Navajo Generating Station Owners Initial Proposal Long Term Emissions Control Plan January 21, 2011
Plant Overview ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],01/21/2011  GDReeves
Ownership 01/21/2011 GDReeves  Entity Percent Ownership  (%) Capacity Ownership (MW) 1 USBR 24.3 546.6 2 SRP 21.7 488.3 3 LADWP 21.2 477.0 4 APS 14.0 315.0 5 NV Energy 11.3 254.3 6 TEP 7.5 168.8 Total 100.0 2250.0
Navajo & Hopi Annual Economic Benefits (Plant and Mine) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],01/21/2011 GDReeves
Employment ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],01/21/2011 GDReeves 5
Objectives ,[object Object],[object Object],01/21/2011 GDReeves
Key Challenges EPA Rulings Expected Co-Tenancy Expires LADWP Withdraws Lease Expires 323 Grants Expire Coal Contract Expires Transmission Contracts Expire  LADWP Seeks Withdrawal Environmental Critical Agreements  Ownership Equipment  Installation Requirement Expected 01/21/2011  GDReeves  Water Service Contract  Expires  2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Environmental  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],01/21/2011 GDReeves
Proposal ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],01/21/2011 GDReeves
Proposal (Continued) ,[object Object],[object Object],[object Object],[object Object],[object Object],01/21/2011 GDReeves
01/21/2011 GDReeves    Back-up Slides

More Related Content

What's hot

U.S. Department of Energy Office of Fossil Energy – Early CCUS Deployment th...
U.S. Department of Energy Office of Fossil Energy –  Early CCUS Deployment th...U.S. Department of Energy Office of Fossil Energy –  Early CCUS Deployment th...
U.S. Department of Energy Office of Fossil Energy – Early CCUS Deployment th...
Global CCS Institute
 

What's hot (19)

Sam latz-se tu-p-solar-energy-transformation-program-setup
Sam latz-se tu-p-solar-energy-transformation-program-setupSam latz-se tu-p-solar-energy-transformation-program-setup
Sam latz-se tu-p-solar-energy-transformation-program-setup
 
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerFeasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
 
James Beal Bwea 08 Presentation
James Beal Bwea 08 PresentationJames Beal Bwea 08 Presentation
James Beal Bwea 08 Presentation
 
Kann solar summit 2017 keynote final
Kann   solar summit 2017 keynote finalKann   solar summit 2017 keynote final
Kann solar summit 2017 keynote final
 
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
 
Steven's County Energy Future
Steven's County Energy FutureSteven's County Energy Future
Steven's County Energy Future
 
"Proposed British Columbia LNG Facilities and Renewable Power: A Feasibility ...
"Proposed British Columbia LNG Facilities and Renewable Power: A Feasibility ..."Proposed British Columbia LNG Facilities and Renewable Power: A Feasibility ...
"Proposed British Columbia LNG Facilities and Renewable Power: A Feasibility ...
 
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
SUMMARY: Feasibility of Maximizing Renewables at LNG FacilitiesSUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
 
U.S. Department of Energy Office of Fossil Energy – Early CCUS Deployment th...
U.S. Department of Energy Office of Fossil Energy –  Early CCUS Deployment th...U.S. Department of Energy Office of Fossil Energy –  Early CCUS Deployment th...
U.S. Department of Energy Office of Fossil Energy – Early CCUS Deployment th...
 
Renewables driven resilience
Renewables driven resilienceRenewables driven resilience
Renewables driven resilience
 
TNEB -SOLAR POWER PLANT
TNEB -SOLAR POWER PLANTTNEB -SOLAR POWER PLANT
TNEB -SOLAR POWER PLANT
 
Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017
 
Wind Watts Proposed Rate Reduction
Wind Watts Proposed Rate ReductionWind Watts Proposed Rate Reduction
Wind Watts Proposed Rate Reduction
 
Supporting CCS deployment – an update from the UK Department of Energy and Cl...
Supporting CCS deployment – an update from the UK Department of Energy and Cl...Supporting CCS deployment – an update from the UK Department of Energy and Cl...
Supporting CCS deployment – an update from the UK Department of Energy and Cl...
 
