CHAPTER 4
CONCRETE FRAMED BUILDINGS
CONCRETE
Mixture of cement, fine
& coarse aggregate &
water
Basic construction:
a) Concrete
b) Formwork
c) Reinforcement
FRAMED
Consists of:
a) upright load bearing
members such as posts
in timber
b) columns in concrete
c) stanchions in steel
which are arranged at the
corners of the square or
rectangular base
Transfer loads of heavy
structure plus any
imposed loads via the
f r a m e s t r u c t u r e
members to a suitable
lower ground
BUILDING
R e s i d e n t i a l ,
Commercial, Offices,
Etc
1.0 BASIC DEFINITION
a) Concrete
b) Formwork
c) Reinforcement
Frame Building
1.1 CONCRETE
•  Increases its strength during curing / hardening period
•  Portland cement is used –28days
•  Nominal max sizes of aggregates: 40, 20, 14 and 10mm;
5mm is for precast products
•  Grade 7 & 10 -plain unreinforced concrete
•  Grade 15 & 30 –RC with lightweight aggregates
•  Grade 25 –RC with dense aggregates
•  Grade 30 to 50 –pre-stressed concrete
1.2 REINFORCEMENT
Requirements:
•  Capable of achieving tensile strength without any undue strain
•  A material can be easily bend to any required shape
•  Surface must be capable of developing adequate bond between the
concrete & reinforcement
•  Reasonable cost & acceptable to overall design concept
•  Steel in the form of bars
•  mild steel (R) & high yield (T)
•  nominal sizes: 6, 8, 10, 12, 16, 20, 25, 32mm
1.3 FABRIC REINFORCEMENT
•  Structural members that require only small area of reinforcement
•  Can be reinforced by steel fabric, which can be supplied by sheets /
rolls
•  Factory-made by welding
•  Sheets: 4800mm x 2400mm
•  Rolls: 48.00m & 72.00m with a common width of 2.40m
1.4 FORMWORK
•  A mould / box into which wet concrete can be poured so that it will flow
& finally set to the inner profile of the box
•  Requirements:
•  Strong enough to support the load of wet concrete
•  Must be accurately set out
•  Have grout-tight joints –grout leakage can cause honeycombing of the
surface
•  Designed to be the max size that can be easily handled by hand &
mechanical lifting device
•  Moisture content btw 15 –20%
Bad Formwork Design :
Leakage which cause
honeycombing
TYPE OF FORMWORK
Beam
Column
Slab
Foundation
1.4.1 FOUNDATION FORMWORK
There are 2 types of foundation formwork:
1.  Permanent formwork
2.  Traditional timber formwork
Benefits of using permanent formwork:
Ø  Less concrete waste
Ø  Requires less excavation than traditional wood planks
Ø  Easily transported because of the light weights
Ø  No skilled labours are needed
Benefits of using traditional timber formwork:
Ø  It can be reused
Ø  Cheaper production cost
Ø  Higher availability than steel
Ø  Easy to work by using hammer and nails
Permanent formwork
Traditional timber formwork
1.4.2 COLUMN FORMWORK
1.4.3 BEAM FORMWORK
•  A beam form consists of a three-sided box which is supported by
cross-members called headtrees.
•  Soffit board should be fixed inside the beam sides so that latter can
be removed. This also can speed up the hardening process and also
release the formwork for re-use.
1.4.4 SLAB FORMWORK
There is four type of slab formwork:
1.  Timber beam slab formwork
2.  Traditional slab formwork
3.  Metal beam slab formwork
4.  Modular slab formwork
Metal	
  beam	
  
slab	
  fwk.	
  
Timber	
  beam	
  
slab	
  fwk.	
  
Modular	
  
slab	
  fwk.	
  
Schema7c	
  sketch	
  of	
  
tradi7onal	
  fwk.	
  
