1. BIM in infrastructure
Project presentation - Ski railway station
Åge Langedrag – Cathrine Mørch
Oslo | Multiconsult – European Task Force - 13.09.2012
2. Introduction
Who we are:
Åge Langedrag
M.Arch. – Oslo 1999 – Landscape, Film, Theatre, Architecture…………Multiconsult 2001
BIM/3D Coordinator - Ski Stasjon 2009-2011
Department of Methods and strategy, BIM Manager
Cathrine Mørch
M. Sci – Oslo 2008 – Implementation og «BIM», courses, speaches…..…. Multiconsult 2012
BIM/3D Coordinator – Ski stasjon 2009-2012
Department of Metodhs and strategy, BIM Manager
3. Agenda
Film – «Why BIM» and «More Sustainable Infrastructure»
Challenges and Demands
Ski Jernbanestasjon
History
Lessons learnt
Examples from Ski station (model and drawings)
Film
11. Ski Station
Is located 24 km south of Oslo Central Station
Is part of Follobane project.
The entire project from Oslo S will significantly go underground and is
estimated to cost 11.6 billion NOK (13 billion SEK).
Together with the existing path on the route this will cause a increase in
capasity on the line.
Following line designed for 250 km / h and can be the first stage in a
possible high-speed rail to Sweden and Europe.
Why is this project so demanding?
12. 2006 Multiconsult signed a contract with The Norwegian National Rail Administration
The contract states that Multiconsult actively use 3D modelling (Nobody talked
about BIM at this point.)
Most engineering disciplines designing in 2D CAD. 3D models are mainly used for
visualization and film.
2008 Multiconsult delivers services drawings but the mission is stopped. According
to the contract delivered paper drawings and 2 movies made in Virtual Map.
http://www.regjeringen.no/nb/dep/sd/ly
d_bilde/video/animasjon---ski-
stasjon.html?id=611132
http://www.regjeringen.no/nb/dep/sd/l
yd_bilde/video/aanimasjon---ski-
stasjon-ii.html?id=611133
Looking back at the Project Ski railway station
13. 2009 The projects starts again. Meanwhile Multiconsult started an internal
development project called «4D In Multiconsult», based on a BIM mindset.
Ski station is now going to modelled in 3D. All disiplines starts to model with BIM in
mind.
Multiconsult chooses Navisworks as a collaboration tool. In the project this is used
for clashcontrols and multidisiplinary coordination.
14.
15.
16. The project has many temporary structures and temporary
tracks changes.
17. What was the status in 2009
Few technical disciplines working in 3D
Some technical disciplines had not software for 3D modeling
Few knew how to produce drawings from 3D models
No one could get out interdisciplinary sections from 3D model (2-3months
testing showed that Revit could do this but we had to wait a whole delivery
because we had to give priority to produce drawings on the old method.)
Few modeled in terms of phases and time system implementation.
Few modeled temporary structures and installation.
Hard to know the quality of the objects in the models.
Weak interdisciplinary coordination in model considering that technical
disciplines should work within the same area in the model.
20. Where are we now in 2012?
2D to 3D and 4D
All disciplines
working in 3D
working for a common working method (BIM / CAD manual)
working with time on their objects (4D)
All subjects have a conscious relationship to construction technical execution
projecting full temporary structures
using object-based modeling, information on all objects
relate to interdisciplinary coordination and control of a common interaction model
All geometry on the drawing comes from the 3D model
More professionals can work in one single database file
New methods have been incorporated into the all project deliverables and conducted by the
same people who have been responsible for the model and drawing production
28. All items to be placed into any of the discipline models must constantly be checked
against the final design but not least all temporary structures and installations
43. Where are we heading?
“We can use new software that is linked to the
architect's design software. This gives us great
opportunities for innovation in transport and
infrastructure projects.”
45. Future benefits for the engineering group.
Quantities directly from the model
Cost and price linked to the objects in the model
Description, Process Codes
Microsoft Project, project planning
Product data to objects in the model
FM (Facility Management) data to objects in the model
Link drawings, pdf, etc to objects
Link checklists to objects and model
Set the status of all objects in the model
46. Future benefits for the client and contractor
Drawings and model to Webserver
Drawings and model exported to smartphones and tablets
Drawings and models linked to GPS to see where you are in the model and
drawing when you go on the site
Using Augmented Reality at the construction site, view model in place on
site
Using Augmented Reality on drawings in meetings
47. Future opportunities for simulation and analysis
Running trains on the tracks to control visibility
Simulate evacuation/people traffic of trains and platforms
Simulation of parking needs and traffic analysis.
Passanger traffic in rush hour linked to the timetables for trains and buses
Publish online, allowing users access to a game that they can download
and walk around in?
48. Exporting engineering models to new applications that improve the
customer access to information and visualization in our BIM models.
49. All drawings and models available directly on the smart phone or tablet
anytime and anywhere.
50. Augmented reality allows you to view 3D model both linked to the
drawings, and out on the construction site terrain.
51. Taking pictures with smartphone on the site that automatically
transforms into 3D objects that can be taken back into the model
instead of laser scanning.
52. Exporting models for game engines and futher on to the
smartphone and tablets. Free app - Live on iPhone