Introduction:
When cement mixed with water to form a paste the chemical reaction starts which is known
as hydration, due to hydration the mixture starts changing from fluid state to a solid state this
is known as initial setting of cement and continuous reaction of cement with water will
increase the temperature of the paste because of heat of hydration, when the paste reached to
the maximum peak of temperature this is known as final setting of cement. So it is required
to find the minimum initial setting time necessary for mixing, transporting, placing and
compacting the concrete, and finding maximum final setting time necessary to asses the
reaction rate of cement with water.
The initial and final setting time are approximately related:
Final time (min.) = 90 + 1.2 [initial time (min.)]
Purpose:
To find the initial and final setting time of cement.
Materials:
1- Ordinary Portland cement.
2- Water.
Apparatus:
1- Vicat apparatus with the mould and its initial and final setting needles.
2- Weighing balance with capacity at least 2000 gram.
3- Trowel, Scoop, Container, Hand gloves, Glass Graduates.
Procedure:
1. Prepare the paste by adding the amount of water required for standard consistency of the
paste to 500 gm of cement.
2. Mixing for 4±1/4 minutes.
3. Form the cement paste into the approximate shape of ball with gloved hands. Then toss
six times through a free path of a bout 150 mm from one hand to another. Press the ball
resting on the palm of one hand into the mould, and then remove the excess.
4. Zeroing Vicat apparatus (the initial setting needle attaches the base of the mould and
gauge read zero).
5. Place the mould under the Vicat device.
6. Let the initial setting needle to attach surface of the paste.
7. Let the needle to fall under its own weight to penetrate the paste (this must not exceed 30
seconds after completion of mixing).
8. Read the gauge or the penetration depth taking the distance from the base plate to the tip
of the needle.
9. Repeat step 8 each 5-10 minutes time on different points of the paste.
10. When the reading on the gauge equal to 5 mm or higher, initial set has occurred and the
time taken from the moment of addition of water to cement up to this gauge reading.
11. Replace initial setting needle by final setting needle.
12. Repeat steps 6 and 7 for each 15 minutes times interval.
University of Salahaddin/ College of Engineering 2015-2016
Dept. Of Dams & Water resources Engineering By: Goran Adil
Construction Material 2
13. When the set of needle behind the tip of needle made an impression on the paste while the
circular cutting edge failed to do so this is by visual inspection, final set has occurred. The
time taken from the moment of addition of water to cement.
Specification:
Specification I.S.S. (5/1984) BS 12:1991 ASTM (C150)
Initial setting time ≥ 45 minutes ≥ 45 minutes ≥ 45 minutes
Final setting time ≤ 10 hours ≤ 10 hours ≤ 375 minutes
Precautions:
1- Needle must be cleaned each time before use.
2- After recording the penetration of the needle, the mould should be shifted (change its
position) so that penetration of needle may not take place at the same place.
3- The mixing has to be undertaken at a temperature of 20±2 o
C and minimum relative
humidity of 65%, and cement paste stored at 20±1 o
C and maximum relative humidity of
90%.
4- The initial and final setting time are approximately related:
Final time (min.) = 90 + 1.2 [initial time (min.)]
Discussion:
- Compare the test results with the standard specifications.
- What is the significance of this test?
- What is the effect of temperature and finesse of cement on the test results?
University of Salahaddin/ College of Engineering 2015-2016
Dept. Of Dams & Water resources Engineering By: Goran Adil
Construction Material 3
Data Sheet
Setting Time of Cement
Test No.: 3
Test name: Setting Time of Cement
Name of the student:
Group No.:
Date:
Group No.:
Time
minutes
Penetration depth for
initial setting
mm
Visual inspection for
final setting
Remarks
5
Results:

Weitere ähnliche Inhalte

Was ist angesagt?

