Mega-olefin plant design: Reality now
Bigger is better, when planning future ethylene processing capacity
C. P. Bowen and D. F. Jones, Shaw Energy & Chemicals, Houston, Texas
     Comments? Write:
     editorial@HydrocarbonProcessing.com

The olefin industry continues to expand and upgrade its capacity and equipment. Present olefin-
plant capacities, investment costs, equipment delivery schedules and construction timetables
represent many of the industry's major challenges. These concerns were true in the late 1990s
when the largest cracking furnaces (ethane and naphtha types) were constructed, and when the
largest total plant capacities approached 1,500,000 tpy (1.5 MMtpy).

As current projects, prices and participants have extended plant sizes and
upstream/downstream links, these challenges must be addressed in conjunction with key
equipment manufacturers. Ongoing design of key equipment corresponds to respective nominal
naphtha/ethane cracking capacities of 1.5 MMtpy to
2 MMtpy for future ethylene plant designs.

Market trends. Olefin production capacity has virtually doubled in the past 15 years. Current
capacity is approximately 130 MMtpy and demand is about 114 MMtpy. Global ethylene growth
rate is still approximately 4.5%/yr, and processing capacity is forecast to double again by 2025.
Various alternative production routes to ethylene/propylene have been recently proposed, but
the bulk of new production will still come from conventional steam crackers.

Corresponding plant capacity projections. As a consequence to the total olefin growth rate
during the past generation, steam cracker maximum capacities have increased from 0.5 MMtpy
ethylene (late 1970s) to 1.5 MMtpy today. At present, there are over 30 units with 1+ MMtpy of
processing capability in service or under construction. The industry has correspondingly
increased individual equipment item sizes, and, in anticipation of even larger plant capacities, is
now developing even larger key equipment items.

The steam-cracking industry is not unique in this trend. Refinery units have doubled during the
same time frame (200 Mbpd to 400 Mbpd); petrochemical derivative units have also increased
unit size by a similar factor as per ethylene units.

Investment cost vs. capacity. A standard relationship between investment and plant capacity
for most olefin units is linked to a factor ranging from 0.65 to 0.85. Accordingly, larger olefin
units can generate higher cost production margins. But this involves several investment
concerns including equipment and operational reliability, availability of essential feedstocks and
adequate product disposal.

Feedstock, energy and chemical plant investment costs have significantly increased during the
last five years. At the turn of the century, the reference cost for a standard naphtha-cracking
ethylene plant was ±$1,000/ton ethylene per year. At present, that cost is 40% higher due to the
higher cost of basic and specialty materials, increasing fabrication sales costs, construction
team availability and general engineering costs. So, the combination of higher unit costs offset
by investment costs vs. capacity factors further encourages the olefins industry to move to
higher capacity facilities.
Fig. 1   Current mega-plants incorporate significantly higher
                         cracking furnace capacities and performance flexibility.


Equipment size trends. The industry has responded well to the increasing plant capacity
demands and improved operational efficiency. Accordingly, equipment disposition and item
count within today's olefin units is actually less than it was a generation before. New plant
designs have increased specific capacities of key items significantly. Newer olefin facilities have
integrated several heat and mass transfer facilities, combined various equipment vessels,
expanded catalytic reactor capacities, extended heat pump links between standard
compressors and fractionators, and significantly increased key equipment duties/capacities.
Specific data related to key olefin equipment items will be further discussed.

Cracking furnaces. Early smaller ethylene plants often contained up to 20 individual cracking
furnaces. For example, a major European unit, constructed 35 years ago, had an initial
processing capacity of 450 Mtpy and used 16 fresh-feed furnaces plus two recycle furnaces.
Today, the standard liquid-feed furnace sizes are seven times larger. Gas-feed cracking
furnaces produce even higher ethylene yield outputs.