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
Exploration & Production of Oil and Gas in Brazil no Offshore Technology Conf...
 
Solar 102: Going Solar for Multi-Unit Owners, Condo-Owners, and Landlords
Solar 102: Going Solar for Multi-Unit Owners, Condo-Owners, and LandlordsSolar 102: Going Solar for Multi-Unit Owners, Condo-Owners, and Landlords
Solar 102: Going Solar for Multi-Unit Owners, Condo-Owners, and Landlords
 
Compliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or ReplaceCompliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or Replace
 
Utilizing solar+storage to obviate natural gas peaker plants
Utilizing solar+storage to obviate natural gas peaker plants  Utilizing solar+storage to obviate natural gas peaker plants
Utilizing solar+storage to obviate natural gas peaker plants
 
Nl energy aug 22 - aug 28, 2015
Nl energy aug 22 - aug 28, 2015Nl energy aug 22 - aug 28, 2015
Nl energy aug 22 - aug 28, 2015
 

Viewers also liked

Grand Canyon Trust - Opportunity for Transition
Grand Canyon Trust - Opportunity for TransitionGrand Canyon Trust - Opportunity for Transition
Grand Canyon Trust - Opportunity for Transition
en3pro
 
Forgotten People and NGS - Securing Economic & Climate Justice
Forgotten People and NGS - Securing Economic & Climate JusticeForgotten People and NGS - Securing Economic & Climate Justice
Forgotten People and NGS - Securing Economic & Climate Justice
en3pro
 
NGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline DiscussionNGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline Discussion
en3pro
 
Forgotten People and NGS: Securing Environmental and Climate Justice
Forgotten People and NGS: Securing Environmental and Climate JusticeForgotten People and NGS: Securing Environmental and Climate Justice
Forgotten People and NGS: Securing Environmental and Climate Justice
en3pro
 
Peabody - Arizona Operations
Peabody - Arizona OperationsPeabody - Arizona Operations
Peabody - Arizona Operations
en3pro
 
NGS Emissions and Air Quality Compliance
NGS Emissions and Air Quality ComplianceNGS Emissions and Air Quality Compliance
NGS Emissions and Air Quality Compliance
en3pro
 
DOI - Framework for a Solution
DOI - Framework for a SolutionDOI - Framework for a Solution
DOI - Framework for a Solution
en3pro
 
John Coggins/SRP - Coal-fired Plants and Renewables
John Coggins/SRP - Coal-fired Plants and RenewablesJohn Coggins/SRP - Coal-fired Plants and Renewables
John Coggins/SRP - Coal-fired Plants and Renewables
en3pro
 

Viewers also liked (8)

Grand Canyon Trust - Opportunity for Transition
Grand Canyon Trust - Opportunity for TransitionGrand Canyon Trust - Opportunity for Transition
Grand Canyon Trust - Opportunity for Transition
 
Forgotten People and NGS - Securing Economic & Climate Justice
Forgotten People and NGS - Securing Economic & Climate JusticeForgotten People and NGS - Securing Economic & Climate Justice
Forgotten People and NGS - Securing Economic & Climate Justice
 
NGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline DiscussionNGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline Discussion
 
Forgotten People and NGS: Securing Environmental and Climate Justice
Forgotten People and NGS: Securing Environmental and Climate JusticeForgotten People and NGS: Securing Environmental and Climate Justice
Forgotten People and NGS: Securing Environmental and Climate Justice
 
Peabody - Arizona Operations
Peabody - Arizona OperationsPeabody - Arizona Operations
Peabody - Arizona Operations
 
NGS Emissions and Air Quality Compliance
NGS Emissions and Air Quality ComplianceNGS Emissions and Air Quality Compliance
NGS Emissions and Air Quality Compliance
 
DOI - Framework for a Solution
DOI - Framework for a SolutionDOI - Framework for a Solution
DOI - Framework for a Solution
 
John Coggins/SRP - Coal-fired Plants and Renewables
John Coggins/SRP - Coal-fired Plants and RenewablesJohn Coggins/SRP - Coal-fired Plants and Renewables
John Coggins/SRP - Coal-fired Plants and Renewables
 