2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement pptBhaswati Sharma
 
Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test ceky007
 
Tests on cement
Tests on cementTests on cement
Tests on cementDeviprasad
 
Construction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackConstruction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackNikhil Kumar
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio testAsok999
 
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.Sayed Sajid H.Zidani
 
Standard Penetration Test & Liquid Limit,Plasticity Limit
Standard Penetration Test & Liquid Limit,Plasticity LimitStandard Penetration Test & Liquid Limit,Plasticity Limit
Standard Penetration Test & Liquid Limit,Plasticity Limitgurjapsinghsomal
 
Aggregate impact and crushing test
Aggregate impact and crushing testAggregate impact and crushing test
Aggregate impact and crushing testsudeepmahapatro
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTAniket Pateriya
 
Proctor compaction test
Proctor compaction testProctor compaction test
Proctor compaction testFaizan Tanoli
 
Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...Sayed Sajid H.Zidani
 
proctor test and compaction
 proctor test and compaction proctor test and compaction
proctor test and compactionJyoti Khatiwada
 
Compaction tests
Compaction testsCompaction tests
Compaction testsAmi jasani
 

Was ist angesagt? (20)

2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement ppt
 
Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test
 
Tests on cement
Tests on cementTests on cement
Tests on cement
 
Construction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackConstruction of High Speed Highway and Test track
Construction of High Speed Highway and Test track
 
4 soundness of cement.
4 soundness of cement.4 soundness of cement.
4 soundness of cement.
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio test
 
1 specific gravity of cement
1 specific gravity of cement1 specific gravity of cement
1 specific gravity of cement
 
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
 
Mix design-ppt
Mix design-pptMix design-ppt
Mix design-ppt
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation
 
Standard Penetration Test & Liquid Limit,Plasticity Limit
Standard Penetration Test & Liquid Limit,Plasticity LimitStandard Penetration Test & Liquid Limit,Plasticity Limit
Standard Penetration Test & Liquid Limit,Plasticity Limit
 
Hydration of cement
Hydration of cementHydration of cement
Hydration of cement
 
Aggregate impact and crushing test
Aggregate impact and crushing testAggregate impact and crushing test
Aggregate impact and crushing test
 
Aggregate crushing strength test
Aggregate crushing strength testAggregate crushing strength test
Aggregate crushing strength test
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPT
 
Proctor compaction test
Proctor compaction testProctor compaction test
Proctor compaction test
 
Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...
 
proctor test and compaction
 proctor test and compaction proctor test and compaction
proctor test and compaction
 
Compaction tests
Compaction testsCompaction tests
Compaction tests
 

Andere mochten auch (18)

Cement
CementCement
Cement
 
2 standard consistency of cement
2 standard consistency of cement2 standard consistency of cement
2 standard consistency of cement
 
Cement
CementCement
Cement
 
Power point presentation
Power point presentationPower point presentation
Power point presentation
 
Cement
CementCement
Cement
 
Cement
CementCement
Cement
 
Topic 1
Topic 1Topic 1
Topic 1
 
Heat of Hydration in Mass Concrete
Heat of Hydration in Mass ConcreteHeat of Hydration in Mass Concrete
Heat of Hydration in Mass Concrete
 
Use of chemical and mineral admixture in concrete
Use of chemical and mineral admixture in concreteUse of chemical and mineral admixture in concrete
Use of chemical and mineral admixture in concrete
 
Hydration of cement
Hydration of cementHydration of cement
Hydration of cement
 
Cement
CementCement
Cement
 
Cement
CementCement
Cement
 
1. cement ppt
1. cement ppt1. cement ppt
1. cement ppt
 
Admixture of concrete
Admixture of concreteAdmixture of concrete
Admixture of concrete
 
Concrete Admixtures
 Concrete Admixtures Concrete Admixtures
Concrete Admixtures
 
Concrete Technology Unit I
Concrete Technology Unit IConcrete Technology Unit I
Concrete Technology Unit I
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
types of admixtures for concrete
types of admixtures for concretetypes of admixtures for concrete
types of admixtures for concrete
 

Ähnlich wie 3 setting time of cement

Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.Sayed Sajid H.Zidani
 
Setting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
Setting Time of Hydraulic Cement By Vicat Needle | Jameel AcademySetting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
Setting Time of Hydraulic Cement By Vicat Needle | Jameel AcademyJameel Academy
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Vijay Patidar
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01Engr. Umair Razzaq
 
cm lab report.docx
cm lab  report.docxcm lab  report.docx
cm lab report.docxyonasdawit4
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technologySunny Saha
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxLaxmiNarayanGurung
 
