1. The document outlines the filming and editing schedule for a student production project taking place from January to April.
2. It details the dates, times, locations, crew, costumes, and equipment needed for filming scenes and editing phases.
3. Post-production editing will take place in the media room and involve editing each scene using a Sony camera, SD cards, computer and headphones over several dates from late February to mid-March.
2. Date/Time Pre/Production/
Post-Production
Task (what you
will be doing)
Where will
the task take
place
What crew
and cast are
needed
Props and
Costume
required
What
equipment is
needed
Friday 11th
January
Period 5:
1.40-2.30
Pre-Production Recce: taking
photos of the
locations that I
will be filming
in.
The recce will
take place in
Ringwood
School, inside
a house and
the street.
I am the only
person from
the crew that
will be taking
the recce
photos.
N/A Sony DLR
Camera and
an SD card. I
will have to
ensure that
the battery is
charged.
Tuesday
15th January
P2: 10.01-
10.55
Pre-Production Upload recce
photos, actors
headshots and
complete LO1
casting details.
ME2 N/A N/A Computer,
USB, phone.
3. Date/Time Pre/Production/
Post-Production
Task (what you will
be doing)
Where will the
task take place
What crew and
cast are needed
Props and Costume
required
What equipment is needed
Tuesday 19th
February
9.30am
Production Filming: Act 1
Scene 2
Ringwood Sixth
Form:
Corridor
All cast and crew
are needed
All actors need to be
in DAY 1
Sony DLR camera, battery,
with SD card and tripod.
Tuesday 19th
February
10am
Production Filming: Act 1
Scene 3
Outside Ringwood
Sixth Form
All cast and crew
are needed
All actors need to be
in DAY 2
Sony DLR camera, battery,
with SD card and tripod.
Tuesday 19th
February
10.30am
Production Filming: Act 1
Scene 4
Outside Sixth
Form, inside
classroom, study,
common room
and corridor.
All cast and crew
are needed
All actors need to be
in DAY 2
Sony DLR camera, battery,
with SD card and tripod.
Tuesday 19th
February
11am
Production Filming: Act 1
Scene 5
Inside Sixth Form
toilets.
All cast and crew
are needed
All actors need to be
in DAY 2
Sony DLR camera, battery,
with SD card and tripod.
Tuesday 19th
February
11.30am
Production Filming: Act 1
Scene 6
Interior and
exterior of Sixth
Form classroom
All cast and crew
are needed
All actors need to be
in DAY 2
Sony DLR camera, battery,
with SD card and tripod.
Tuesday 19th
February
12.00pm
Production BREAK BREAK BREAK BREAK BREAK
4. Date/Time Pre/Production/
Post-Production
Task (what
you will be
doing)
Where will the
task take place
What crew and
cast are needed
Props and
Costume required
What equipment is
needed
Tuesday 19th
February
12.45pm
Production Filming: Act 2
Scene 1
Outside the
Sixth Form
block.
All cast and crew
are needed
All actors need to
be in DAY 2
Sony DLR camera,
battery, with SD card
and tripod.
Tuesday 19th
February
1.15pm
Production Filming: Act 2
Scene 2
Inside the Sixth
Form block:
Common room
All cast and crew
are needed
All actors need to
be in DAY 3
Sony DLR camera,
battery, with SD card
and tripod.
Tuesday 19th
February
1.45pm
Production Filming: Act 2
Scene 3
Inside the Sixth
From block:
Corridor
All cast and crew
are needed
All actors need to
be in DAY 3
Sony DLR camera,
battery, with SD card
and tripod.
Tuesday 19th
February
2.15pm
Production Filming: Act 3
Scene 2
Inside the Sixth
From block:
Corridor
All cast and crew
are needed
All actors need to
be in DAY 4
Sony DLR camera,
battery, with SD card
and tripod.
Tuesday 19th
February
2.45
Production Filming: Act 3
Scene 1 and
Act 1 Scene 1
At my house
and outside on
street.
All cast and crew
are needed
All actors need to
be in DAY 3 and
DAY 1
Sony DLR camera,
battery, with SD card
and tripod.
