Beta Programs and the
           Project Manager



                                             Gary Shea
                                            www.garyshea.com




©2008 G Shea    Beta Programs PMI-Madison                      1
Objective


        Show project managers
         the value of participating
          in beta programs




©2008 G Shea    Beta Programs PMI-Madison   2
Topics
   Definitions
                                         Examples
   Benefits
                                         Gotchas
   The Role of the Project
    Manager                              Exercises
      Preliminaries                     Advice
      A Process                         The Ultimate Goal
   PMBOK Connections                    Questions




©2008 G Shea         Beta Programs PMI-Madison                3
Definition - What is a Beta?
     Early usage                Test non-
     Pre – General
                                   development –
                                      Sales / marketing
      Availability                    Support
     Not production                  Delivery

     Not buggy code             Unique
     Partners’                   configurations
      readiness period           Customer
                                  perspective



©2008 G Shea     Beta Programs PMI-Madison                 4
Benefits?
   For the organization
      Product awareness and
       knowledge
      Critical business
       functions
      Competitive advantage
      Vendor contacts
      Vendor relationship
      $avings




©2008 G Shea      Beta Programs PMI-Madison   5
Benefits?
 To      Project Manager
      Gain  knowledge of the
       business
      Be able to make a
       difference
      New contacts
      Visibility
      Travel
      Have more fun




©2008 G Shea      Beta Programs PMI-Madison   6
Preliminaries (for the Project
     Manager)

 Be a pro-active project manager
 Be an investigator
 Get the lay of the land
 Configuration Management
 Dig in
 Determine what is critical
 Get the user perspective
 Moving targets – stay current
 Who? Get to know them.

©2008 G Shea    Beta Programs PMI-Madison   7
A Process (for the organization)
                Interest
                Negotiation
                Qualification
                Implementation
                Closure



©2008 G Shea       Beta Programs PMI-Madison   8
A Process: Interest
 Learn  organization environment
 Identify core product set
 Your interests
 Identify possibilities
  (questionnaire)
 Organization needs, directions,
  sponsorship
 Sketch out project or 2: include
  timing, resources, benefits


 ©2008 G Shea   Beta Programs PMI-Madison   9
A Process: Negotiation
 An internal process – gaining
  support for the project
 Evaluation of the next release –
  why early access is essential
 Executive approval
 Resources earmarked
 Expectations set




©2008 G Shea   Beta Programs PMI-Madison   10
A Process: Qualification
   Vendor may seek
    you out

   You may have to
    sell – Why
    essential?
    Resources ready.
    Smooth sailing thru
    legalities,
    sponsorship…


©2008 G Shea      Beta Programs PMI-Madison   11
A Process: Qualification

   Make case –
    paperwork, plan,
    schedule, meet
    deadlines, be pro-
    active and clear

   Keep your team
    involved and
    informed


©2008 G Shea     Beta Programs PMI-Madison   12
A Process - Implementation
  Track activities & refine plan: what needs
   to be done – product and documentation
   shipments, installation, usage, meetings,
   training, reporting, issue management,
   test cases and tree
  Enjoy the intensity
  Report and resole issues, provide
   feedback. Make a difference.
  Stick to schedule, meetings, checkpoints
  Take good notes.


©2008 G Shea    Beta Programs PMI-Madison       13
A Process: Closure
 Final report – jointly written. Team
  reviewed. Summarize issues,
  recommendations, …
 Lessons learned.
 Dot Is cross Ts all paperwork complete
 Make recommendations on going into
  production
 Report to sponsor




©2008 G Shea   Beta Programs PMI-Madison   14
PMBOK Connections
 Configuration               Work Breakdown
  Management                   Structures
 Stakeholders                Project phases
 Cross functional            Feedback
  team                        Closure
 Decentralized team          Lessons learned
 Scope management            Successful projects
 Dependencies




©2008 G Shea   Beta Programs PMI-Madison             15
PMBOK – WBS Examples
  Evaluate environment for prerequisite
   products, system programmer, ½ day
  Upgrade prerequisite product to next
   version, separate dependent project
  Evaluate user guide (200 pages) – 3
   days, four end users
  Interview end users – business analyst, 1
   day
  ….




