1. DRAFT SOLAR PARK FV 5 MW BULGARIA
GENERAL INFORMATION final, executive):
Project Location: BULGARIA Connection costs provided: 100.000€ C.P
Region: Novi Pazar CONNECTION
County: Surveillance Camera NO
Photovoltaic project with 4,9MWP Delimitation NO
power
Rated (KWp) KWP 4900 CITY OR STATE
Project Status (Development / LICENSES ALLOW CONVENTION
construction built): THE START Royalties: None
CONSTRUCTION rent regime
IMMEDIATE PLANT Convezioni with council € 29000
Price mw project WP € 0.34
OWNERS CONDITIONS
Land rent regime NO
SITUATION PERMITS Land sales INCLUDED
DIA
Date Presentation: SI
Planing INSTALLATION
D statusIA (accepted / ACCEPTED
Immediate IMMEDIATE
not accepted)
estimatedtion to begin the FEBRUARY
AUTHORIZATION ONLY OK
installation
Date response of the 2010
competent authority:
OTHER
ROYAL DECREE excluding Edge Recincion
energy Camara surveillance
Rates / premiums 0,379€WP PRIMA /Security
duration 20 YEARS
National Distributor EON COMMENTS
PROJECT DETAILS
situation (preliminary, final, EXECUTIVE
executive):
typology modules (mono / 21739 UD .-
policristallino /; only nominal POLICRYSTAL 230 wp
power module) 50 UD. INVESTORS
Type structures FIXED
Surface total acres land 24 HA
Area extension modules cover 18 HA
Field position SOUTH FLAT-LAND
1350 HOURS OF SUN
Area of accessibility (good, GOOD PROVINCIAL
discreet, low): ROAD
Environmental Links APPROVED BY THE
REGION
Presented Aval OK
Building permit OK
NETWORK CONNECTION
Distance from the point of 1000 MT 400 MT C.P
connection:
WITH OPTION.
Date presentation DDP: 13.11.2009
Datecceptance DDP (YES / SI
NO):
EON filing date SI STEP
Acceptance date EON SI
Type connection to network MEDIA TENSIONS
(MT / AT)
Ifsituation or completion of the
cabin NOT PROVIDED
transformation(Preliminary,