GEOTHERMAL POWER GENERATION
Final Year Project
3/35
Introduction
Renewable Energy Vs. Non-Renewable Energy [1]
4/35
GEOTHERMAL ENERGY
Geothermal Energy is energy stored in the form of heat beneath the surface of the solid
earth.
Geothermal production of energy is 3rd highest among renewable energies. It is behind hydro
and biomass, but before solar and wind.
Layers of Earth [2,3]
5/35
Geothermal in Pakistan
 According to Alternative Energy Board of Pakistan, a global seismic
belt passes through Pakistan and the country has a long geological
history of geotectonic events.
Two-third of
Pakistan lies
on fault lines
6/35
6
7/35
LOCATIONS OF GEOTHERMAL SPRINGS
IN PAKISTAN
LOCATIONS TEMPERATURES
Himalayan Collision Zone Turboto das (Gilgit area)
Darkot pas (Gilgit area)
Garam Chashma
Tatta pani
Mashkin
Sassi
ranges up to 910 oC
ranges up to 910 oC
850 oC to 2520 oC
51 to 970 oC
860 oC
400 oC
Chagai Volcanic Arc Chicken dik spring
Koh-e-Sultan springs 25-320 oC
Indus Basin Margin
(Karachi and Dadu areas)
Mangopir area
Salt range area
480 oC
25-32 oC
Locations of Geothermal Resources in Pakistan [4]
8/35
GEOTHERMAL USAGE
1 : Direct Use
 Geothermal heat is used directly rather than for power
generation
 For example space heating ,greenhouse heating, Bathing
and swimming, Geothermal heat pumps
 Extract heat from low temperature geothermal
resources
 < 150 oC or 300 oF.
 Applications sited near source (<10 km)
9/35
GEOTHERMAL usage
2 : indirect use
 Dry Steam Power Plants
 Flash Steam Power Plants
 Single flash
 Double flash
 Binary Cycle Power Plants
 Combined Cycle Power Plants (Flash and Binary)
10/35
KEY FEATURES
 There is no pollution
 This mean of power generation is Emission free
 Infinite source of heat energy
 It is inexpensive and prices of electricity will be Stable
 Base load energy supplies low-cost energy at constant rate in order to meet
the region’s continuous energy demand.
11/35
OBJECTIVE
 Working model of geothermal power generation
 Power production to tackle the power energy crises
 Get rid of use of fossil fuel
 Great geothermal source potential in Pakistan
 No practical work and productive plant yet
12/35
STEAM GENERATING ASSEMBLY
SOLENOID
VALVE
SOLENOID
VALVE
PRESSURE
GAUGE
TEMPERATURE
SENSORS
TURBINE GENERATOR
POWER
SUPPLY
LOAD
DIGITAL VOLT &
CURRENT METER
EXTERNAL
WATER TANK
WATER
PUMP
TEMPERATURE
METER
EXHAUST FANS
WATER LEVEL
CONTROLLER
STEAM VALVE
CONTROLLER
PROJECT BLOCK DIAGRAM
13/35
Algorithmic diagram
TURBINE GENERATOR
VALVE
CONTROLLER
TEMPERATURE
SENSOR
STEAM GENERATING ASSEMBLY
WATER PUMP &
EXTERNAL
RESERVOIR
WATER LEVEL
CONTROOLER &
SENSOR
SOLENOID
VALVE
SOLENOID
VALVE
If temperature is = > 85 ⁰ C
on
on
If water level is less than the
predefined level
14/35
Physical Diagram
15/35
• Steam generating assembly is assembled by the combination of following
• equipments
o Pressure cooker
o Burnerpipe
o Frame
o Copper Pipe
Steam generating assembly
16/35
FRAME
 Material = iron
 Shape= angle iron
 Size = l*w* h= 4*3*3 (in feet)
17/35
PIPE
 Material copper
 Size 5/16 inch
 Copper has high melting point (1023⁰C) and it does not get oxidized
 Purpose
 Steam and water flow
18/35
Temperature Sensors
• Thermocouples (K-type)
•Resistance Temperature Detectors (RTDs)
19/35
pressure gauge
 Operating voltage
 220 v
 Control flow of water and
steam
 Scale
 15psi (pounds per
square inch)
~1 bar
It shows the temperature of
pressure cooker in
degree centigrade.
SOLENOID VALVE thermometer
20/35
TURBINE
 Cross flow
 No. of blades 24 blades
 Blade size l*w=11cm* 1cm
21/35
generator
 DC 12 Volt
 RPM measured by using RPM meter
 Voltage RPM
 2 v 497 rpm
 4 v 1200 rpm
 8 v 2410 rpm
 12 v 3420 rpm
22/35
EXHAUST FANS
 Operating voltage 12 volt dc
 7.8 watt
 Operating voltage
 220 volt ac
 22 watt
