Judicial (Massey) Complex Master Plan
December 10, 2020
DPWES Capital Facilities Building Design & Construction
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Site Map – Assigned to Providence District
2
Judicial (Massey) Complex Master Plan Briefing
DPWES Capital Facilities Building Design & Construction
Scope and Framework
Master Plan Framework and Scope of Work included:
 Coordination with the surrounding community including Fairfax City and GMU
 Site infrastructure analysis
 Integration of the historic structures into a vibrant urban community
 A coordinated long-term plan to meet the needs for multiple stakeholders
 A budget roadmap for future funding
 Opportunity for the County to synthesize and effectively facilitate a discussion of trade-offs,
challenges, and opportunities
 Possible public private development opportunities
3
Many structures exist on the 47.8 acre
complex and are planned to remain. The
master plan looked at strategic land use &
development planning for the best use and
integration within the surrounding area.
Judicial (Massey) Complex Master Plan Briefing
DPWES Capital Facilities Building Design & Construction
Master Plan Priorities
4
As identified by the Land Use Development Team:
 Sustain a judicial complex that is safe and secure for visitors and employees.
 Create a welcoming and accessible complex, designed to efficiently facilitate
access and interaction with county-wide judicial and public safety functions
that is compatible with the surrounding community and its context.
 Respect the integrity of on-site historic resources and enhance the public’s
experience of these assets.
 Identify opportunities for public private partnerships to create complementary
secondary uses through strategic planning and site design.
As identified by the Executive Leadership Team:
 Use available development capacity for consolidation of leased space and
additional county programs
Judicial (Massey) Complex Master Plan Briefing
DPWES Capital Facilities Building Design & Construction
Site Stakeholders
5
• Circuit Court
• General District Court
• Juvenile Domestic Relations
• Office of the Sherriff
• Office of the Magistrate
• Commonwealth Attorney
• Law Library
• Department of Family Services
• Community Services Board
• Fairfax Bar Association
• Courthouse Building Services
• Facility Management
• Police and Fire
• Non-Profit services
• Public Schools
• Health Department (New)
• Office for Children (New)
• Workforce Housing (New)
• Potential Commercial Uses (New)
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Preservation + Replacement Potential of Existing Buildings
6
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Final Master Plan Concept
7
Workforce
Housing
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan Aerial View
8
View from Main Street & Rt. 123 looking south
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan Concept Images
9
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan Concept Images
10
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan Concept Images
11
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan Concept Images – Historic Courthouse
12
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan – Cultural Resources
13
Cultural Resources in Development or Recommended for the CIP
 Historic Jail Roof Replacement – Design in Process
 Old Courthouse Grounds Renewal – Recommended for the CIP including
wing & sallyport removal, wall relocation, new pedestrian walkway along
Main St & 123.
 Old Courthouse Building Renewal – Recommended for the CIP including
full renewal/restoration with a new proposed accessible entrance on the
west side
 Create a large green open space around the Historic elements to
highlight and celebrate Fairfax’s rich cultural heritage.
 Relocation of Legato School – creating a Historic Quarter of the Complex
DPWES Capital Facilities Building Design & Construction
Judicial (Massey) Complex Master Plan Briefing
Master Plan - Next Steps
14
 Final Master Plan Reports are currently in review
 Presentation of Master Plan to Stakeholders & Community - Early 2021
 Building 1 – Concept Study - Early 2021
Additional Information
Fairfax County Web Page
https://www.fairfaxcounty.gov/publicworks/capital-projects/massey-complex-master-plan-project
Questions via Email
Joan.Beacham@fairfaxcounty.gov

Weitere ähnliche Inhalte

Was ist angesagt?

Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1
RamaChilamkurthy
 
Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019
RamaChilamkurthy
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
RamaChilamkurthy
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
RamaChilamkurthy
 
NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012
Island Health
 
Eastern market metro park project community meeting 07-22-2020
Eastern market metro park project community meeting  07-22-2020Eastern market metro park project community meeting  07-22-2020
Eastern market metro park project community meeting 07-22-2020
RamaChilamkurthy
 

Was ist angesagt? (20)

Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Hunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingHunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach Meeting
 
Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane Walkway
 
UDO Amendment
UDO AmendmentUDO Amendment
UDO Amendment
 
Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018
Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018
Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
 