The latest designs for liquids-cracking furnaces use symmetrical U-type radiant coils; thus,
furnace capacities have increased by up to 25% within identical radiant firebox dimensions. One
of the largest naphtha-cracking furnaces currently under construction will produce 190 Mtpy of
ethylene. Key design features in this unit are:

    •   Dual radiant cell design (each cell contains 112 U-type coils)
    •   Total radiant firebox floor firing with relatively large low-NOx burners
    •   Radiant cells may be separately decoked; decoking effluent directed into radiant firebox
        to minimize decoke effluent contaminants
    •   Multi-pass convection section including slot for future SCR—selective NOx catalytic
        reduction
    •   Variable RPM induced flue gas fan to optimize combustion conditions during
        startup/decoke/turn-down
    •   Modular system design-fabrication of entire furnace to facilitate construction phase
    •   Individual double-tube selective linear exchangers (SLEs) are directly connected to
        each radiant coil outlet; total quench heat recovery is achieved in each SLE per each
        unit.
    •   For heavy feedstocks, the cracked effluent is cooled to at higher temperature and is
        subsequently directly quenched with quench oil to reduce main transfer line operating
        temperatures
•   Multi-stage startup/shutdown control facilities provide necessary uniform operations and
        avoid equipment damage due to emergency conditions
    •   The 190-Mtpy U furnace consumes about 200 MW fuel and generates 100 metric
        tons/hr super high-pressure (SHP) steam
    •   Operating run length for such furnaces is typically about 45 days.

Representative cracking furnace capacities are listed in Fig. 2.




                Fig. 2   Recent North American mega-furnace designs.



Main train compressors. Virtually all ethylene plants today incorporate a single cracked-gas
compression system. Earlier units sometimes used twin parallel units or even a spare unit.
Some units prior to 1970 consisted of multiple reciprocating compressors. High-capacity
centrifugal compressors represent many design, fabrication and operational challenges. Today,
there are few compressor manufacturers who can meet mega-capacity requirements. Recent
design extensions and definitions include:

    •   Naphtha-type cracking requires low suction pressures (0.17 barg– 0.30 barg) to
        optimize cracking selectivity. Discharge pressure is typically about 35 barg to permit
        downstream condensation of methane vs. ethylene refrigerant. Maximum interstage
        discharge temperatures should ideally not exceed 90°C. Accordingly, such system
        normally requires five stages in series.
    •   Typical suction volumetric flow for a 1.5-MMtpy ethylene naphtha cracker compressor
                                                    3
        ranges from 500,000 m3/h to 700,000 m /h. The LP body for recent larger scale plants
        has either been a large, double flow machine, or, in some plants two parallel flow LP
        bodies. Typically, the impellers in process Stage 2 (MP body section) are very similar in
        flow coefficient to each of the double flow impellers in process Stage 1 (double flow LP
        body or two parallel single flow bodies). Each stage often consists of three impellers.
        But the diameter and rotating shaft length for the 3D impellers sometimes limit the
        impeller count for such double flow casings to only two impellers per stage.
    •   The cracked-gas compressor (CGC) will either consist of three or four casings,
        depending on capacity and vendor. The three casing arrangement is normally a double
        flow LP casing for stage one; a single flow MP casing for Stages 2 and 3; and a single
        flow HP casing for Stages 4 and 5. In some cases, vendors have selected four
        compressor bodies, two parallel flow LP bodies for Stage 1 and the MP and HP bodies
        similar to the three body arrangement described previously.
    •   Client input is required during the selection of the first-stage compressor flow
                                                       2
        coefficient—      = f (volume flow, diameter  , RPM). Long-term plans to increase plant
        capacity will impact this decision (See Fig. 3).
    •   Client input is also required for train layout considerations. For 1.5-MMtpy-naphtha
        crackers, the cracked gas API normal condition can absorb power in the range of 90
MW to 100 MW. Operating two trains in series, LP/MP and HP, respectively, is to be
    considered. In a single-train arrangement, normally the impeller/diffuser pairs selected
    for Stages 1 and 2 will operate at optimum efficiency. The performance for Stages 3, 4
    and 5 are progressively compromised by the rotational speed dictated by Stages 1 and
    2. In mega-plant sizes, the power saved by operating Stages 4 and 5 at a higher
    optimum speed can be significant.
•   Ethane-cracking compressors can be optimally designed for higher suction pressures
    (~1.3 barg) and slightly lower discharge pressures, and accordingly have only four
    stages. Ethane cracking yield molecular count is about two whereas naphtha yield is
    approximately four molecules per feed molecule. Ethane-cracker cryogenic fractionation
    is essentially ethylene/hydrogen; hence, the demethanizer system pressure is
    somewhat lower than that of the naphtha generated ethylene/methane/hydrogen
    system. Accordingly, the ethane-cracker CGC and its upstream quench area system
    are smaller in terms of both volumetric flow and energy demand.
•   For reference purposes, ethane-cracker CGC capacity and power are typically only
    75% of that of the equivalent ethylene capacity naphtha cracker. Based on present
    commercially available designs, the corresponding single compressor/driver maximum
    capacities are about 1.5-MMtpy ethylene from naphtha and 2 MMtpy ethylene from
    ethane.
•   Client input into the final selection of impeller flow coefficient will impact future uprate
    potential. It also impacts capital investment (casing size), operating cost (polytropic
    efficiency at operating flow coefficient relative to peak efficiency flow coefficient) and
    reliability (impeller stress and/or critical speed margin). For example, very high flow
    coefficient impellers, bordering on mixed-flow designs, have a significantly higher
    aspect ratio (axial stage length vs. diameter) than lower flow coefficient designs. Critical
    speed margin can be compromised by selecting very high flow coefficient impellers.
    Such high-flow coefficient impellers can also limit train speed based on operating
    impeller stress.
•   Since cracked gas invariably contains concentrations of hydrogen sulfide up to 1,000
    ppm, the operating stress limits of the compressor impellers must be lower than that of
    the equivalent sulfur-free compression condition. Today, essentially all CGC
    compressors are designed per NACE.
•   All critical duty centrifugal compressors are equipped with dry-gas seals. Dry-gas seal
    systems improve unit reliability and reduce maintenance, such as the avoidance of
    lube-oil contamination of the cracked gas and refrigerant inventories associated with
    legacy oil seal systems.
•   Continuous clean-water injection facilities are installed for CGC compressor
    temperature suppression. The vendors have specific limitations on injection rate and
    water particulate size to minimize erosion while minimizing temperature rise and its
    resultant positive impact on run length. Many users also install an intermittent wash-oil
    injection for cleaning. Considering the modest capital required, it is recommended to
    design and install both systems during construction. As noted, water injection is
    continuous, except when the oil is injected for cleaning. The frequency for cleaning is
    site specific and established during operation of the plant.
•   Internal coatings of both stationary and rotating elements of the CGC compressor are
    used by many olefin facilities as a preventive measure to fouling. Such coatings are
    often re-installed at each plant scheduled turn-around.
•   An essential element in verifying the integrity of the compressor system is shop testing,
    as shown in Fig. 4. Component material verification, testing and dimensional
    compliance are consistent with current world-scale plant practices. As with the present
    practice, system energy levels demand section by section compressor thermodynamic
    performance testing and individual body mechanical testing. The requirement for string
    testing is user specific.
Fig. 3   Typical centrifugal compressor impeller configuration
                        and efficiency vs. flow coefficient, typical trend for a
                        centrifugal compressor.




