Presentation on Quality Management

Md. Masudur Rahman, PMP
Md. Masudur Rahman, PMPAssistant Commissioner & Executive Magistrate, DC Office, Sirajganj um DC Office Sirajganj
2. STARTING THE PROJECT (Continue)
Already assembled a high performing engaged and
empowered project team,
Now we have started the planning phase
At the beginning, we have to determine the
methodology or method
A. Assess project needs, complexity, and
magnitude to determine the appropriate project
methodology /methods and practices.
B. Plan & Manage the Scope
C. Plan & Manage the budget & resources
D. Plan, prepare, modify & manage the project
schedule based on methodology
E. Plan & manage quality of product &
deliverables
F. Integrate project planning activities
G. Plan & manage procurement strategy
H. Establish the project governance structure
I. Plan & manage project/phase
closure
Lesson Objectives:
Enablers:
• Plan Quality Standard required for project deliverables
• Recommend options for improvement based on quality gaps
• Continually survey project deliverable quality
- What the level of quality is?
- How the project quality is to be measured?
- How it will be aligned to the project objectives?
- How the quality is to be tracked & reported?
Following Deliverables & Tools are relevant to the enablers:
E. PLAN AND MANAGE QUALITY OF PRODUCT & DELIVERABLES
Quality
Quality is the degree to which a set of inherent characteristics fulfills requirements
 Quality represents what the stakeholders expect from the project.
 The stated and implied quality needs are inputs for devising project requirements.
 In Business – Quality should be feasible, modifiable and measureable.
Quality Standards and Regulations
A standard is a document established by an authority, custom, or general consent as model or example.
 Standards are typically voluntary Guidelines or characteristics
 Approved by recognized body of experts (such as International Organization for Standardization - ISO).
Regulations are requirement imposed by a governmental body.
 Requirements can established product, process, or service characteristics.
 Its kind of government-mandated compliance.
 Stands often start out as accepted or De facto best practice describing a preferred approach
 May later become de jure regulations such as uniting the critical path method in Scheduling major
construction projects.
Quality Management Plan
The quality management plan describes how applicable policies, procedures, and guidelines
will be implemented to achieve the quality objectives.
It describes the activities and resources necessary for the project management team to
achieve the quality objectives set for the project. The quality management plan may be formal or
informal, detailed, or broadly framed.
Quality Management Plan includes:
 Quality objectives of the project
 Quality standards that will be used by the project
 Quality roles and responsibilities
 Project deliverables and processes subject to quality review
 Quality control and quality management activities planned for the project
 Quality tools that will be used for the project
 Major procedures relevant for the project, such as dealing with nonconformance, corrective
actions procedures, and continuous improvement procedures.
Quality
Quality is the degree to which the product or result meets the
customer or end-user requirements. Their requirements may
or may not be in alignment with the documented project
requirements, however. It is simply their assessment on how
well the output aligns with their needs and expectations.
Grade
Grade is a category assigned to products that have the same
functional use but different technical characteristics. Grade is
usually determined through some set of pre-determined
measurements and demonstration of compliance to those
measurements.
 Low grade may not be a problem, but low quality is
almost always a problem.
 High quality doesn’t necessarily mean high grade.
 The project management team manages the
trade-off between quality and grade based on the
project requirements.
 Higher grade products are usually more expensive
than lower grade ones.
Cost of Quality (COQ) is primarily a measure of
all costs related to the quality and the lack thereof.
In other words, its an integrated concept of the costs to
achieve quality and the costs that occur due to quality
issues.
COQ = Cost of Conformance + Cost of Non-Conformance (or failure costs)
Cost of non-conformance = sum of external and internal failure costs.
Cost of conformance = sum of the prevention and appraisal costs
Cost of conformance
describes the amount of resources
needed to achieve the quality
requirements and targets of a project.
The underlying rationale is to spend
money on the prevention of quality
issues rather than for fixing them.
Cost of non-conformance
is used as a synonym for failure
cost. It refers to the resources that
are required to fix failures and
take corrective actions but also
to indirect effects from quality
issues, such as negative business
impact.
Appraisal costs are the (financial and non-financial) resources that are consumed to
assess and measure the quality of the deliverables of a project. This relates to quality
assurance and money invested in activities that identify quality issues.
Quality Audits
An audit is a structured, independent process used to determine if project activities comply
with organizational and project policies, processes, and procedures.
A quality audit is usually conducted by a team external to the project, such as the organization’s
internal audit department, PMO, or by an auditor external to the organization.
Quality audit objectives may include:
 Identifying all good and best practices being implemented
 Identifying all nonconformity, gaps, and shortcomings
 Sharing good practices introduced or implemented in similar projects in the organization and/or
industry
 Proactively offering assistance in a positive manner to improve the implementation of
processes to help raise team productivity
 Highlighting contributions of each audit in the lessons learned repository of the organization
Quality Measurement Tolls:
There are a variety of tools available for continually surveying the
quality of a project. Seven common tools are:
 Cause and effect diagram. Diagrams that define the inputs to a
process or product in order to identify potential causes of defects.
 Histogram. A bar chart showing a distribution of variables.
 Run chart. Show trends in the variation of a process over time.
 Scatter diagram. Shows the relationship between two variables.
 Control chart. A graphic display of process data over time and
against established control limits, and that has a centerline that
assists in detecting a trend of plotted values toward either control
limit.
 Flowcharting. The depiction in a diagram format of the inputs,
process actions, and outputs of one or more processes within a
system.
 Pareto chart. A histogram, ordered by frequency of occurrence, that
shows how many results were generated by each identified cause.
Quality Metrics is a description of a
project or product attribute and how to
measure it. The tolerance is the allowable
variation in this measurement.
For Example:
Schedule is within +10% and -10% of the
actual schedule.
Other Example:
 Budget variance
 Defect count
 Requirements coverage
 Failure rate
Cause and effect diagram. Diagrams that define the inputs to
a process or product to identify the potential causes of defects are known
as Cause and effect diagrams.
This diagram is also referred to as Fish-bone analysis
diagram or Ishikawa diagram.
The given diagram illustration simply helps us list out the
possible causes of the cost over-run. Once the root
cause is determined, it could be handled with
appropriate resolution and may help in damage control.
Histogram. A bar chart showing a distribution of variables over time, is called a Histogram.
Histograms give us a fair idea of how our data breaks down. It shows the distribution of data over various streams
ranging from resource allocation to budget distribution.
Histogram represents each attribute or characteristic
as a column and the frequency of each attribute or
characteristic occurring as the height of the column.
Shows IT department’s survey to rank the reasons for
dissatisfaction of a call center’s service. Its uses bars to
demonstrate the number of times each cause of
dissatisfaction was checked.
Run Chart. A run chart is a line graph of data plotted over time used to show trends in the variation of a process.
In a run chart, you are looking for trends in the data over time. You could check the chart to see if it seem to be going
up or down as the project progresses.
The run chart is a running record of a process over
time:
 Vertical axis represents the process being
measured
 The horizontal axis represents the units of time
by which the measurements are made
In software development, we observed that the trend of
fixing the bugs was slower in the initial phase of software
testing. However, as more and more bugs were generated
by the tester, the developers started focusing on fixing
more bugs to ensure delivery on-time and on-budget.
Scatter Diagram. A scatter diagram, or scatter graph is a graphical representation of quantitative analysis on
mathematical statistics of two variables, using Cartesian coordinates.
In a run chart, you are looking for trends in the data over time. You could check the chart to see if it seem to be going
up or down as the project progresses.
 Scatter diagrams use two variables, one
called an ‘independent variable’, which is
an input and the other called the
‘dependent variable’, which is an output.
 This relationship is also analyzed to prove
or disapprove cause and effects
relationship between the variable.
The local ice cream shop keeps track of how much ice
cream they sell versus the noon temperature on that day
Presentation on Quality Management
Control Chart. A Control Chart is a graphical display of data over time and against established control limits that
has a center line that assists in detecting a trend of plotted values toward either control limits.
Control Charts measure the results of processes over time and display the result in graph form to show whether the
process variance is in control or out of control.
A process is considered to be in control if the
measurements fall within the control limits. So in
a Control Chart, there is a mean, a Lower
control limit and an Upper control limit.
Control charts helps to answers to the following:
 Is the process under control?
 Is the project moving in the right direction?
 Are the deliverables within the specification limits?
Presentation on Quality Management
Flow Chart. The depiction in a diagram format of the inputs, process actions, and outputs of one or more
processes within a system is called a Flow Chart. .
The flowchart shows the steps as
boxes of various kinds, and their
order by connecting the boxes with
arrows. This diagrammatic
representation illustrates a solution
model to a given problem.
Pareto Chart. A Pareto chart is a specific type of histogram that ranks causes or issues by their overall influence.
A Pareto chart assists in prioritizing corrective actions as the issues with the greatest impact are displayed in order. In
addition, the Pareto chart includes an arc representing the cumulative percentage of the causes..
A Pareto chart is named after Pareto’s Law that states
that a relatively small number of causes will typically
produce a large majority of the problems or defects.
This is commonly known as the 80/20 rule, where
80% of the problems are due to 20% of the causes.
The causes on the left of the intersection point of the
80% cumulative line (orange line) and the cumulative
frequency line (red line) are the issues to focus the
attention on.
Presentation on Quality Management
Statistical sampling is one of the tools and techniques
used in Control Quality. It is defined as selecting part of a
population in question or interest for inspection. The samples are
chosen and tested according to the quality management plan.
Population is the entire set of items from which you draw
data for a statistical study. It can be a group of individuals, a
set of items, etc. It makes up the data pool for a study.
A sample represents the group of interest from the
population, which you will use to represent the data. The
sample is an unbiased subset of the population that best
represents the whole data.
In attribute sampling, data is in the “attribute” form,
and the result either conforms or does not conform.
Attribute sampling checks whether an item is defective or
not. It’s a yes or no answer.
In variable sampling, data is in the “variable”
form, and the result is rated on a continuous scale
that measures the degree of conformity.
Variable sampling is about checking “how much”,
“how good”, or “how bad”.
Enablers:
 Manage & rectify ground rule violations
 Consolidate the project/phase plans
 Assess plans for dependencies, gaps, and continued business
value
 Analyze the data collected
 Collect & Analyze data to make informed project decisions
 Determine critical information requirements
 Plan and manage project compliance to business factors
 Plans are developed and updated throughout the project, need to integrate all
those plans and components.
 This integrated view can identify and correct gaps or conflicts
Following Deliverables & Tools are relevant to the enablers:
F. INTEGRATE PROJECT PLANNING ACTIVITIES
Project Management Plan
and Project Documents:
F. INTEGRATE PROJECT PLANNING ACTIVITIES
A project plan, also known as the
project management plan, is the document
that describes how the project will be
executed, monitored, and controlled, and
closed.
There is generally not one single plan,
But many plans that make up the project
management plan.
Project documentation is the
process of recording the key project details
and producing the documents that are
required to implement it successfully.
Project documents come in many forms
Project Management Plan
Components:
 Baselines (4)
 Subsidiary plans (13)
 Life Cycle (1)
 Project Processes
 Work Explanation
 Agile Project Plan
F. INTEGRATE PROJECT PLANNING ACTIVITIES
Baselines are used to compare what has been done to what was
planned. The three most common baselines are:
 Scope baseline - an approved version of the detailed project scope
 Schedule baseline - an approved version of the schedule
 Cost baseline - an approved version of the time-phased budget
Performance measurement baseline
An integrated scope-schedule-cost plan for the project work. Used to
measure and manage project work during project execution.
Project Management Plan
Components:
 Baselines (4)
 Subsidiary plans (13)
 Life Cycle (1)
 Project Processes
 Work Explanation
 Agile Project Plan
F. INTEGRATE PROJECT PLANNING ACTIVITIES
The scope management plan is a component of the project or program management
plan that describes how the scope will be defined, developed, monitored, controlled, and
verified. The scope management plan is a significant input into the Develop Project
Management Plan process and the other scope management processes.
The components are as follows:
 The process to prepare a detailed project scope
statement
 The process that allows creating WBS from the detailed
project scope statement
 The process that establishes how the WBS will be
maintained and approved
 The process that explains how formal acceptance of
completed project deliverables are to be obtained
 The process to control the requests for changes to the
detailed project scope statement will be documented.
The Requirements Management Plan A process that describes how the project
requirements will be analyzed, documented, and managed. They rightly choose the most effective
relationship for the project and document the approach in the requirements management plan.
The plan focuses on:
 How the requirement activities are planned,
tracked, and reported.
 How the changes to the product will be initiated.
 The procedures required for analyzing the impacts,
and methods used to trace and report the issues.
 Getting Details of the authorization levels that are
required to approve the changes made.
 The conditions required to rank the implemented
processes.
 Focusing on why and how the product metrics are
being used.
 Traceability structure to reflect which requirement
features will be captured on the traceability matrix.
The Schedule Management Plan defines how the
project schedule is managed throughout the project lifecycle. The
plan provides guidance and sets expectations for project
schedule policies and procedures for planning, developing,
managing, executing, and controlling the project schedule.
The components of the Schedule Management Plan can include:
 Roles and responsibilities. (Schedule owner. Who can update? Who
can read?)
 Update frequency. describe the timing of schedule updates.
(weekly, bi-weekly)
 Progress feedback. describes how the schedule feedback will be
delivered (status report, progress report)
 Schedule change review and approval. define the process
required to evaluate and approve proposed schedule changes.
 Tools. Describe about any scheduling tool used on this project
(read the schedule, update schedule, etc)
 Reports. types and names of reports using to manage the project,
 Schedule integration. master schedule is the result of a roll-up of
other underlying schedules
Risk Management Plan – The Risk Management Plan
shall outline the strategies how to increase the probability and
impact of positive events and decrease the probability and impact
of negative events in a project by utilizing the processes set out
by PMBOK.
Components of Risk Management?
1. Risk Identification
Risk identification is the process of documenting potential risks and then
categorizing the actual risks the business faces.
2. Risk Analysis
Once risks have been identified, the next step is to analyze their likelihood and
potential impact. How exposed is the business to a particular risk? What is the
potential cost of a risk becoming a reality?
3. Response Planning
Response planning answers the question: What are we going to do about it?
4. Risk Mitigation
Risk mitigation is the implementation of your response plan. It is the action your
business and its employees take to reduce exposure.
5. Risk Monitoring
Risks are not static; they change over time. The potential impact and probability
of occurrence change, and what was once considered a minor risk can grow
into one that presents a significant threat to the business and its revenue.
“The configuration management plan defines those
items that are configurable, those items that are require formal
change control, & the process for controlling changes to such
items.”
Configuration Planning tells us the following:
 What all project items are configurable
 Which all items (say Scope Statement, WBS Dictionary) needs,
formal change control
 And, what would be the process of controlling changes to these
items?
Configuration Management Plan also recommends:
 A tool to manage Configurable Items,
 A versioning scheme. For example, a Document Version will have two
segments like aa, bb, cc, .dd. The first segment will represent the
product; the second will represent deliverable, etc.
Change Management Plan
A change management plan is a component of the project management plan that establishes
the change control board or involvement level of the Product Owner, documents that extent of it
authority and describes how the change control system will be implemented.
A change management plan can answer the
following questions:
 Who can propose a change?
 What exactly constitutes a change?
 What is the impact of the change on the project’s
objectives?
 What steps are necessary to evaluate the change
request before approving or rejecting it?
 When a change request is approved, what project
documents must be amended to record the actions
necessary to effect the change?
 How will these actions be monitored to confirm that
they have been completed satisfactorily?
Enablers:
• Define external resource requirements and needs
• Communicate external resource requirements
• Manage suppliers/Contracts
• Analyze the data collected
• Plan & manage procurement strategy
• Develop a delivery solution
 Identifying suppliers, obtaining bids or proposal from them, awarding contracts
based on their evaluation
 All procurements must be done within time, cost & quality
Following Deliverables & Tools are relevant to the
enablers:
G. PLAN AND MANAGE PROCUREMENT
Procurement Management Plan – Documents the
activities relative to purchasing or acquiring services from
outside the project team or entity. An entity can either be the
buyer or vendor of a service or a product.
Project Procurement Management takes into account four
(4) processes namely:
1. Plan Procurements
2. Conduct Procurements
3. Administer Procurements
4. Close Procurements
Make or Buy Analysis
A make or buy analysis typically occurs in the
Plan Procurement Management stage of a
project. There are two PMP exam definitions
you should know:
Make or Buy Analysis: The process of
gathering and organizing data about product
requirements and analyzing them against
available alternatives, including the purchase
or internal manufacture of the product.
Make or Buy Decisions: Decisions made
regarding the external purchase or internal
manufacture of a product
Calculate Make or Buy Decisions
 Direct and Indirect Costs
 Costs of producing in-house vs.
an outside source
 Cost of conformance vs. non-
conformance
Enablers:
• Determine appropriate governance for a project
• Define escalation path and thresholds
 Organization use governance guidelines to establish strategic direction and
performance parameters
 Strategic direction provides the purpose, expectation, goals and action to guide
business pursuits and is aligned with the business objectives.
 Project management activities must stay aligned with business direction.
Following Deliverables & Tools are relevant to the enablers:
H. ESTABLISH PROJECT GOVERNANCE STRUCTURE
I. Project Governance
II. Project Governance Framework
III. Project Phases
IV. Applying governance to Project Lifecycle
V. Escalation Paths (Phase Gate/Tollgate/Kill Point)
VI. Phase-to-Phase Relations
 Sequential Relationship
 Overlapping Relationship
VII. Guideline to Determine Appropriate Governance for a Project
This topic covers:
Project Governance:
 Framework, functions, and processes that guide project management activities to
meet organizational, strategic and operational goals.
 It provides the structure, processes and decision making model and tools for the
project manager and team to manage the project
H. ESTABLISH PROJECT GOVERNANCE STRUCTURE
Project Governance Framework:
 Project success and deliverable acceptance
criteria
 Process to identify, escalate and resolve issue
 Relationship between project team, organizational
groups and external stakeholders
 Project organizational chart with roles
 Communication process and procedures
 Process for project decision making
 Project Life cycle approach
 Process for stage gate or phase review etc.
Guideline to Determine Appropriate
Governance for a Project:
 Involve the organization’s decision managers
 Choose the most appropriate governance goals
 Select a group of experienced people for all
governance activities
 Practice the governance for projects, programs and
portfolios.
 Keep the governance process transparent to
stakeholders
H. ESTABLISH PROJECT GOVERNANCE STRUCTURE
Enablers:
• Determine criteria to successfully close the project or phase
• Develop transition planning artifacts
• Validate readiness for transition
• Conclude activities to close out project or phases
Following Deliverables & Tools
are relevant to the enablers:
Close Project or Phase Process:
- All work is completed and project has delivered its objectives
- Scope baseline is reviewed to confirm completion
- Deliverables meet acceptance criteria are formally signed off or approved by
the customer or sponsor
- All invoices are paid
- Contracts are closed out
- Project lessons learned are discussed and documented
- Any other loose ends are wrapped up
- Project or phase information is archived
- Resources are released
I. PLAN & MANAGE PROJECT/PHASE CLOSURE
Close Project or Phase Criteria:
 Project/phase successfully met its completion objectives
 Requirement changed during execution where project is no longer feasible
 Adequate funding is no longer available
 Significant risks are encountered that make the project success impossible
 Organization no longer needs the project deliverable
 Change in laws or regulation
 Global or national economic changes
Consideration of lessons learned:
 Scheduling lessons learned: Relevant scheduling problems/issues)
 Conflict management lessons learned: Within the team or between the team & customer)
 Sellers lessons learned: Seller experience and performance
 Customer lessons learned: Excessively litigious or unreasonable to work with
 Strategic lessons learned: Some aspects of project management methodology, template, form or process
 Tactical lessons learned: If you do this type of project again what should you stop, start and continue so
that you can execute flawlessly?
I. PLAN & MANAGE PROJECT/PHASE CLOSURE
Difference between grade and quality
 The process of identifying quality requirements and/or
standards for the project and its deliverables, and
documenting how the project will demonstrate
compliance with relevant quality requirements.
 Concerned with the stability or predictability of the
product.
 Is a general characteristic or property, such as
capacity and height.
 Grade: characteristics of the product. Quality: stability
or predictability of the product or how well something
works
Fishbone (Ishikawa) diagram
 Shows cause and effect to identify potential
root cause of defects; evaluate what could
potentially cause defects; review symptoms
to determine real problems (continue to ask
questions until the root cause is determined).
 Tools you can use to capture and categorize
quantitative or qualitative data. Can use to
indicate each time a process failed over a
specific period of time.
 are used to depict a goal and the steps
required to attain that goal
 Practice of providing more than the customer
requested
Sample Question
Sample Question
Peter works as a project manager for GOODSTEEL, a steel melting shop. He was assigned by his
Executive Project Manager to study and prepare a report on the defects that eroded the blast furnace
lining which has caused a drastic decline in production. Since this report will be used by the
management to control the process and material quality, Peter performed a careful study and identified
two major factors out of many factors related to refractories that caused majority of the lining problems.
Which of the following statements BEST illustrate the technique Peter must have used in this scenario?
A. A Pareto chart indicates that the vital few sources of the problem.
B. A cause and effect diagram indicates how various causes show the
history and variation of defects
C. A Pareto chart identifies the possible relationship between changes
observed in two independent variables
D. A cause and effect diagram indicates how various factors or causes can
be linked to potential problems
Sample Question
Sample Question
THANK YOU
42
1 von 42

Recomendados

Project Execution & Control Checklist von
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control ChecklistAnand Subramaniam
10.9K views22 Folien
Project Health Check von
Project Health CheckProject Health Check
Project Health CheckAnand Subramaniam
6.5K views24 Folien
VTU Syllabus, MBA TQM, Module 8 von
VTU Syllabus, MBA TQM, Module 8VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8Adani University
2.2K views32 Folien
VTU MBA-TQM 12MBA42 Module 3 von
VTU MBA-TQM 12MBA42 Module 3VTU MBA-TQM 12MBA42 Module 3
VTU MBA-TQM 12MBA42 Module 3Adani University
1.8K views46 Folien
LSS - 5 Year Strategy von
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year StrategyAnand Subramaniam
5.4K views39 Folien
Performance Improvement Culture von
Performance Improvement CulturePerformance Improvement Culture
Performance Improvement CultureAnand Subramaniam
2.8K views30 Folien

Más contenido relacionado

Was ist angesagt?

Quality Planning von
Quality PlanningQuality Planning
Quality PlanningFirnando Buenayre
12.2K views47 Folien
Mba ii pmom_unit-4.1 project management a von
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aRai University
1.1K views41 Folien
Quality Metrics von
Quality Metrics Quality Metrics
Quality Metrics Haroon Abbu
16.4K views40 Folien
Lean Six Sigma Awareness Handouts von
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
5.7K views17 Folien
Practice Management von
Practice ManagementPractice Management
Practice ManagementAnand Subramaniam
1.9K views18 Folien
VTU MBA-TQM 12MBA42 Module 7 von
VTU MBA-TQM 12MBA42 Module 7VTU MBA-TQM 12MBA42 Module 7
VTU MBA-TQM 12MBA42 Module 7Adani University
1.4K views77 Folien

Was ist angesagt?(20)

Mba ii pmom_unit-4.1 project management a von Rai University
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
Rai University1.1K views
Quality Metrics von Haroon Abbu
Quality Metrics Quality Metrics
Quality Metrics
Haroon Abbu16.4K views
Lean Six Sigma Awareness Handouts von guest0981f4
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
guest0981f45.7K views
Quality and Strategy Summary von QQMD
Quality and Strategy SummaryQuality and Strategy Summary
Quality and Strategy Summary
QQMD834 views
Integrated Performance Management von Glen Alleman
Integrated Performance ManagementIntegrated Performance Management
Integrated Performance Management
Glen Alleman2.3K views
Research paper on TQM von Mital Damani
Research paper on TQM Research paper on TQM
Research paper on TQM
Mital Damani2.4K views
Requirements Engineering: A Good Practice Guide von Ian Sommerville
Requirements Engineering: A Good Practice GuideRequirements Engineering: A Good Practice Guide
Requirements Engineering: A Good Practice Guide
Ian Sommerville5.7K views
Customer Requirement template von Noel Hatch
Customer Requirement templateCustomer Requirement template
Customer Requirement template
Noel Hatch 752 views
Quality management and quality planning von Amartya Talukdar
Quality management and quality planningQuality management and quality planning
Quality management and quality planning
Amartya Talukdar6.3K views
Getting Started With CMMi level 3 von Manas Das
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
Manas Das1.1K views

Similar a Presentation on Quality Management

Project Management 12 von
Project Management 12Project Management 12
Project Management 12Tathagat Varma
680 views51 Folien
Pmbok 5th planning process group part three von
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part threeHossam Maghrabi
1.2K views53 Folien
Quality metrics in project management von
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
3.1K views13 Folien
Quality management procedures von
Quality management proceduresQuality management procedures
Quality management proceduresselinasimpson1201
492 views10 Folien
Project on quality management von
Project on quality managementProject on quality management
Project on quality managementselinasimpson2901
166 views8 Folien
Quality Control von
Quality ControlQuality Control
Quality ControlMark John Lado, MIT
280 views39 Folien

Similar a Presentation on Quality Management(20)

Pmbok 5th planning process group part three von Hossam Maghrabi
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part three
Hossam Maghrabi1.2K views
PROJECT QUALITY MANAGEMENT.pptx von SuzyTharwat1
PROJECT QUALITY MANAGEMENT.pptxPROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptx
SuzyTharwat124 views
2.08 quality management 1 von reddvise
2.08 quality management 12.08 quality management 1
2.08 quality management 1
reddvise453 views
PMP Exam Flashcards common definitions 7th edition original v1.0 von Vinod Kumar, PMP®
PMP Exam Flashcards common definitions 7th edition original v1.0PMP Exam Flashcards common definitions 7th edition original v1.0
PMP Exam Flashcards common definitions 7th edition original v1.0
Vinod Kumar, PMP®166 views

Más de Md. Masudur Rahman, PMP

Business Plan - Castleton Trading Inc.pdf von
Business Plan - Castleton Trading Inc.pdfBusiness Plan - Castleton Trading Inc.pdf
Business Plan - Castleton Trading Inc.pdfMd. Masudur Rahman, PMP
2 views19 Folien
Amar Bari Amar Khamar von
Amar Bari Amar KhamarAmar Bari Amar Khamar
Amar Bari Amar KhamarMd. Masudur Rahman, PMP
4 views3 Folien
Team Building & Leadershipt von
Team Building & LeadershiptTeam Building & Leadershipt
Team Building & LeadershiptMd. Masudur Rahman, PMP
2 views3 Folien
Research - Asrayan Project of BD von
Research  - Asrayan Project of BDResearch  - Asrayan Project of BD
Research - Asrayan Project of BDMd. Masudur Rahman, PMP
9 views25 Folien
Assignment - Public Value and Innovation.pdf von
Assignment - Public Value and Innovation.pdfAssignment - Public Value and Innovation.pdf
Assignment - Public Value and Innovation.pdfMd. Masudur Rahman, PMP
2 views6 Folien
Case Study as a Scrum Master von
Case Study as a Scrum MasterCase Study as a Scrum Master
Case Study as a Scrum MasterMd. Masudur Rahman, PMP
12 views10 Folien

Más de Md. Masudur Rahman, PMP(18)

সিরাজগঞ্জের জেলা ব্রান্ডিং কার্যক্রমের অগ্রগতি নিয়ে প্রেজেন্টেশন von Md. Masudur Rahman, PMP
সিরাজগঞ্জের জেলা ব্রান্ডিং কার্যক্রমের অগ্রগতি নিয়ে প্রেজেন্টেশনসিরাজগঞ্জের জেলা ব্রান্ডিং কার্যক্রমের অগ্রগতি নিয়ে প্রেজেন্টেশন
সিরাজগঞ্জের জেলা ব্রান্ডিং কার্যক্রমের অগ্রগতি নিয়ে প্রেজেন্টেশন

Último

Narcissism vs Leadership (1).pdf von
Narcissism vs Leadership (1).pdfNarcissism vs Leadership (1).pdf
Narcissism vs Leadership (1).pdfkullmd
9 views5 Folien
What Is Psychological Safety? von
What Is Psychological Safety?What Is Psychological Safety?
What Is Psychological Safety?Alex Clapson
26 views5 Folien
Intuitively Moving Institutions Towards Global Regulatory Resilience von
Intuitively Moving Institutions Towards Global Regulatory Resilience Intuitively Moving Institutions Towards Global Regulatory Resilience
Intuitively Moving Institutions Towards Global Regulatory Resilience Ajaz Hussain
78 views79 Folien
balixa.io Plan.pdf von
balixa.io Plan.pdfbalixa.io Plan.pdf
balixa.io Plan.pdftycoonone91
30 views29 Folien
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom... von
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...Andrew Networks
50 views40 Folien
Sohail Ahmed Profile von
Sohail Ahmed ProfileSohail Ahmed Profile
Sohail Ahmed ProfileSOHAIL AHMED - The Rising STAR
10 views3 Folien

Último(13)

Narcissism vs Leadership (1).pdf von kullmd
Narcissism vs Leadership (1).pdfNarcissism vs Leadership (1).pdf
Narcissism vs Leadership (1).pdf
kullmd9 views
What Is Psychological Safety? von Alex Clapson
What Is Psychological Safety?What Is Psychological Safety?
What Is Psychological Safety?
Alex Clapson26 views
Intuitively Moving Institutions Towards Global Regulatory Resilience von Ajaz Hussain
Intuitively Moving Institutions Towards Global Regulatory Resilience Intuitively Moving Institutions Towards Global Regulatory Resilience
Intuitively Moving Institutions Towards Global Regulatory Resilience
Ajaz Hussain78 views
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom... von Andrew Networks
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...
Andrew Networks50 views
The Wheel of Life - Coaching Wheel von Alex Clapson
The Wheel of Life - Coaching WheelThe Wheel of Life - Coaching Wheel
The Wheel of Life - Coaching Wheel
Alex Clapson22 views
TAX ANALYSIS (CASE OF RWANDA).pptx von SadamuFrancois
TAX ANALYSIS (CASE  OF RWANDA).pptxTAX ANALYSIS (CASE  OF RWANDA).pptx
TAX ANALYSIS (CASE OF RWANDA).pptx
SadamuFrancois11 views
Creating Unity Through Systems Thinking - Southern Cross Case Study.pptx von y9v9xbdk72
Creating Unity Through Systems Thinking - Southern Cross Case Study.pptxCreating Unity Through Systems Thinking - Southern Cross Case Study.pptx
Creating Unity Through Systems Thinking - Southern Cross Case Study.pptx
y9v9xbdk727 views
Cracking the Optimism vs Pessimism Code.pptx von Workforce Group
Cracking the Optimism vs Pessimism Code.pptxCracking the Optimism vs Pessimism Code.pptx
Cracking the Optimism vs Pessimism Code.pptx
Workforce Group32 views

