Department of Public Works and Environmental Services
Huntington Levee
Community Meeting
October 26, 2016
Building Design and Construction Division 2
Agenda
Huntington Levee
I. Project Background
II. Levee System Design
III. Construction
IV. Community Amenities
V. Flood Modeling Results
VI. Permitting
VII. Schedule
VIII. Environmental Design
IX. Community Outreach
X. Questions
Building Design and Construction Division 3
Project Background
• June 2006 -160 homes were
flooded from a storm event
• 2009 – US Army Corps of
Engineers (USACE)
completed a study to
evaluate flood damage
reduction measures in the
Huntington Community
• November 6, 2012 – Fairfax County voters approved stormwater
bond referendum
• November 2013 – Phase I design completed
• January 2014 – Fairfax County and Huntington Community reached
consensus on conceptual design features
Building Design and Construction Division 4
Project Background
• July 2014 – Hydraulic and Hydrologic Modelling for Cameron Run
• September 2014 – Schematic (30%) Design
• October 2014 - Value Engineering Workshop
• June 2015 – Design Development (60%) Design
• February 2016 – Construction Documents (100%) Design
• Spring 2016 – Technical review by County and Corps of Engineers
• July 2016 – CLOMR approved by FEMA
• August 2016 – Project advertised for bid to pre-qualified contractors
• September 2016 – Wetlands permitting approved by DEQ and Corps of
Engineers
Building Design and Construction Division 5
Levee System Design
Levee System
Building Design and Construction Division 6
Levee System Design
Key Design Features
• Earthen Levee/I-Wall Combination
• Pump Station
• Stormwater Diversion
Building Design and Construction Division 7
Levee System Design
Rendering – Looking West
Levee I-Wall
Open Channel
Ponding Area
Cameron Run
Building Design and Construction Division 8
Levee System Design
Rendering – Looking East with Cross Section
Asphalt
Trail
Open Channel
with Drains
Ponding
Area
Ponding Area
Slope
Slope
Slope
Sloped to
Pump Station
Building Design and Construction Division 9
Levee System Design
Rendering – Looking East from Top of Levee Trail
Asphalt Trail
Concrete
I-Wall
Ponding Area
Building Design and Construction Division 10
Levee System Design
Rendering – Looking Northeast Toward Pump Station
Note: Fence with gate to be constructed around Pump Station
Building Design and Construction Division 11
Levee System Design
Rendering – Cross Section of Pump Station
Building Design and Construction Division 12
Construction
Next Steps in Construction
Bids
Opened
Bid
Evaluation
County
Approval of
Contract
Notice of
Award
Notice to
Proceed
October 6,
2016
October
2016
November
2016
December
2016
January
2017
Building Design and Construction Division 13
Construction
Key Activities during Construction
Notice to
Proceed
Site
Management
Plan
Contractor
Mobilization
Substantial
Completion
January
2017
January/
February
2017
January/
February
2017
February
2019
Building Design and Construction Division 14
Site Management Plan
• Submitted by contractor 30 days after NTP
• Approved by County
Included in Site Management Plan
• Phasing of Construction
• Control of Water
• Emergency Response
Construction
Building Design and Construction Division 15
Contractor Restrictions
• Construction activities limited to 7:00am to 7:00pm, Monday – Friday
• Weekend and holiday work to be approved by County
• Contractor parking prohibited in neighborhood
• Truck traffic through neighborhood restricted
• Noise per Fairfax County Noise Ordinance
Construction
Building Design and Construction Division 16
Construction
First Construction Activities
• Identification of Limits of Disturbance
• Safety Fencing
• Erosion and Sediment Control
• Construction of Access Road
Building Design and Construction Division 17
Construction
Construction Extents
For General Reference – Actual Extent determined by Contractor
Construction
Safety Fence
around Site
Perimeter
Construction
Access Road
Utility
Work
Location of
Pump
Station
Building Design and Construction Division 18
Construction
Construction Access
• Route A: Primary Construction Access
• Route D: Secondary Access for Pump Station
• Routes B and C: Possible Tertiary Construction Access
Building Design and Construction Division 19
Community Amenities
Trails
• Native Grasses in Ponding Area, Mowed 1-3 times per Year
• Coarse Turf Grass on Levee
Trail Atop
Levee
Trail in
Ponding
Area
Pump
Station
Existing
Trail
Service
Drive
Building Design and Construction Division 20
Community Amenities
Playground Area in Farrington Park
• Worked with Community Group in Fall 2015
• Separate Equipment for Age Groups
• Construction in December 2016/ January 2017
Building Design and Construction Division 21
Community Amenities
Playground Area in Farrington Park – Proposed Design
Building Design and Construction Division 22
Flood Modelling Results
Protection of Homes from 100-Year Storm
Flood elevation 1-ft below lowest home opening
Building Design and Construction Division 23
Flood Modelling Results
100-year Stormwater Ponding
Some Street Flooding, but Water Surface Elevation Below Structures
Building Design and Construction Division 24
Flood Modelling Results
25-year Stormwater Ponding
Some Street Flooding, but Water Surface Elevation Below Structures
Building Design and Construction Division 25
Flood Modelling Results
10-year Stormwater Ponding
Some Street Flooding, but Water Surface Elevation Below Structures
Building Design and Construction Division 26
Permitting Update
All Permitting Completed
• Joint Permit Application (Wetlands)
• Conditional Letter of Map Revision (CLOMR)
• DEQ Stormwater Permit
• Building Permit
• Site Permit
• Zoning
• Floodplain Study
Building Design and Construction Division 27
Permitting Update
Permitting Requirements
• Construction Limits marked
with 4-foot tall orange fencing
• Non-impacted surface waters
with 50-feet of construction
limits clearly demarcated
• Monthly DEQ inspection
checklist
• Inspections by DEQ and US
Army Corps of Engineers
Tree
Preservation
Areas
Levee
Building Design and Construction Division 28
Schedule
• Phase II (January 2014-Winter 2017)
 Schematic Design (30%)
 Design Development (60%)
 Permitting (began March 2015)
 Land Acquisition (began September 2014)
 Construction Documents
• Bidding
• Phase III (Winter 2017-Spring 2019)
• Construction
Project Remains on Schedule
Building Design and Construction Division 29
Environmental Design
Envision
• Rating System for Infrastructure Projects
• Bronze Level
• Similar to LEED
• 5 Categories:
• Quality of Life
• Leadership
• Resource Allocation
• Natural World
• Climate and Risk
Building Design and Construction Division 30
Community Outreach
Building Design and Construction Division 31
Community Outreach
Building Design and Construction Division 32
Community Outreach
• Bi-annually
• Important Milestones
• Next Community meeting – Spring 2017
Community Meetings
Building Design and Construction Division 33
Community Outreach
• Similar to current response
• Contractor responsible to maintain current condition (no
worse)
• Temporary pumping as needed
• Contractor will be notified when County dispatches to site
Storm Events
Building Design and Construction Division 34
Community Outreach
 Contact Information – Huntington Levee Project
 Phone #: 703-324-5800
 Email address: HuntingtonLevee@fairfaxcounty.gov
 Huntington Levee Website:
www.fairfaxcounty.gov/dpwes/huntingtonlevee
To request this document in an alternate format call 703-324-5800, TTY 711.