               Fig. 4   Main train compressor testing at the fabrication shop.



Refrigerant compressors. In ethylene plant design, the respective power demands of the
ethylene refrigerant compressor and propylene (or propane) refrigerant compressor are
approximately 1/3 and 1/2 of that of the CGC:

   •   The C2, C3 refrigerant compressor capacities are smaller than that of the cracked-gas
       machine. Ethylene product export is typically high-pressure ambient vapor. When
       ethylene users are not available, the plant is often designed for storage, where the
       product must be exported temporarily as cryogenic liquid. The vapor product condition
       typically defines the API "Normal" condition for the refrigerant compressors. The
       intermittent liquid condition often defines the API "Rated" condition. The volumetric
       differential between these two conditions can be significant, and can drive the API
Normal condition toward surge. Initial compressor impeller/diffuser selection, number of
        stages (head per stage) and relative Mach number (rotational speed) all impact the
        compressor stability, and should be evaluated carefully prior to order.
    •   Depending on the precise recovery scheme design, liquid-ethane-feed cracker C3
        refrigerant compressor may have only two or three stages. Naphtha-cracker designs
        are typically more complex (~ four stages) due to the minimum feedstock refrigeration
        credit and range of products and co-products.
    •   Most C2 refrigerant compressors, which are typically combined with C2 fractionation
        heat pump duty are designed with four stages. In some cases, the C2 refrigerant
        compressor duty requires five stages, and two compressor bodies.
    •   The refrigerant compressors are not exposed to component sulfur; therefore, they are
        not required to be manufactured to NACE requirements. However, the relatively low
        operating temperatures for these machines require materials of construction that can
        maintain sufficient ductility throughout the operating range.
    •   Depending on the plant location and available utilities, some C3 refrigerant compressors
        use air-cooled C3 condensers. The discharge pressure must be correspondingly higher
        than water-cooled condenser systems. Final discharge pressure has a second order
        impact on the selection, and virtually all C3 systems are designed with a single-body C3
        compressor.
    •   Certain of the critical sized equipment related to the refrigerant compression systems
        are the respective low-temperature plate-fin reboilers/condensers and the refrigerant
        condensers (Fig. 5).




