I-395 Express Lanes Extension
Fairfax County Transportation Committee
February 12, 2016
Susan Shaw, PE, CCM, DBIA, VDOT Megaprojects Director
395 Express Lanes
• The Comprehensive
Agreement executed in 2012
with 95 Express Lanes, LLC.
(95 Express) for the 95 Express
Lanes contemplated the
potential future development of
the Northern HOT Lanes along
the I-395 corridor.
• In November of 2015, VDOT
and 95 Express signed a
Development Framework
Agreement (Agreement)
outlining the Parties initial roles
and responsibilities in
developing this Project.
2
Development Framework Agreement
• The Parties agree that the intent of this Agreement is to advance the
395 Project as a Concessionaire Project Enhancement under the
structure of Section 12.06(a) of the Comprehensive Agreement.
• Outlines the responsibilities of the Parties.
• Improvements to be built within VDOT’s existing right of way.
• The Parties will work together to finalize the scope, finance plan and
agreement.
• Project will provide Long-Term Transit Investment through an annual
transit payment amount.
3
Regional Express Lanes Network
4
395 Express Lanes Project Scope
• Convert the two existing reversible High Occupancy Vehicle (HOV)
lanes to High Occupancy Toll (HOT) lanes; construct an additional
HOT lane (Total = 3 HOT Lanes)
• Install an Active Traffic Management System
• Install signage and toll systems
• Provide sound walls
• Provide improved connections between the proposed I-395 Express
Lanes and Eads Street
• Conduct multimodal study
5
VDOT’s Responsibilities
• Planning/Environmental Approvals
• Inclusion in MWCOG Transportation Planning Board’s
Constrained Long Range Plan (CLRP)
• Public Outreach
• Environmental Assessment and supporting technical studies
• Interchange Modification Report (IMR)
• Stormwater Management Approvals
• Preliminary Sound Wall Work
• Federal, State and Local Agency Coordination
• Multimodal Study (conducted by DRPT)
6
Responsibilities of 95 Express
• Preliminary Engineering and Design
• Cost Estimating
• Finance Plan
• Design-Build Procurement
• Community Outreach for I-395 Express Lanes
7
No impacts to most interchangesProject Access
Existing and Proposed
8
Environmental Assessment
• VDOT initiating preparation of an Environmental
Assessment (EA) for the I-395 Express Lanes Project
• Finalizing NEPA concurrence with FHWA
• Scoping sent January 2016
• Technical studies to include:
• Traffic Analysis and Forecasting
• Air Analysis
• Noise Analysis
• Indirect and Cumulative Effects
• Public Information Meeting anticipated April 2016
• Release of Draft EA anticipated later summer 2016
9
Multimodal Study
DRPT leading Transit/Transportation Demand Management (TDM)
Study
• Scope is broader than project limits - will extend entire proposed I-395 and
existing 95 Express Lanes corridor
• DRPT will solicit stakeholder input and finalize scope of study with goal of
beginning study in March 2016
• Study will identify transit services and TDM program enhancements that
would increase mobility and benefit toll payers in the I-95/I-395 corridor
• A list of projects will be identified, prioritized for funding through this
project
10
Key Project Milestones
Key Milestones Begin Dates
Public Outreach Ongoing
Stakeholder Advisory Group Meeting #1 January 12, 2016
Begin NEPA – Environmental Assessment January 2016
Begin Multimodal Study March 2016
Public Information Meeting April 2016
Adopted in Constrained Long Range Plan November 2016
Design Build Contract Award (95 Express) December 2016
Final NEPA Decision December 2016
Final Multimodal Study December 2016
Final Agreement January 2017
Begin Construction (95 Express) Spring 2017
Project Completion (95 Express) Summer 2019
11

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
 
Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016   Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
 
Fairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
Fairfax County Taxicab Regulation: 2015 Certificate Demand AnalysisFairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
Fairfax County Taxicab Regulation: 2015 Certificate Demand Analysis
 
Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2
 
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
 
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
 
VDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives AnalysisVDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives Analysis
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the Beltway
 
Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings...
Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings...Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings...
Dulles Corridor Metrorail Project Phase 2 & Station Names: Community Meetings...
 
Fairfax County Capital Bikeshare
Fairfax County Capital BikeshareFairfax County Capital Bikeshare
Fairfax County Capital Bikeshare
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
 
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
Reston Transportation Funding Plan: Funding Scenarios and Advisory Group Work...
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 

Andere mochten auch

Andere mochten auch (20)

Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 
95 Express Lanes Project Update
95 Express Lanes Project Update95 Express Lanes Project Update
95 Express Lanes Project Update
 
Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016
Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016
Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016
 
Board of Supervisors Transportation Committee: Next Steps for Urban Street St...
Board of Supervisors Transportation Committee: Next Steps for Urban Street St...Board of Supervisors Transportation Committee: Next Steps for Urban Street St...
Board of Supervisors Transportation Committee: Next Steps for Urban Street St...
 
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 19, 2017
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
 
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor StudyFairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
 
Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....
Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....
Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....
 
