Veracia is a product that helps ensure accuracy and consistency when implementing Oracle Primavera Unifier. It automates the change control process and allows users to compare business processes, forms, and environments across versions. Key features include searching the entire Unifier object model, comparing features across tiers, and generating comprehensive as-built documentation for reference. Veracia provides change control capabilities that help teams stay organized and on track with their Unifier configuration.
Veracia™ by Enstoa: Change control for Oracle Primavera Unifier
1. A Better Way to Build
Kerry Foley
Chief Operating Officer kfoley@enstoa.com +1 (718) 288 1897
KEEP YOUR TEAM OUT OF THE
WEEDS WITH VERACIA™
An indispensable product for ensuring
the accuracy and consistency of your
Unifier implementation
BENEFITS
• Automate the change control
process and IT audit policies
• Know with certainty the
compliance of your configuration
across projects, templates and
environments
• Save time by quickly determining
which fields were used across
multiple forms
• Eliminate misalignment between
your Unifier configuration, report
writing and integration activities
Compare business processes across versions
FEATURES
Quickly check production and staging
environments across timeline for
differences in
• Business processes
• Workflows
Global search to inspect field properties
VERACIA™Change control for Oracle Primavera Unifier
2. A Better Way to Build
Kerry Foley
Chief Operating Officer kfoley@enstoa.com +1 (718) 288 1897
SEARCH AND NAVIGATE THE
ENTIRE OBJECT MODEL TO FIND
AND INSPECT FIELD ATTRIBUTES
AT A GLANCE
• Business Processes
• Forms
• Blocks
• Data elements
COMPARE FEATURES ACROSS
THREE TIERS
• Business Processes
• Snapshots
• Environments
EASILY GENERATE
COMPREHENSIVE AS-BUILT
DOCUMENTATION FOR
REFERENCE
• Business Processes
• Forms
• Blocks
• Data Dictionary
• Environments
Use Veracia’s Data Dictionary
to annotate field with your own
internal comments and definitions
Create editable PDF and Word
documents from XML to show
all comments and definitions on
elements above
Compare workflow changes
Generate as-built documentation
VERACIA™Change control for Oracle Primavera Unifier