©2008 G Shea    Beta Programs PMI-Madison      16
Real Life Example – Hudson
        Bay Company
     Canadian retailer
      uses BI for
      applications
         Example Top 50
          Selling Products
   Qualifies for
    Teradata Beta
    program
   Five times
    participant


©2008 G Shea         Beta Programs PMI-Madison   17
 Selectively
        participates
        depending on
        new function
       Driven by project
        managers –
        “they know apps
        best and make
        case to senior
        management”




©2008 G Shea      Beta Programs PMI-Madison   18
Real Life - Blackbaud
     Provides software for non-profits – Raisers’
      Edge
     Local users: MSO, Wisc. Public TV
     Beta is main activity of Stabilization phase
     Processes refined over the years
     Fifty early user customers
     Formal agreements
     Beta Bucks, production environment
      ‘handholding”
     Recruits through trade shows, user groups
     Function specific, phased, short duration


©2008 G Shea        Beta Programs PMI-Madison        19
Real Life – Harley Davidson
 Internal Engineering
  betas
 Roll out of tools and
  processes (e.g. issue
  tracking and risk
  assessing tool)
 Borrowed modules
  from sister division
 Best practices



©2008 G Shea    Beta Programs PMI-Madison   20
 Tweaking and
  tuning, refinement
 User acceptance
  (best case they
  embrace new
  product)
 Project oriented




©2008 G Shea    Beta Programs PMI-Madison   21
Gotchas

    Organizational            goal: minimal change
           Workarounds: pilots, proof of concepts, test
            environment
    Mismatch          of PM / SDLC rigor
           Solutions: understood up-front, clear contract,
            flexibility
    Mismatch          of needs (vendor /
       customer)
           Solutions: narrowly focused objectives, “next
            time”


©2008 G Shea           Beta Programs PMI-Madison              22
Exercises

       Identify core functions, products,
        processes
       …..
       …..
       …..
       Configuration (e.g. Oracle, Teradata,
        Blackbaud)
       …..
       …..



©2008 G Shea      Beta Programs PMI-Madison     23
Advice
    Think quality and process improvements
    No hidden agenda
    Share ideas, information, wisdom
    Pushing too had? Ease off
    Stay focused
    Track, advertise, attract
    Consider others’ ideas
    Don’t forget what’s in it for the vendor




©2008 G Shea     Beta Programs PMI-Madison      24
The Ultimate Goal
   Make a successful project of
   beta participation




©2008 G Shea       Beta Programs PMI-Madison   25
Acknowledgements
    Paul Radke, PMI
    Bucky Wall, Blackbaud
    Ken Sutton,Harley Davidson
    Mahmood Rad, Harley Davidson
    Noel Skarpmoen, WUWM Radio
    Mary-Jane Jarvis-Haig, Hudson
     Bay Company


                                            Graphics by YKDesigns
©2009 G Shea       Beta Programs and Proj Mgmt                      26

Weitere ähnliche Inhalte

Was ist angesagt?

Proposal 2 Release
Proposal 2 ReleaseProposal 2 Release
Proposal 2 ReleaseManageware
 
Cobb Solutions Overview 6-28-12
Cobb Solutions Overview 6-28-12Cobb Solutions Overview 6-28-12
Cobb Solutions Overview 6-28-12Michael Swart
 
Product Launch Team Charter
Product Launch Team CharterProduct Launch Team Charter
Product Launch Team CharterDemand Metric
 
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...mjohns3500
 
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Liana Underwood
 
Stage-Gate success: How the social web drives product development
Stage-Gate success: How the social web drives product developmentStage-Gate success: How the social web drives product development
Stage-Gate success: How the social web drives product developmentNetworked Insights
 
Why Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management ApproachWhy Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management ApproachSccharron
 
Yoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project ManagementYoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project ManagementYoxel Systems
 
Product Development Charter
Product Development CharterProduct Development Charter
Product Development CharterDemand Metric
 
Glenn Dale Resume
Glenn Dale ResumeGlenn Dale Resume
Glenn Dale Resumegmdale
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinarAli Zeeshan
 
From Balanced Scorecard to Project Portfolio Management
From Balanced Scorecard to Project Portfolio ManagementFrom Balanced Scorecard to Project Portfolio Management
From Balanced Scorecard to Project Portfolio ManagementRoberto Toledo
 
Aligning Your Organization for PLM Success
Aligning Your Organization for PLM SuccessAligning Your Organization for PLM Success
Aligning Your Organization for PLM SuccessPTC
 
Agile Is Killing Me! Product Camp Austin 2010
Agile Is Killing Me!   Product Camp Austin 2010Agile Is Killing Me!   Product Camp Austin 2010
Agile Is Killing Me! Product Camp Austin 2010Paul Brownell
 

