBOK®
PMI PMBOK Definition of Quality:
Quality control in construction is the
process involves insuring compliance
with minimum standards of material
and workmanship in order to insure the
performance of the facility according to
the design.
PMI PMBOK®
Guide Knowledge Areas
Chapter 4 - Project Integration Management
Chapter 5 - Project Scope Management
Chapter 6 - Project Time Management
Chapter 7 - Project Cost Management
Chapter 8 - Project Quality Management
Chapter 9 - Project Resource Management
Chapter 10 - Project Communications Management
Chapter 11 - Project Risk Management
Chapter 12 - Project Procurement Management
Chapter 13 - Project Stakeholder Management
Chapter 14 - Project HSSE Management
Chapter 15 - Project Financial Management
PMI PMBOK®
• Process improvement
• Starts from Pre-Construction to Construction,
Closeouts and Warranty
• Risk Management Tool
• Collaboration & Integration
• Preventive & Proactive Measures
• Minimizing rework and construction defects
• Reduce project costs & schedule delays
• Adherence to plans and specifications
• Implementation of Lean practices
• Improve productivity and efficiency
• Precisely coordinated design which yields a more
realistic budget estimate, thus reducing changes
during construction
• Fewer customer warranty calls & achieve
Customer satisfaction
Quality can be defined as …
• Optimization
• Used during preconstruction and in the early stages
of construction substantially minimizes conflicts.
The ability to view 3D information via a program
assists in the identification of potential conflicts in
the field, better Constructability Reciews and
provides value to the entire team
• Improves collaboration among the team.
• Digital decision-making tool to quickly evaluate
different options
• The accuracy of estimates are improved by using
the models as visual feedback.
• Coordinate design ahead of the field construction
• More accurate drawings
• Fewer RFIs and Change Orders
• More clear scope
• More coordinated Site logistics
• Spatial coordination and clash detection
BIM
BIM
• Components built virtually
• Design documents are more complete and understandable
• Minimize information gaps and reduce errors
• Less rework, yielding a higher quality project in less time
• Additionally, digital model can be used as intelligent “as-built” drawings to manage the
facility over the life cycle of the project
Visualization Improves Quality Control
BIM
DIVIDER AQUA
PATTERN
10 July 2020Presentation Title
WHY BIM?
Conclusion
Preventing mistakes is much more
time and cost-effective
than correcting them!

More Related Content

What's hot

Digital Facilities (2017)
Digital Facilities (2017)Digital Facilities (2017)
Digital Facilities (2017)
enstoa
 
Sprint 0
Sprint 0Sprint 0
Sprint 0
enstoa
 

What's hot (20)

Tips for transitioning to BIM | BIM 3D Model
Tips for transitioning to BIM | BIM 3D Model Tips for transitioning to BIM | BIM 3D Model
Tips for transitioning to BIM | BIM 3D Model
 
BIM 4D Services
BIM 4D ServicesBIM 4D Services
BIM 4D Services
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Why project managers should be leading BIM, 6 March 2017
Why project managers should be leading BIM, 6 March 2017Why project managers should be leading BIM, 6 March 2017
Why project managers should be leading BIM, 6 March 2017
 
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
 
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfLearn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
 
RICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew SaundersRICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew Saunders
 
BIM Engineering US.,L.L.C. - BIM construction project management
BIM Engineering US.,L.L.C. - BIM construction project management BIM Engineering US.,L.L.C. - BIM construction project management
BIM Engineering US.,L.L.C. - BIM construction project management
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
 
Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...
 
BIM Data for Owners - Sam Nseir
BIM Data for Owners - Sam NseirBIM Data for Owners - Sam Nseir
BIM Data for Owners - Sam Nseir
 
BEXEL Manager - Designer BIM integrado
BEXEL Manager - Designer BIM integradoBEXEL Manager - Designer BIM integrado
BEXEL Manager - Designer BIM integrado
 
Digital Facilities (2017)
Digital Facilities (2017)Digital Facilities (2017)
Digital Facilities (2017)
 
Transforming your Construction Projects with 4D BIM
Transforming your Construction Projects with 4D BIMTransforming your Construction Projects with 4D BIM
Transforming your Construction Projects with 4D BIM
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling Services
 
Sprint 0
Sprint 0Sprint 0
Sprint 0
 
BIM Bringing A Real Change in Construction
BIM Bringing A Real Change in ConstructionBIM Bringing A Real Change in Construction
BIM Bringing A Real Change in Construction
 
Steel and Rebar detailing using Tekla Structure
Steel and Rebar detailing using Tekla StructureSteel and Rebar detailing using Tekla Structure
Steel and Rebar detailing using Tekla Structure
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEight
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 

Similar to PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam

AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
Ahmad Balawi
 

Similar to PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam (20)

Giving construction a new face with enhanced project quality and reduced rewo...
Giving construction a new face with enhanced project quality and reduced rewo...Giving construction a new face with enhanced project quality and reduced rewo...
Giving construction a new face with enhanced project quality and reduced rewo...
 