Weitere ähnliche Inhalte

Was ist angesagt?

Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration ProjectFairfax County
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectFairfax County
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectFairfax County
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectFairfax County
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectFairfax County
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream RestorationFairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Fairfax County
 
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Fairfax County
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFairfax County
 
Lorton Landfill Closure Status Update 3 13-18 SCF mtg
Lorton Landfill Closure Status Update 3 13-18 SCF mtgLorton Landfill Closure Status Update 3 13-18 SCF mtg
Lorton Landfill Closure Status Update 3 13-18 SCF mtgFairfax County
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
 
Broyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectBroyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectFairfax County
 
Paul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationPaul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationFairfax County
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationFairfax County
 

Was ist angesagt? (20)

Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Towlston Meadows Restoration Project
Towlston Meadows Restoration ProjectTowlston Meadows Restoration Project
Towlston Meadows Restoration Project
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
Lorton Landfill Closure Status Update 3 13-18 SCF mtg
Lorton Landfill Closure Status Update 3 13-18 SCF mtgLorton Landfill Closure Status Update 3 13-18 SCF mtg
Lorton Landfill Closure Status Update 3 13-18 SCF mtg
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
 
Broyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectBroyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement Project
 
Paul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream RestorationPaul Springs Segment 1 & 2 Stream Restoration
Paul Springs Segment 1 & 2 Stream Restoration
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
 

Ähnlich wie Huntington Levee Community Meeting: Oct. 26. 2016

Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Fairfax County
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting Fairfax County
 
Huntington Levee Community Meeting: Nov. 1, 2017
Huntington Levee Community Meeting: Nov. 1, 2017Huntington Levee Community Meeting: Nov. 1, 2017
Huntington Levee Community Meeting: Nov. 1, 2017Fairfax County
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
 
