County of Fairfax, Virginia
Project Timelines
2
County of Fairfax, Virginia
Background on Six Year Project Priorities
• Virginia General Assembly approved HB 2313 in April 2013, authorizing
new revenues for use specifically on transportation projects.
• Staff created a list and an interactive map of more than 200 unfunded
projects located throughout the County.
• In the Fall of 2013, staff conducted extensive outreach through the
Countywide Dialogue on Transportation to gain input on project
selection.
• Staff considered numerous criteria, including cost-benefit analysis,
congestion reduction, school and park access, regional consideration,
public input, and mode balance.
• http://www.fairfaxcounty.gov/fcdot/cdot/
• On January 28, 2014, the Board of Supervisors adopted the six-year
project priorities for FY 2015-FY 2020. The Six-Year Program includes
approximately 170 projects worth about $1.4 billion from multiple local,
regional and state sources.
3
County of Fairfax, Virginia
Project Timelines
• On January 28, 2014, the Board directed staff to return with
project timelines
• Several considerations:
• Advance highest priority projects
• Spread projects across six-year timeframe
• Respect funding limitations, restrictions, and availability
• Follow guidelines or requirements set by funding decision-
makers (NVTA, CTB, etc.)
• Consider project complexity, size, and geographic location
• Consider input from implementation partners, particularly
VDOT
4
County of Fairfax, Virginia
Draft Timelines and Project Priorities
• After drafting timelines, staff
discussed timelines and
priorities with each Board
member.
• Adjustments made based on
feedback received.
• Project timelines reflect
reasonable expectations for
projects of similar size and type.
• More specific project schedules
will be developed as each
project advances through
scoping/preliminary
engineering process.
5
County of Fairfax, Virginia
Explanation of Draft Timelines on the Next
Slide
• Project phases are color coded
– Planning - Blue
– Scoping/Preliminary Engineering - Green
– Design - Red
– Right-of-way - Yellow
– Utilities - Black
– Construction - Orange
• Not all projects will have all phases. Length of phases varies
based on project specifics.
• Project Titles/Descriptions abbreviated.
6
County of Fairfax, Virginia
Draft Timelines
7
County of Fairfax, Virginia
Draft Timelines (Continued)
8
• Projected timelines are based on preliminary information.
• Project timelines will be posted on the FCDOT -
Countywide Dialogue on Transportation (CDOT) web page.
• http://www.fairfaxcounty.gov/fcdot/cdot/
• Project descriptions and background information is also
available on the website.
• Projects that enter scoping/preliminary engineering will
be incorporated into a status report with specific
scheduling.
County of Fairfax, Virginia
Questions?
9
County of Fairfax, Virginia
Proposed 2014 Transportation
Bond Referendum
10
County of Fairfax, Virginia
Funding Background
June 2010 - Ten-Year Transportation
Needs/Revenues (FY11-FY20)
presented to the Board Transportation
Committee (BTC).
Prior to February 2012 – Staff
reexamined needs, revised assumed
revenues, and subsequently reduced
the ten-year deficit.
February 2012 - The revised Ten-Year
Transportation Needs/Revenues was
presented to the Board during its
retreat.
11
$10.1 B in expenditures
-$ 4.7 B in assumed revenues
$ 5.3 B deficit ($530M/year)
$8.1B in expenditures
-$5.1B in assumed revenues1
$3.0B deficit ($300M/year)
June 2010
February 2012
[1] Assumes receipt of $50M in EDA
bonds, and $100M in General
Obligation bonds from November
2014 referendum.
County of Fairfax, Virginia
HB 2313, Tysons, and the Ten-Year
Transportation Needs and Revenues
Impact of new revenues on the Ten-Year Plan:
*January 8, 2013—The Tysons Funding Plan approved by the Board.
**Staff estimate of state revenues anticipated to be expended in Fairfax County over the next
ten years. Estimates include construction and transit revenues, not maintenance
expenditures.
HB2 and transit allocations recommended by TSDAC to the CTB will impact this figure.
12
$3.00 billion deficit (10-year total) , February 2012
-$0.40 billion in assumed revenues from Tysons Funding Plan*
-$1.30 billion in new regional funding from HB 2313
-$0.56 billion in new state funding from HB 2313**
$0.74 billion deficit (10-year total)
$74 million per year still needed.
County of Fairfax, Virginia
The Board’s Four-Year Plan (FY13-FY16)
• On July 10, 2012, the Board of Supervisors approved its third
Four-Year Plan (FY 2013 – FY 2016) for transportation projects.
• The plan included $100 million in transportation projects to be
