Automation in Construction
INTRODUCTION
• THE USE OR THE INRODUCTION OF AUTOMATIC EQUIPMENTS OR
OTHER PROCESS OR FACILITIES IN CONSTRUCTION IS CALLED AS
AUTOMATION IN CONSTRUCTION INDUSTRY
• KEY RESEARCHERS AND THEORISTS IN THE FIELD OF ROBOTICS
SAY AUTOMATED MACHINES ARE ABOUT TO MIGRATE FROM
FACTORIES AND MANUFACTURING FACILITIES TO BUILDING AND
CONSTRUCTION SITES AS A RESULT OF RAPID TECHNOLOGICAL
ADVANCES WHICH ENABLE THEM TO PERFORM INCREASINGLY
COMPLEX TASKS
ENGINEERING AUTOMATION
ENGINEERING
AUTOMATION
SURVEY
AUTOMATION
CONSTRUCTION
AUTOMATION
DESIGN
AUTOMATION
 INSPECTION
 POSITION AUTOMATION
 SITE MONITORING
 MACHINE AUTOMATION
 MATERIAL CERTIFICATION
CONSTRUCTION AUTOMATION
ADVANTAGES OF AUTOMATION
 HELPS TO IMPROVE EFFICIENCY OF WORK
 INCREASED PRODUCTIVITY
 IMPROVED SAFETY AND REMOTE ACCESS TO DATA
 REDUCES THE TIME REQUIRED FOR CONSTRUCTION
 THE POSSIBILITY OF HUMAN ERROR IS REDUCED (ACCURACY)
 HEAVY WORK CAN BE COMPLETED SATISFACTORILY WITHIN THE STIPULATED
TIME
 RESULTING IN GREATER CONTROL AND CONSISTENCY OF PRODUCT QUALITY
 UNIFORM QUALITY PRODUCT AND HIGH VOLUME PRODUCTION
 ENHANCE WORK ENVIRONMENT BECAUSE WORKERS WILL BE DISTANCED
FROM UNCOMFORTABLE WORK POSITION
DISADVANTAGES OF AUTOMATION
 LESS VERSATILITY
 MORE POLLUTION
 LARGE INITIAL INVESTMENT
 INCREASE IN UNEMPLOYMENT.
 CONTINUOUS POWER SUPPLY
 MAINTENANCE COST IS VERY HIGH BECAUSE MAINTENANCE LABOR OF
HIGH CALIBER ARE REQIURED
 LEADS TO BRAIN DRAIN FROM THE COUNTRY
NEED OF AUTOMATION
Building objects are produced by people who perform the necessary tasks using
equipment. The technological level of construction industry during the old ages was very high
for their historical period. The old civilisations have built very long-lasting structures like
pyramids, acropolis, aqueducts, cathedrals, etc.
They used innovative processes and elements for their contemporary normal
building procedures. Nevertheless, some of now-a-days construction processes have changed
a little.
For example, the building erection process has changed very little over the past
eight hundred years. The old ages pulleys are substituted by cranes. These are more
sophisticated than centuries ago, but they work with the same principle: manual control, human
operator visual feedback, big positioning error, etc.
Thus the human element involved in every aspect of construction process is very
hard to replace with many times results into delay in project completion. If we have to keep pace
with the world, projects must complete fast.
 INCREASE IN PROJECT SPEED:
AUTOMATING CONSTRUCTION PROCESS IS NECESSARY IN ORDER TO