Pike Branch at Ridgeview Park Stream Restoration Oct 2018
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Pike Branch at Ridgeview Park Stream Restoration Oct 2018
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Fairfax County
 
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meetingTysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meetingFairfax County
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Fairfax County
 
Final Design Presentation
Final Design PresentationFinal Design Presentation
Final Design PresentationBrian Weaver
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Fairfax County
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Fairfax County
 
Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration ProjectFairfax County
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1Seventh Hill
 
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Fairfax County
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Fairfax County
 
PYP_APA draft Final ZAC
PYP_APA draft Final ZACPYP_APA draft Final ZAC
PYP_APA draft Final ZACZachary Lette
 

Ähnlich wie Huntington Levee Community Meeting: Oct. 26. 2016 (20)

Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting
 
Huntington Levee Community Meeting: Nov. 1, 2017
Huntington Levee Community Meeting: Nov. 1, 2017Huntington Levee Community Meeting: Nov. 1, 2017
Huntington Levee Community Meeting: Nov. 1, 2017
 
successful applications of project visualization
successful applications of project visualizationsuccessful applications of project visualization
successful applications of project visualization
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Pike Branch at Ridgeview Park Stream Restoration Oct 2018
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Pike Branch at Ridgeview Park Stream Restoration Oct 2018
Pike Branch at Ridgeview Park Stream Restoration Oct 2018
 
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meetingTysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
Tysons Fire Station #29 and Bus Transit Facility - 111621 community meeting
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
 
Final Design Presentation
Final Design PresentationFinal Design Presentation
Final Design Presentation
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3
 
Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration Project
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1
 
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
 
PYP_APA draft Final ZAC
PYP_APA draft Final ZACPYP_APA draft Final ZAC
PYP_APA draft Final ZAC
 

Mehr von Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)ssuser583c35
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 

Kürzlich hochgeladen (6)