Soapstone Connector Supplemental Phase I Architectural Survey Public Involvem...
Soapstone Connector Supplemental Phase I Architectural Survey Public Involvem...Soapstone Connector Supplemental Phase I Architectural Survey Public Involvem...
Soapstone Connector Supplemental Phase I Architectural Survey Public Involvem...
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
Dulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and FundingDulles Rail Silver Line Phase 2 Status and Funding
Dulles Rail Silver Line Phase 2 Status and Funding
 
Affordable Housing Development Request
Affordable Housing Development RequestAffordable Housing Development Request
Affordable Housing Development Request
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Finance Strategy: Initial Findings (May 2013)
Finance Strategy: Initial Findings (May 2013)Finance Strategy: Initial Findings (May 2013)
Finance Strategy: Initial Findings (May 2013)
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
Murch School SIT Meeting Presentation (March 14, 2016)
Murch School SIT Meeting Presentation (March 14, 2016)Murch School SIT Meeting Presentation (March 14, 2016)
Murch School SIT Meeting Presentation (March 14, 2016)
 
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
 
Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021Little Pimmit Run Community Meeting 10-4-2021
Little Pimmit Run Community Meeting 10-4-2021
 
NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012
 
Eastern market metro park project community meeting 07-22-2020
Eastern market metro park project community meeting  07-22-2020Eastern market metro park project community meeting  07-22-2020
Eastern market metro park project community meeting 07-22-2020
 

Ähnlich wie Fairfax County Judicial (Massey) Complex Master Plan 12/10/20

ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315
Matt Lindley
 
a-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nominationa-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nomination
Ray Pini
 
Brush Creek Community Partners DrillDown
Brush Creek Community Partners DrillDownBrush Creek Community Partners DrillDown
Brush Creek Community Partners DrillDown
nptech
 
Land Use Planning PUP 301 Introduction to Urban PlanningD.docx
Land Use Planning PUP 301 Introduction to Urban PlanningD.docxLand Use Planning PUP 301 Introduction to Urban PlanningD.docx
Land Use Planning PUP 301 Introduction to Urban PlanningD.docx
smile790243
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130
voit1
 

Ähnlich wie Fairfax County Judicial (Massey) Complex Master Plan 12/10/20 (20)

Massey Complex Briefing 4-25-2018
Massey Complex Briefing 4-25-2018Massey Complex Briefing 4-25-2018
Massey Complex Briefing 4-25-2018
 
MAPC's Sustainable Communities Regional Planning Grant Project Posters
MAPC's Sustainable Communities Regional Planning Grant Project PostersMAPC's Sustainable Communities Regional Planning Grant Project Posters
MAPC's Sustainable Communities Regional Planning Grant Project Posters
 
ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315
 
a-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nominationa-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nomination
 
3.Finding New Uses for Former Military Land: Military Land in the Planning Pr...
3.Finding New Uses for Former Military Land: Military Land in the Planning Pr...3.Finding New Uses for Former Military Land: Military Land in the Planning Pr...
3.Finding New Uses for Former Military Land: Military Land in the Planning Pr...
 
Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocation
 
POLS3801 Internship.docx
POLS3801 Internship.docxPOLS3801 Internship.docx
POLS3801 Internship.docx
 
Chevy chase comm mtg-11-06-2019
Chevy chase comm mtg-11-06-2019Chevy chase comm mtg-11-06-2019
Chevy chase comm mtg-11-06-2019
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
 
Brush Creek Community Partners DrillDown
Brush Creek Community Partners DrillDownBrush Creek Community Partners DrillDown
Brush Creek Community Partners DrillDown
 
CORPJan2016
CORPJan2016CORPJan2016
CORPJan2016
 
Parks master plan final (8) 12 19 2013
Parks master plan final (8) 12 19 2013Parks master plan final (8) 12 19 2013
Parks master plan final (8) 12 19 2013
 
NRSSBC Town Meeting October 3, 2011
NRSSBC Town Meeting October 3, 2011NRSSBC Town Meeting October 3, 2011
NRSSBC Town Meeting October 3, 2011
 
Massey Complex Briefing - July 12, 2018
Massey Complex Briefing - July 12, 2018Massey Complex Briefing - July 12, 2018
Massey Complex Briefing - July 12, 2018
 
Wildwood_Final_Report
Wildwood_Final_ReportWildwood_Final_Report
Wildwood_Final_Report
 