REDUCE PRODUCTION TIMES. EARLIER COMMISSIONING OF ANY PROJECT HAS
TREMDOUS IMPACT DOWN THE LINE: I.E. PRODUCTION, MARKETING
CONSUMPTION, CONNECTED BUSINESSES, ETC. GET BOOST AND REDUCES THE
OVERHEAD COST.
 IMPROVE WORKING CONDITION:
WITH AUTOMATION, DANGEROUS WORK CAN BE AVOIDED FOR MANUAL
LABOUR. IT DOES THE WORK, PEOPLE CANNOT DO EASILY, AND INCREASE THE
PERFORMANCE.
 QUALITY IN CONSTRUCTION:
AUTOMATION GIVES QUALITY CONSTRUCTION.WITH AUTOMATION THE
MEASUREMENT ARE MORE ACCURATE; THE WEIGHING AND PROPORTION OF
MIXING INGREDIENTS IS BETTER
AUTOMATION IS USEFUL FOR:
 PLANNERS WHO CONCEIVE A PROJECT AND PREPARE PRELIMINARY
REPORT
 THOSE WHO PREPARE FINAL ESTIMATES
 THOSE WHO TENDER
 THOSE WHO HAVE LARGE NUMBER OF SIMILAR PROJECTS
 THOSE WHO NEED TO CORRECT DESIGNS FROM TIME TO TIME AND
REVISE ESTIMATES
 FEW YEARS AGO, ALL CONCRETE WAS PREPARED ON PROJECT SITE. BUT
TODAY EVEN SMALL CONCRETE PLANTS, SAY, 15m3/hr CAPACITY, HAVE
INTEGRATED WEIGH BATCHERS AT SMALL AND MEDIUM SIZE PROJECTS.
CONCRETE BATCHING PLANTS UPTO A CAPACITY OF 150m3/hr ARE USED IN LARGE
PROJECT SITES.
 THE TOWER CRANE IS AN EXAMPLE OF AUTOMATION IN MATERIAL
MOVEMENT. THE TOWER CRANE PICKS IT UP, SWINGS AND PLACES AT THE
REQUIRED HEIGHT. THEN AT LARGE PROJECTS e.g. DAMS AND TUNNEL
CONSTRUCTION, AUTOMATION HAS HAPPENED IN THE USE OF EARTH MOVING
EQUIPMENT, DUMPERS, ETC. FOR LARGE PROJECTS 25 OR 30-TON DUMPERS ARE
COMMON TAKING AWAY LARGE EXACAVATION DEBRIS.
READY MIX CONCRETE(RMC)
AREAS OF AUTOMATION IN
CONSTRUCTION
 ROADS AND RUNWAYS CONSTRUCTION
 STRUCTURES
 BUILDING CONSRUCTION
 PORTS
 TUNNELS
 FACTORIES AND INDUSTRIES
ROADS
 ASPHALT MIXERS AND ASPHALT PAVERS ARE
AUTOMATIC MACHINES. SIMILARLY CONCRETE
PAVERS ARE USED FOR ROADWORK
 USE OF HIGHLY AUTOMATED HYDRAULIC DRILL
RIG FOR PILING HAS BECOME COMMON, FOR
ALL HIGHWAYS AND FLYOVERS
TUNNELS
 IN TRENCHLESS CONSTRUCTION TWO
MANHOLES ARE DUG AT TWO PLACES AND THEN
A TUNNEL IS BORED BELOW THE SURFACE,
WITHOUT DISTURBING THE SURFACE.
 FOR TUNNEL WORK, HIGH LEVEL OF AUTOMATION
EXISTS. DRILLING JUMBOS, ROAD HEADERS AND
TUNNEL BORING MACHINES ARE USED, TBM CAN
DRILL A TUNNEL 3 TO 8 m IN DIAMETER, AT THE
RATE OF 1m/hr, GIVING AN OVERALL PROGRESS
OF 12 TO 15m/day. BY THE CONVENTIONAL
METHOD, THE RATE WOULD BE 3 TO 5m/day.
SURVEY WORK
 SITES CAN BE SURVEYED WITH THE USE OF MODERN
INSTRUMENTS SUCH AS ‘TOTAL STATION’ HAVING A PC
CONNECTIVITY AND SOFTWARE
 THE SURVEY READINGS ARE DIRECTLY RECORDED ON A
CD AND AN ENGINEERING DRAWING IS OBTAINED AS END
RESULT. THE READINGS ARE MEASURED ON THE FIELD
USING ELECTRONIC SIGNALS AND LASERS
EXAMPLES RELATED TO