WATER PUMP
23/35
WATER LEVEL CONTROLLER
 Check water level of steam
generating assembly
 Control water pump and solenoid
valve
24/35
Water Level Controller
25/35
POWER SUPPLY CIRCUIT
 Power circuit takes 220v ac and step down to 24 volts which are further
rectified and filtered by capacitor.
 7812 IC is used to get 12v for exhaust fans.
 7805 IC is used to get 5v for volt and ammeter.
 Direct 220v ac is supplied to other circuitry.
26/35
Power Supply CIRCUIT
7812 7805
11
2 2
33
220
Vac
2200μF
20 pF
12
Vac
27/35
Steam Valve Controller
TEMPERATURE METER
C
POWER SUPPLY
220 Vac
SOLENOID VALVE
(STEAM FLOW)
94kohm
47kohm
520ohm
12 Vdc
RELAY
12 Vdc /220 Vac
TEMPERATURE
SENSORS
28/35
Project Wiring Diagram
220 Vac
DC POWER SUPPLY
STEAM VALVE
STEAM VALVE
CONTROLLER
+5V
+12V
WATER VALVE
WATER VALVE
CONTROLLER WATER PUMP
EXHAUST FAN
GND
TEMPERATURE
METER
VOLT AND
AMMETER
29/35
PROJECT CALCULATION
 At 7.5 psi pressure of steam ,
Generator produces 3.6 volt
 RPM at 4 volt: 1200rpm
30/35
CONCLUSION
 It can be seen that a number of thermal springs exist in Pakistan. Studies of
these springs are far from complete.
 It is suggested that detailed geochemical and radiometric studies should be
carried out. After the data is collected of these springs is ascertained some of
them can be developed as power generation plants as in China, France, USA
and Iceland.
31/35
references
 What is Geothermal Energy?
Mary H. Dickson and Mario Fanelli, Istituto di Geoscienze e Georisorse , Pisa, Italy
 [1] http://clilenergies.wikispaces.com/1.+Energy+and+sources+of+energy
 [2] http://www.colorado.edu/physics/phys2900/homepages/Marianne.Hogan/inside.html
 [3]
http://www.kentlaw.edu/faculty/fbosselman/classes/Spring2003/studentpresentations/Geoth
ermalRobinson.ppt
 [4] Investigation of Major Geothermal Fields of Pakistan Using Isotope and Chemical
Techniques
Manzoor Ahmad, Muhammad Rafiq, Naveed Iqbal, Waheed Akram, M. Azam Tasneem,
Mubarik Ali
Radiation and Isotope Application Division, PINSTECH, P.O. Nilore, Islamabad, Pakistan
Proceedings World Geothermal Congress 2005
Antalya, Turkey, 24-29 April 2005
32/35
references
 [5] An Overview of Geothermal Resources of Pakistan
Malik Sikander Bakht
Geological Survey of Pakistan
84, H-8/1, Islamabad, Pakistan.
Proceedings World Geothermal Congress 2000
Kyushu - Tohoku, Japan, May 28 - June 10, 2000
 [6] Geothermal Resources of Pakistan and Methods For Early Stage Exploration
Mohammad Naseer Mughal
Geological Survey of Pakistan, A.K. Directorate 65.B. Upper Chatter, Muzaffarabad AK,
Pakistan
Geothermal Training Programme, Orkuslofnun, Grensasvegur 9, IS-108 Reykjavik, Iceland
 [7] The Economical, Environmental and Technological
Evaluation of Using Geothermal Energy
Mohammed Awwad Ali Al-Dabbas
European Journal of Scientific Research
ISSN 1450-216X Vol.38 No.4 (2009), pp 626-642
© EuroJournals Publishing, Inc. 2009
33/35
references
 [8] Geothermal Power Plant Projects in Central America: Technical and Financial Feasibility
Assessment Model
Faculty of Industrial Engineering, Mechanical Engineering and
Computer Science, School of Engineering and Natural Sciences
University of Iceland, Reykjavík, 2012
 [9] http://en.wikipedia.org/wiki/Thermocouple
 [10]https://en.wikipedia.org/wiki/Resistance_thermometer
 [11] http://janderson99.hubpages.com/hub/Excellent-Prospects-for-Geothermal-Power-in-
Australia-America-and-Worldwide
https://en.wikipedia.org/wiki/Thermistor
http://www.personal.psu.edu/ked2/EE210/Temperature%20Measurement%20using%20sensors%20and%20signal%20conditioning.p
pt
http://oscar.iitb.ac.in/OSCARPP/Mechanical%20Engineering/UploadedStoryboards/SME030 1P0434Steam%20Turbine.ppt
https://sites.google.com/site/ee535test/pavan-naga
http://en.wikipedia.org/wiki/Surface_condenser
34/35
‹#›
35/35

