SlideShare a Scribd company logo
1 of 2
Download to read offline
fmsreliability.com http://www.fmsreliability.com/education/early-reliability-problems-news/
Fred
Early reliability problems in the news
Working down product launch
reliability problems
Boeing representatives explained the Dreamliner would need an additional 6 months of work to bring the aircraft’s
reliability in par with the existing 777 model. They made the announcement at the start of the Dubai air show. Not a
good start to a week of showing off the features of the aircraft.
http://www.ainonline.com/aviation-news/dubai-air-show/2013-11-17/boeing-sees-six-month-horizon-787-fixes
Generally, even the most general reliability goal a new product is to be as good or better than the last model. Sure,
the Dreamliner has many new features, materials and upgrades. Yet, it did as much or more design evaluation and
testing as any model previously.
Publicity and the benefits
One way to view this news, is the increased attention has two elements. First, Boeing is working very hard to identify
and resolve all quality and reliability issues as fast as possible. Second, they are spending money they most likely (I
do not know for sure) would not have spent over the next six months.
The Dreamliner is an expensive and low production volume product. Unlike game consoles (see Playstation launch
failures noticed article) stocked and sold for the holidays, the Dreamliner’s early units provide information immediately
useful to prevent future early life failures. Correcting design or production faults while the aircraft prior to shipment to
a customer is less expensive then repairs of aircraft already in service. The number of aircraft at risk for a newly
identified failure mechanism is limited by the production to date. Game consoles may have a million systems in boxes
in stores or customers homes before the first new failure mechanism reveals a major portion of the units are likely to
fail. The exposure of units likely to fail is not as large for aircraft.
Boeing is claiming they can find and resolve reliability issues over the next six months that will bring the Dreamliner’s
reliability up to the existing 777’s reliability. This illustrates Boeings (or anyone’s) ability to quickly find and resolve
reliability issues with a limited number of production units. The advantage is in six months they claim they can
replicate the work that the older unit accomplished over many years. The focus is benefiting Boeing and their
customers. Over the next few years Boeing expects to continue to benefit from an rapidly improved fleet reliability.
Improving product reliability internally
In my experience, I’ve seen other expensive, low volume benefit from the early and intensive attention to any field
failure. In the groups that benefits the most, they dedicated key design and operations engineers to rapidly solve even
minor issues. The ability to drive down the failure rate faster and possibly to a lower rate than achieved without the
early attention, provides value to all involved.
The second result of the media attention is the (possibly) increased cost to staff support and design teams to resolve
problems quickly. Boeing and other product development teams understand a new design will have early problems.
Most organizations quickly shift design teams to the next project and let the operations team resolve field issues. By
having to divert additional resources to resolve field issues appears expensive. The new product does not have the
staffing to make the expected progress. Plus the heightened awareness of any quality and reliability issue requires
additional work to resolve. When time is a factor, as with the Dreamliner at this point, costs increases and parts are
expedited, existing inventories are scrapped, etc. The additional cost is an investment and has two district benefits.
The first is the public relations message that Boeing is (now) serious about improving the Dreamliner’s reliability.
Second, Boeing has to maintain customer confidence and satisfaction that the aircraft’s reliability will actually improve.
The lost of customer confidence may lead to reduced sales and tarnish the companies brand image.
Design teams do not, in my experience, plan on increasing management attention with burning batteries or other field
failures. Design teams work very hard to avoid or minimize field failures from the first production unit. Today’s
products continue to experience early production related failures. A hallmark of organizations with great reliability
programs, even in the absence of heightened media attention, dedicate resources from the design team to rapidly
reduce field failure rates during the early production phase. The investment continues to have value.

More Related Content

Viewers also liked (16)

Internship project
Internship projectInternship project
Internship project
 
Joomla Chicago Kickstart Part 3
Joomla Chicago Kickstart Part 3Joomla Chicago Kickstart Part 3
Joomla Chicago Kickstart Part 3
 
Acerca De Solvis Consulting
Acerca De Solvis ConsultingAcerca De Solvis Consulting
Acerca De Solvis Consulting
 
ProductCamp St Louis - 2014 flyer
ProductCamp St Louis - 2014 flyerProductCamp St Louis - 2014 flyer
ProductCamp St Louis - 2014 flyer
 
Twitter en Facebook voor Journalisten
Twitter en Facebook voor JournalistenTwitter en Facebook voor Journalisten
Twitter en Facebook voor Journalisten
 
Social Collaboration at Grundfos
Social Collaboration at GrundfosSocial Collaboration at Grundfos
Social Collaboration at Grundfos
 
Kinh nhan qua luan hoi
Kinh nhan qua luan hoiKinh nhan qua luan hoi
Kinh nhan qua luan hoi
 
Student Analytics en aansluiting VO-HO – een verkenning van de mogelijkheden ...
Student Analytics en aansluiting VO-HO – een verkenning van de mogelijkheden ...Student Analytics en aansluiting VO-HO – een verkenning van de mogelijkheden ...
Student Analytics en aansluiting VO-HO – een verkenning van de mogelijkheden ...
 