DIFFERENT CIVIL
ENGINEERING
PROJECTS
PYRAMID OF
GIZA
 REMAINED TALLEST
FOR 3800 YEARS
 CONSTRUCTED OVER
TWENTY YEAR PERIOD
TIME
 IT WOULD COST $5
BILLION TODAY TO
CONSTRUCT ITS
REPLICA
GREAT WALL OF
CHINA
 13,171 MILES
 MODERN DAY COST: $13-65 BILLION
AQUEDUCT OF
SEGOVIA
 AQUEDUCT BRIDGE
 EXCELLENT CONDITION
OVER THE YEARS
 LOCATED IN SPAIN
 IT SUPPLIED WATER TO
SEGOVIA
BROOKLYN
BRIDGE
 COMPLETED IN 1883
 BOTH, SUSPENSION AND
CABLE-STAYED BRIDGE
 ONE OF THE OLDEST
BRIDGES IN UNITED
STATES
PANAMA CANAL
• 48 MILE WATERWAY IN
PANAMA
• CONNECTS ATLANTIC AND
PACIFIC OCEAN
• CRUCIAL FOR MARITIME
TRADE
HOOVER DAM
• CONSTRUCTED DURING
THE GREAT DEPRESSION
• CONCRETE ARCH-
GRAVITY DAM
• CONSTRUCTED OVER
COLORADO RIVER
• TOOK FIVE YEARS TO
BUILD
GOLDEN GATE
BRIDGE
• OPENED IN 1937
• LONGEST SUSPENSION
BRIDGE IN THE WORLD
ENGLISH
CHANNEL TUBE
• €9BILLION, MOST
EXPENSIVE PROJECT AT
THAT TIME
• LONGEST UNDERSEA
TUNNEL
BURJ KHALIFA
• 829.8 M HIGH
• SUPERTALL SKYSCRAPER
CRANES WERE USED
• CRANES SHIFTED MORE
THAN 63,000 TONNES IN
45,000 HOURS
QINGDAO WATER
BRIDGE
• LONGEST WATER BRIDGE
IN THE WORLD
• 43.58 KM LONG STRETCH
• ALL MODERN
MACHINERIES WERE
IMPLEMENTED AND WAS
COMPLETED WITHIN 4
YEARS
CONCLUSION
 Construction is a part of infrastructure, which is essential to promote growth in
the economy. India is one of the fastest growing economies in the world. The
scope for infrastructure industry is enormous as the Indian industry has been
witnessing large growth. Thus, the effective use of automation is one of the
greatest opportunities.
 The importance of implementing automation technologies is the need of
todays infrastructure project and construction firms in order to increase the
productivity and good quality of work.
 Since India has second largest manpower in the world, automation is not
replacements of human power but is an important supplement that carters to the
need of mega construction and fast-track construction
 The problems associated with constructed work such as decreasing quality of
work, labour shortages, etc. can be overcome by new innovative technologies
such as automation which has the potential to improve the quality, safety,
productivity of the construction industry.
Therefore, a big effort needs to be made to increase the level
of automation of this important sector and to coordinate more
the involved processes in order to improve its productivity.
Since last decade of 20th century a lot of progress is made in
this direction by countries like Japan, Germany, USA by
focusing new robotics systems and in the automation of
existing machinery.