Weitere ähnliche Inhalte

Was ist angesagt?

Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...Ajay Singhal
 
Geothermal energy
Geothermal energyGeothermal energy
Geothermal energyAhmed Tarek
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boilerMilap Desai
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...Saikat Halder
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsAshutosh Garg
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safetyRakeshBhowmick1
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger designhossie
 
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Gerard B. Hawkins
 
Selection and Design of Condensers
Selection and Design of CondensersSelection and Design of Condensers
Selection and Design of CondensersGerard B. Hawkins
 
Two Phase Flow Research
Two Phase Flow ResearchTwo Phase Flow Research
Two Phase Flow ResearchRex Liu
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube DesignGerard B. Hawkins
 
Line Sizing presentation on Types and governing Equations.
Line Sizing presentation on Types and governing Equations.Line Sizing presentation on Types and governing Equations.
Line Sizing presentation on Types and governing Equations.Hassan ElBanhawi
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignGerard B. Hawkins
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampGerard B. Hawkins
 

Was ist angesagt? (20)

Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
 
Geothermal energy
Geothermal energyGeothermal energy
Geothermal energy
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safety
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger design
 
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
 
Ammonia CO2 Removal Systems
Ammonia CO2 Removal SystemsAmmonia CO2 Removal Systems
Ammonia CO2 Removal Systems
 
Selection and Design of Condensers
Selection and Design of CondensersSelection and Design of Condensers
Selection and Design of Condensers
 
Cooling tower calculation (1) (1)
Cooling tower calculation (1) (1)Cooling tower calculation (1) (1)
Cooling tower calculation (1) (1)
 
Two Phase Flow Research
Two Phase Flow ResearchTwo Phase Flow Research
Two Phase Flow Research
 
cooling towers
 cooling towers cooling towers
cooling towers
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube Design
 
Line Sizing presentation on Types and governing Equations.
Line Sizing presentation on Types and governing Equations.Line Sizing presentation on Types and governing Equations.
Line Sizing presentation on Types and governing Equations.
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer Design
 
Cooling Tower
Cooling TowerCooling Tower
Cooling Tower
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit Revamp
 

Ähnlich wie GEOTHERMAL POWER GENERATION PROJECT REPORT

Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...
Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...
Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...ijtsrd
 