Make BIM work for you
Make BIM work for youMake BIM work for you
Make BIM work for you
 
BIM Implementation for Construction Projects and Developers
BIM Implementation for Construction Projects and DevelopersBIM Implementation for Construction Projects and Developers
BIM Implementation for Construction Projects and Developers
 
BIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptxBIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptx
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptx
 
5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
 
Spar2010murphy
Spar2010murphySpar2010murphy
Spar2010murphy
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Build Smarter with Scan to BIM Services Silicon Engineering Consultant NZ.pptx
Build Smarter with Scan to BIM Services  Silicon Engineering Consultant NZ.pptxBuild Smarter with Scan to BIM Services  Silicon Engineering Consultant NZ.pptx
Build Smarter with Scan to BIM Services Silicon Engineering Consultant NZ.pptx
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Services
 
atb-brochure.pdf
atb-brochure.pdfatb-brochure.pdf
atb-brochure.pdf
 
GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects
 
BIM Benefits Abu Dhabi
BIM Benefits Abu DhabiBIM Benefits Abu Dhabi
BIM Benefits Abu Dhabi
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
 
As Built to BIM Services | Offshore Outsourcing India.pptx
As Built to BIM Services | Offshore Outsourcing India.pptxAs Built to BIM Services | Offshore Outsourcing India.pptx
As Built to BIM Services | Offshore Outsourcing India.pptx
 
Bim
BimBim
Bim
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Recently uploaded (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 

PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam

  • 1. Importance of a BIM Model in Quality Management of a Construction Project Haitham Sarsam Email: hsarsam@obriencc.com Number: 248.320.9006 https://www.linkedin.com/in/sarsam/
  • 2. Haitham A. Sarsam • MCEM, • DBIA, • LEED AP (BD+C) • More than 20 years in the Construction Industry • PASSSION FOR QUALITY IMPROVEMENT • Director of Construction at O’Brien Construction • Adjust Professor at Lawrence Technological University
  • 3. PMI PMBOK® PMI PMBOK Definition of Quality: Quality control in construction is the process involves insuring compliance with minimum standards of material and workmanship in order to insure the performance of the facility according to the design.
  • 4. PMI PMBOK® Guide Knowledge Areas Chapter 4 - Project Integration Management Chapter 5 - Project Scope Management Chapter 6 - Project Time Management Chapter 7 - Project Cost Management Chapter 8 - Project Quality Management Chapter 9 - Project Resource Management Chapter 10 - Project Communications Management Chapter 11 - Project Risk Management Chapter 12 - Project Procurement Management Chapter 13 - Project Stakeholder Management Chapter 14 - Project HSSE Management Chapter 15 - Project Financial Management
  • 6. • Process improvement • Starts from Pre-Construction to Construction, Closeouts and Warranty • Risk Management Tool • Collaboration & Integration • Preventive & Proactive Measures • Minimizing rework and construction defects • Reduce project costs & schedule delays • Adherence to plans and specifications • Implementation of Lean practices • Improve productivity and efficiency • Precisely coordinated design which yields a more realistic budget estimate, thus reducing changes during construction • Fewer customer warranty calls & achieve Customer satisfaction Quality can be defined as …
  • 7. • Optimization • Used during preconstruction and in the early stages of construction substantially minimizes conflicts. The ability to view 3D information via a program assists in the identification of potential conflicts in the field, better Constructability Reciews and provides value to the entire team • Improves collaboration among the team. • Digital decision-making tool to quickly evaluate different options • The accuracy of estimates are improved by using the models as visual feedback. • Coordinate design ahead of the field construction • More accurate drawings • Fewer RFIs and Change Orders • More clear scope • More coordinated Site logistics • Spatial coordination and clash detection BIM
  • 8. BIM • Components built virtually • Design documents are more complete and understandable • Minimize information gaps and reduce errors • Less rework, yielding a higher quality project in less time • Additionally, digital model can be used as intelligent “as-built” drawings to manage the facility over the life cycle of the project Visualization Improves Quality Control
  • 9. BIM
  • 10. DIVIDER AQUA PATTERN 10 July 2020Presentation Title WHY BIM?
  • 11. Conclusion Preventing mistakes is much more time and cost-effective than correcting them!