                    Fig. 5   Axially split, radial flow inline compressor for
                             olefins refrigeration service.


Steam turbine drivers. Key design criteria include:

    •   Fixed-rpm steam turbine drivers above 200 MW are currently available. Variable-rpm
        units, as implemented for ethylene plants, are currently limited to 80 MW. We anticipate
        that the next-generation steam turbine variable-rpm drivers will shortly be rated at 100-
        MW capacities.
    •   Critical-duty drivers are supplied by steam pressures from 100 barg to 300 barg.
        Ethylene plants are designed to supply steam from 66 barg to 130 barg. Higher
pressure systems are typically more efficient; their steam system operating conditions
        require very high-quality boiler feedwater (BFW) pre-treatment contaminant removal,
        de-ionization and de-phlegmation. High-power turbine drivers incorporate various
        intermediate steam pressure extraction systems. Ethylene plant turbines driving
        compressors are typically designed as extraction condensing. Normal operating
        conditions dictate the extraction section design, and startup normally defines the
        condensing section design.
    •   Close-cycle ethylene plant steam systems involve relatively high capacity steam turbine
        condensation fractions. Accordingly, the lowest pressure turbine blades are relatively
        long and operating speeds often approach blade mechanical design limits. More
        efficient systems, particularly for high-capacity units, maximize medium/low pressure
        steam export opportunities and consequently reduce the condensing phase traffic.
        Consequently, this design reduces the condensing section volume and required blade
        length, and resultant tip speed and mechanical stress.
    •   Another operating adjustment involves steam turbine condenser exhaust pressure.
        During startup or reduced duty operation, the compressor power demand is reduced
        and, accordingly, the steam exhaust pressure can be higher. The condensation
        temperature is consequently higher; the flowrate can be higher, and the HP or MP
        extraction rates can be conveniently reduced. Hence, the turbine blade mechanical tip
        speed limits can be consequently avoided.
    •   It is expected that the mega-plant cracked gas and C3 drivers will both operate on the
        highest pressure steam available within the system. The C2 driver can be designed to
        operate at the highest (SHP) steam pressure, or possibly an intermediate pressure
        (HP), depending on location specifics.
    •   Over the past two decades, advanced steam turbine coatings have been successfully
        installed in olefin plant applications. The resulting reliability and run-length
        improvements attributed to steam turbine stationary and rotating coatings warrant
        evaluation of these options.
    •   For the 1.5-MMtpy-naphtha crackers or 2-MMtpy-gas crackers referenced, the CGC
        driver requirement is nominally 100-MW. This condition exceeds the power of steam
        turbine mechanical drive systems currently operating in the market. Some vendors have
        completed feasibility and are willing to build 100 MW, single-driver CGC drivers. As
        noted earlier, compressor power consumption optimization compels the consideration of
        two drivers. Many other technical factors influence the driver selection including: trip
        and throttle valve number and size, valve chest references, number of control sections,
        blade references, etc. Preferred vendor selection, user preference and risk aversion will
        impact the final decision for one driver vs. two drivers for the cracked-gas train.

Main fractionating towers. Mega-olefin plants include several major towers. Earlier designs
often involved semi-tower delivery and in-situ upper/lower section welding. Today, entire towers
can be delivered without such construction challenges. A 1-MMtpy naphtha cracker ethylene
unit will typically include up to four towers weighing over 1,000 tons. However, freight transport
systems adjacent to ports can handle towers of up to 2,000 tons; equivalent major erection
facilities can also handle such items.

As plants become larger, the vessel diameters increase on a square root ratio. In certain cases,
the diameters and corresponding weight of vessels and towers can be reduced by reducing the
reflux ratio and increasing the tray count. Such optimum dimensions apply to the major ethylene
and propylene fractionators. Other multi-tower sequences can be adapted to reduce duty, e.g.,
combination rectifier/stripper towers.