Solar-Thermoelectric Hybrid Powergenerator
Solar-Thermoelectric Hybrid PowergeneratorSolar-Thermoelectric Hybrid Powergenerator
Solar-Thermoelectric Hybrid PowergeneratorIJMER
 
Industrial Training Report.pdf
Industrial Training Report.pdfIndustrial Training Report.pdf
Industrial Training Report.pdfZahidLateef2
 
Thermoelectric power generator integrated cookstove a sustainable approach of...
Thermoelectric power generator integrated cookstove a sustainable approach of...Thermoelectric power generator integrated cookstove a sustainable approach of...
Thermoelectric power generator integrated cookstove a sustainable approach of...eSAT Publishing House
 
comparative analysis of solar photovoltaic thermal (pvt) water and solar
comparative analysis of solar photovoltaic thermal (pvt) water and solarcomparative analysis of solar photovoltaic thermal (pvt) water and solar
comparative analysis of solar photovoltaic thermal (pvt) water and solarIJCMESJOURNAL
 
Review of enhancement for ocean thermal energy conversion system.pdf
Review of enhancement for ocean thermal energy conversion system.pdfReview of enhancement for ocean thermal energy conversion system.pdf
Review of enhancement for ocean thermal energy conversion system.pdfIreneKoronaki1
 
WIND POWER GENERATION_GROUP 4.pptx
WIND POWER GENERATION_GROUP 4.pptxWIND POWER GENERATION_GROUP 4.pptx
WIND POWER GENERATION_GROUP 4.pptxSamDelmo
 
Enhancing Photoelectric Conversion Efficiency of Solar Panel by Water Cooling
Enhancing Photoelectric Conversion Efficiency of Solar Panel by Water CoolingEnhancing Photoelectric Conversion Efficiency of Solar Panel by Water Cooling
Enhancing Photoelectric Conversion Efficiency of Solar Panel by Water CoolingIJAPEJOURNAL
 
Design and Fabrication of a Multi-spice dryer
Design and Fabrication of a Multi-spice dryerDesign and Fabrication of a Multi-spice dryer
Design and Fabrication of a Multi-spice dryerIRJET Journal
 
Design of hybrid micro thermoelectric and stirling engine
Design of hybrid micro thermoelectric and stirling engineDesign of hybrid micro thermoelectric and stirling engine
Design of hybrid micro thermoelectric and stirling engineUNIVERSITI MALAYSIA PAHANG
 
Solar Photovoltaic/Thermal Hybrid System: Seminar Topic
Solar Photovoltaic/Thermal Hybrid System: Seminar TopicSolar Photovoltaic/Thermal Hybrid System: Seminar Topic
Solar Photovoltaic/Thermal Hybrid System: Seminar TopicKaran Prajapati
 
THERMOELECTRIC GENERATORS SEMINAR IEEE
THERMOELECTRIC GENERATORS SEMINAR IEEETHERMOELECTRIC GENERATORS SEMINAR IEEE
THERMOELECTRIC GENERATORS SEMINAR IEEEjiyadh.k. sabeer
 
Fuel Cell: Survey and Analysis
Fuel Cell: Survey and AnalysisFuel Cell: Survey and Analysis
Fuel Cell: Survey and AnalysisIJRES Journal
 
Experiment study of water based photovoltaic-thermal (PV/T) collector
Experiment study of water based photovoltaic-thermal (PV/T) collectorExperiment study of water based photovoltaic-thermal (PV/T) collector
Experiment study of water based photovoltaic-thermal (PV/T) collectorIJECEIAES
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plantvandana bharti
 

Ähnlich wie GEOTHERMAL POWER GENERATION PROJECT REPORT (20)

Thesis on Hydro Power Plant
Thesis on Hydro Power PlantThesis on Hydro Power Plant
Thesis on Hydro Power Plant
 
hydro-181014224840.pdf
hydro-181014224840.pdfhydro-181014224840.pdf
hydro-181014224840.pdf
 
Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...
Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...
Performance Improvement Analysis on PV/T Solar Water Collectors Connected in ...
 
