1. ELECTRONIC DOCUMENTATION FORM
1. Report Title and Type (Thesis): Special Purpose Vehicle (SPV) for Infrastructure
Projects Financing through Public-Private Partnerships (PPPs)
2. Name of the Author: Abu Naser Chowdhury
3. Name of Advisor and Committee Members:
Dr. Chotchai Charoenngam (Chairperson)
Dr. Pannapa Herabat
Dr. B.H.W. Hadikusumo
4. Field of Study : Construction, Engineering and Infrastructure Management
5. School: School of Engineering and Technology
6. Abstract:
The development of special purpose vehicle (SPV) is essential for successful financial
closeout of public-private partnership (PPP) projects. The financing of infrastructure
projects depends on the anticipated financial performance of the SPV. Ambitious and
improper setup of SPV causes suffering to project, forces restructuring debt mechanism
and even bankruptcy to giant companies. Concerted efforts from the government and
private sectors, as well as political, legal and financial issues need to deal with for smooth
mechanism of SPV. These issues have been identified and evaluated from twelve
worldwide infrastructure projects. It is found that different projects used different SPV
structure. An Attempted has taken to identify the attributes governing the setup of SPV in
those cases. Furthermore, six cases out of twelve in Asia and Mediterranean Middle East
are screened out for in-depth analysis on financial strategies, legal framework, contract,
securities for the SPV framework. The findings are based on a variety of diverse
situations. Finally, a SPV structure for infrastructure projects in general has been
developed, addressing key issues in five areas: (1) finance-ability; (2) sources of funds;
(3) securities and agreements; (4) sovereign support; and (5) credit enhancement. The
research findings should enable public as well as private sector clients to establish more
efficient SPV with respect to financial framework for infrastructure projects.
7. Keywords: Special Purpose Vehicle, Concession, Equity, Debt repayment, Host
government, Export Credit Agencies, Multilateral Development Banks, Off-take,
Sovereign Support, Guarantee
8. References:
2. Abdul-Aziz, A.R. (2001). Unraveling of BOT schemes: Malaysia’s Indah Water
Konsortium. Journal of Construction Engineering and Management, 127(6), 457-
460.
Albouy, Y. and Bousba, R. The Impact of IPPs in Developing Countries- Out of Crisis
and into the Future, The World Bank Private Sector (www.worldbank.org), Note
168, December 1998.
Alfen, H. W. (2006). The German Procurement Process for BOT-type Projects, EAP3N-
Teaching Sessions, Video conference presentation, Weimar/Bangkok, 11 January
2006.
Asenova, D. and Beck, M. (2003). A financial perspective on risk management in public-
private partnerships. In Akintoye, Beck & Hardcastle (Eds.), Public-Private
Partnerships: Managing risks and opportunities (pp. 127-151). London: Blackwell
Science Ltd.
Becker, H. S. (1996). The epistemology of qualitative research. In R. Josser, A. Colby &
R. A. Shweder (Eds.), Ethnography and Human development: Context and
meaning in social inquiry (pp. 205-216). Cambridge, England: Cambridge
University Press.
Bing, L., Akintoye, A., Edwards, P.J. and Hardcastle, C. (2005). The allocation of risk in
PPP/PFI construction projects in the UK. International Journal of Project
Management, 23, 25-35.
Chang, L.M. and Chen, P.H. (2000). BOT Financial Model: Taiwan High Speed Rail
Case. Journal of Construction Engineering and Management, 127(3), 214-222.
Cooper, R.D. and Schindler, S.P. (2003). Business Research Methods, (8th ed.),
Singapore: The McGrawHill.
Dailami, M. and Klein, M. (1997). Government Support to Private Infrastructure Projects
in Emerging Markets. Dealing with Public Risk in Private Infrastructure, The
World Bank, 21-37.
Deane, J. (2002). Private sector participation in desalination in the Mediterranean Middle
East (MME)- past, present and future. Desalination Journal, 152, 57-66.