More Related Content

What's hot

Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
3D printing technology in building construction
3D printing technology in building construction3D printing technology in building construction
3D printing technology in building constructionVodepalliManaswini
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingPradeepa M
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in constructionShailja km
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
Role of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementRole of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementKundan Sanap
 
3D printing and its application in construction field
3D printing and its application in construction field3D printing and its application in construction field
3D printing and its application in construction fieldAnsarsha Azi
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEDr K M SONI
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
 
Presentation on Modern construction materials
Presentation on Modern construction materialsPresentation on Modern construction materials
Presentation on Modern construction materialsAxay Sharma
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential buildingK.MAHESH KUMAR
 
Automation in Construction
Automation in Construction Automation in Construction
Automation in Construction rgbimbochamp
 

What's hot (20)

Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
3D printing technology in building construction
3D printing technology in building construction3D printing technology in building construction
3D printing technology in building construction
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
3D printer construction
3D printer construction3D printer construction
3D printer construction
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Role of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementRole of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & management
 
3D printing and its application in construction field
3D printing and its application in construction field3D printing and its application in construction field
3D printing and its application in construction field
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Presentation on Modern construction materials
Presentation on Modern construction materialsPresentation on Modern construction materials
Presentation on Modern construction materials
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential building
 
Automation in Construction
Automation in Construction Automation in Construction
Automation in Construction
 
Cost Effective and Alternate construction techniques
 Cost Effective and Alternate construction techniques Cost Effective and Alternate construction techniques
Cost Effective and Alternate construction techniques
 

Similar to Automation in construction

IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...IRJET Journal
 
Km145 wall plastering machine (wecompress)
Km145 wall plastering machine (wecompress)Km145 wall plastering machine (wecompress)
Km145 wall plastering machine (wecompress)1000kv technologies
 
Presentation made during Key Note Addess
Presentation made during Key Note AddessPresentation made during Key Note Addess
Presentation made during Key Note AddessIEI GSC
 
Significance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needsSignificance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needsCurb Fox Equipment
 
AUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptx
AUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptxAUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptx
AUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptxVishahanVenthan
 
IRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro ProjectIRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro ProjectIRJET Journal
 
Precast Concrete Structure
Precast Concrete StructurePrecast Concrete Structure
Precast Concrete StructureArchit Ahmad
 
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision DiggingVacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision DiggingTec
 
IRJET- Contour Crafting (A Management Tool for Swift Construction)
IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)
IRJET- Contour Crafting (A Management Tool for Swift Construction)IRJET Journal
 
IRJET- Development in Floor Cleaner Machine
IRJET- Development in Floor Cleaner MachineIRJET- Development in Floor Cleaner Machine
IRJET- Development in Floor Cleaner MachineIRJET Journal
 
Contour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of futureContour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of futureKhyati Saggu
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...IRJET Journal
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET Journal
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineIRJET Journal
 
Introduction to Heavy Construction Machinery
Introduction to Heavy Construction MachineryIntroduction to Heavy Construction Machinery
Introduction to Heavy Construction MachineryFazal-E- Jalal
 
Dinamikler 2017 - Alan Sharp Sunum
Dinamikler 2017 - Alan Sharp SunumDinamikler 2017 - Alan Sharp Sunum
Dinamikler 2017 - Alan Sharp Sunumdinamikler17
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...IRJET Journal
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in ConstructionIRJET Journal
 

Similar to Automation in construction (20)

IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
 
Km145 wall plastering machine (wecompress)
Km145 wall plastering machine (wecompress)Km145 wall plastering machine (wecompress)
Km145 wall plastering machine (wecompress)
 
Presentation made during Key Note Addess
Presentation made during Key Note AddessPresentation made during Key Note Addess
Presentation made during Key Note Addess
 
Significance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needsSignificance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needs
 
AUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptx
AUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptxAUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptx
AUTOMATIC PNEUMATIC INTERNAL PIPE SCRAP REMOVING MACHINE2.pptx
 
IRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro ProjectIRJET-To Study Various Construction Equipment used in Metro Project
IRJET-To Study Various Construction Equipment used in Metro Project
 
Precast Concrete Structure
Precast Concrete StructurePrecast Concrete Structure
Precast Concrete Structure
 
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision DiggingVacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
Vacuum Excavation Services Bay Area Unleashing The Power Of Precision Digging
 
IRJET- Contour Crafting (A Management Tool for Swift Construction)
IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)IRJET-  	  Contour Crafting (A Management Tool for Swift Construction)
IRJET- Contour Crafting (A Management Tool for Swift Construction)
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
 