Solar-Thermoelectric Hybrid Powergenerator
Solar-Thermoelectric Hybrid PowergeneratorSolar-Thermoelectric Hybrid Powergenerator
Solar-Thermoelectric Hybrid Powergenerator
 
Industrial Training Report.pdf
Industrial Training Report.pdfIndustrial Training Report.pdf
Industrial Training Report.pdf
 
Thermoelectric power generator integrated cookstove a sustainable approach of...
Thermoelectric power generator integrated cookstove a sustainable approach of...Thermoelectric power generator integrated cookstove a sustainable approach of...
Thermoelectric power generator integrated cookstove a sustainable approach of...
 
Under water windmill
Under water windmill Under water windmill
Under water windmill
 
comparative analysis of solar photovoltaic thermal (pvt) water and solar
comparative analysis of solar photovoltaic thermal (pvt) water and solarcomparative analysis of solar photovoltaic thermal (pvt) water and solar
comparative analysis of solar photovoltaic thermal (pvt) water and solar
 
hybrid
hybridhybrid
hybrid
 
Review of enhancement for ocean thermal energy conversion system.pdf
Review of enhancement for ocean thermal energy conversion system.pdfReview of enhancement for ocean thermal energy conversion system.pdf
Review of enhancement for ocean thermal energy conversion system.pdf
 
WIND POWER GENERATION_GROUP 4.pptx
WIND POWER GENERATION_GROUP 4.pptxWIND POWER GENERATION_GROUP 4.pptx
WIND POWER GENERATION_GROUP 4.pptx
 
Enhancing Photoelectric Conversion Efficiency of Solar Panel by Water Cooling
Enhancing Photoelectric Conversion Efficiency of Solar Panel by Water CoolingEnhancing Photoelectric Conversion Efficiency of Solar Panel by Water Cooling
Enhancing Photoelectric Conversion Efficiency of Solar Panel by Water Cooling
 
Design and Fabrication of a Multi-spice dryer
Design and Fabrication of a Multi-spice dryerDesign and Fabrication of a Multi-spice dryer
Design and Fabrication of a Multi-spice dryer
 
Design of hybrid micro thermoelectric and stirling engine
Design of hybrid micro thermoelectric and stirling engineDesign of hybrid micro thermoelectric and stirling engine
Design of hybrid micro thermoelectric and stirling engine
 
Solar Photovoltaic/Thermal Hybrid System: Seminar Topic
Solar Photovoltaic/Thermal Hybrid System: Seminar TopicSolar Photovoltaic/Thermal Hybrid System: Seminar Topic
Solar Photovoltaic/Thermal Hybrid System: Seminar Topic
 
2006_deer_fairbanks.pdf
2006_deer_fairbanks.pdf2006_deer_fairbanks.pdf
2006_deer_fairbanks.pdf
 
THERMOELECTRIC GENERATORS SEMINAR IEEE
THERMOELECTRIC GENERATORS SEMINAR IEEETHERMOELECTRIC GENERATORS SEMINAR IEEE
THERMOELECTRIC GENERATORS SEMINAR IEEE
 
Fuel Cell: Survey and Analysis
Fuel Cell: Survey and AnalysisFuel Cell: Survey and Analysis
Fuel Cell: Survey and Analysis
 
Experiment study of water based photovoltaic-thermal (PV/T) collector
Experiment study of water based photovoltaic-thermal (PV/T) collectorExperiment study of water based photovoltaic-thermal (PV/T) collector
Experiment study of water based photovoltaic-thermal (PV/T) collector
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 

Kürzlich hochgeladen

Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 

Kürzlich hochgeladen (20)

Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 

GEOTHERMAL POWER GENERATION PROJECT REPORT

  • 2. 2/35 M. Faizan Mughal, Umair Khaliq, Tasswar Hussain, Arshad Mehmood Contact: umairkhaliq24@gmail.com Supervisor: Mukhtar Ahmed DEPARTMENT OF ELECTRICAL ENGINEERING SWEDISH COLLEGE OF ENGINEERING AND TECHNOLOGY WAH CANTT JULY 2013 GEOTHERMAL POWER GENERATION Final Year Project
  • 3. 3/35 Introduction Renewable Energy Vs. Non-Renewable Energy [1]
  • 4. 4/35 GEOTHERMAL ENERGY Geothermal Energy is energy stored in the form of heat beneath the surface of the solid earth. Geothermal production of energy is 3rd highest among renewable energies. It is behind hydro and biomass, but before solar and wind. Layers of Earth [2,3]
  • 5. 5/35 Geothermal in Pakistan  According to Alternative Energy Board of Pakistan, a global seismic belt passes through Pakistan and the country has a long geological history of geotectonic events. Two-third of Pakistan lies on fault lines
  • 7. 7/35 LOCATIONS OF GEOTHERMAL SPRINGS IN PAKISTAN LOCATIONS TEMPERATURES Himalayan Collision Zone Turboto das (Gilgit area) Darkot pas (Gilgit area) Garam Chashma Tatta pani Mashkin Sassi ranges up to 910 oC ranges up to 910 oC 850 oC to 2520 oC 51 to 970 oC 860 oC 400 oC Chagai Volcanic Arc Chicken dik spring Koh-e-Sultan springs 25-320 oC Indus Basin Margin (Karachi and Dadu areas) Mangopir area Salt range area 480 oC 25-32 oC Locations of Geothermal Resources in Pakistan [4]
  • 8. 8/35 GEOTHERMAL USAGE 1 : Direct Use  Geothermal heat is used directly rather than for power generation  For example space heating ,greenhouse heating, Bathing and swimming, Geothermal heat pumps  Extract heat from low temperature geothermal resources  < 150 oC or 300 oF.  Applications sited near source (<10 km)
  • 9. 9/35 GEOTHERMAL usage 2 : indirect use  Dry Steam Power Plants  Flash Steam Power Plants  Single flash  Double flash  Binary Cycle Power Plants  Combined Cycle Power Plants (Flash and Binary)
  • 10. 10/35 KEY FEATURES  There is no pollution  This mean of power generation is Emission free  Infinite source of heat energy  It is inexpensive and prices of electricity will be Stable  Base load energy supplies low-cost energy at constant rate in order to meet the region’s continuous energy demand.
  • 11. 11/35 OBJECTIVE  Working model of geothermal power generation  Power production to tackle the power energy crises  Get rid of use of fossil fuel  Great geothermal source potential in Pakistan  No practical work and productive plant yet
  • 12. 12/35 STEAM GENERATING ASSEMBLY SOLENOID VALVE SOLENOID VALVE PRESSURE GAUGE TEMPERATURE SENSORS TURBINE GENERATOR POWER SUPPLY LOAD DIGITAL VOLT & CURRENT METER EXTERNAL WATER TANK WATER PUMP TEMPERATURE METER EXHAUST FANS WATER LEVEL CONTROLLER STEAM VALVE CONTROLLER PROJECT BLOCK DIAGRAM
  • 13. 13/35 Algorithmic diagram TURBINE GENERATOR VALVE CONTROLLER TEMPERATURE SENSOR STEAM GENERATING ASSEMBLY WATER PUMP & EXTERNAL RESERVOIR WATER LEVEL CONTROOLER & SENSOR SOLENOID VALVE SOLENOID VALVE If temperature is = > 85 ⁰ C on on If water level is less than the predefined level
  • 15. 15/35 • Steam generating assembly is assembled by the combination of following • equipments o Pressure cooker o Burnerpipe o Frame o Copper Pipe Steam generating assembly
  • 16. 16/35 FRAME  Material = iron  Shape= angle iron  Size = l*w* h= 4*3*3 (in feet)
  • 17. 17/35 PIPE  Material copper  Size 5/16 inch  Copper has high melting point (1023⁰C) and it does not get oxidized  Purpose  Steam and water flow
  • 18. 18/35 Temperature Sensors • Thermocouples (K-type) •Resistance Temperature Detectors (RTDs)
  • 19. 19/35 pressure gauge  Operating voltage  220 v  Control flow of water and steam  Scale  15psi (pounds per square inch) ~1 bar It shows the temperature of pressure cooker in degree centigrade. SOLENOID VALVE thermometer
  • 20. 20/35 TURBINE  Cross flow  No. of blades 24 blades  Blade size l*w=11cm* 1cm