The largest single duty in most naphtha crackers is the C3 fractionator. Its standard reflux ratio
may be up to 15:1; thus, both tray count and diameter are extended duties. For reference, a
600-Mtpy polymer-grade propylene fractionator will typically consist of a two series tower
system; the respective diameters could be up to 7 m, with 115 m in length and the
corresponding weight up to 1,350 tons.
Another major tower is the quench-oil tower. A heavy-naphtha feedstock 1-MMtpy ethylene unit
quench tower would be approximately 13 m in diameter and up to 45 m tall. Erection weight for
such a unit would exceed 1,100 tons. Fig. 6 shows an example unit.




                        Fig. 6   The 1,000+ ton quench-oil tower is a
                                 key element in this heavy cracking
                                 feedstock mega unit.

Ethane or ethane/propane crackers incorporate a quench-water tower in a similar role. That
vessel may be of equivalent size/weight to the naphtha-cracker quench-oil tower. But, as
mentioned previously, if the ethane cracking coil outlet pressure is elevated (e.g., 1.8 barg vs.
0.6 barg) the downstream quench system and cracked-gas compression system are of reduced
physical size. Such a high-pressure ethane cracker producing 1.5 MMtpy of ethylene would
incorporate a quench-water tower of only 8.5 m in diameter and 30 m in height with a weight of
approximately 500 tons. If however the same plant was based on lower conventional coil outlet
pressure, the volumetric cracked gas flowrate would be approximately doubled with a
corresponding increase in quench tower diameter and weight.

The other major fractionator tower is the ethylene-ethane splitter. The present current recovery
scheme design minimizes the duty on this tower but it is nonetheless of major proportions and
weight. A 1.5-MMtpy ethylene fractionator is approximately 7 m in diameter and 60 m in length
with a weight of 500 tons.

Major heat exchangers. The largest heat exchangers on many plants are the various air
coolers, which can represent up to 50% of the total plant cooling duty. The installed area of
such mega plants poses problems. In most cases, the horizontal air coolers will be installed
above mega pipe racks—up to 20 m in elevation. Major air coolers will consist of 4–6 rows of up
to possibly 20 m in length. Many Middle East plants have restricted seawater usage for cooling,
but the ambient-air temperature range forces air coolers to operate at high condensing
temperature/pressure. Steam turbine condensers may also be air coolers; these are frequently
installed in triangular overhead formats to maximize available duty per unit plot area.
Shell-and-tube heat exchangers have also been extended beyond their traditional dimensions.
One of the latest mega plants have incorporated single mega exchangers in high-capacity
services such as cracked-gas intercoolers/aftercoolers, refrigerant condensers and fractionator
                                                   2
condensers. Such exchangers are up to 2,000 m surface area per shell with single pass tubes
of 13 m in length. Mega units typically relax the delta in temperatures and pressure drops
across such exchangers and thereby reduce the surface area and process-side flow
dimensions. Key benefits from such designs are linked to the associated piping and installation
advantages.

Plate-fin exchangers have also been significantly increased in sizes and capacity as a
consequence of mega unit decisions. The manufacturing facilities and techniques have been
                                                                          3
upgraded so that unit exchangers volumetric size may extend up to 18 m per core and
parallel/series requirements are minimized. Various related improvements have also been
incorporated into plate-fin exchangers that directly benefit mega-plant systems, e.g., anti-
corrosion metallurgy, upstream protective guard beds, integrated tower reboilers/condensers,
etc.

Piping systems. The proportional cost of the piping system in mega plans can be as high as
40% of total investment cost. Incremental cost elements include design, fabrication, associated
valving, installation, insulation, testing, pre-commissioning and initial start-up. A major US pipe
fabrication company is highly aware of these project elements and has promoted induction
heating/bending fabrication techniques to minimize piping bending components and related
welding.

Further mega unit features. Operating companies continue to extend capacities on many
similar plants. However, we must recognize that the cost:capacity advantage is less pronounced
at super high capacities, and various associated feedstock, product, utility, emission aspects
pose more difficult operational challenges. Nonetheless, we anticipate continuing plant
capacities in the 1-1.5 MMtpy range where key design elements have been successfully
achieved. Fig. 7 indicates a recent related mega-capacity unit.




      Fig. 7   This recently completed mega-unit was the first joint venture ethylene
               project and the first unique EPC LSTK unit in China, currently under
               expansion.