IRJET- Development in Floor Cleaner Machine
IRJET- Development in Floor Cleaner MachineIRJET- Development in Floor Cleaner Machine
IRJET- Development in Floor Cleaner Machine
 
Contour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of futureContour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of future
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
 
Study of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling MachineStudy of Fabrication of Multipurpose Tooling Machine
Study of Fabrication of Multipurpose Tooling Machine
 
Introduction to Heavy Construction Machinery
Introduction to Heavy Construction MachineryIntroduction to Heavy Construction Machinery
Introduction to Heavy Construction Machinery
 
2016 Samir A. Fattah CV
2016 Samir A. Fattah CV2016 Samir A. Fattah CV
2016 Samir A. Fattah CV
 
Dinamikler 2017 - Alan Sharp Sunum
Dinamikler 2017 - Alan Sharp SunumDinamikler 2017 - Alan Sharp Sunum
Dinamikler 2017 - Alan Sharp Sunum
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 

Recently uploaded

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 

Recently uploaded (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Automation in construction

  • 2. INTRODUCTION • THE USE OR THE INRODUCTION OF AUTOMATIC EQUIPMENTS OR OTHER PROCESS OR FACILITIES IN CONSTRUCTION IS CALLED AS AUTOMATION IN CONSTRUCTION INDUSTRY • KEY RESEARCHERS AND THEORISTS IN THE FIELD OF ROBOTICS SAY AUTOMATED MACHINES ARE ABOUT TO MIGRATE FROM FACTORIES AND MANUFACTURING FACILITIES TO BUILDING AND CONSTRUCTION SITES AS A RESULT OF RAPID TECHNOLOGICAL ADVANCES WHICH ENABLE THEM TO PERFORM INCREASINGLY COMPLEX TASKS
  • 4.  INSPECTION  POSITION AUTOMATION  SITE MONITORING  MACHINE AUTOMATION  MATERIAL CERTIFICATION CONSTRUCTION AUTOMATION
  • 5.
  • 7.  HELPS TO IMPROVE EFFICIENCY OF WORK  INCREASED PRODUCTIVITY  IMPROVED SAFETY AND REMOTE ACCESS TO DATA  REDUCES THE TIME REQUIRED FOR CONSTRUCTION  THE POSSIBILITY OF HUMAN ERROR IS REDUCED (ACCURACY)  HEAVY WORK CAN BE COMPLETED SATISFACTORILY WITHIN THE STIPULATED TIME  RESULTING IN GREATER CONTROL AND CONSISTENCY OF PRODUCT QUALITY  UNIFORM QUALITY PRODUCT AND HIGH VOLUME PRODUCTION  ENHANCE WORK ENVIRONMENT BECAUSE WORKERS WILL BE DISTANCED FROM UNCOMFORTABLE WORK POSITION
  • 8.
  • 10.  LESS VERSATILITY  MORE POLLUTION  LARGE INITIAL INVESTMENT  INCREASE IN UNEMPLOYMENT.  CONTINUOUS POWER SUPPLY  MAINTENANCE COST IS VERY HIGH BECAUSE MAINTENANCE LABOR OF HIGH CALIBER ARE REQIURED  LEADS TO BRAIN DRAIN FROM THE COUNTRY
  • 11.
  • 13. Building objects are produced by people who perform the necessary tasks using equipment. The technological level of construction industry during the old ages was very high for their historical period. The old civilisations have built very long-lasting structures like pyramids, acropolis, aqueducts, cathedrals, etc. They used innovative processes and elements for their contemporary normal building procedures. Nevertheless, some of now-a-days construction processes have changed