Tuesday 19th
February
3.15
END END END END END END
5. Date/Time Pre/Production/Post
-Production
Task (what you
will be doing)
Where will
the task
take place
What crew
and cast are
needed
Props and
Costume
required
What equipment is needed
Tuesday 26th
February
Period 2: 10.05 –
10.55am
Post-Production Editing:Act 1
Scene 1
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Wednesday 27th
February
Period 3 and 4: 11.15
– 12.55pm
Post-Production Editing:Act 1
Scene 2
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Thursday 28th
February
Period 5 and 6:
1.40 – 3.20pm
Post-Production Editing:Act 1
Scene 3
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Friday 1st March
Period 5: 1.40 –
2.30pm
Post-Production Editing:Act 1
Scene 4
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Tuesday 5th March
Period 2: 10.05 –
10.55am
Post-Production Editing:Act 1
Scene 5
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Wednesday 6th
March
Period 3 and 4: 11.15
– 12.55pm
Post-Production Editing:Act 1
Scene 6
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
6. Date/Time Pre/Production/Pos
t-Production
Task (what you will
be doing)
Where will
the task
take place
What crew
and cast are
needed
Props and
Costume
required
What equipment is needed
Thursday 7th March
Period 5 and 6:
1.40 – 3.20pm
Post-Production Editing:Act 2 Scene
1
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Friday 8th March
Period 5: 1.40 –
2.30pm
Post-Production Editing:Act 2 Scene
2
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Tuesday 9th March
Period 2: 10.05 –
10.55am
Post-Production Editing:Act 2 Scene
3
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Wednesday 10th
March
Period 3 and 4: 11.15
– 12.55pm
Post-Production Editing:Act 3 Scene
1
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Thursday 11th March
Period 5 and 6:
1.40 – 3.20pm
Post-Production Editing:Act 3 Scene
2
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
Friday 12th March
Period 5: 1.40 –
2.30pm
Post-Production Complete any other
editing.
ME1 N/A N/A Sony DLR camera, SD card, SD card
reader, computer and headphones.
7. Date/Time Pre/Production/
Post-Production
Task (what
you will be
doing)
Where will
the task
take place
What crew and
cast are
needed
Props and
Costume
required
What equipment is needed
Tuesday 12th
March
Post-Production LO4Tasks ME1 N/A N/A PC
Wednesday 13th
March
Production Filming: Act 3
Scene 1
On the
street
I will only need
Charlotte who
plays Abbie as
she is the only
character in this
scene
She will need to
wear DAY 3
costume and
bring her school.
Sony DLR camera, battery,
with SD card and tripod.
Thursday 14th
March
Post-Production LO4Tasks ME1 N/A N/A PC
Friday 15th March Post-Production LO4Tasks ME1 N/A N/A PC
8. Date/Time Pre/Production/Post
-Production
Task (what you
will be doing)
Where will
the task take
place
What crew and
cast are needed
Props and Costume
required
What equipment is
needed
Tuesday 19th
March
Post-Production LO4Tasks ME1 N/A N/A PC
Wednesday 20th
March
Production Filming: Act 3
Scene 2
Act 1 Scene 6
Sixth Form
Block (both
scenes)
I will need all
cast members
forAct 3 scene 2.
I will only need
Abbie, Alissa and
Sofiya forAct 1
Scene 6.
For Act 3 Scene 2 they
will need to wear DAY
4 costume.
Charlotte and Grace
will need school bags.
For Act 1 Scene 6 they
will need to wear DAY
2 costume. Charlotte
will need a school
bag.
Sony DLR camera,
battery, with SD card
and tripod.
Thursday 21st
March
Post-Production LO4Tasks ME1 N/A N/A PC
Friday 22nd March Post-Production LO4Tasks ME1 N/A N/A PC
9. Date/Time Pre/Production
/Post-
Production
Task (what you
will be doing)
Where
will the
task
take
place
What
crew and
cast are
needed
Props and
Costume
required
What equipment is needed
Tuesday 2nd
April
Production Filming:Act 2
Scene 2
Sixth
Form
Block
I will
need
Charlotte
and
Grace.
They will
need to wear
DAY 3
costume.
Neither with
school bags.
Sony DLR camera, battery,
with SD card and tripod.
Wednesday 3rd
April
Post-
Production
LO4Tasks ME1 N/A N/A PC
Thursday 4th
March
Post-
Production
LO4Tasks ME1 N/A N/A PC
Friday 5th
March
Post-
Production
Export Film ME1 N/A N/A PC and USB card.