1.4.4.1 TRADITIONAL SLAB FORMWORK
•  Consists of supports out of lumber or young tree trunks, that support tows of
stringers
•  Assembled roughly to 2 meters apart, depending the thickness of slab
•  Between these stringers, joists are positioned roughly 30cm apart upon which
boards or plywood are placed.
•  The stringers and joists are usually 4 by 4 inch or 4 by 6 inch lumber
1.4.4.2 TIMBER BEAM SLAB FORMWORK
•  Similar to the traditional method
•  But stringers and joist are replaced with engineered wood beams
•  Supports are replaced with metal props
•  This method more systematic and reusable
1.4.4.3 METAL BEAM SLAB FORMWORK
•  Similar to traditional method
•  But stringers and joist are replaced with aluminium forming systems or steel
beams
•  Supports are replaced with metal props
•  More systematic and reusable
1.4.4.4 MODULAR SLAB FORMWORK
•  These systems consist of prefabricated timber, steel or aluminum
beams and formwork modules
•  Modules are often no larger than 1 to 2 meter in size
•  Beams and formwork are typically set by hand and pinned, clipped, or
screwed together
1.5 CONCRETE FRAMED BUILDING
Concrete
Framed
Building
Stump
Ground
Beam
Ground
Floor
Slab
Ground
Floor
Column
1st Floor
Beam &
Slab
1st Floor
Column
Roof
Beam
1.5.1 STUMP
•  A short column constructed on top of the pad foundation / pile
cap to support ground beam & column above
•  To transfer the load of a building onto the pad foundation / pile
cap
•  To raise ground beam & ground floor slab to the required
height above GL
1.5.2 BEAMS
•  Supporting walls, joists, etc., at or near ground level, itself either
resting directly upon the ground or supported at both ends by piers.
•  Vary in their complexity of design & reinforcement depends on
loading
•  Erected over columns or piers taken into the soil
•  Transfer their loadings to columns
•  When erecting them, the piers must be already cast in the ground
1.5.2.1 BEAM CONSTRUCTION PROCESS
Clearing the ground
Blinding layer
Reinforcements are then tied and bent
separately; carried and laid over the columns
and blinding
Formwork erected to sides
Concrete is prepared and poured
Reinforcement
Formwork
Concrete
Blinding
1.5.3 COLUMNS
•  Constructed from either plain concrete (1:3:6) / reinforced concrete
(1:2:4)
•  Vertical structural element that transmits, through compression, the
weight of the structure above to other structural elements below
•  To support beams or arches on which the upper parts of walls or
ceilings rest
•  Columns must be properly located, and the choice of a steel beam or
wood beams
1.5.3.1 COLUMN CONSTRUCTION PROCESS
Link tied to main bars Adding spacer block
Lapping
Wood Bracing
Beam Column
1.5.4 FLOOR
Functions of Ground Floor
•  Withstand load imposed upon them, dead & live load
•  Prevent the growth of greens inside the building by concrete over-site
•  Prevent damp penetrating the building –damp proof membrane
•  To be durable so to reduce the amount of maintenance / replacement
work to a min
•  Provide acceptable finish which will meet the needs of users
Functions of Upper Floor
•  Support their own weight, ceilings & superimposed
loads
•  Restrict the passage of fire; for high-rise building
•  Restrict transmission of sound from 1 floor to another
•  Durability
•  Bridge the specific span economically & be capable of
fairly quick erection
•  Accommodate services
•  Provide acceptable finish which will meet the needs of
users
Floor Slab
•  The formwork for floor beam & floor slab is constructed
together
•  Reinforcement for floor slab tied to beam reinforcement
1.5.4.1 CONSTRUCTION OF GROUND FLOOR SLAB
a)  Hardcore
•  To fill hollows & to raise the finished level of an over-site concrete
slab after removal of turf
•  Provide a firm working surface & prevent contamination of the lower
part of wet concrete
•  Reduce the amount of rising ground moisture
•  hard, durable & chemically inert; will not attack concrete & mortar;
readily be placed in in a compact & dense condition
•  100-150mm thick
b) Blinding
•  To even-off the surface of hardcore if a damp-proof membrane is to
be placed under concrete bed
•  A layer of sand 25 –50mm thick
c) Damp Proof Membrane
•  To prevent dampness getting through a ground bearing concrete floor should be
protected by an impervious layer, usually a 1200 gauge (0.3mm) heavy duty
polythene damp-proof membrane.
•  The DPM can be positioned either on the sand blinding or on the concrete slab.
•  Joints in a Polythene DPM should be welted or taped and should overlap by at
least 300mm.
•  The DPM must be linked with the DPC in the walls, to ensure that the entire
interior of the building is protected from moisture by a continuous, impervious
barrier.
d) Concrete Floor Slab
•  A typical concrete mix for a ground bearing slab is 1:2:4 mix.
•  The floor slab is usually placed over the DPM
•  The floor slab should not be less than 100mm thick.
•  Ensure all the services and ducts running under the floor are installed
and tested before pouring the slab.
•  If required, the concrete slab may be reinforced with a layer of steel
mesh
•  Once the concrete slab has been poured, it can be temped with a
heavy beam to remove air and surplus water and ensure a level
surface.
•  The concrete slab should be left to dry out for around two to three days
1.5.4.2 CONSTRUCTION OF UPPER FLOOR SLAB
1) Construct coulmn
2) Slab formwork
3) Concreting
1.5.4.3 FLOOR FINISHES
Factors to be considered during choosing a right floor finishes:
•  Durability –avoid premature replacement with extra cost &
inconvenience
•  Function
•  Resistance to wear –resistance to indentation as floor has to withstand
heavy furniture, fittings & equipment; resistance to abrasion in
buildings subject to movable equipment
•  Economy –initial & maintenance cost
•  Non-slip qualities –bathroom & kitchen
•  Appearance –wood blocks & strip flooring
1.6 ROOF BEAM
•  A load-bearing member in the roof structure.
•  Member that span across the openings & support structure or
loading above them
•  Material : timber, steel & reinforced concrete
•  Purlin act as beam, reducing the span of the rafter enabling an
economic section to be used
TUTORIAL 4 (A)
•  In a table form, explain the type of materials available
for formwork.
•  Item to be included in the tables are:
ü Suitability
ü Advantages
ü Disadvantages
ü Cost
Requirements:
You should prepare the table form which need to be presented.
Please state your name, student ID and title. (Group)
•  In a table form, explain the type of materials available
for floor finishes.
•  Item to be included in the tables are:
ü Suitability
ü Advantages
ü Disadvantages
ü Cost
Requirements:
You should prepare the table form which need to be presented.
Please state your name, student ID and title. (Group)
TUTORIAL 4 (B)

More Related Content

What's hot

Brick walling an introduction
Brick walling an introductionBrick walling an introduction
Brick walling an introduction
doogstone
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
Hamdija Velagic
 

What's hot (20)

Pile foundation
Pile foundationPile foundation
Pile foundation
 
Formwork
FormworkFormwork
Formwork
 
Foundation selection
Foundation selectionFoundation selection
Foundation selection
 
Building construction notes pdf
Building construction notes pdfBuilding construction notes pdf
Building construction notes pdf
 
Foundations
FoundationsFoundations
Foundations
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Concrete Block Walling
Concrete Block WallingConcrete Block Walling
Concrete Block Walling
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Brick walling an introduction
Brick walling an introductionBrick walling an introduction
Brick walling an introduction
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick Wall
 
Foundations
FoundationsFoundations
Foundations
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagram
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
TYPES OF SHEAR FAILURE UNDER FOOTING
TYPES OF SHEAR FAILURE UNDER FOOTINGTYPES OF SHEAR FAILURE UNDER FOOTING
TYPES OF SHEAR FAILURE UNDER FOOTING
 
TYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONSTYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONS
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
Roofs
RoofsRoofs
Roofs
 

Similar to Chapter 4

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 

Similar to Chapter 4 (20)

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
 
Pile
PilePile
Pile
 
1.7.ppt
1.7.ppt1.7.ppt
1.7.ppt
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slab
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
 
Bubbleds 170408171346
Bubbleds 170408171346Bubbleds 170408171346
Bubbleds 170408171346
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
TIMBER FRAME UPPER FLOOR (1).pptx
TIMBER FRAME  UPPER FLOOR (1).pptxTIMBER FRAME  UPPER FLOOR (1).pptx
TIMBER FRAME UPPER FLOOR (1).pptx
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
concrete.pptx
concrete.pptxconcrete.pptx
concrete.pptx
 
national building code
national building codenational building code
national building code
 
Form Work
Form Work Form Work
Form Work
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
 

More from Est chua

Intro 1 malsia
Intro 1 malsiaIntro 1 malsia
Intro 1 malsia
Est chua
 
Info pack participants
Info pack   participantsInfo pack   participants
Info pack participants
Est chua
 
Bld62003 timber mak
Bld62003 timber makBld62003 timber mak
Bld62003 timber mak
Est chua
 
Bld62003 mak metal
Bld62003 mak metalBld62003 mak metal
Bld62003 mak metal
Est chua
 
Microsoft power point lecture4
Microsoft power point   lecture4Microsoft power point   lecture4
Microsoft power point lecture4
Est chua
 
Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15
Est chua
 
Building Materials Course outline
Building Materials Course outline Building Materials Course outline
Building Materials Course outline
Est chua
 
Measurment 1 course outline
Measurment 1 course outline Measurment 1 course outline
Measurment 1 course outline
Est chua
 
Construction Technology Course outline
Construction Technology Course outlineConstruction Technology Course outline
Construction Technology Course outline
Est chua
 
Module outline itd dmz feb2015 aug2014
Module outline itd dmz feb2015  aug2014Module outline itd dmz feb2015  aug2014
Module outline itd dmz feb2015 aug2014
Est chua
 
Design project two brief
Design project two   briefDesign project two   brief
Design project two brief
Est chua
 
Design project one brief
Design project one   briefDesign project one   brief
Design project one brief
Est chua
 
Design design process journal brief
Design design process journal briefDesign design process journal brief
Design design process journal brief
Est chua
 
Design project one - brief - 1 a only
Design   project one - brief - 1 a onlyDesign   project one - brief - 1 a only
Design project one - brief - 1 a only
Est chua
 
Course outline
Course outlineCourse outline
Course outline
Est chua
 
Psychology report
Psychology reportPsychology report
Psychology report
Est chua
 
Psycho final
Psycho finalPsycho final
Psycho final
Est chua
 
Psycho comic
Psycho comicPsycho comic
Psycho comic
Est chua
 

More from Est chua (20)

Intro 1 malsia
Intro 1 malsiaIntro 1 malsia
Intro 1 malsia
 
Info pack participants
Info pack   participantsInfo pack   participants
Info pack participants
 
Bld62003 timber mak
Bld62003 timber makBld62003 timber mak
Bld62003 timber mak
 
Bld62003 mak metal
Bld62003 mak metalBld62003 mak metal
Bld62003 mak metal
 
Microsoft power point lecture4
Microsoft power point   lecture4Microsoft power point   lecture4
Microsoft power point lecture4
 
Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15Integrated assignment ct1 and bm aug15
Integrated assignment ct1 and bm aug15
 
Building Materials Course outline
Building Materials Course outline Building Materials Course outline
Building Materials Course outline
 
Measurment 1 course outline
Measurment 1 course outline Measurment 1 course outline
Measurment 1 course outline
 
Construction Technology Course outline
Construction Technology Course outlineConstruction Technology Course outline
Construction Technology Course outline
 
Module outline itd dmz feb2015 aug2014
Module outline itd dmz feb2015  aug2014Module outline itd dmz feb2015  aug2014
Module outline itd dmz feb2015 aug2014
 
Design project two brief
Design project two   briefDesign project two   brief
Design project two brief
 
Design project one brief
Design project one   briefDesign project one   brief
Design project one brief
 
Design design process journal brief
Design design process journal briefDesign design process journal brief
Design design process journal brief
 
Design project one - brief - 1 a only
Design   project one - brief - 1 a onlyDesign   project one - brief - 1 a only
Design project one - brief - 1 a only
 
Rsv
Rsv Rsv
Rsv
 
Course outline
Course outlineCourse outline
Course outline
 
0 final
0 final0 final
0 final
 
Psychology report
Psychology reportPsychology report
Psychology report
 
Psycho final
Psycho finalPsycho final
Psycho final
 
Psycho comic
Psycho comicPsycho comic
Psycho comic
 

Recently uploaded

Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
amitlee9823
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...
Health
 
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
amitlee9823
 
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
ezgenuh
 
➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men 🔝Asansol🔝 Escorts...
➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men  🔝Asansol🔝   Escorts...➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men  🔝Asansol🔝   Escorts...
➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men 🔝Asansol🔝 Escorts...
amitlee9823
 
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
amitlee9823
 
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
amitlee9823
 

Recently uploaded (20)

What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
 
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
Top Rated Call Girls Vashi : 9920725232 We offer Beautiful and sexy Call Girl...
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN ABUDHABI,DUBAI MA...
 
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
 
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
一比一原版(PU学位证书)普渡大学毕业证学历认证加急办理
 
➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men 🔝Asansol🔝 Escorts...
➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men  🔝Asansol🔝   Escorts...➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men  🔝Asansol🔝   Escorts...
➥🔝 7737669865 🔝▻ Asansol Call-girls in Women Seeking Men 🔝Asansol🔝 Escorts...
 
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
 
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls DubaiDubai Call Girls R0yalty O525547819 Call Girls Dubai
Dubai Call Girls R0yalty O525547819 Call Girls Dubai
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
 
Stay Cool and Compliant: Know Your Window Tint Laws Before You Tint
Stay Cool and Compliant: Know Your Window Tint Laws Before You TintStay Cool and Compliant: Know Your Window Tint Laws Before You Tint
Stay Cool and Compliant: Know Your Window Tint Laws Before You Tint
 
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
Top Rated Call Girls Mumbai Central : 9920725232 We offer Beautiful and sexy ...
 
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic Manual
 
Workplace-Hazards TLE EIM 10 QUARTER3 W2
Workplace-Hazards TLE EIM 10 QUARTER3 W2Workplace-Hazards TLE EIM 10 QUARTER3 W2
Workplace-Hazards TLE EIM 10 QUARTER3 W2
 
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7
(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7
(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
BOOK FARIDABAD CALL GIRL(VIP Sunny Leone) @8168257667 BOOK 24/7
BOOK FARIDABAD CALL GIRL(VIP Sunny Leone) @8168257667 BOOK  24/7BOOK FARIDABAD CALL GIRL(VIP Sunny Leone) @8168257667 BOOK  24/7
BOOK FARIDABAD CALL GIRL(VIP Sunny Leone) @8168257667 BOOK 24/7
 

Chapter 4

  • 1. BACHELOR OF QUANTITY SURVEYING (HONS) BLD 60104 CONSTRUCTION TECHNOLOGY 1 By Azrina Md Yaakob Azrina.MdYaakob@taylors.edu.my CHAPTER 4 CONCRETE FRAMED BUILDINGS
  • 2. CONCRETE Mixture of cement, fine & coarse aggregate & water Basic construction: a) Concrete b) Formwork c) Reinforcement FRAMED Consists of: a) upright load bearing members such as posts in timber b) columns in concrete c) stanchions in steel which are arranged at the corners of the square or rectangular base Transfer loads of heavy structure plus any imposed loads via the f r a m e s t r u c t u r e members to a suitable lower ground BUILDING R e s i d e n t i a l , Commercial, Offices, Etc 1.0 BASIC DEFINITION
  • 3. a) Concrete b) Formwork c) Reinforcement Frame Building
  • 4. 1.1 CONCRETE •  Increases its strength during curing / hardening period •  Portland cement is used –28days •  Nominal max sizes of aggregates: 40, 20, 14 and 10mm; 5mm is for precast products •  Grade 7 & 10 -plain unreinforced concrete •  Grade 15 & 30 –RC with lightweight aggregates •  Grade 25 –RC with dense aggregates •  Grade 30 to 50 –pre-stressed concrete
  • 5. 1.2 REINFORCEMENT Requirements: •  Capable of achieving tensile strength without any undue strain •  A material can be easily bend to any required shape •  Surface must be capable of developing adequate bond between the concrete & reinforcement •  Reasonable cost & acceptable to overall design concept •  Steel in the form of bars •  mild steel (R) & high yield (T) •  nominal sizes: 6, 8, 10, 12, 16, 20, 25, 32mm
  • 6. 1.3 FABRIC REINFORCEMENT •  Structural members that require only small area of reinforcement •  Can be reinforced by steel fabric, which can be supplied by sheets / rolls •  Factory-made by welding •  Sheets: 4800mm x 2400mm •  Rolls: 48.00m & 72.00m with a common width of 2.40m
  • 7. 1.4 FORMWORK •  A mould / box into which wet concrete can be poured so that it will flow & finally set to the inner profile of the box •  Requirements: •  Strong enough to support the load of wet concrete •  Must be accurately set out •  Have grout-tight joints –grout leakage can cause honeycombing of the surface •  Designed to be the max size that can be easily handled by hand & mechanical lifting device •  Moisture content btw 15 –20% Bad Formwork Design : Leakage which cause honeycombing
  • 9. 1.4.1 FOUNDATION FORMWORK There are 2 types of foundation formwork: 1.  Permanent formwork 2.  Traditional timber formwork Benefits of using permanent formwork: Ø  Less concrete waste Ø  Requires less excavation than traditional wood planks Ø  Easily transported because of the light weights Ø  No skilled labours are needed Benefits of using traditional timber formwork: Ø  It can be reused Ø  Cheaper production cost Ø  Higher availability than steel Ø  Easy to work by using hammer and nails
  • 12.
  • 13. 1.4.3 BEAM FORMWORK •  A beam form consists of a three-sided box which is supported by cross-members called headtrees. •  Soffit board should be fixed inside the beam sides so that latter can be removed. This also can speed up the hardening process and also release the formwork for re-use.
  • 14. 1.4.4 SLAB FORMWORK There is four type of slab formwork: 1.  Timber beam slab formwork 2.  Traditional slab formwork 3.  Metal beam slab formwork 4.  Modular slab formwork Metal  beam   slab  fwk.   Timber  beam   slab  fwk.   Modular   slab  fwk.   Schema7c  sketch  of   tradi7onal  fwk.  
  • 15. 1.4.4.1 TRADITIONAL SLAB FORMWORK •  Consists of supports out of lumber or young tree trunks, that support tows of stringers •  Assembled roughly to 2 meters apart, depending the thickness of slab •  Between these stringers, joists are positioned roughly 30cm apart upon which boards or plywood are placed. •  The stringers and joists are usually 4 by 4 inch or 4 by 6 inch lumber
  • 16. 1.4.4.2 TIMBER BEAM SLAB FORMWORK •  Similar to the traditional method •  But stringers and joist are replaced with engineered wood beams •  Supports are replaced with metal props •  This method more systematic and reusable
  • 17. 1.4.4.3 METAL BEAM SLAB FORMWORK •  Similar to traditional method •  But stringers and joist are replaced with aluminium forming systems or steel beams •  Supports are replaced with metal props •  More systematic and reusable
  • 18. 1.4.4.4 MODULAR SLAB FORMWORK •  These systems consist of prefabricated timber, steel or aluminum beams and formwork modules •  Modules are often no larger than 1 to 2 meter in size •  Beams and formwork are typically set by hand and pinned, clipped, or screwed together
  • 19. 1.5 CONCRETE FRAMED BUILDING Concrete Framed Building Stump Ground Beam Ground Floor Slab Ground Floor Column 1st Floor Beam & Slab 1st Floor Column Roof Beam
  • 20. 1.5.1 STUMP •  A short column constructed on top of the pad foundation / pile cap to support ground beam & column above •  To transfer the load of a building onto the pad foundation / pile cap •  To raise ground beam & ground floor slab to the required height above GL
  • 21.
  • 22. 1.5.2 BEAMS •  Supporting walls, joists, etc., at or near ground level, itself either resting directly upon the ground or supported at both ends by piers. •  Vary in their complexity of design & reinforcement depends on loading •  Erected over columns or piers taken into the soil •  Transfer their loadings to columns •  When erecting them, the piers must be already cast in the ground
  • 23. 1.5.2.1 BEAM CONSTRUCTION PROCESS Clearing the ground Blinding layer Reinforcements are then tied and bent separately; carried and laid over the columns and blinding Formwork erected to sides Concrete is prepared and poured
  • 25. 1.5.3 COLUMNS •  Constructed from either plain concrete (1:3:6) / reinforced concrete (1:2:4) •  Vertical structural element that transmits, through compression, the weight of the structure above to other structural elements below •  To support beams or arches on which the upper parts of walls or ceilings rest •  Columns must be properly located, and the choice of a steel beam or wood beams
  • 26. 1.5.3.1 COLUMN CONSTRUCTION PROCESS Link tied to main bars Adding spacer block Lapping Wood Bracing
  • 27.
  • 29. 1.5.4 FLOOR Functions of Ground Floor •  Withstand load imposed upon them, dead & live load •  Prevent the growth of greens inside the building by concrete over-site •  Prevent damp penetrating the building –damp proof membrane •  To be durable so to reduce the amount of maintenance / replacement work to a min •  Provide acceptable finish which will meet the needs of users
  • 30. Functions of Upper Floor •  Support their own weight, ceilings & superimposed loads •  Restrict the passage of fire; for high-rise building •  Restrict transmission of sound from 1 floor to another •  Durability •  Bridge the specific span economically & be capable of fairly quick erection •  Accommodate services •  Provide acceptable finish which will meet the needs of users
  • 31. Floor Slab •  The formwork for floor beam & floor slab is constructed together •  Reinforcement for floor slab tied to beam reinforcement
  • 32. 1.5.4.1 CONSTRUCTION OF GROUND FLOOR SLAB
  • 33.
  • 34. a)  Hardcore •  To fill hollows & to raise the finished level of an over-site concrete slab after removal of turf •  Provide a firm working surface & prevent contamination of the lower part of wet concrete •  Reduce the amount of rising ground moisture •  hard, durable & chemically inert; will not attack concrete & mortar; readily be placed in in a compact & dense condition •  100-150mm thick b) Blinding •  To even-off the surface of hardcore if a damp-proof membrane is to be placed under concrete bed •  A layer of sand 25 –50mm thick
  • 35. c) Damp Proof Membrane •  To prevent dampness getting through a ground bearing concrete floor should be protected by an impervious layer, usually a 1200 gauge (0.3mm) heavy duty polythene damp-proof membrane. •  The DPM can be positioned either on the sand blinding or on the concrete slab. •  Joints in a Polythene DPM should be welted or taped and should overlap by at least 300mm. •  The DPM must be linked with the DPC in the walls, to ensure that the entire interior of the building is protected from moisture by a continuous, impervious barrier.
  • 36. d) Concrete Floor Slab •  A typical concrete mix for a ground bearing slab is 1:2:4 mix. •  The floor slab is usually placed over the DPM •  The floor slab should not be less than 100mm thick. •  Ensure all the services and ducts running under the floor are installed and tested before pouring the slab. •  If required, the concrete slab may be reinforced with a layer of steel mesh •  Once the concrete slab has been poured, it can be temped with a heavy beam to remove air and surplus water and ensure a level surface. •  The concrete slab should be left to dry out for around two to three days
  • 37.
  • 38. 1.5.4.2 CONSTRUCTION OF UPPER FLOOR SLAB 1) Construct coulmn 2) Slab formwork 3) Concreting
  • 39. 1.5.4.3 FLOOR FINISHES Factors to be considered during choosing a right floor finishes: •  Durability –avoid premature replacement with extra cost & inconvenience •  Function •  Resistance to wear –resistance to indentation as floor has to withstand heavy furniture, fittings & equipment; resistance to abrasion in buildings subject to movable equipment •  Economy –initial & maintenance cost •  Non-slip qualities –bathroom & kitchen •  Appearance –wood blocks & strip flooring
  • 40. 1.6 ROOF BEAM •  A load-bearing member in the roof structure. •  Member that span across the openings & support structure or loading above them •  Material : timber, steel & reinforced concrete •  Purlin act as beam, reducing the span of the rafter enabling an economic section to be used
  • 41.
  • 42.
  • 43. TUTORIAL 4 (A) •  In a table form, explain the type of materials available for formwork. •  Item to be included in the tables are: ü Suitability ü Advantages ü Disadvantages ü Cost Requirements: You should prepare the table form which need to be presented. Please state your name, student ID and title. (Group)
  • 44. •  In a table form, explain the type of materials available for floor finishes. •  Item to be included in the tables are: ü Suitability ü Advantages ü Disadvantages ü Cost Requirements: You should prepare the table form which need to be presented. Please state your name, student ID and title. (Group) TUTORIAL 4 (B)