a little. For example, the building erection process has changed very little over the past eight hundred years. The old ages pulleys are substituted by cranes. These are more sophisticated than centuries ago, but they work with the same principle: manual control, human operator visual feedback, big positioning error, etc. Thus the human element involved in every aspect of construction process is very hard to replace with many times results into delay in project completion. If we have to keep pace with the world, projects must complete fast.
  • 14.  INCREASE IN PROJECT SPEED: AUTOMATING CONSTRUCTION PROCESS IS NECESSARY IN ORDER TO REDUCE PRODUCTION TIMES. EARLIER COMMISSIONING OF ANY PROJECT HAS TREMDOUS IMPACT DOWN THE LINE: I.E. PRODUCTION, MARKETING CONSUMPTION, CONNECTED BUSINESSES, ETC. GET BOOST AND REDUCES THE OVERHEAD COST.  IMPROVE WORKING CONDITION: WITH AUTOMATION, DANGEROUS WORK CAN BE AVOIDED FOR MANUAL LABOUR. IT DOES THE WORK, PEOPLE CANNOT DO EASILY, AND INCREASE THE PERFORMANCE.  QUALITY IN CONSTRUCTION: AUTOMATION GIVES QUALITY CONSTRUCTION.WITH AUTOMATION THE MEASUREMENT ARE MORE ACCURATE; THE WEIGHING AND PROPORTION OF MIXING INGREDIENTS IS BETTER
  • 15. AUTOMATION IS USEFUL FOR:  PLANNERS WHO CONCEIVE A PROJECT AND PREPARE PRELIMINARY REPORT  THOSE WHO PREPARE FINAL ESTIMATES  THOSE WHO TENDER  THOSE WHO HAVE LARGE NUMBER OF SIMILAR PROJECTS  THOSE WHO NEED TO CORRECT DESIGNS FROM TIME TO TIME AND REVISE ESTIMATES
  • 16.  FEW YEARS AGO, ALL CONCRETE WAS PREPARED ON PROJECT SITE. BUT TODAY EVEN SMALL CONCRETE PLANTS, SAY, 15m3/hr CAPACITY, HAVE INTEGRATED WEIGH BATCHERS AT SMALL AND MEDIUM SIZE PROJECTS. CONCRETE BATCHING PLANTS UPTO A CAPACITY OF 150m3/hr ARE USED IN LARGE PROJECT SITES.  THE TOWER CRANE IS AN EXAMPLE OF AUTOMATION IN MATERIAL MOVEMENT. THE TOWER CRANE PICKS IT UP, SWINGS AND PLACES AT THE REQUIRED HEIGHT. THEN AT LARGE PROJECTS e.g. DAMS AND TUNNEL CONSTRUCTION, AUTOMATION HAS HAPPENED IN THE USE OF EARTH MOVING EQUIPMENT, DUMPERS, ETC. FOR LARGE PROJECTS 25 OR 30-TON DUMPERS ARE COMMON TAKING AWAY LARGE EXACAVATION DEBRIS. READY MIX CONCRETE(RMC)
  • 17.
  • 18. AREAS OF AUTOMATION IN CONSTRUCTION  ROADS AND RUNWAYS CONSTRUCTION  STRUCTURES  BUILDING CONSRUCTION  PORTS  TUNNELS  FACTORIES AND INDUSTRIES
  • 19. ROADS  ASPHALT MIXERS AND ASPHALT PAVERS ARE AUTOMATIC MACHINES. SIMILARLY CONCRETE PAVERS ARE USED FOR ROADWORK  USE OF HIGHLY AUTOMATED HYDRAULIC DRILL RIG FOR PILING HAS BECOME COMMON, FOR ALL HIGHWAYS AND FLYOVERS
  • 20. TUNNELS  IN TRENCHLESS CONSTRUCTION TWO MANHOLES ARE DUG AT TWO PLACES AND THEN A TUNNEL IS BORED BELOW THE SURFACE, WITHOUT DISTURBING THE SURFACE.  FOR TUNNEL WORK, HIGH LEVEL OF AUTOMATION EXISTS. DRILLING JUMBOS, ROAD HEADERS AND TUNNEL BORING MACHINES ARE USED, TBM CAN DRILL A TUNNEL 3 TO 8 m IN DIAMETER, AT THE RATE OF 1m/hr, GIVING AN OVERALL PROGRESS OF 12 TO 15m/day. BY THE CONVENTIONAL METHOD, THE RATE WOULD BE 3 TO 5m/day.
  • 21. SURVEY WORK  SITES CAN BE SURVEYED WITH THE USE OF MODERN INSTRUMENTS SUCH AS ‘TOTAL STATION’ HAVING A PC CONNECTIVITY AND SOFTWARE  THE SURVEY READINGS ARE DIRECTLY RECORDED ON A CD AND AN ENGINEERING DRAWING IS OBTAINED AS END RESULT. THE READINGS ARE MEASURED ON THE FIELD USING ELECTRONIC SIGNALS AND LASERS
  • 22.
  • 23.
  • 24.
  • 25. EXAMPLES RELATED TO DIFFERENT CIVIL ENGINEERING PROJECTS
  • 26.
  • 27.
  • 28. PYRAMID OF GIZA  REMAINED TALLEST FOR 3800 YEARS  CONSTRUCTED OVER TWENTY YEAR PERIOD TIME  IT WOULD COST $5 BILLION TODAY TO CONSTRUCT ITS REPLICA
  • 29. GREAT WALL OF CHINA  13,171 MILES  MODERN DAY COST: $13-65 BILLION
  • 30. AQUEDUCT OF SEGOVIA  AQUEDUCT BRIDGE  EXCELLENT CONDITION OVER THE YEARS  LOCATED IN SPAIN  IT SUPPLIED WATER TO SEGOVIA
  • 31. BROOKLYN BRIDGE  COMPLETED IN 1883  BOTH, SUSPENSION AND CABLE-STAYED BRIDGE  ONE OF THE OLDEST BRIDGES IN UNITED STATES
  • 32. PANAMA CANAL • 48 MILE WATERWAY IN PANAMA • CONNECTS ATLANTIC AND PACIFIC OCEAN • CRUCIAL FOR MARITIME TRADE
  • 33. HOOVER DAM • CONSTRUCTED DURING THE GREAT DEPRESSION • CONCRETE ARCH- GRAVITY DAM • CONSTRUCTED OVER COLORADO RIVER • TOOK FIVE YEARS TO BUILD
  • 34. GOLDEN GATE BRIDGE • OPENED IN 1937 • LONGEST SUSPENSION BRIDGE IN THE WORLD
  • 35. ENGLISH CHANNEL TUBE • €9BILLION, MOST EXPENSIVE PROJECT AT THAT TIME • LONGEST UNDERSEA TUNNEL
  • 36. BURJ KHALIFA • 829.8 M HIGH • SUPERTALL SKYSCRAPER CRANES WERE USED • CRANES SHIFTED MORE THAN 63,000 TONNES IN 45,000 HOURS
  • 37. QINGDAO WATER BRIDGE • LONGEST WATER BRIDGE IN THE WORLD • 43.58 KM LONG STRETCH • ALL MODERN MACHINERIES WERE IMPLEMENTED AND WAS COMPLETED WITHIN 4 YEARS
  • 38. CONCLUSION  Construction is a part of infrastructure, which is essential to promote growth in the economy. India is one of the fastest growing economies in the world. The scope for infrastructure industry is enormous as the Indian industry has been witnessing large growth. Thus, the effective use of automation is one of the greatest opportunities.  The importance of implementing automation technologies is the need of todays infrastructure project and construction firms in order to increase the productivity and good quality of work.
  • 39.  Since India has second largest manpower in the world, automation is not replacements of human power but is an important supplement that carters to the need of mega construction and fast-track construction  The problems associated with constructed work such as decreasing quality of work, labour shortages, etc. can be overcome by new innovative technologies such as automation which has the potential to improve the quality, safety, productivity of the construction industry.
  • 40. Therefore, a big effort needs to be made to increase the level of automation of this important sector and to coordinate more the involved processes in order to improve its productivity. Since last decade of 20th century a lot of progress is made in this direction by countries like Japan, Germany, USA by focusing new robotics systems and in the automation of existing machinery.