Was ist angesagt? (20)

Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
Good governance of the project portfolio
Good governance of the project portfolioGood governance of the project portfolio
Good governance of the project portfolio
 
Proposal 2 Release
Proposal 2 ReleaseProposal 2 Release
Proposal 2 Release
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 
Cobb Solutions Overview 6-28-12
Cobb Solutions Overview 6-28-12Cobb Solutions Overview 6-28-12
Cobb Solutions Overview 6-28-12
 
Requirements management by Dr Matthew Bell
Requirements management by Dr Matthew BellRequirements management by Dr Matthew Bell
Requirements management by Dr Matthew Bell
 
Frameworks detail
Frameworks detailFrameworks detail
Frameworks detail
 
Product Launch Team Charter
Product Launch Team CharterProduct Launch Team Charter
Product Launch Team Charter
 
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
Clarity Management Consulting - How To Select Innovative Suppliers Using a 5-...
 
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
 
Stage-Gate success: How the social web drives product development
Stage-Gate success: How the social web drives product developmentStage-Gate success: How the social web drives product development
Stage-Gate success: How the social web drives product development
 
Why Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management ApproachWhy Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management Approach
 
Guide to Product Management
Guide to Product ManagementGuide to Product Management
Guide to Product Management
 
Yoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project ManagementYoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project Management
 
Product Development Charter
Product Development CharterProduct Development Charter
Product Development Charter
 
Glenn Dale Resume
Glenn Dale ResumeGlenn Dale Resume
Glenn Dale Resume
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
From Balanced Scorecard to Project Portfolio Management
From Balanced Scorecard to Project Portfolio ManagementFrom Balanced Scorecard to Project Portfolio Management
From Balanced Scorecard to Project Portfolio Management
 
Aligning Your Organization for PLM Success
Aligning Your Organization for PLM SuccessAligning Your Organization for PLM Success
Aligning Your Organization for PLM Success
 
Agile Is Killing Me! Product Camp Austin 2010
Agile Is Killing Me!   Product Camp Austin 2010Agile Is Killing Me!   Product Camp Austin 2010
Agile Is Killing Me! Product Camp Austin 2010
 

Andere mochten auch

Collaborative Gene Project BETA presented at the IDSA Global Conference 2009
Collaborative Gene Project BETA presented at the IDSA Global Conference 2009Collaborative Gene Project BETA presented at the IDSA Global Conference 2009
Collaborative Gene Project BETA presented at the IDSA Global Conference 2009Collaborative Human
 
Things we learned beta 1
Things we learned beta 1Things we learned beta 1
Things we learned beta 1whatidiscover
 
Things we learned beta 2
Things we learned beta 2Things we learned beta 2
Things we learned beta 2whatidiscover
 
Liquidity, capital adequacy and operating efficiency of commercial banks in k...
Liquidity, capital adequacy and operating efficiency of commercial banks in k...Liquidity, capital adequacy and operating efficiency of commercial banks in k...
Liquidity, capital adequacy and operating efficiency of commercial banks in k...Alexander Decker
 
Managing Risk Around Capital Structure, Liquidity, and Mission
Managing Risk Around Capital Structure, Liquidity, and Mission  Managing Risk Around Capital Structure, Liquidity, and Mission
Managing Risk Around Capital Structure, Liquidity, and Mission jsmatteo
 
FIM - Credit Derivatives PPT
FIM - Credit Derivatives PPTFIM - Credit Derivatives PPT
FIM - Credit Derivatives PPTBishnu Kumar
 
Market value added
Market value addedMarket value added
Market value addedSowmyR
 
Credit Rate Risk Management In Banks-B.V.Raghunandan
Credit  Rate  Risk  Management In  Banks-B.V.RaghunandanCredit  Rate  Risk  Management In  Banks-B.V.Raghunandan
Credit Rate Risk Management In Banks-B.V.RaghunandanSVS College
 

Andere mochten auch (13)

TEMPLATE BETA_docu
TEMPLATE BETA_docuTEMPLATE BETA_docu
TEMPLATE BETA_docu
 
Collaborative Gene Project BETA presented at the IDSA Global Conference 2009
Collaborative Gene Project BETA presented at the IDSA Global Conference 2009Collaborative Gene Project BETA presented at the IDSA Global Conference 2009
Collaborative Gene Project BETA presented at the IDSA Global Conference 2009
 
Mfs
MfsMfs
Mfs
 
Things we learned beta 1
Things we learned beta 1Things we learned beta 1
Things we learned beta 1
 
Things we learned beta 2
Things we learned beta 2Things we learned beta 2
Things we learned beta 2
 
Liquidity, capital adequacy and operating efficiency of commercial banks in k...
Liquidity, capital adequacy and operating efficiency of commercial banks in k...Liquidity, capital adequacy and operating efficiency of commercial banks in k...
Liquidity, capital adequacy and operating efficiency of commercial banks in k...
 