Northeastern Pa Financial Services
Northeastern Pa Financial ServicesNortheastern Pa Financial Services
Northeastern Pa Financial Services
 
Blossoms daimyo
Blossoms daimyoBlossoms daimyo
Blossoms daimyo
 
Heart Management
Heart ManagementHeart Management
Heart Management
 
Wtmfinal
Wtmfinal
Wtmfinal
Wtmfinal
 
PréS CréRéSeau
PréS CréRéSeauPréS CréRéSeau
PréS CréRéSeau
 
Parenthése Internship Presentation - University of Brighton
Parenthése Internship Presentation - University of BrightonParenthése Internship Presentation - University of Brighton
Parenthése Internship Presentation - University of Brighton
 
UFI Education FM - Taipei 2010 - Paul Woodward
UFI Education FM - Taipei 2010 - Paul WoodwardUFI Education FM - Taipei 2010 - Paul Woodward
UFI Education FM - Taipei 2010 - Paul Woodward
 
Some things Spiritism can do for you
Some things Spiritism can do for you Some things Spiritism can do for you
Some things Spiritism can do for you
 

More from Accendo Reliability

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfAccendo Reliability
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdfAccendo Reliability
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdfAccendo Reliability
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 

More from Accendo Reliability (20)

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdf
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 

Recently uploaded

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 

Recently uploaded (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 

Early reliability problems in the news

  • 1. fmsreliability.com http://www.fmsreliability.com/education/early-reliability-problems-news/ Fred Early reliability problems in the news Working down product launch reliability problems Boeing representatives explained the Dreamliner would need an additional 6 months of work to bring the aircraft’s reliability in par with the existing 777 model. They made the announcement at the start of the Dubai air show. Not a good start to a week of showing off the features of the aircraft. http://www.ainonline.com/aviation-news/dubai-air-show/2013-11-17/boeing-sees-six-month-horizon-787-fixes Generally, even the most general reliability goal a new product is to be as good or better than the last model. Sure, the Dreamliner has many new features, materials and upgrades. Yet, it did as much or more design evaluation and testing as any model previously. Publicity and the benefits One way to view this news, is the increased attention has two elements. First, Boeing is working very hard to identify and resolve all quality and reliability issues as fast as possible. Second, they are spending money they most likely (I do not know for sure) would not have spent over the next six months. The Dreamliner is an expensive and low production volume product. Unlike game consoles (see Playstation launch failures noticed article) stocked and sold for the holidays, the Dreamliner’s early units provide information immediately useful to prevent future early life failures. Correcting design or production faults while the aircraft prior to shipment to a customer is less expensive then repairs of aircraft already in service. The number of aircraft at risk for a newly identified failure mechanism is limited by the production to date. Game consoles may have a million systems in boxes in stores or customers homes before the first new failure mechanism reveals a major portion of the units are likely to fail. The exposure of units likely to fail is not as large for aircraft. Boeing is claiming they can find and resolve reliability issues over the next six months that will bring the Dreamliner’s reliability up to the existing 777’s reliability. This illustrates Boeings (or anyone’s) ability to quickly find and resolve
  • 2. reliability issues with a limited number of production units. The advantage is in six months they claim they can replicate the work that the older unit accomplished over many years. The focus is benefiting Boeing and their customers. Over the next few years Boeing expects to continue to benefit from an rapidly improved fleet reliability. Improving product reliability internally In my experience, I’ve seen other expensive, low volume benefit from the early and intensive attention to any field failure. In the groups that benefits the most, they dedicated key design and operations engineers to rapidly solve even minor issues. The ability to drive down the failure rate faster and possibly to a lower rate than achieved without the early attention, provides value to all involved. The second result of the media attention is the (possibly) increased cost to staff support and design teams to resolve problems quickly. Boeing and other product development teams understand a new design will have early problems. Most organizations quickly shift design teams to the next project and let the operations team resolve field issues. By having to divert additional resources to resolve field issues appears expensive. The new product does not have the staffing to make the expected progress. Plus the heightened awareness of any quality and reliability issue requires additional work to resolve. When time is a factor, as with the Dreamliner at this point, costs increases and parts are expedited, existing inventories are scrapped, etc. The additional cost is an investment and has two district benefits. The first is the public relations message that Boeing is (now) serious about improving the Dreamliner’s reliability. Second, Boeing has to maintain customer confidence and satisfaction that the aircraft’s reliability will actually improve. The lost of customer confidence may lead to reduced sales and tarnish the companies brand image. Design teams do not, in my experience, plan on increasing management attention with burning batteries or other field failures. Design teams work very hard to avoid or minimize field failures from the first production unit. Today’s products continue to experience early production related failures. A hallmark of organizations with great reliability programs, even in the absence of heightened media attention, dedicate resources from the design team to rapidly reduce field failure rates during the early production phase. The investment continues to have value.