Digital Library and Archives, (2005). Choosing Qualitative Research: A Primer for
Technology Education Research. Retrieved September 29, 2005 from http://
www.scholar.lib.vt.edu/ejournals/JTE/v9n1/hoepfl.html
Doh, P. J. and Ramamurti, R. (2003). Reassessing Risk in Developing Country
Infrastructure. Long Range Planning Journal, 36, 337-353.
3. Eisner, E. W. (1991). The enlightened eye: Qualitative inquiry and the enhancement of
educational practice. New York, NY: Macmillan Publishing Company.
Ellis, S. (1999). Financing options. The Private Finance Initiative Journal, 3(6), 60-61.
Esty, C.B. (2004). Why Study Large Projects? An Introduction to Research on Project
Finance. European Financial Management, 10(2), 213-224.
Fabozzi, F.J. (2001). Accessing Capital Market Through Securitization. Pennsylvania:
Author.
Finlayson, J. A. (2002, February). The What and Why of Public-Private Partnerships
[Electronic version]. Business Council of British Columbia, 9(1), 1-6.
Finnerty, J.D. (1996). Project Financing: Asset-Based Financial Engineering. John
Wiley & Sons, Inc.
Ghosh, S. and Jintanapakanont, J. (2004). Identifying and assessing the critical risk
factors in an underground rail project in Thailand. International Journal of
Project Management, 22, 633-643.
Gonzales, A.D. and Paul, H. (2000). Financing of private infrastructure investments in
the emerging markets of Southeast Asia. Journal of Financial Management of
Property and Construction, 8(2), 61-78.
Grimsey, D. and Lewis, M.K. (2002). Evaluating the risks of public private partnership
for infrastructure projects. International Journal of Project Management, 20, 107-
118.
Gupta, J.P. and Sravat, A. (1998). Development and Project financing of private power
projects in developing countries: a case study of India. International Journal of
Project Management, 16(2), 99-105.
Hoepfl, M. C. (1997). Choosing Qualitative Research: A Primer for Technology
Education Researchers. Journal of Technology Education, 9(1), 3-20.
International Finance Corporation (1999). Project Finance in Developing Countries.
Lessons of Experience no. 7
Johnson, S.D. (1995). Will our research hold up under scrutiny? Journal of Industrial
Teacher Education, 32(2), 3-6.
Khan, M.F.K. and Parra, R. J. (2003). Financing Large Projects: Using Project Finance
Techniques and Practices. Singapore, Pearson Prentice Hall.
4. Kumaraswamy, M.M. and Zhang, X.Q. (2001). Governmental role in BOT-led
infrastructure development. International Journal of Project Management, 19,
195-205.
Lam, P.T.I. (1999). A sectoral review of risks associated with major infrastructure
projects. International Journal of Project Management, 17(2), 77-87.
Lloyd-Jones, G. (2003). Design and control issues in qualitative case study research.
International Journal of Qualitative Methods, 2(2). Article 4. Retrieved
September 29, 2005 from http://www.
ualberta.ca/iiqm/backissues/2_2/pdf/lloydjones.pdf
Maxwell, J. A. (1996). Qualitative Research Design: An Interactive Approach, Thousand
Oaks, CA: Sage Publication Inc.
Miles, M. B., and Huberman, A. M. (1994). An expanded sourcebook: Qualitative data
analysis. International Educational and Professional Publisher, CA: Sage
Publication Inc.
Neuman, W. L. (1997). Social research methods: Qualitative and quantitative approaches.
(3rd ed.). MA: Allyn & Bacon.
Nevitt, P.K. and Fabozzi, F. (1995). Project Financing, (6th ed.), Euromoney Publication
Ogunlana, S. O. (1997). Build Operate Transfer procurement traps: examples from
transportation projects in Thailand. Proc., CIB W92 Symp. On Procurement, IF
Research Corporation, Montreal, 585-594.