  • 21. 21/35 generator  DC 12 Volt  RPM measured by using RPM meter  Voltage RPM  2 v 497 rpm  4 v 1200 rpm  8 v 2410 rpm  12 v 3420 rpm
  • 22. 22/35 EXHAUST FANS  Operating voltage 12 volt dc  7.8 watt  Operating voltage  220 volt ac  22 watt WATER PUMP
  • 23. 23/35 WATER LEVEL CONTROLLER  Check water level of steam generating assembly  Control water pump and solenoid valve
  • 25. 25/35 POWER SUPPLY CIRCUIT  Power circuit takes 220v ac and step down to 24 volts which are further rectified and filtered by capacitor.  7812 IC is used to get 12v for exhaust fans.  7805 IC is used to get 5v for volt and ammeter.  Direct 220v ac is supplied to other circuitry.
  • 26. 26/35 Power Supply CIRCUIT 7812 7805 11 2 2 33 220 Vac 2200μF 20 pF 12 Vac
  • 27. 27/35 Steam Valve Controller TEMPERATURE METER C POWER SUPPLY 220 Vac SOLENOID VALVE (STEAM FLOW) 94kohm 47kohm 520ohm 12 Vdc RELAY 12 Vdc /220 Vac TEMPERATURE SENSORS
  • 28. 28/35 Project Wiring Diagram 220 Vac DC POWER SUPPLY STEAM VALVE STEAM VALVE CONTROLLER +5V +12V WATER VALVE WATER VALVE CONTROLLER WATER PUMP EXHAUST FAN GND TEMPERATURE METER VOLT AND AMMETER
  • 29. 29/35 PROJECT CALCULATION  At 7.5 psi pressure of steam , Generator produces 3.6 volt  RPM at 4 volt: 1200rpm
  • 30. 30/35 CONCLUSION  It can be seen that a number of thermal springs exist in Pakistan. Studies of these springs are far from complete.  It is suggested that detailed geochemical and radiometric studies should be carried out. After the data is collected of these springs is ascertained some of them can be developed as power generation plants as in China, France, USA and Iceland.
  • 31. 31/35 references  What is Geothermal Energy? Mary H. Dickson and Mario Fanelli, Istituto di Geoscienze e Georisorse , Pisa, Italy  [1] http://clilenergies.wikispaces.com/1.+Energy+and+sources+of+energy  [2] http://www.colorado.edu/physics/phys2900/homepages/Marianne.Hogan/inside.html  [3] http://www.kentlaw.edu/faculty/fbosselman/classes/Spring2003/studentpresentations/Geoth ermalRobinson.ppt  [4] Investigation of Major Geothermal Fields of Pakistan Using Isotope and Chemical Techniques Manzoor Ahmad, Muhammad Rafiq, Naveed Iqbal, Waheed Akram, M. Azam Tasneem, Mubarik Ali Radiation and Isotope Application Division, PINSTECH, P.O. Nilore, Islamabad, Pakistan Proceedings World Geothermal Congress 2005 Antalya, Turkey, 24-29 April 2005
  • 32. 32/35 references  [5] An Overview of Geothermal Resources of Pakistan Malik Sikander Bakht Geological Survey of Pakistan 84, H-8/1, Islamabad, Pakistan. Proceedings World Geothermal Congress 2000 Kyushu - Tohoku, Japan, May 28 - June 10, 2000  [6] Geothermal Resources of Pakistan and Methods For Early Stage Exploration Mohammad Naseer Mughal Geological Survey of Pakistan, A.K. Directorate 65.B. Upper Chatter, Muzaffarabad AK, Pakistan Geothermal Training Programme, Orkuslofnun, Grensasvegur 9, IS-108 Reykjavik, Iceland  [7] The Economical, Environmental and Technological Evaluation of Using Geothermal Energy Mohammed Awwad Ali Al-Dabbas European Journal of Scientific Research ISSN 1450-216X Vol.38 No.4 (2009), pp 626-642 © EuroJournals Publishing, Inc. 2009
  • 33. 33/35 references  [8] Geothermal Power Plant Projects in Central America: Technical and Financial Feasibility Assessment Model Faculty of Industrial Engineering, Mechanical Engineering and Computer Science, School of Engineering and Natural Sciences University of Iceland, Reykjavík, 2012  [9] http://en.wikipedia.org/wiki/Thermocouple  [10]https://en.wikipedia.org/wiki/Resistance_thermometer  [11] http://janderson99.hubpages.com/hub/Excellent-Prospects-for-Geothermal-Power-in- Australia-America-and-Worldwide https://en.wikipedia.org/wiki/Thermistor http://www.personal.psu.edu/ked2/EE210/Temperature%20Measurement%20using%20sensors%20and%20signal%20conditioning.p pt http://oscar.iitb.ac.in/OSCARPP/Mechanical%20Engineering/UploadedStoryboards/SME030 1P0434Steam%20Turbine.ppt https://sites.google.com/site/ee535test/pavan-naga http://en.wikipedia.org/wiki/Surface_condenser
  • 35. 35/35