funded by new General Obligation bond funds.
• Assumed going to referendum in Fall 2014 .
• Included a variety of roadway, transit capital, spot
improvements, and bicycle and pedestrian projects.
• The 2014 Bond is one of several funding sources addressing
project priorities over next six years.
13
County of Fairfax, Virginia
Proposed Changes to 2014 Bond Projects
Projects previously intended to be funded by the 2014 transportation
bond:
• ~$87 million for large-scale roadway projects, transit facilities,
and spot/intersection improvements.
• ~$13 million in bicycle, pedestrian, trails, and walkway
improvements.
• Since July 2012, many of the large-scale roadway and transit
projects have other funding sources programmed.
• HB 2313 limits the types of projects that can be funded
Staff now recommends Board consideration of the proposed 2014
transportation bond funds be used primarily for the implementation
of spot improvements, and bicycle and pedestrian projects.
14
County of Fairfax, Virginia
What has Prompted the Change?
• HB 2313 revenues provide new funding for roadway projects.
• The project priorities approved by the Board on January 28, 2014,
included over $200 million in bicycle and pedestrian
improvements over the next six years.
• There is a need to optimize the various revenue sources with the
Board’s project priorities.
• General Obligation bonds are the most flexible source of revenue
for transportation projects.
15
County of Fairfax, Virginia
Limited sources of funding currently available for spot
improvements, bicycle and pedestrian projects:
• Commercial & Industrial Taxes
• Transit Operations for Expanded Service
• Debt Service for Qualifying Projects
• Bike, Pedestrian, and Roadway projects in the Four-Year Plan
• Transportation Alternative Program Grants
• $1M/year
• General Obligation Bonds
• Bond funds would be available in FY 2015.
16
Why a Spot Improvement, Bicycle &
Pedestrian Focused Bond
County of Fairfax, Virginia
• Limited sources of state and federal funds fully committed.
• Primarily CMAQ
• Federal funding makes these types of projects more complicated,
time consuming, and costly:
• Use of federal funds require agreements between the County
and the state.
• In some cases, this could take months.
• Federal approval prior to moving to each phase of a project
(30-60 days for approval at each phase).
• Additional right of way requirements must be met prior to
land acquisition.
• Use of local funds facilitates the most efficient implementation of
bicycle, pedestrian, and spot projects.
Why a Spot Improvement, Bicycle &
Pedestrian Focused Bond (continued)
17
County of Fairfax, Virginia
• Guidelines for use of HB 2313 regional revenues ensure qualifying
projects reduce congestion and are regional in nature.
• HB 2313 local revenues can be used for road construction, capital
projects reducing congestion, projects included in TransAction
2040, or public transportation purposes.
• Most bicycle and pedestrian do not qualify for HB 2313 local
or regional revenues.
• Sources of state funding:
• Transportation Trust Fund, Mass Transit Fund cannot be used
for these projects.
• Revenue Sharing, and Secondary Road Funds are currently not
available for these projects.
18
Why a Spot Improvement, Bicycle &
Pedestrian Focused Bond (continued)
County of Fairfax, Virginia
Criteria for Selection of Bond Projects
• Projects originally proposed to be funded by the bond
continue to be funded by the bond.
• Those projects proposed to be included in the first and
second thirds of the six-year plan.
• Countywide balance was considered.
There remains a significant backlog of bicycle and pedestrian
projects in need of funding.
19
County of Fairfax, Virginia
• Bonds are expected to be sold according to actual cash
requirements over the next several years as part of the
County’s annual general obligation bond sales.
• Financing costs associated with the 2014 Transportation
Bond Referendum have been incorporated into the County’s
long term debt ratio projections.
• Referenced in the FY 2015-FY 2019 Capital Improvement
Program.
20
Financial Feasibility
County of Fairfax, Virginia
Next Steps
• Modifications to proposed bond project list (see attachments.)
• Board feedback requested.
• Staff will return to the Board during its June 3, 2014, meeting
requesting authorization to proceed with planning for the 2014
bond referendum and a final list of projects.
• Staff will work with other County agencies and citizen task force
to educate the citizens about the November 2014
Transportation Bond Referendum
21
County of Fairfax, Virginia
Questions?
22