Quality control lab
Quality control labQuality control lab
Quality control labRaja Katoch
 
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyJameel Academy
 
Properties of Concrete (cement)
Properties of Concrete (cement)Properties of Concrete (cement)
Properties of Concrete (cement)Salman H. Sindhoo
 
Testing of concrete materials
Testing of concrete materials Testing of concrete materials
Testing of concrete materials Tushar Sonawane
 
PLAIN AND REINFORCED CONRETE (LAB MANUAL)
PLAIN AND REINFORCED CONRETE (LAB MANUAL)PLAIN AND REINFORCED CONRETE (LAB MANUAL)
PLAIN AND REINFORCED CONRETE (LAB MANUAL)Hamza Waheed
 
Ppt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalPpt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalAMIT PAYAL
 
IRJET- Comparative Study between Bitumen Roads and Plastic Bitumen Roads
IRJET- Comparative Study between Bitumen Roads and Plastic Bitumen RoadsIRJET- Comparative Study between Bitumen Roads and Plastic Bitumen Roads
IRJET- Comparative Study between Bitumen Roads and Plastic Bitumen RoadsIRJET Journal
 

Ähnlich wie 3 setting time of cement (20)

Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.Experiment no 03 setting time of cement.
Experiment no 03 setting time of cement.
 
Setting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
Setting Time of Hydraulic Cement By Vicat Needle | Jameel AcademySetting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
Setting Time of Hydraulic Cement By Vicat Needle | Jameel Academy
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
cm lab report.docx
cm lab  report.docxcm lab  report.docx
cm lab report.docx
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptx
 
Quality control lab
Quality control labQuality control lab
Quality control lab
 
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
 
6 tensile strength of cement
6 tensile strength of cement6 tensile strength of cement
6 tensile strength of cement
 
Properties of Concrete (cement)
Properties of Concrete (cement)Properties of Concrete (cement)
Properties of Concrete (cement)
 
Testing of concrete materials
Testing of concrete materials Testing of concrete materials
Testing of concrete materials
 
Cement tests
Cement testsCement tests
Cement tests
 
Cement Test.pdf
Cement Test.pdfCement Test.pdf
Cement Test.pdf
 
PLAIN AND REINFORCED CONRETE (LAB MANUAL)
PLAIN AND REINFORCED CONRETE (LAB MANUAL)PLAIN AND REINFORCED CONRETE (LAB MANUAL)
PLAIN AND REINFORCED CONRETE (LAB MANUAL)
 
Setting time test
Setting time testSetting time test
Setting time test
 
Ppt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalPpt on test certificate-Amit Payal
Ppt on test certificate-Amit Payal
 
Rcc lab manual
Rcc lab manualRcc lab manual
Rcc lab manual
 
IRJET- Comparative Study between Bitumen Roads and Plastic Bitumen Roads
IRJET- Comparative Study between Bitumen Roads and Plastic Bitumen RoadsIRJET- Comparative Study between Bitumen Roads and Plastic Bitumen Roads
IRJET- Comparative Study between Bitumen Roads and Plastic Bitumen Roads
 

Mehr von University of Salahaddin-Erbil (11)

2.5 measure of position
2.5 measure of position2.5 measure of position
2.5 measure of position
 
2.2 pict of data
2.2 pict of data2.2 pict of data
2.2 pict of data
 
2.1 frequency distribtuion
2.1  frequency distribtuion2.1  frequency distribtuion
2.1 frequency distribtuion
 
2.3 measure of central tendancies
2.3 measure of central tendancies2.3 measure of central tendancies
2.3 measure of central tendancies
 
3.2 probablity
3.2 probablity3.2 probablity
3.2 probablity
 
3.1 probability
3.1 probability3.1 probability
3.1 probability
 
Ch02 concrete ingredients
Ch02  concrete ingredientsCh02  concrete ingredients
Ch02 concrete ingredients
 
Ch01 fundamentals of concrete
Ch01  fundamentals of concreteCh01  fundamentals of concrete
Ch01 fundamentals of concrete
 
8 bulk densty of aggr.
8 bulk densty of aggr.8 bulk densty of aggr.
8 bulk densty of aggr.
 