Coral bay presentation final
Coral bay presentation finalCoral bay presentation final
Coral bay presentation final
 
Newsletter 2014 November
Newsletter 2014 NovemberNewsletter 2014 November
Newsletter 2014 November
 
Land Use Planning PUP 301 Introduction to Urban PlanningD.docx
Land Use Planning PUP 301 Introduction to Urban PlanningD.docxLand Use Planning PUP 301 Introduction to Urban PlanningD.docx
Land Use Planning PUP 301 Introduction to Urban PlanningD.docx
 
Planning Commission Meeting 5-22-2019
Planning Commission Meeting 5-22-2019Planning Commission Meeting 5-22-2019
Planning Commission Meeting 5-22-2019
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130
 

Mehr von Fairfax County

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

Fairfax County Judicial (Massey) Complex Master Plan 12/10/20

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Judicial (Massey) Complex Master Plan December 10, 2020 DPWES Capital Facilities Building Design & Construction
  • 2. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Site Map – Assigned to Providence District 2
  • 3. Judicial (Massey) Complex Master Plan Briefing DPWES Capital Facilities Building Design & Construction Scope and Framework Master Plan Framework and Scope of Work included:  Coordination with the surrounding community including Fairfax City and GMU  Site infrastructure analysis  Integration of the historic structures into a vibrant urban community  A coordinated long-term plan to meet the needs for multiple stakeholders  A budget roadmap for future funding  Opportunity for the County to synthesize and effectively facilitate a discussion of trade-offs, challenges, and opportunities  Possible public private development opportunities 3 Many structures exist on the 47.8 acre complex and are planned to remain. The master plan looked at strategic land use & development planning for the best use and integration within the surrounding area.
  • 4. Judicial (Massey) Complex Master Plan Briefing DPWES Capital Facilities Building Design & Construction Master Plan Priorities 4 As identified by the Land Use Development Team:  Sustain a judicial complex that is safe and secure for visitors and employees.  Create a welcoming and accessible complex, designed to efficiently facilitate access and interaction with county-wide judicial and public safety functions that is compatible with the surrounding community and its context.  Respect the integrity of on-site historic resources and enhance the public’s experience of these assets.  Identify opportunities for public private partnerships to create complementary secondary uses through strategic planning and site design. As identified by the Executive Leadership Team:  Use available development capacity for consolidation of leased space and additional county programs
  • 5. Judicial (Massey) Complex Master Plan Briefing DPWES Capital Facilities Building Design & Construction Site Stakeholders 5 • Circuit Court • General District Court • Juvenile Domestic Relations • Office of the Sherriff • Office of the Magistrate • Commonwealth Attorney • Law Library • Department of Family Services • Community Services Board • Fairfax Bar Association • Courthouse Building Services • Facility Management • Police and Fire • Non-Profit services • Public Schools • Health Department (New) • Office for Children (New) • Workforce Housing (New) • Potential Commercial Uses (New)
  • 6. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Preservation + Replacement Potential of Existing Buildings 6
  • 7. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Final Master Plan Concept 7 Workforce Housing
  • 8. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan Aerial View 8 View from Main Street & Rt. 123 looking south
  • 9. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan Concept Images 9
  • 10. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan Concept Images 10
  • 11. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan Concept Images 11
  • 12. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan Concept Images – Historic Courthouse 12
  • 13. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan – Cultural Resources 13 Cultural Resources in Development or Recommended for the CIP  Historic Jail Roof Replacement – Design in Process  Old Courthouse Grounds Renewal – Recommended for the CIP including wing & sallyport removal, wall relocation, new pedestrian walkway along Main St & 123.  Old Courthouse Building Renewal – Recommended for the CIP including full renewal/restoration with a new proposed accessible entrance on the west side  Create a large green open space around the Historic elements to highlight and celebrate Fairfax’s rich cultural heritage.  Relocation of Legato School – creating a Historic Quarter of the Complex
  • 14. DPWES Capital Facilities Building Design & Construction Judicial (Massey) Complex Master Plan Briefing Master Plan - Next Steps 14  Final Master Plan Reports are currently in review  Presentation of Master Plan to Stakeholders & Community - Early 2021  Building 1 – Concept Study - Early 2021 Additional Information Fairfax County Web Page https://www.fairfaxcounty.gov/publicworks/capital-projects/massey-complex-master-plan-project Questions via Email Joan.Beacham@fairfaxcounty.gov