Similar to NGS Owners Initial Proposal 1 21-2011

Full Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFull Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal Energy
Fernando Penarroyo
 
Delivering to the Energy Marketplace - Texas Harvests Wind and Solar
Delivering to the Energy Marketplace - Texas Harvests Wind and SolarDelivering to the Energy Marketplace - Texas Harvests Wind and Solar
Delivering to the Energy Marketplace - Texas Harvests Wind and Solar
Rick Borry
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
Yamen Nanne
 
Palo alto vote solar webinar 7 24 13
Palo alto   vote solar webinar 7 24 13Palo alto   vote solar webinar 7 24 13
Palo alto vote solar webinar 7 24 13
VoteSolar
 
xcel energy Better_Investing_April2008
xcel energy  Better_Investing_April2008xcel energy  Better_Investing_April2008
xcel energy Better_Investing_April2008
finance26
 
xcel energy Better_Investing_April2008
xcel energy  Better_Investing_April2008xcel energy  Better_Investing_April2008
xcel energy Better_Investing_April2008
finance26
 

Similar to NGS Owners Initial Proposal 1 21-2011 (20)

Full Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFull Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal Energy
 
Ips connect 2015 nikolasi fonua
Ips connect 2015 nikolasi fonuaIps connect 2015 nikolasi fonua
Ips connect 2015 nikolasi fonua
 
Delivering to the Energy Marketplace - Texas Harvests Wind and Solar
Delivering to the Energy Marketplace - Texas Harvests Wind and SolarDelivering to the Energy Marketplace - Texas Harvests Wind and Solar
Delivering to the Energy Marketplace - Texas Harvests Wind and Solar
 
SodaPDF-converted-필리핀풍력지도.pptx
SodaPDF-converted-필리핀풍력지도.pptxSodaPDF-converted-필리핀풍력지도.pptx
SodaPDF-converted-필리핀풍력지도.pptx
 
Renewables Energy in India.ppt
Renewables Energy in India.pptRenewables Energy in India.ppt
Renewables Energy in India.ppt
 
RCREEE-enerMENA_lebanon presentation
RCREEE-enerMENA_lebanon presentationRCREEE-enerMENA_lebanon presentation
RCREEE-enerMENA_lebanon presentation
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
 
2014ENERGY EFFICIENCY IMPLEMENTATION TO REDUCE GHG EMISSION
2014ENERGY EFFICIENCY IMPLEMENTATION TO REDUCE GHG EMISSION2014ENERGY EFFICIENCY IMPLEMENTATION TO REDUCE GHG EMISSION
2014ENERGY EFFICIENCY IMPLEMENTATION TO REDUCE GHG EMISSION
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...
 
Indonesia
IndonesiaIndonesia
Indonesia
 
New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13
 
Palo alto vote solar webinar 7 24 13
Palo alto   vote solar webinar 7 24 13Palo alto   vote solar webinar 7 24 13
Palo alto vote solar webinar 7 24 13
 
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
 
Pakistan's Renewable Energy prospects_an update
Pakistan's Renewable Energy prospects_an updatePakistan's Renewable Energy prospects_an update
Pakistan's Renewable Energy prospects_an update
 
MEC5037Z Electricity Group presentation
MEC5037Z Electricity Group presentationMEC5037Z Electricity Group presentation
MEC5037Z Electricity Group presentation
 
xcel energy Better_Investing_April2008
xcel energy  Better_Investing_April2008xcel energy  Better_Investing_April2008
xcel energy Better_Investing_April2008
 
xcel energy Better_Investing_April2008
xcel energy  Better_Investing_April2008xcel energy  Better_Investing_April2008
xcel energy Better_Investing_April2008
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
 
Climate Change Mitigation & Adaptation
Climate Change  Mitigation & AdaptationClimate Change  Mitigation & Adaptation
Climate Change Mitigation & Adaptation
 

More from en3pro

Gila River Indian Community and NGS Impacts
Gila River Indian Community and NGS ImpactsGila River Indian Community and NGS Impacts
Gila River Indian Community and NGS Impacts
en3pro
 
Navajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGS
Navajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGSNavajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGS
Navajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGS
en3pro
 
Arizona Coal: Economic Development for the Hopi Tribe
Arizona Coal: Economic Development for the Hopi TribeArizona Coal: Economic Development for the Hopi Tribe
Arizona Coal: Economic Development for the Hopi Tribe
en3pro
 
USEPA 2011-01-07 presentation
USEPA 2011-01-07 presentationUSEPA 2011-01-07 presentation
USEPA 2011-01-07 presentation
en3pro
 
Black Mesa Water Coalition - Green Economy
Black Mesa Water Coalition - Green EconomyBlack Mesa Water Coalition - Green Economy
Black Mesa Water Coalition - Green Economy
en3pro
 
CAP and the Navajo Generating Station
CAP and the Navajo Generating StationCAP and the Navajo Generating Station
CAP and the Navajo Generating Station
en3pro
 
Air Pollution over Navajo and Hopi Lands - Beth Holland
Air Pollution over Navajo and Hopi Lands - Beth HollandAir Pollution over Navajo and Hopi Lands - Beth Holland
Air Pollution over Navajo and Hopi Lands - Beth Holland
en3pro
 

More from en3pro (7)

Gila River Indian Community and NGS Impacts
Gila River Indian Community and NGS ImpactsGila River Indian Community and NGS Impacts
Gila River Indian Community and NGS Impacts
 
Navajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGS
Navajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGSNavajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGS
Navajo Nation EPA - Comments to ANPRM for BART FIP for FCPP and NGS
 
Arizona Coal: Economic Development for the Hopi Tribe
Arizona Coal: Economic Development for the Hopi TribeArizona Coal: Economic Development for the Hopi Tribe
Arizona Coal: Economic Development for the Hopi Tribe
 
USEPA 2011-01-07 presentation
USEPA 2011-01-07 presentationUSEPA 2011-01-07 presentation
USEPA 2011-01-07 presentation
 
Black Mesa Water Coalition - Green Economy
Black Mesa Water Coalition - Green EconomyBlack Mesa Water Coalition - Green Economy
Black Mesa Water Coalition - Green Economy
 
CAP and the Navajo Generating Station
CAP and the Navajo Generating StationCAP and the Navajo Generating Station
CAP and the Navajo Generating Station
 
Air Pollution over Navajo and Hopi Lands - Beth Holland
Air Pollution over Navajo and Hopi Lands - Beth HollandAir Pollution over Navajo and Hopi Lands - Beth Holland
Air Pollution over Navajo and Hopi Lands - Beth Holland
 

NGS Owners Initial Proposal 1 21-2011

  • 1. Navajo Generating Station Owners Initial Proposal Long Term Emissions Control Plan January 21, 2011
  • 2.
  • 3. Ownership 01/21/2011 GDReeves Entity Percent Ownership (%) Capacity Ownership (MW) 1 USBR 24.3 546.6 2 SRP 21.7 488.3 3 LADWP 21.2 477.0 4 APS 14.0 315.0 5 NV Energy 11.3 254.3 6 TEP 7.5 168.8 Total 100.0 2250.0
  • 4.
  • 5.
  • 6.
  • 7. Key Challenges EPA Rulings Expected Co-Tenancy Expires LADWP Withdraws Lease Expires 323 Grants Expire Coal Contract Expires Transmission Contracts Expire LADWP Seeks Withdrawal Environmental Critical Agreements Ownership Equipment Installation Requirement Expected 01/21/2011 GDReeves Water Service Contract Expires 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
  • 8.
  • 9.
  • 10.
  • 11. 01/21/2011 GDReeves Back-up Slides

Editor's Notes

  1. EPA Clean Air Act Regional Haze Rules – program to improve visibility in Class 1 areas. Program requires a return to natural background by 2064. However, potential installation of SCR’s may be required much sooner.
  2. SO 2 scrubbers (wet) installed in 1999 as part of a settlement between SRP, State of Arizona, Grand Canyon Trust and EPA