11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 

Huntington Levee Community Meeting: Oct. 26. 2016

  • 1. Department of Public Works and Environmental Services Huntington Levee Community Meeting October 26, 2016
  • 2. Building Design and Construction Division 2 Agenda Huntington Levee I. Project Background II. Levee System Design III. Construction IV. Community Amenities V. Flood Modeling Results VI. Permitting VII. Schedule VIII. Environmental Design IX. Community Outreach X. Questions
  • 3. Building Design and Construction Division 3 Project Background • June 2006 -160 homes were flooded from a storm event • 2009 – US Army Corps of Engineers (USACE) completed a study to evaluate flood damage reduction measures in the Huntington Community • November 6, 2012 – Fairfax County voters approved stormwater bond referendum • November 2013 – Phase I design completed • January 2014 – Fairfax County and Huntington Community reached consensus on conceptual design features
  • 4. Building Design and Construction Division 4 Project Background • July 2014 – Hydraulic and Hydrologic Modelling for Cameron Run • September 2014 – Schematic (30%) Design • October 2014 - Value Engineering Workshop • June 2015 – Design Development (60%) Design • February 2016 – Construction Documents (100%) Design • Spring 2016 – Technical review by County and Corps of Engineers • July 2016 – CLOMR approved by FEMA • August 2016 – Project advertised for bid to pre-qualified contractors • September 2016 – Wetlands permitting approved by DEQ and Corps of Engineers
  • 5. Building Design and Construction Division 5 Levee System Design Levee System
  • 6. Building Design and Construction Division 6 Levee System Design Key Design Features • Earthen Levee/I-Wall Combination • Pump Station • Stormwater Diversion
  • 7. Building Design and Construction Division 7 Levee System Design Rendering – Looking West Levee I-Wall Open Channel Ponding Area Cameron Run
  • 8. Building Design and Construction Division 8 Levee System Design Rendering – Looking East with Cross Section Asphalt Trail Open Channel with Drains Ponding Area Ponding Area Slope Slope Slope Sloped to Pump Station
  • 9. Building Design and Construction Division 9 Levee System Design Rendering – Looking East from Top of Levee Trail Asphalt Trail Concrete I-Wall Ponding Area
  • 10. Building Design and Construction Division 10 Levee System Design Rendering – Looking Northeast Toward Pump Station Note: Fence with gate to be constructed around Pump Station
  • 11. Building Design and Construction Division 11 Levee System Design Rendering – Cross Section of Pump Station
  • 12. Building Design and Construction Division 12 Construction Next Steps in Construction Bids Opened Bid Evaluation County Approval of Contract Notice of Award Notice to Proceed October 6, 2016 October 2016 November 2016 December 2016 January 2017
  • 13. Building Design and Construction Division 13 Construction Key Activities during Construction Notice to Proceed Site Management Plan Contractor Mobilization Substantial Completion January 2017 January/ February 2017 January/ February 2017 February 2019
  • 14. Building Design and Construction Division 14 Site Management Plan • Submitted by contractor 30 days after NTP • Approved by County Included in Site Management Plan • Phasing of Construction • Control of Water • Emergency Response Construction
  • 15. Building Design and Construction Division 15 Contractor Restrictions • Construction activities limited to 7:00am to 7:00pm, Monday – Friday • Weekend and holiday work to be approved by County • Contractor parking prohibited in neighborhood • Truck traffic through neighborhood restricted • Noise per Fairfax County Noise Ordinance Construction
  • 16. Building Design and Construction Division 16 Construction First Construction Activities • Identification of Limits of Disturbance • Safety Fencing • Erosion and Sediment Control • Construction of Access Road
  • 17. Building Design and Construction Division 17 Construction Construction Extents For General Reference – Actual Extent determined by Contractor Construction Safety Fence around Site Perimeter Construction Access Road Utility Work Location of Pump Station
  • 18. Building Design and Construction Division 18 Construction Construction Access • Route A: Primary Construction Access • Route D: Secondary Access for Pump Station • Routes B and C: Possible Tertiary Construction Access
  • 19. Building Design and Construction Division 19 Community Amenities Trails • Native Grasses in Ponding Area, Mowed 1-3 times per Year • Coarse Turf Grass on Levee Trail Atop Levee Trail in Ponding Area Pump Station Existing Trail Service Drive
  • 20. Building Design and Construction Division 20 Community Amenities Playground Area in Farrington Park • Worked with Community Group in Fall 2015 • Separate Equipment for Age Groups • Construction in December 2016/ January 2017
  • 21. Building Design and Construction Division 21 Community Amenities Playground Area in Farrington Park – Proposed Design
  • 22. Building Design and Construction Division 22 Flood Modelling Results Protection of Homes from 100-Year Storm Flood elevation 1-ft below lowest home opening
  • 23. Building Design and Construction Division 23 Flood Modelling Results 100-year Stormwater Ponding Some Street Flooding, but Water Surface Elevation Below Structures
  • 24. Building Design and Construction Division 24 Flood Modelling Results 25-year Stormwater Ponding Some Street Flooding, but Water Surface Elevation Below Structures
  • 25. Building Design and Construction Division 25 Flood Modelling Results 10-year Stormwater Ponding Some Street Flooding, but Water Surface Elevation Below Structures
  • 26. Building Design and Construction Division 26 Permitting Update All Permitting Completed • Joint Permit Application (Wetlands) • Conditional Letter of Map Revision (CLOMR) • DEQ Stormwater Permit • Building Permit • Site Permit • Zoning • Floodplain Study
  • 27. Building Design and Construction Division 27 Permitting Update Permitting Requirements • Construction Limits marked with 4-foot tall orange fencing • Non-impacted surface waters with 50-feet of construction limits clearly demarcated • Monthly DEQ inspection checklist • Inspections by DEQ and US Army Corps of Engineers Tree Preservation Areas Levee
  • 28. Building Design and Construction Division 28 Schedule • Phase II (January 2014-Winter 2017)  Schematic Design (30%)  Design Development (60%)  Permitting (began March 2015)  Land Acquisition (began September 2014)  Construction Documents • Bidding • Phase III (Winter 2017-Spring 2019) • Construction Project Remains on Schedule
  • 29. Building Design and Construction Division 29 Environmental Design Envision • Rating System for Infrastructure Projects • Bronze Level • Similar to LEED • 5 Categories: • Quality of Life • Leadership • Resource Allocation • Natural World • Climate and Risk
  • 30. Building Design and Construction Division 30 Community Outreach
  • 31. Building Design and Construction Division 31 Community Outreach
  • 32. Building Design and Construction Division 32 Community Outreach • Bi-annually • Important Milestones • Next Community meeting – Spring 2017 Community Meetings
  • 33. Building Design and Construction Division 33 Community Outreach • Similar to current response • Contractor responsible to maintain current condition (no worse) • Temporary pumping as needed • Contractor will be notified when County dispatches to site Storm Events
  • 34. Building Design and Construction Division 34 Community Outreach  Contact Information – Huntington Levee Project  Phone #: 703-324-5800  Email address: HuntingtonLevee@fairfaxcounty.gov  Huntington Levee Website: www.fairfaxcounty.gov/dpwes/huntingtonlevee To request this document in an alternate format call 703-324-5800, TTY 711.