Weitere ähnliche Inhalte

Was ist angesagt?

VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsFairfax County
 
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Fairfax County
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Fairfax County
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationFairfax County
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesFairfax County
 
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...Fairfax County
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County
 
Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016Fairfax County
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsFairfax County
 
Fairfax County Capital Bikeshare
Fairfax County Capital BikeshareFairfax County Capital Bikeshare
Fairfax County Capital BikeshareFairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Fairfax County
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Fairfax County
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Fairfax County
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Fairfax County
 

Was ist angesagt? (20)

VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
 
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on Transportation
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
Reston Transportation Funding Plan: Updates and Recommendation-Community Meet...
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation Results
 
Fairfax County Capital Bikeshare
Fairfax County Capital BikeshareFairfax County Capital Bikeshare
Fairfax County Capital Bikeshare
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 

Andere mochten auch

Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Fairfax County
 
Fairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Fairfax County
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare ProgramFairfax County
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentFairfax County
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare ProgramFairfax County
 
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Fairfax County
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Fairfax County
 
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Fairfax County
 
Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2Fairfax County
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Fairfax County
 
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Fairfax County
 
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailDesign Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailFairfax County
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementFairfax County
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Fairfax County
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Fairfax County
 
Mobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayMobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayFairfax County
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsFairfax County
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Fairfax County
 

Andere mochten auch (20)

Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...
 
Fairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development Plan
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare Program
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework Document
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare Program
 
Protective Helmets
Protective HelmetsProtective Helmets
Protective Helmets
 
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
 
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
 
Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
 
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailDesign Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Mobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayMobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-Way
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation Results
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
 

Ähnlich wie Transportation Priorities: Project Timelines and the 2014 Bond Referendum

Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
 
Transportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesTransportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesFairfax County
 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax County
 
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County
 
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...Fairfax County
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewMelissaARC
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate DiscussionFairfax County
 
Status of Transportation Priorities Plan Update
Status of Transportation Priorities Plan UpdateStatus of Transportation Priorities Plan Update
Status of Transportation Priorities Plan UpdateFairfax County
 
Fixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActFixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActJill Reeves
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Fairfax County
 
2040 lrtp executive summary
2040 lrtp executive summary2040 lrtp executive summary
2040 lrtp executive summaryBrendan O'Connor
 
Transportation Infrastructure FInancing and Value Capture
Transportation Infrastructure FInancing and Value CaptureTransportation Infrastructure FInancing and Value Capture
Transportation Infrastructure FInancing and Value CaptureRPO America
 
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...Fairfax County
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsSouth Shore Clean Cities
 
ROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation InitiativeROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation Initiativenado-web
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status ReportFairfax County
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018Fairfax County
 
Artba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow ActArtba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow Actartba
 

Ähnlich wie Transportation Priorities: Project Timelines and the 2014 Bond Referendum (20)

Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Transportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesTransportation Priorities Plan Future Updates
Transportation Priorities Plan Future Updates
 
Fairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for TransportationFairfax Commercial and Industrial Property Tax for Transportation
Fairfax Commercial and Industrial Property Tax for Transportation
 
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for Transportation
 
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
Reston Transportation Funding Plan: Public Meeting Summary and Advisory Group...
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate Discussion
 
Status of Transportation Priorities Plan Update
Status of Transportation Priorities Plan UpdateStatus of Transportation Priorities Plan Update
Status of Transportation Priorities Plan Update
 
Fixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActFixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) Act
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
 
2040 lrtp executive summary
2040 lrtp executive summary2040 lrtp executive summary
2040 lrtp executive summary
 
Transportation Infrastructure FInancing and Value Capture
Transportation Infrastructure FInancing and Value CaptureTransportation Infrastructure FInancing and Value Capture
Transportation Infrastructure FInancing and Value Capture
 
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
Transportation Priorities Plan (TPP): Board Transportation Committee - July 1...
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 
ROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation InitiativeROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation Initiative
 
Improving Project Delivery Status Report
Improving Project DeliveryStatus ReportImproving Project DeliveryStatus Report
Improving Project Delivery Status Report
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
 
Artba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow ActArtba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow Act
 

Mehr von Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Kürzlich hochgeladen (8)

complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 

Transportation Priorities: Project Timelines and the 2014 Bond Referendum

  • 1. County of Fairfax, Virginia Transportation Priorities: Project Timelines and the 2014 Bond Referendum 1 Tom Biesiadny, Karyn Moreland, Todd Minnix, Ray Johnson Board Transportation Committee May 6, 2014
  • 2. County of Fairfax, Virginia Project Timelines 2
  • 3. County of Fairfax, Virginia Background on Six Year Project Priorities • Virginia General Assembly approved HB 2313 in April 2013, authorizing new revenues for use specifically on transportation projects. • Staff created a list and an interactive map of more than 200 unfunded projects located throughout the County. • In the Fall of 2013, staff conducted extensive outreach through the Countywide Dialogue on Transportation to gain input on project selection. • Staff considered numerous criteria, including cost-benefit analysis, congestion reduction, school and park access, regional consideration, public input, and mode balance. • http://www.fairfaxcounty.gov/fcdot/cdot/ • On January 28, 2014, the Board of Supervisors adopted the six-year project priorities for FY 2015-FY 2020. The Six-Year Program includes approximately 170 projects worth about $1.4 billion from multiple local, regional and state sources. 3
  • 4. County of Fairfax, Virginia Project Timelines • On January 28, 2014, the Board directed staff to return with project timelines • Several considerations: • Advance highest priority projects • Spread projects across six-year timeframe • Respect funding limitations, restrictions, and availability • Follow guidelines or requirements set by funding decision- makers (NVTA, CTB, etc.) • Consider project complexity, size, and geographic location • Consider input from implementation partners, particularly VDOT 4
  • 5. County of Fairfax, Virginia Draft Timelines and Project Priorities • After drafting timelines, staff discussed timelines and priorities with each Board member. • Adjustments made based on feedback received. • Project timelines reflect reasonable expectations for projects of similar size and type. • More specific project schedules will be developed as each project advances through scoping/preliminary engineering process. 5
  • 6. County of Fairfax, Virginia Explanation of Draft Timelines on the Next Slide • Project phases are color coded – Planning - Blue – Scoping/Preliminary Engineering - Green – Design - Red – Right-of-way - Yellow – Utilities - Black – Construction - Orange • Not all projects will have all phases. Length of phases varies based on project specifics. • Project Titles/Descriptions abbreviated. 6
  • 7. County of Fairfax, Virginia Draft Timelines 7
  • 8. County of Fairfax, Virginia Draft Timelines (Continued) 8 • Projected timelines are based on preliminary information. • Project timelines will be posted on the FCDOT - Countywide Dialogue on Transportation (CDOT) web page. • http://www.fairfaxcounty.gov/fcdot/cdot/ • Project descriptions and background information is also available on the website. • Projects that enter scoping/preliminary engineering will be incorporated into a status report with specific scheduling.
  • 9. County of Fairfax, Virginia Questions? 9
  • 10. County of Fairfax, Virginia Proposed 2014 Transportation Bond Referendum 10
  • 11. County of Fairfax, Virginia Funding Background June 2010 - Ten-Year Transportation Needs/Revenues (FY11-FY20) presented to the Board Transportation Committee (BTC). Prior to February 2012 – Staff reexamined needs, revised assumed revenues, and subsequently reduced the ten-year deficit. February 2012 - The revised Ten-Year Transportation Needs/Revenues was presented to the Board during its retreat. 11 $10.1 B in expenditures -$ 4.7 B in assumed revenues $ 5.3 B deficit ($530M/year) $8.1B in expenditures -$5.1B in assumed revenues1 $3.0B deficit ($300M/year) June 2010 February 2012 [1] Assumes receipt of $50M in EDA bonds, and $100M in General Obligation bonds from November 2014 referendum.
  • 12. County of Fairfax, Virginia HB 2313, Tysons, and the Ten-Year Transportation Needs and Revenues Impact of new revenues on the Ten-Year Plan: *January 8, 2013—The Tysons Funding Plan approved by the Board. **Staff estimate of state revenues anticipated to be expended in Fairfax County over the next ten years. Estimates include construction and transit revenues, not maintenance expenditures. HB2 and transit allocations recommended by TSDAC to the CTB will impact this figure. 12 $3.00 billion deficit (10-year total) , February 2012 -$0.40 billion in assumed revenues from Tysons Funding Plan* -$1.30 billion in new regional funding from HB 2313 -$0.56 billion in new state funding from HB 2313** $0.74 billion deficit (10-year total) $74 million per year still needed.
  • 13. County of Fairfax, Virginia The Board’s Four-Year Plan (FY13-FY16) • On July 10, 2012, the Board of Supervisors approved its third Four-Year Plan (FY 2013 – FY 2016) for transportation projects. • The plan included $100 million in transportation projects to be funded by new General Obligation bond funds. • Assumed going to referendum in Fall 2014 . • Included a variety of roadway, transit capital, spot improvements, and bicycle and pedestrian projects. • The 2014 Bond is one of several funding sources addressing project priorities over next six years. 13