7 specific gravity of aggr.
7 specific gravity of aggr.7 specific gravity of aggr.
7 specific gravity of aggr.
 
5 compressive strength of cement
5 compressive strength of cement5 compressive strength of cement
5 compressive strength of cement
 

Kürzlich hochgeladen

CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 

Kürzlich hochgeladen (20)

CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 

3 setting time of cement

  • 1. University of Salahaddin/ College of Engineering 2015-2016 Dept. Of Dams & Water resources Engineering By: Goran Adil Construction Material 1 Test No. 3 Test Name: Setting Time of Cement. Introduction: When cement mixed with water to form a paste the chemical reaction starts which is known as hydration, due to hydration the mixture starts changing from fluid state to a solid state this is known as initial setting of cement and continuous reaction of cement with water will increase the temperature of the paste because of heat of hydration, when the paste reached to the maximum peak of temperature this is known as final setting of cement. So it is required to find the minimum initial setting time necessary for mixing, transporting, placing and compacting the concrete, and finding maximum final setting time necessary to asses the reaction rate of cement with water. The initial and final setting time are approximately related: Final time (min.) = 90 + 1.2 [initial time (min.)] Purpose: To find the initial and final setting time of cement. Materials: 1- Ordinary Portland cement. 2- Water. Apparatus: 1- Vicat apparatus with the mould and its initial and final setting needles. 2- Weighing balance with capacity at least 2000 gram. 3- Trowel, Scoop, Container, Hand gloves, Glass Graduates. Procedure: 1. Prepare the paste by adding the amount of water required for standard consistency of the paste to 500 gm of cement. 2. Mixing for 4±1/4 minutes. 3. Form the cement paste into the approximate shape of ball with gloved hands. Then toss six times through a free path of a bout 150 mm from one hand to another. Press the ball resting on the palm of one hand into the mould, and then remove the excess. 4. Zeroing Vicat apparatus (the initial setting needle attaches the base of the mould and gauge read zero). 5. Place the mould under the Vicat device. 6. Let the initial setting needle to attach surface of the paste. 7. Let the needle to fall under its own weight to penetrate the paste (this must not exceed 30 seconds after completion of mixing). 8. Read the gauge or the penetration depth taking the distance from the base plate to the tip of the needle. 9. Repeat step 8 each 5-10 minutes time on different points of the paste. 10. When the reading on the gauge equal to 5 mm or higher, initial set has occurred and the time taken from the moment of addition of water to cement up to this gauge reading. 11. Replace initial setting needle by final setting needle. 12. Repeat steps 6 and 7 for each 15 minutes times interval.
  • 2. University of Salahaddin/ College of Engineering 2015-2016 Dept. Of Dams & Water resources Engineering By: Goran Adil Construction Material 2 13. When the set of needle behind the tip of needle made an impression on the paste while the circular cutting edge failed to do so this is by visual inspection, final set has occurred. The time taken from the moment of addition of water to cement. Specification: Specification I.S.S. (5/1984) BS 12:1991 ASTM (C150) Initial setting time ≥ 45 minutes ≥ 45 minutes ≥ 45 minutes Final setting time ≤ 10 hours ≤ 10 hours ≤ 375 minutes Precautions: 1- Needle must be cleaned each time before use. 2- After recording the penetration of the needle, the mould should be shifted (change its position) so that penetration of needle may not take place at the same place. 3- The mixing has to be undertaken at a temperature of 20±2 o C and minimum relative humidity of 65%, and cement paste stored at 20±1 o C and maximum relative humidity of 90%. 4- The initial and final setting time are approximately related: Final time (min.) = 90 + 1.2 [initial time (min.)] Discussion: - Compare the test results with the standard specifications. - What is the significance of this test? - What is the effect of temperature and finesse of cement on the test results?
  • 3. University of Salahaddin/ College of Engineering 2015-2016 Dept. Of Dams & Water resources Engineering By: Goran Adil Construction Material 3 Data Sheet Setting Time of Cement Test No.: 3 Test name: Setting Time of Cement Name of the student: Group No.: Date: Group No.: Time minutes Penetration depth for initial setting mm Visual inspection for final setting Remarks 5 Results: