Personal Information
Unternehmen/Arbeitsplatz
New Delhi Area, India, Delhi India
Beruf
Manager (Engineering) at Alstom Grid
Branche
Electronics / Computer Hardware
Info
Electrical design engineer with 10 years of experience in field of electrical design & engineering of sub stations, power plants and process plants.
•Collecting data for design and coordinating the entire engineering operation including requirement analysis, finalizing specifications
•Dealing directly with client for technical queries & giving best solution
•Directing, leading and motivating workforce for accomplishing greater operational effectiveness/ efficiency
•Monitoring and executing power plant projects with respect to demand forecasts, time over-runs and engineering support for achieving sales target and timely execution of the projects
•Handling resource planning, des
Tags
power cable sizing
lv switchboards design & selection
low voltage switchgear
postulates and axioms
basic set up
terminologies
advantage and drawbacks of gis
gis substation
system earthing
Mehr anzeigen
Präsentationen
(5)Gefällt mir
(3)Public Address System
Mohammed Zaid Shaikh
•
Vor 8 Jahren
PowerPoint Hacks for Rookies: 4 Must Consider Aspects
24Slides
•
Vor 8 Jahren
capacitors
Vincent Wedelich, PE MBA
•
Vor 9 Jahren
Personal Information
Unternehmen/Arbeitsplatz
New Delhi Area, India, Delhi India
Beruf
Manager (Engineering) at Alstom Grid
Branche
Electronics / Computer Hardware
Info
Electrical design engineer with 10 years of experience in field of electrical design & engineering of sub stations, power plants and process plants.
•Collecting data for design and coordinating the entire engineering operation including requirement analysis, finalizing specifications
•Dealing directly with client for technical queries & giving best solution
•Directing, leading and motivating workforce for accomplishing greater operational effectiveness/ efficiency
•Monitoring and executing power plant projects with respect to demand forecasts, time over-runs and engineering support for achieving sales target and timely execution of the projects
•Handling resource planning, des
Tags
power cable sizing
lv switchboards design & selection
low voltage switchgear
postulates and axioms
basic set up
terminologies
advantage and drawbacks of gis
gis substation
system earthing
Mehr anzeigen