Carbones del Guasare S.A. Paso Diablo Mine  Venezuela
 
Paso Diablo and the Guasare Basin Guasare Maracaibo MINA NORTE CACHIRÍ 120 Mt 240 Mt 169 Mt 246 Mt
Ownership and Operating Structure Joint Venturers CDG   Organización Carbozulia Carbones del Guasare,S.A.
<ul><li>Resource </li></ul><ul><li>Large resource base CDG and CBZ (+415 Mt) </li></ul><ul><li>High energy content (12800 ...
Coal Sales
200 m LITHOLOGY SEAM THICKNESS (m) Legend Middle Marcelina Sandy Clayee Mud Stone Sand Stone Coal Interburden thicknesses ...
Resource Base & Coal Quality
HIGH WALL 15 and 12 m Benches BACK FILL West East South
OPERATING PROCESS
OPERATION OVERVIEW PILA DE CARBON CORREA TRANSPORTADORA APILADOR CORREA TRANSPORTADORA CARGA DE BUQUE BULK WAYUU REMOLQUE ...
TOP SOIL REMUVAL
  4 DRILLS / 9 7/8” CDG HOLES LOADING
 
 
BLASTING PROCESS
3 P&H de 36 m3 de cap.  4 O&K de 26 m3 de cap. 7 Cat 789 de 180 t de cap. 25 Cat 793 de 240 t de cap. WASTE REMOVAL CDG
 
 
 
WASTE EXTRACTION
 
INTERBURDEN OPERATIONS CDG Minería
External Spoils 20m high 5m safety
Backfill  CDG Minería
Coal Mining CDG Minería
Coal  Haul CDG Minería
Crusher CDG Mining
 
CRUSHING AND COAL LOADING
TRUCKS LOADING CDG
TRUCKS WASHER CDG Minería
CDG
Santa Cruz de Mara Port CDG  Operaciones Portuarias
 
CDG Operaciones de Embarque Bulk w ay ύ - Operations
 
Ships Load CDG
ENVIROMENT PROTECTION AIR QUALITY WATER QUALITY SOLID WASTE Zulia Cuenca del Guasare  RECLAMATION
DUST CONTROL
CRUSHER DUST CONTROL
CDG  Enviroment
RECLAMATION
Paso Diablo - Reclamation
Paso Diablo - Relamation CDG
SOUTH SPOIL
QUESTIONS ???
Nächste SlideShare
Wird geladen in …5
×

Paso Diablo Mine Presentation

3.371 Aufrufe

Veröffentlicht am

Veröffentlicht in: Karriere
  • I hope the interest in la Guajira and Perija remains the most important factor, before destroying more the biodiversity of the area.
       Antworten 
    Sind Sie sicher, dass Sie …  Ja  Nein
    Ihre Nachricht erscheint hier
  • We hope that the expropriation process that is currently taking place in Venezuela on marine assets at Maracaibo Lake including the coal industry (see Coeclerici Business about transhipment on Maracaibo Lake) the president Chavez could make a thought
       Antworten 
    Sind Sie sicher, dass Sie …  Ja  Nein
    Ihre Nachricht erscheint hier
  • Gehören Sie zu den Ersten, denen das gefällt!

Paso Diablo Mine Presentation

  1. 1. Carbones del Guasare S.A. Paso Diablo Mine Venezuela
  2. 3. Paso Diablo and the Guasare Basin Guasare Maracaibo MINA NORTE CACHIRÍ 120 Mt 240 Mt 169 Mt 246 Mt
  3. 4. Ownership and Operating Structure Joint Venturers CDG Organización Carbozulia Carbones del Guasare,S.A.
  4. 5. <ul><li>Resource </li></ul><ul><li>Large resource base CDG and CBZ (+415 Mt) </li></ul><ul><li>High energy content (12800 btu/lb), Low sulphur (0.70%) </li></ul><ul><li>Favorable stripping ratio (Cubic Meters of waste per ton) </li></ul><ul><li>Market </li></ul><ul><li>PCI, Premium Thermal and Standard Thermal Products </li></ul><ul><li>Diversified customer base </li></ul><ul><li>Performance </li></ul><ul><li>Capacity increased to 7.1 Mtpa (potential to 8.0 Mtpa) </li></ul><ul><li>Expansion Opportunities </li></ul><ul><li>Paso Diablo South </li></ul>Key Attributes
  5. 6. Coal Sales
  6. 7. 200 m LITHOLOGY SEAM THICKNESS (m) Legend Middle Marcelina Sandy Clayee Mud Stone Sand Stone Coal Interburden thicknesses not to scale Paso Diablo Mine 9Q 8I 8K 8M 7M 7O 6K 6M 6O 6Q 5M 5N9 5O 4M 4O 1.50 1.20 1.90 0.75 2.20 3.75 0.75 3.15 3.22 0.90 2.10 0.45 2.60 8.45 3.65
  7. 8. Resource Base & Coal Quality
  8. 9. HIGH WALL 15 and 12 m Benches BACK FILL West East South
  9. 10. OPERATING PROCESS
  10. 11. OPERATION OVERVIEW PILA DE CARBON CORREA TRANSPORTADORA APILADOR CORREA TRANSPORTADORA CARGA DE BUQUE BULK WAYUU REMOLQUE DE GABARRA CORREA TRANSPORTADORA CARGA DE GABARRAS GABARRA (2300 T) OPERACIONES EN TERMINAL DE EMBARQUE GANDOLA 45 TON REMOCION DE VEGETACION ORIGINAL Y CAPA VEGETAL PERFORACION Y VOLADURA ESCOMBRERAS REVEGETACION REMANEJO AL TERMINAL DE STA. CRUZ (83 Km) CAPA DE CARBON PILA DE CARBON SISTEMA DE TRITURACION CORREA TRANSPORTADORA REMOCION DE ESTERIL OPERACIONES EN MINA
  11. 12. TOP SOIL REMUVAL
  12. 13. 4 DRILLS / 9 7/8” CDG HOLES LOADING
  13. 16. BLASTING PROCESS
  14. 17. 3 P&H de 36 m3 de cap. 4 O&K de 26 m3 de cap. 7 Cat 789 de 180 t de cap. 25 Cat 793 de 240 t de cap. WASTE REMOVAL CDG
  15. 21. WASTE EXTRACTION
  16. 23. INTERBURDEN OPERATIONS CDG Minería
  17. 24. External Spoils 20m high 5m safety
  18. 25. Backfill CDG Minería
  19. 26. Coal Mining CDG Minería
  20. 27. Coal Haul CDG Minería
  21. 28. Crusher CDG Mining
  22. 30. CRUSHING AND COAL LOADING
  23. 31. TRUCKS LOADING CDG
  24. 32. TRUCKS WASHER CDG Minería
  25. 33. CDG
  26. 34. Santa Cruz de Mara Port CDG Operaciones Portuarias
  27. 36. CDG Operaciones de Embarque Bulk w ay ύ - Operations
  28. 38. Ships Load CDG
  29. 39. ENVIROMENT PROTECTION AIR QUALITY WATER QUALITY SOLID WASTE Zulia Cuenca del Guasare RECLAMATION
  30. 40. DUST CONTROL
  31. 41. CRUSHER DUST CONTROL
  32. 42. CDG Enviroment
  33. 43. RECLAMATION
  34. 44. Paso Diablo - Reclamation
  35. 45. Paso Diablo - Relamation CDG
  36. 46. SOUTH SPOIL
  37. 47. QUESTIONS ???

×