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
 
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailDesign Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 
Fairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County Parkway Corridor Study
Fairfax County Parkway Corridor Study
 
Huntington Area Transportation Study (HATS) Project Update
Huntington Area Transportation Study (HATS) Project UpdateHuntington Area Transportation Study (HATS) Project Update
Huntington Area Transportation Study (HATS) Project Update
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
 
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
 
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master Plan
 
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
Update on Tysons Transportation Projects: Board Transportation Committee: Feb...
 

Ähnlich wie I-395 Express Lanes Extension

Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13
Adina Levin
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
ssuserc1ed5e
 
2014_Annual_P3_Report
2014_Annual_P3_Report2014_Annual_P3_Report
2014_Annual_P3_Report
Bryan Kendro
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
vvchamber123
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
directionsto2050
 

Ähnlich wie I-395 Express Lanes Extension (20)

I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
MTC core capacity transit study
MTC core capacity transit studyMTC core capacity transit study
MTC core capacity transit study
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework Document
 
2016 Florida Automated Vehicles Summit presentation
2016 Florida Automated Vehicles Summit presentation2016 Florida Automated Vehicles Summit presentation
2016 Florida Automated Vehicles Summit presentation
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
2014_Annual_P3_Report
2014_Annual_P3_Report2014_Annual_P3_Report
2014_Annual_P3_Report
 
Connecting the dots
Connecting the dotsConnecting the dots
Connecting the dots
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
 
Greater Miami Chamber of Commerce SMART Plan update presentation.
Greater Miami Chamber of Commerce SMART Plan update presentation.Greater Miami Chamber of Commerce SMART Plan update presentation.
Greater Miami Chamber of Commerce SMART Plan update presentation.
 
Learnings from a programme business case
Learnings from a programme business case Learnings from a programme business case
Learnings from a programme business case
 

Mehr von Fairfax County

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Kürzlich hochgeladen (20)

BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 

I-395 Express Lanes Extension

  • 1. I-395 Express Lanes Extension Fairfax County Transportation Committee February 12, 2016 Susan Shaw, PE, CCM, DBIA, VDOT Megaprojects Director
  • 2. 395 Express Lanes • The Comprehensive Agreement executed in 2012 with 95 Express Lanes, LLC. (95 Express) for the 95 Express Lanes contemplated the potential future development of the Northern HOT Lanes along the I-395 corridor. • In November of 2015, VDOT and 95 Express signed a Development Framework Agreement (Agreement) outlining the Parties initial roles and responsibilities in developing this Project. 2
  • 3. Development Framework Agreement • The Parties agree that the intent of this Agreement is to advance the 395 Project as a Concessionaire Project Enhancement under the structure of Section 12.06(a) of the Comprehensive Agreement. • Outlines the responsibilities of the Parties. • Improvements to be built within VDOT’s existing right of way. • The Parties will work together to finalize the scope, finance plan and agreement. • Project will provide Long-Term Transit Investment through an annual transit payment amount. 3
  • 5. 395 Express Lanes Project Scope • Convert the two existing reversible High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes; construct an additional HOT lane (Total = 3 HOT Lanes) • Install an Active Traffic Management System • Install signage and toll systems • Provide sound walls • Provide improved connections between the proposed I-395 Express Lanes and Eads Street • Conduct multimodal study 5
  • 6. VDOT’s Responsibilities • Planning/Environmental Approvals • Inclusion in MWCOG Transportation Planning Board’s Constrained Long Range Plan (CLRP) • Public Outreach • Environmental Assessment and supporting technical studies • Interchange Modification Report (IMR) • Stormwater Management Approvals • Preliminary Sound Wall Work • Federal, State and Local Agency Coordination • Multimodal Study (conducted by DRPT) 6
  • 7. Responsibilities of 95 Express • Preliminary Engineering and Design • Cost Estimating • Finance Plan • Design-Build Procurement • Community Outreach for I-395 Express Lanes 7
  • 8. No impacts to most interchangesProject Access Existing and Proposed 8
  • 9. Environmental Assessment • VDOT initiating preparation of an Environmental Assessment (EA) for the I-395 Express Lanes Project • Finalizing NEPA concurrence with FHWA • Scoping sent January 2016 • Technical studies to include: • Traffic Analysis and Forecasting • Air Analysis • Noise Analysis • Indirect and Cumulative Effects • Public Information Meeting anticipated April 2016 • Release of Draft EA anticipated later summer 2016 9
  • 10. Multimodal Study DRPT leading Transit/Transportation Demand Management (TDM) Study • Scope is broader than project limits - will extend entire proposed I-395 and existing 95 Express Lanes corridor • DRPT will solicit stakeholder input and finalize scope of study with goal of beginning study in March 2016 • Study will identify transit services and TDM program enhancements that would increase mobility and benefit toll payers in the I-95/I-395 corridor • A list of projects will be identified, prioritized for funding through this project 10
  • 11. Key Project Milestones Key Milestones Begin Dates Public Outreach Ongoing Stakeholder Advisory Group Meeting #1 January 12, 2016 Begin NEPA – Environmental Assessment January 2016 Begin Multimodal Study March 2016 Public Information Meeting April 2016 Adopted in Constrained Long Range Plan November 2016 Design Build Contract Award (95 Express) December 2016 Final NEPA Decision December 2016 Final Multimodal Study December 2016 Final Agreement January 2017 Begin Construction (95 Express) Spring 2017 Project Completion (95 Express) Summer 2019 11