Presentation on Quality Management

  • 1. 2. STARTING THE PROJECT (Continue) Already assembled a high performing engaged and empowered project team, Now we have started the planning phase At the beginning, we have to determine the methodology or method A. Assess project needs, complexity, and magnitude to determine the appropriate project methodology /methods and practices. B. Plan & Manage the Scope C. Plan & Manage the budget & resources D. Plan, prepare, modify & manage the project schedule based on methodology E. Plan & manage quality of product & deliverables F. Integrate project planning activities G. Plan & manage procurement strategy H. Establish the project governance structure I. Plan & manage project/phase closure Lesson Objectives:
  • 2. Enablers: • Plan Quality Standard required for project deliverables • Recommend options for improvement based on quality gaps • Continually survey project deliverable quality - What the level of quality is? - How the project quality is to be measured? - How it will be aligned to the project objectives? - How the quality is to be tracked & reported? Following Deliverables & Tools are relevant to the enablers: E. PLAN AND MANAGE QUALITY OF PRODUCT & DELIVERABLES
  • 3. Quality Quality is the degree to which a set of inherent characteristics fulfills requirements  Quality represents what the stakeholders expect from the project.  The stated and implied quality needs are inputs for devising project requirements.  In Business – Quality should be feasible, modifiable and measureable. Quality Standards and Regulations A standard is a document established by an authority, custom, or general consent as model or example.  Standards are typically voluntary Guidelines or characteristics  Approved by recognized body of experts (such as International Organization for Standardization - ISO). Regulations are requirement imposed by a governmental body.  Requirements can established product, process, or service characteristics.  Its kind of government-mandated compliance.  Stands often start out as accepted or De facto best practice describing a preferred approach  May later become de jure regulations such as uniting the critical path method in Scheduling major construction projects.
  • 4. Quality Management Plan The quality management plan describes how applicable policies, procedures, and guidelines will be implemented to achieve the quality objectives. It describes the activities and resources necessary for the project management team to achieve the quality objectives set for the project. The quality management plan may be formal or informal, detailed, or broadly framed. Quality Management Plan includes:  Quality objectives of the project  Quality standards that will be used by the project  Quality roles and responsibilities  Project deliverables and processes subject to quality review  Quality control and quality management activities planned for the project  Quality tools that will be used for the project  Major procedures relevant for the project, such as dealing with nonconformance, corrective actions procedures, and continuous improvement procedures.
  • 5. Quality Quality is the degree to which the product or result meets the customer or end-user requirements. Their requirements may or may not be in alignment with the documented project requirements, however. It is simply their assessment on how well the output aligns with their needs and expectations. Grade Grade is a category assigned to products that have the same functional use but different technical characteristics. Grade is usually determined through some set of pre-determined measurements and demonstration of compliance to those measurements.  Low grade may not be a problem, but low quality is almost always a problem.  High quality doesn’t necessarily mean high grade.  The project management team manages the trade-off between quality and grade based on the project requirements.  Higher grade products are usually more expensive than lower grade ones.
  • 6. Cost of Quality (COQ) is primarily a measure of all costs related to the quality and the lack thereof. In other words, its an integrated concept of the costs to achieve quality and the costs that occur due to quality issues. COQ = Cost of Conformance + Cost of Non-Conformance (or failure costs) Cost of non-conformance = sum of external and internal failure costs. Cost of conformance = sum of the prevention and appraisal costs
  • 7. Cost of conformance describes the amount of resources needed to achieve the quality requirements and targets of a project. The underlying rationale is to spend money on the prevention of quality issues rather than for fixing them. Cost of non-conformance is used as a synonym for failure cost. It refers to the resources that are required to fix failures and take corrective actions but also to indirect effects from quality issues, such as negative business impact. Appraisal costs are the (financial and non-financial) resources that are consumed to assess and measure the quality of the deliverables of a project. This relates to quality assurance and money invested in activities that identify quality issues.
  • 8. Quality Audits An audit is a structured, independent process used to determine if project activities comply with organizational and project policies, processes, and procedures. A quality audit is usually conducted by a team external to the project, such as the organization’s internal audit department, PMO, or by an auditor external to the organization. Quality audit objectives may include:  Identifying all good and best practices being implemented  Identifying all nonconformity, gaps, and shortcomings  Sharing good practices introduced or implemented in similar projects in the organization and/or industry  Proactively offering assistance in a positive manner to improve the implementation of processes to help raise team productivity  Highlighting contributions of each audit in the lessons learned repository of the organization
  • 9. Quality Measurement Tolls: There are a variety of tools available for continually surveying the quality of a project. Seven common tools are:  Cause and effect diagram. Diagrams that define the inputs to a process or product in order to identify potential causes of defects.  Histogram. A bar chart showing a distribution of variables.  Run chart. Show trends in the variation of a process over time.  Scatter diagram. Shows the relationship between two variables.  Control chart. A graphic display of process data over time and against established control limits, and that has a centerline that assists in detecting a trend of plotted values toward either control limit.  Flowcharting. The depiction in a diagram format of the inputs, process actions, and outputs of one or more processes within a system.  Pareto chart. A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause. Quality Metrics is a description of a project or product attribute and how to measure it. The tolerance is the allowable variation in this measurement. For Example: Schedule is within +10% and -10% of the actual schedule. Other Example:  Budget variance  Defect count  Requirements coverage  Failure rate
  • 10. Cause and effect diagram. Diagrams that define the inputs to a process or product to identify the potential causes of defects are known as Cause and effect diagrams. This diagram is also referred to as Fish-bone analysis diagram or Ishikawa diagram. The given diagram illustration simply helps us list out the possible causes of the cost over-run. Once the root cause is determined, it could be handled with appropriate resolution and may help in damage control.
  • 11. Histogram. A bar chart showing a distribution of variables over time, is called a Histogram. Histograms give us a fair idea of how our data breaks down. It shows the distribution of data over various streams ranging from resource allocation to budget distribution. Histogram represents each attribute or characteristic as a column and the frequency of each attribute or characteristic occurring as the height of the column. Shows IT department’s survey to rank the reasons for dissatisfaction of a call center’s service. Its uses bars to demonstrate the number of times each cause of dissatisfaction was checked.
  • 12. Run Chart. A run chart is a line graph of data plotted over time used to show trends in the variation of a process. In a run chart, you are looking for trends in the data over time. You could check the chart to see if it seem to be going up or down as the project progresses. The run chart is a running record of a process over time:  Vertical axis represents the process being measured  The horizontal axis represents the units of time by which the measurements are made In software development, we observed that the trend of fixing the bugs was slower in the initial phase of software testing. However, as more and more bugs were generated by the tester, the developers started focusing on fixing more bugs to ensure delivery on-time and on-budget.
  • 13. Scatter Diagram. A scatter diagram, or scatter graph is a graphical representation of quantitative analysis on mathematical statistics of two variables, using Cartesian coordinates. In a run chart, you are looking for trends in the data over time. You could check the chart to see if it seem to be going up or down as the project progresses.  Scatter diagrams use two variables, one called an ‘independent variable’, which is an input and the other called the ‘dependent variable’, which is an output.  This relationship is also analyzed to prove or disapprove cause and effects relationship between the variable. The local ice cream shop keeps track of how much ice cream they sell versus the noon temperature on that day
  • 15. Control Chart. A Control Chart is a graphical display of data over time and against established control limits that has a center line that assists in detecting a trend of plotted values toward either control limits. Control Charts measure the results of processes over time and display the result in graph form to show whether the process variance is in control or out of control. A process is considered to be in control if the measurements fall within the control limits. So in a Control Chart, there is a mean, a Lower control limit and an Upper control limit. Control charts helps to answers to the following:  Is the process under control?  Is the project moving in the right direction?  Are the deliverables within the specification limits?
  • 17. Flow Chart. The depiction in a diagram format of the inputs, process actions, and outputs of one or more processes within a system is called a Flow Chart. . The flowchart shows the steps as boxes of various kinds, and their order by connecting the boxes with arrows. This diagrammatic representation illustrates a solution model to a given problem.
  • 18. Pareto Chart. A Pareto chart is a specific type of histogram that ranks causes or issues by their overall influence. A Pareto chart assists in prioritizing corrective actions as the issues with the greatest impact are displayed in order. In addition, the Pareto chart includes an arc representing the cumulative percentage of the causes.. A Pareto chart is named after Pareto’s Law that states that a relatively small number of causes will typically produce a large majority of the problems or defects. This is commonly known as the 80/20 rule, where 80% of the problems are due to 20% of the causes. The causes on the left of the intersection point of the 80% cumulative line (orange line) and the cumulative frequency line (red line) are the issues to focus the attention on.
  • 20. Statistical sampling is one of the tools and techniques used in Control Quality. It is defined as selecting part of a population in question or interest for inspection. The samples are chosen and tested according to the quality management plan. Population is the entire set of items from which you draw data for a statistical study. It can be a group of individuals, a set of items, etc. It makes up the data pool for a study. A sample represents the group of interest from the population, which you will use to represent the data. The sample is an unbiased subset of the population that best represents the whole data. In attribute sampling, data is in the “attribute” form, and the result either conforms or does not conform. Attribute sampling checks whether an item is defective or not. It’s a yes or no answer. In variable sampling, data is in the “variable” form, and the result is rated on a continuous scale that measures the degree of conformity. Variable sampling is about checking “how much”, “how good”, or “how bad”.
  • 21. Enablers:  Manage & rectify ground rule violations  Consolidate the project/phase plans  Assess plans for dependencies, gaps, and continued business value  Analyze the data collected  Collect & Analyze data to make informed project decisions  Determine critical information requirements  Plan and manage project compliance to business factors  Plans are developed and updated throughout the project, need to integrate all those plans and components.  This integrated view can identify and correct gaps or conflicts Following Deliverables & Tools are relevant to the enablers: F. INTEGRATE PROJECT PLANNING ACTIVITIES
  • 22. Project Management Plan and Project Documents: F. INTEGRATE PROJECT PLANNING ACTIVITIES A project plan, also known as the project management plan, is the document that describes how the project will be executed, monitored, and controlled, and closed. There is generally not one single plan, But many plans that make up the project management plan. Project documentation is the process of recording the key project details and producing the documents that are required to implement it successfully. Project documents come in many forms
  • 23. Project Management Plan Components:  Baselines (4)  Subsidiary plans (13)  Life Cycle (1)  Project Processes  Work Explanation  Agile Project Plan F. INTEGRATE PROJECT PLANNING ACTIVITIES Baselines are used to compare what has been done to what was planned. The three most common baselines are:  Scope baseline - an approved version of the detailed project scope  Schedule baseline - an approved version of the schedule  Cost baseline - an approved version of the time-phased budget Performance measurement baseline An integrated scope-schedule-cost plan for the project work. Used to measure and manage project work during project execution.
  • 24. Project Management Plan Components:  Baselines (4)  Subsidiary plans (13)  Life Cycle (1)  Project Processes  Work Explanation  Agile Project Plan F. INTEGRATE PROJECT PLANNING ACTIVITIES
  • 25. The scope management plan is a component of the project or program management plan that describes how the scope will be defined, developed, monitored, controlled, and verified. The scope management plan is a significant input into the Develop Project Management Plan process and the other scope management processes. The components are as follows:  The process to prepare a detailed project scope statement  The process that allows creating WBS from the detailed project scope statement  The process that establishes how the WBS will be maintained and approved  The process that explains how formal acceptance of completed project deliverables are to be obtained  The process to control the requests for changes to the detailed project scope statement will be documented.
  • 26. The Requirements Management Plan A process that describes how the project requirements will be analyzed, documented, and managed. They rightly choose the most effective relationship for the project and document the approach in the requirements management plan. The plan focuses on:  How the requirement activities are planned, tracked, and reported.  How the changes to the product will be initiated.  The procedures required for analyzing the impacts, and methods used to trace and report the issues.  Getting Details of the authorization levels that are required to approve the changes made.  The conditions required to rank the implemented processes.  Focusing on why and how the product metrics are being used.  Traceability structure to reflect which requirement features will be captured on the traceability matrix.
  • 27. The Schedule Management Plan defines how the project schedule is managed throughout the project lifecycle. The plan provides guidance and sets expectations for project schedule policies and procedures for planning, developing, managing, executing, and controlling the project schedule. The components of the Schedule Management Plan can include:  Roles and responsibilities. (Schedule owner. Who can update? Who can read?)  Update frequency. describe the timing of schedule updates. (weekly, bi-weekly)  Progress feedback. describes how the schedule feedback will be delivered (status report, progress report)  Schedule change review and approval. define the process required to evaluate and approve proposed schedule changes.  Tools. Describe about any scheduling tool used on this project (read the schedule, update schedule, etc)  Reports. types and names of reports using to manage the project,  Schedule integration. master schedule is the result of a roll-up of other underlying schedules
  • 28. Risk Management Plan – The Risk Management Plan shall outline the strategies how to increase the probability and impact of positive events and decrease the probability and impact of negative events in a project by utilizing the processes set out by PMBOK. Components of Risk Management? 1. Risk Identification Risk identification is the process of documenting potential risks and then categorizing the actual risks the business faces. 2. Risk Analysis Once risks have been identified, the next step is to analyze their likelihood and potential impact. How exposed is the business to a particular risk? What is the potential cost of a risk becoming a reality? 3. Response Planning Response planning answers the question: What are we going to do about it? 4. Risk Mitigation Risk mitigation is the implementation of your response plan. It is the action your business and its employees take to reduce exposure. 5. Risk Monitoring Risks are not static; they change over time. The potential impact and probability of occurrence change, and what was once considered a minor risk can grow into one that presents a significant threat to the business and its revenue.
  • 29. “The configuration management plan defines those items that are configurable, those items that are require formal change control, & the process for controlling changes to such items.” Configuration Planning tells us the following:  What all project items are configurable  Which all items (say Scope Statement, WBS Dictionary) needs, formal change control  And, what would be the process of controlling changes to these items? Configuration Management Plan also recommends:  A tool to manage Configurable Items,  A versioning scheme. For example, a Document Version will have two segments like aa, bb, cc, .dd. The first segment will represent the product; the second will represent deliverable, etc.
  • 30. Change Management Plan A change management plan is a component of the project management plan that establishes the change control board or involvement level of the Product Owner, documents that extent of it authority and describes how the change control system will be implemented. A change management plan can answer the following questions:  Who can propose a change?  What exactly constitutes a change?  What is the impact of the change on the project’s objectives?  What steps are necessary to evaluate the change request before approving or rejecting it?  When a change request is approved, what project documents must be amended to record the actions necessary to effect the change?  How will these actions be monitored to confirm that they have been completed satisfactorily?
  • 31. Enablers: • Define external resource requirements and needs • Communicate external resource requirements • Manage suppliers/Contracts • Analyze the data collected • Plan & manage procurement strategy • Develop a delivery solution  Identifying suppliers, obtaining bids or proposal from them, awarding contracts based on their evaluation  All procurements must be done within time, cost & quality Following Deliverables & Tools are relevant to the enablers: G. PLAN AND MANAGE PROCUREMENT
  • 32. Procurement Management Plan – Documents the activities relative to purchasing or acquiring services from outside the project team or entity. An entity can either be the buyer or vendor of a service or a product. Project Procurement Management takes into account four (4) processes namely: 1. Plan Procurements 2. Conduct Procurements 3. Administer Procurements 4. Close Procurements Make or Buy Analysis A make or buy analysis typically occurs in the Plan Procurement Management stage of a project. There are two PMP exam definitions you should know: Make or Buy Analysis: The process of gathering and organizing data about product requirements and analyzing them against available alternatives, including the purchase or internal manufacture of the product. Make or Buy Decisions: Decisions made regarding the external purchase or internal manufacture of a product Calculate Make or Buy Decisions  Direct and Indirect Costs  Costs of producing in-house vs. an outside source  Cost of conformance vs. non- conformance
  • 33. Enablers: • Determine appropriate governance for a project • Define escalation path and thresholds  Organization use governance guidelines to establish strategic direction and performance parameters  Strategic direction provides the purpose, expectation, goals and action to guide business pursuits and is aligned with the business objectives.  Project management activities must stay aligned with business direction. Following Deliverables & Tools are relevant to the enablers: H. ESTABLISH PROJECT GOVERNANCE STRUCTURE
  • 34. I. Project Governance II. Project Governance Framework III. Project Phases IV. Applying governance to Project Lifecycle V. Escalation Paths (Phase Gate/Tollgate/Kill Point) VI. Phase-to-Phase Relations  Sequential Relationship  Overlapping Relationship VII. Guideline to Determine Appropriate Governance for a Project This topic covers: Project Governance:  Framework, functions, and processes that guide project management activities to meet organizational, strategic and operational goals.  It provides the structure, processes and decision making model and tools for the project manager and team to manage the project H. ESTABLISH PROJECT GOVERNANCE STRUCTURE
  • 35. Project Governance Framework:  Project success and deliverable acceptance criteria  Process to identify, escalate and resolve issue  Relationship between project team, organizational groups and external stakeholders  Project organizational chart with roles  Communication process and procedures  Process for project decision making  Project Life cycle approach  Process for stage gate or phase review etc. Guideline to Determine Appropriate Governance for a Project:  Involve the organization’s decision managers  Choose the most appropriate governance goals  Select a group of experienced people for all governance activities  Practice the governance for projects, programs and portfolios.  Keep the governance process transparent to stakeholders H. ESTABLISH PROJECT GOVERNANCE STRUCTURE
  • 36. Enablers: • Determine criteria to successfully close the project or phase • Develop transition planning artifacts • Validate readiness for transition • Conclude activities to close out project or phases Following Deliverables & Tools are relevant to the enablers: Close Project or Phase Process: - All work is completed and project has delivered its objectives - Scope baseline is reviewed to confirm completion - Deliverables meet acceptance criteria are formally signed off or approved by the customer or sponsor - All invoices are paid - Contracts are closed out - Project lessons learned are discussed and documented - Any other loose ends are wrapped up - Project or phase information is archived - Resources are released I. PLAN & MANAGE PROJECT/PHASE CLOSURE
  • 37. Close Project or Phase Criteria:  Project/phase successfully met its completion objectives  Requirement changed during execution where project is no longer feasible  Adequate funding is no longer available  Significant risks are encountered that make the project success impossible  Organization no longer needs the project deliverable  Change in laws or regulation  Global or national economic changes Consideration of lessons learned:  Scheduling lessons learned: Relevant scheduling problems/issues)  Conflict management lessons learned: Within the team or between the team & customer)  Sellers lessons learned: Seller experience and performance  Customer lessons learned: Excessively litigious or unreasonable to work with  Strategic lessons learned: Some aspects of project management methodology, template, form or process  Tactical lessons learned: If you do this type of project again what should you stop, start and continue so that you can execute flawlessly? I. PLAN & MANAGE PROJECT/PHASE CLOSURE
  • 38. Difference between grade and quality  The process of identifying quality requirements and/or standards for the project and its deliverables, and documenting how the project will demonstrate compliance with relevant quality requirements.  Concerned with the stability or predictability of the product.  Is a general characteristic or property, such as capacity and height.  Grade: characteristics of the product. Quality: stability or predictability of the product or how well something works Fishbone (Ishikawa) diagram  Shows cause and effect to identify potential root cause of defects; evaluate what could potentially cause defects; review symptoms to determine real problems (continue to ask questions until the root cause is determined).  Tools you can use to capture and categorize quantitative or qualitative data. Can use to indicate each time a process failed over a specific period of time.  are used to depict a goal and the steps required to attain that goal  Practice of providing more than the customer requested Sample Question
  • 39. Sample Question Peter works as a project manager for GOODSTEEL, a steel melting shop. He was assigned by his Executive Project Manager to study and prepare a report on the defects that eroded the blast furnace lining which has caused a drastic decline in production. Since this report will be used by the management to control the process and material quality, Peter performed a careful study and identified two major factors out of many factors related to refractories that caused majority of the lining problems. Which of the following statements BEST illustrate the technique Peter must have used in this scenario? A. A Pareto chart indicates that the vital few sources of the problem. B. A cause and effect diagram indicates how various causes show the history and variation of defects C. A Pareto chart identifies the possible relationship between changes observed in two independent variables D. A cause and effect diagram indicates how various factors or causes can be linked to potential problems