Managing Risk Around Capital Structure, Liquidity, and Mission
Managing Risk Around Capital Structure, Liquidity, and Mission  Managing Risk Around Capital Structure, Liquidity, and Mission
Managing Risk Around Capital Structure, Liquidity, and Mission
 
Credit Derivatives
Credit DerivativesCredit Derivatives
Credit Derivatives
 
FIM - Credit Derivatives PPT
FIM - Credit Derivatives PPTFIM - Credit Derivatives PPT
FIM - Credit Derivatives PPT
 
Market value added
Market value addedMarket value added
Market value added
 
Morphology derivation
Morphology   derivationMorphology   derivation
Morphology derivation
 
Credit Rate Risk Management In Banks-B.V.Raghunandan
Credit  Rate  Risk  Management In  Banks-B.V.RaghunandanCredit  Rate  Risk  Management In  Banks-B.V.Raghunandan
Credit Rate Risk Management In Banks-B.V.Raghunandan
 
Financial management
Financial managementFinancial management
Financial management
 

Ähnlich wie Beta Programs And The Project Manager

Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programGottfried Rudorfer
 
EU Telecom Sla Project Presentation
EU Telecom Sla Project PresentationEU Telecom Sla Project Presentation
EU Telecom Sla Project Presentationmartinjleighfield
 
Bhadale group of companies general framework-level-2
Bhadale group of companies  general framework-level-2Bhadale group of companies  general framework-level-2
Bhadale group of companies general framework-level-2Vijayananda Mohire
 
A Recipe for Scale: Succeeding with Agile Software Development in the Enterprise
A Recipe for Scale: Succeeding with Agile Software Development in the EnterpriseA Recipe for Scale: Succeeding with Agile Software Development in the Enterprise
A Recipe for Scale: Succeeding with Agile Software Development in the EnterpriseVMware Tanzu
 
KPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics FrameworkKPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics FrameworkKPI Partners
 
2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resume2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resumegculpan
 
IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...
IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...
IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...Compuware APM
 
Value of PMP Certification and PMI Membership
Value of PMP Certification and PMI MembershipValue of PMP Certification and PMI Membership
Value of PMP Certification and PMI MembershipRahul Sudame
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012CAMTIC
 
JahiaOne 2015- The Unity Tech Partner Strategy by Piyush Patel
JahiaOne 2015- The Unity Tech Partner Strategy by Piyush PatelJahiaOne 2015- The Unity Tech Partner Strategy by Piyush Patel
JahiaOne 2015- The Unity Tech Partner Strategy by Piyush PatelJahia Solutions Group
 
Tech Services in Latin America Phase 1
Tech Services in Latin America  Phase 1Tech Services in Latin America  Phase 1
Tech Services in Latin America Phase 1Valdir Gomes Silva
 
Google appenginemigrationcasestudy
Google appenginemigrationcasestudyGoogle appenginemigrationcasestudy
Google appenginemigrationcasestudyInphina Technologies
 
Role of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project ManagementRole of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project ManagementGail Raynus, PMP
 
How to get started in extracting business value from big data 2 of 2 oct 2013
How to get started in extracting business value from big data 2 of 2 oct 2013How to get started in extracting business value from big data 2 of 2 oct 2013
How to get started in extracting business value from big data 2 of 2 oct 2013Jaime Nistal
 
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...Infor-media
 

Ähnlich wie Beta Programs And The Project Manager (20)

Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT program
 
EU Telecom Sla Project Presentation
EU Telecom Sla Project PresentationEU Telecom Sla Project Presentation
EU Telecom Sla Project Presentation
 
Bhadale group of companies general framework-level-2
Bhadale group of companies  general framework-level-2Bhadale group of companies  general framework-level-2
Bhadale group of companies general framework-level-2
 
03_AgilePM.pptx
03_AgilePM.pptx03_AgilePM.pptx
03_AgilePM.pptx
 
Dual-Track Agile at Scale
Dual-Track Agile at ScaleDual-Track Agile at Scale
Dual-Track Agile at Scale
 