  • 14. County of Fairfax, Virginia Proposed Changes to 2014 Bond Projects Projects previously intended to be funded by the 2014 transportation bond: • ~$87 million for large-scale roadway projects, transit facilities, and spot/intersection improvements. • ~$13 million in bicycle, pedestrian, trails, and walkway improvements. • Since July 2012, many of the large-scale roadway and transit projects have other funding sources programmed. • HB 2313 limits the types of projects that can be funded Staff now recommends Board consideration of the proposed 2014 transportation bond funds be used primarily for the implementation of spot improvements, and bicycle and pedestrian projects. 14
  • 15. County of Fairfax, Virginia What has Prompted the Change? • HB 2313 revenues provide new funding for roadway projects. • The project priorities approved by the Board on January 28, 2014, included over $200 million in bicycle and pedestrian improvements over the next six years. • There is a need to optimize the various revenue sources with the Board’s project priorities. • General Obligation bonds are the most flexible source of revenue for transportation projects. 15
  • 16. County of Fairfax, Virginia Limited sources of funding currently available for spot improvements, bicycle and pedestrian projects: • Commercial & Industrial Taxes • Transit Operations for Expanded Service • Debt Service for Qualifying Projects • Bike, Pedestrian, and Roadway projects in the Four-Year Plan • Transportation Alternative Program Grants • $1M/year • General Obligation Bonds • Bond funds would be available in FY 2015. 16 Why a Spot Improvement, Bicycle & Pedestrian Focused Bond
  • 17. County of Fairfax, Virginia • Limited sources of state and federal funds fully committed. • Primarily CMAQ • Federal funding makes these types of projects more complicated, time consuming, and costly: • Use of federal funds require agreements between the County and the state. • In some cases, this could take months. • Federal approval prior to moving to each phase of a project (30-60 days for approval at each phase). • Additional right of way requirements must be met prior to land acquisition. • Use of local funds facilitates the most efficient implementation of bicycle, pedestrian, and spot projects. Why a Spot Improvement, Bicycle & Pedestrian Focused Bond (continued) 17
  • 18. County of Fairfax, Virginia • Guidelines for use of HB 2313 regional revenues ensure qualifying projects reduce congestion and are regional in nature. • HB 2313 local revenues can be used for road construction, capital projects reducing congestion, projects included in TransAction 2040, or public transportation purposes. • Most bicycle and pedestrian do not qualify for HB 2313 local or regional revenues. • Sources of state funding: • Transportation Trust Fund, Mass Transit Fund cannot be used for these projects. • Revenue Sharing, and Secondary Road Funds are currently not available for these projects. 18 Why a Spot Improvement, Bicycle & Pedestrian Focused Bond (continued)
  • 19. County of Fairfax, Virginia Criteria for Selection of Bond Projects • Projects originally proposed to be funded by the bond continue to be funded by the bond. • Those projects proposed to be included in the first and second thirds of the six-year plan. • Countywide balance was considered. There remains a significant backlog of bicycle and pedestrian projects in need of funding. 19
  • 20. County of Fairfax, Virginia • Bonds are expected to be sold according to actual cash requirements over the next several years as part of the County’s annual general obligation bond sales. • Financing costs associated with the 2014 Transportation Bond Referendum have been incorporated into the County’s long term debt ratio projections. • Referenced in the FY 2015-FY 2019 Capital Improvement Program. 20 Financial Feasibility
  • 21. County of Fairfax, Virginia Next Steps • Modifications to proposed bond project list (see attachments.) • Board feedback requested. • Staff will return to the Board during its June 3, 2014, meeting requesting authorization to proceed with planning for the 2014 bond referendum and a final list of projects. • Staff will work with other County agencies and citizen task force to educate the citizens about the November 2014 Transportation Bond Referendum 21
  • 22. County of Fairfax, Virginia Questions? 22

Hinweis der Redaktion

  1. In June 2010 the Board was presented with a ten-year outlook of transportation needs and revenues. The needs less revenues for FY11 through FY20 resulted in a deficit of $5.3 billion. In February 2012, The ten-year outlook was revised for the fiscal years 12 through 21, the resulting deficit was reduced to $3 billion over ten years.
  2. So lets have a look at the impact of HB 2313 and the Tysons Funding Plan on the ten year outlook. $3 billion deficit less $400 million in Tysons revenues, less $1.3 billion in HB 2313 revenues, less $450 million in state revenues leaves a deficit of $85 million per year. Read if necessary - Tysons expenditures over the ten-year plan total ~$800M, the TYP already assumed the receipt of ~$400M in roadway/transit revenues (largely private/roadway). This means, that only $400M in anticipated revenues for Tysons can be counted against the overall deficit, not $800M. Do not read – State revenues for TTF and Mass Transit anticipated to be expended in Fairfax County were estimated based on an annual increase in these funds of 5% and 3%, respectively, for FY19-FY21. Estimates for FY14-FY18 were provided by the state.