Pacelle, M., Schoeder, M. and Emshwiller, J. (2001). Enron Has One-Year Restructuring
Target. The Wall Street Journal, 12/13/01, p.A3.
Park, T. (1998). Private infrastructure development in Asia. Journal of Project Finance,
4(3), 25-33.
Patton, M.Q. (1990). Qualitative Evaluation and Research methods.(2nd ed.), Newbury
Park, CA: Sage Publication Inc.
Pickering, C. (1999). The asset option. The Private Finance Initiative Journal, 3(6), 64.
Ramamurti, R. (2003). Can government make credible promise? Insights from
infrastructure projects in emerging economics. Journal of International
Management, 9, 253-269.
Roll, M. and Verbeke, A (1998). Financing of the Trans-European High-Speed Rail
Network: New Forms of Public-Private Partnerships. European Management
Journal, 16(6), 706-713.
5. Schaufelberger, J.E. and Wipadapisut, I. (2003). Alternate Financing Strategies for Build-
Operate-Transfer Projects, Journal for Construction Engineering and
Management, 129(2), 205-213.
Senturk, H.A., Yazici, G. and Kaplanoglu, B. (2004). Case Study: Izmait Domestic and
Industrial Water Supply Build-Operate-Transfer Project. Journal of Construction
Engineering and Management, 130(3), 449-454.
Strauss, A. and Corbin, J (1990). Basics of qualitative research: grounded theory
procedures and techniques. Newbury Park: Sage Publication Inc.
Tiong, L.K.R. and Alum, Jahidul (1997). Financial commitments for BOT projects.
International Journal of Project Management, 15(2), 73-78.
Tiong, R. and Anderson, J. A. (2003). Private-public partnership risk assessment and
management process: the Asian Dimension. In Akintoye, Beck & Hardcastle
(Eds.), Public-Private Partnerships: Managing risks and opportunities (pp. 225-
243). London: Blackwell Science Ltd.
Tiong, L.K.R. (1990). BOT projects: risks and securities. Construction Management and
Economics, 8, 315-328.
Tiong, L.K.R. and Ye, S. (2003). Effects of Tariff Design in Risk Management of
Privately Financed Infrastructure Projects. Journal of Construction Engineering
and Management, 129(6), 610-618.
Trujillo, J.A., Cohen, R., Freixas, X. and R, Sheehy. (1997). Infrastructure Financing
with unbundled mechanism, No. IFM-109, Washington DC: Inter-American
Development Bank.
Available online at: http://www.iadb.org/sds/doc/1208eng.pdf
Wang, S.Q. and Tiong, L.K. (2000). Case study of government initiatives for PRC’s BOT
power plant project. International Journal of Project Management, 18, 69-78.
Wardman, M. (2004). Public transport values of time. Transport Policy, 11, 363-377.
Wolfs, M. and Woodroffe, S. (2002). Structuring and financing international BOO/BOT
desalination projects. Desalination, 142, 101-106.
Yin, R. K. (2003). Case Study Research: Design and Methods. (3rd ed.), Thousand Oaks:
Sage Publication Inc.
Zhang, X. (2005). Financial Viability Analysis and Capital Structure Optimization in
Privatized Public Infrastructure Projects. Journal of Construction Engineering
and Management, 131(6), 656-668.
6. Zhang, X. (2005). Paving the Way for Public-Private Partnerships in Infrastructure
Development. Journal of Construction Engineering and Management ,131(1),
71-80.
Zhang, X. (2005). Critical Success Factors for Public-Private Partnerships in
Infrastructure Development. Journal of Construction Engineering and
Management, 131(1), 3-14.
Zhang, X. (2004). Concessionaire Selection: Methods and Criteria. Journal of
Construction Engineering and Management, 130(2), 235-244.
Zhang, X.Q., Kumaraswamy, M.M., Zheng, W. and Palaneeswaran, E. (2002).
Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong
Kong. Journal of Construction Engineering and Management, 128(2), 155-163.