A Recipe for Scale: Succeeding with Agile Software Development in the Enterprise
A Recipe for Scale: Succeeding with Agile Software Development in the EnterpriseA Recipe for Scale: Succeeding with Agile Software Development in the Enterprise
A Recipe for Scale: Succeeding with Agile Software Development in the Enterprise
 
KPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics FrameworkKPI Partners E-Book: The Project Analytics Framework
KPI Partners E-Book: The Project Analytics Framework
 
Leading Enterprise Wide Projects
Leading Enterprise Wide ProjectsLeading Enterprise Wide Projects
Leading Enterprise Wide Projects
 
2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resume2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resume
 
IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...
IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...
IDC & Gomez Webinar --Best Practices: Protect Your Online Revenue Through Web...
 
Value of PMP Certification and PMI Membership
Value of PMP Certification and PMI MembershipValue of PMP Certification and PMI Membership
Value of PMP Certification and PMI Membership
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012
 
JahiaOne 2015- The Unity Tech Partner Strategy by Piyush Patel
JahiaOne 2015- The Unity Tech Partner Strategy by Piyush PatelJahiaOne 2015- The Unity Tech Partner Strategy by Piyush Patel
JahiaOne 2015- The Unity Tech Partner Strategy by Piyush Patel
 
Professional Engagements
Professional EngagementsProfessional Engagements
Professional Engagements
 
Tech Services in Latin America Phase 1
Tech Services in Latin America  Phase 1Tech Services in Latin America  Phase 1
Tech Services in Latin America Phase 1
 
Google appenginemigrationcasestudy
Google appenginemigrationcasestudyGoogle appenginemigrationcasestudy
Google appenginemigrationcasestudy
 
Role of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project ManagementRole of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project Management
 
How to get started in extracting business value from big data 2 of 2 oct 2013
How to get started in extracting business value from big data 2 of 2 oct 2013How to get started in extracting business value from big data 2 of 2 oct 2013
How to get started in extracting business value from big data 2 of 2 oct 2013
 
Presentation Moscow December 2014
Presentation Moscow December 2014Presentation Moscow December 2014
Presentation Moscow December 2014
 
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
Thomas Walenta, PgMP, PMP, PMI Fellow. Projects & Programs are two different ...
 