Hinweis der Redaktion

  1. Renewable Energy is energy that comes from resources which are continually replenished naturally such as solar, wind, geothermal, hydropower and tidal energy, plus biofuelsThese are grown and harvested without fossil fuelsNon-renewable Energy, such as coal and petroleum, require costly explorations and potentially dangerous and will become more expensive as supplies and demand increases
  2. Himalayan Collision ZoneTurboto das &amp; Darkot pass (Gilgit area) temp. ranges up to 910 oCGaramChashma where the subsurface temperature ranges from 850 oC to 2520 oC, based on silica and Na-K geo-thermometers respectively.The temperature estimated at Tattapani ranges from 93 to 1280 oC, and at Mashkinit is about 1690 oC by the Na-K-Ca geo-thermometer. On the other hand the silica geo-thermometer indicates temperatures from 51 to 970 oC at Tattapani, 860 oC at Mashkin and 400 oC at Sassi.Chagai Volcanic Arc The Chicken dik spring and Koh-e-Sultan springs are located chagai volcanic arc. The water temperature ranges from 25-320 oC. Indus Basin Margin In Karachi and Dadu areas there is a large concentration of thermal springs where the average surface temperature is 400 oC. The surface temperature of the springs in the Mangopir area at Karachi is 480 oC. In the Salt range area temperatures of the thermal springs are from 25-32 oC. The spring water is sulphurous and is known to have therapeutic value for skin disease.It is noted that most of them are considered to be mixed with non-thermal waters.
  3. Dry Steam Power Plants180-225 ºC4-8 MPa (580-1160 psi)Can achieve 1 kWh per 6.5 kg of steamA 55 MW plant requires 100 kg/s of steamFlash Steam Power PlantsGenerate between 5 and 100 MWUse 6 to 9 tones of steam per hourBinary Cycle Power PlantsLow temps – 100o and 150oCUse heat to vaporize organic liquidE.g., iso-butane, iso-pentaneTypically 7 to 12 % efficient0.1 – 40 MW units common
  4. Two wires of different metal alloys.Converts thermal energy into electrical energy.Requires a temperature difference between measuring junction and reference junction.Easy to use and obtainTemperature RangeIts temperature range is -180 oC to 1300 oC.Nikal or platinum Wire wound around an insulator it is positive temperature Range of Pt100: –200° C to +850° C