Beta Programs And The Project Manager

  • 1. Beta Programs and the Project Manager Gary Shea www.garyshea.com ©2008 G Shea Beta Programs PMI-Madison 1
  • 2. Objective Show project managers the value of participating in beta programs ©2008 G Shea Beta Programs PMI-Madison 2
  • 3. Topics  Definitions  Examples  Benefits  Gotchas  The Role of the Project Manager  Exercises  Preliminaries  Advice  A Process  The Ultimate Goal  PMBOK Connections  Questions ©2008 G Shea Beta Programs PMI-Madison 3
  • 4. Definition - What is a Beta?  Early usage  Test non-  Pre – General development –  Sales / marketing Availability  Support  Not production  Delivery  Not buggy code  Unique  Partners’ configurations readiness period  Customer perspective ©2008 G Shea Beta Programs PMI-Madison 4
  • 5. Benefits?  For the organization  Product awareness and knowledge  Critical business functions  Competitive advantage  Vendor contacts  Vendor relationship  $avings ©2008 G Shea Beta Programs PMI-Madison 5
  • 6. Benefits?  To Project Manager  Gain knowledge of the business  Be able to make a difference  New contacts  Visibility  Travel  Have more fun ©2008 G Shea Beta Programs PMI-Madison 6
  • 7. Preliminaries (for the Project Manager)  Be a pro-active project manager  Be an investigator  Get the lay of the land  Configuration Management  Dig in  Determine what is critical  Get the user perspective  Moving targets – stay current  Who? Get to know them. ©2008 G Shea Beta Programs PMI-Madison 7
  • 8. A Process (for the organization)  Interest  Negotiation  Qualification  Implementation  Closure ©2008 G Shea Beta Programs PMI-Madison 8
  • 9. A Process: Interest  Learn organization environment  Identify core product set  Your interests  Identify possibilities (questionnaire)  Organization needs, directions, sponsorship  Sketch out project or 2: include timing, resources, benefits ©2008 G Shea Beta Programs PMI-Madison 9
  • 10. A Process: Negotiation  An internal process – gaining support for the project  Evaluation of the next release – why early access is essential  Executive approval  Resources earmarked  Expectations set ©2008 G Shea Beta Programs PMI-Madison 10
  • 11. A Process: Qualification  Vendor may seek you out  You may have to sell – Why essential? Resources ready. Smooth sailing thru legalities, sponsorship… ©2008 G Shea Beta Programs PMI-Madison 11
  • 12. A Process: Qualification  Make case – paperwork, plan, schedule, meet deadlines, be pro- active and clear  Keep your team involved and informed ©2008 G Shea Beta Programs PMI-Madison 12
  • 13. A Process - Implementation  Track activities & refine plan: what needs to be done – product and documentation shipments, installation, usage, meetings, training, reporting, issue management, test cases and tree  Enjoy the intensity  Report and resole issues, provide feedback. Make a difference.  Stick to schedule, meetings, checkpoints  Take good notes. ©2008 G Shea Beta Programs PMI-Madison 13
  • 14. A Process: Closure  Final report – jointly written. Team reviewed. Summarize issues, recommendations, …  Lessons learned.  Dot Is cross Ts all paperwork complete  Make recommendations on going into production  Report to sponsor ©2008 G Shea Beta Programs PMI-Madison 14
  • 15. PMBOK Connections  Configuration  Work Breakdown Management Structures  Stakeholders  Project phases  Cross functional  Feedback team  Closure  Decentralized team  Lessons learned  Scope management  Successful projects  Dependencies ©2008 G Shea Beta Programs PMI-Madison 15
  • 16. PMBOK – WBS Examples  Evaluate environment for prerequisite products, system programmer, ½ day  Upgrade prerequisite product to next version, separate dependent project  Evaluate user guide (200 pages) – 3 days, four end users  Interview end users – business analyst, 1 day  …. ©2008 G Shea Beta Programs PMI-Madison 16
  • 17. Real Life Example – Hudson Bay Company  Canadian retailer uses BI for applications  Example Top 50 Selling Products  Qualifies for Teradata Beta program  Five times participant ©2008 G Shea Beta Programs PMI-Madison 17
  • 18.  Selectively participates depending on new function  Driven by project managers – “they know apps best and make case to senior management” ©2008 G Shea Beta Programs PMI-Madison 18
  • 19. Real Life - Blackbaud  Provides software for non-profits – Raisers’ Edge  Local users: MSO, Wisc. Public TV  Beta is main activity of Stabilization phase  Processes refined over the years  Fifty early user customers  Formal agreements  Beta Bucks, production environment ‘handholding”  Recruits through trade shows, user groups  Function specific, phased, short duration ©2008 G Shea Beta Programs PMI-Madison 19
  • 20. Real Life – Harley Davidson  Internal Engineering betas  Roll out of tools and processes (e.g. issue tracking and risk assessing tool)  Borrowed modules from sister division  Best practices ©2008 G Shea Beta Programs PMI-Madison 20
  • 21.  Tweaking and tuning, refinement  User acceptance (best case they embrace new product)  Project oriented ©2008 G Shea Beta Programs PMI-Madison 21
  • 22. Gotchas  Organizational goal: minimal change  Workarounds: pilots, proof of concepts, test environment  Mismatch of PM / SDLC rigor  Solutions: understood up-front, clear contract, flexibility  Mismatch of needs (vendor / customer)  Solutions: narrowly focused objectives, “next time” ©2008 G Shea Beta Programs PMI-Madison 22
  • 23. Exercises  Identify core functions, products, processes  …..  …..  …..  Configuration (e.g. Oracle, Teradata, Blackbaud)  …..  ….. ©2008 G Shea Beta Programs PMI-Madison 23
  • 24. Advice  Think quality and process improvements  No hidden agenda  Share ideas, information, wisdom  Pushing too had? Ease off  Stay focused  Track, advertise, attract  Consider others’ ideas  Don’t forget what’s in it for the vendor ©2008 G Shea Beta Programs PMI-Madison 24
  • 25. The Ultimate Goal  Make a successful project of beta participation ©2008 G Shea Beta Programs PMI-Madison 25
  • 26. Acknowledgements  Paul Radke, PMI  Bucky Wall, Blackbaud  Ken Sutton,Harley Davidson  Mahmood Rad, Harley Davidson  Noel Skarpmoen, WUWM Radio  Mary-Jane Jarvis-Haig, Hudson Bay Company Graphics by YKDesigns ©2009 G Shea Beta Programs and Proj Mgmt 26