A further similar mega-plant petrochemical-refining joint design philosophy has recently been
implemented. Several projects are now under design and construction for Middle East and
South American units based on the concept of enhanced fluid catalytic cracking (FCC) schemes
linked with conventional ethane and /or naphtha type steam crackers. Later in 2008, a mega
plant will start up producing approximately 1.5 MMtpy of ethylene and 1 MMtpy of propylene.
Various product recovery facilities and energy supply/demand systems are integrated, and both
the FCC unit converter system and steam-cracker equipment items incorporate mega-plant
design philosophies. In the role as technology/engineering/construction company, we work
closely with operating companies and key equipment manufacturing companies in order to
implement effective mega-plant cost/capacity designs of joint benefit to all parties—Bigger is
Better. HP
The authors
              Colin P. Bowen is the vice president of olefins business development for Shaw's
              Energy & Chemicals Group (formerly Stone & Webster), where he has worked for
              approximately 40 years. He is a graduate of Birmingham University and Imperial
              College, UK. Mr. Bowen is a senior member of AIChE, IChemE and IMechE. He
              was secretary of AIChE's Fuels & Petrochemicals Division and is Shaw's member
              on the AIChE Ethylene Producers Committee. He has worked in the global
              petrochemical industry in a range of contractor positions and has contributed
              significantly to many ethylene projects during his career.
              Daniel Jones is the executive director of furnace technology Shaw's Energy &
              Chemicals Group (formerly Stone & Webster) in Houston, Texas. Mr. Jones has
              worked in the petroleum industry for 28 years. His varied experience includes
              engineered equipment systems for subsea drilling, oil and gas production, gas
              pipelines, refining and petrochemical applications. His responsibilities have
              included engineering, marketing, sales and executive management. He is a
              graduate of the University of Pennsylvania with a BS degree in mechanical
              engineering.

Weitere ähnliche Inhalte

Was ist angesagt?

13 l1-l2-reactor design
13 l1-l2-reactor design13 l1-l2-reactor design
13 l1-l2-reactor designDinesh Shah
 
VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms
VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms
VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms Gerard B. Hawkins
 
Selection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsSelection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsGerard B. Hawkins
 
Ammonia plant efficiency
Ammonia plant efficiencyAmmonia plant efficiency
Ammonia plant efficiencyHimanshu Sharma
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementGerard B. Hawkins
 
Catalytic Reforming: Catalyst, Process Technology and Operations Overview
Catalytic Reforming:  Catalyst, Process Technology and Operations OverviewCatalytic Reforming:  Catalyst, Process Technology and Operations Overview
Catalytic Reforming: Catalyst, Process Technology and Operations OverviewGerard B. Hawkins
 
BE Chemical Engineering Design Project Production Of Propylene Oxide
BE Chemical Engineering Design Project   Production Of Propylene OxideBE Chemical Engineering Design Project   Production Of Propylene Oxide
BE Chemical Engineering Design Project Production Of Propylene Oxidepatrickconneran
 
Electrochemical Characterization of Electrocatalysts .pptx
Electrochemical Characterization of Electrocatalysts .pptxElectrochemical Characterization of Electrocatalysts .pptx
Electrochemical Characterization of Electrocatalysts .pptxMabrook Saleh Amer
 
Processing of petroleum types of reflux
Processing of petroleum types of refluxProcessing of petroleum types of reflux
Processing of petroleum types of refluxKarnav Rana
 
Things That Can Go Wrong in a Methanol Distillation Column
Things That Can Go Wrong in a Methanol Distillation ColumnThings That Can Go Wrong in a Methanol Distillation Column
Things That Can Go Wrong in a Methanol Distillation ColumnGerard B. Hawkins
 
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive OverviewGerard B. Hawkins
 
Steam Reforming - Common Problems
Steam Reforming - Common ProblemsSteam Reforming - Common Problems
Steam Reforming - Common ProblemsGerard B. Hawkins
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balancePrem Baboo
 
Methane Steam Reformer Re-tube Studies
Methane Steam Reformer Re-tube StudiesMethane Steam Reformer Re-tube Studies
Methane Steam Reformer Re-tube StudiesGerard B. Hawkins
 
Troubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsTroubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsGerard B. Hawkins
 
Episode 55 : Conceptual Process Synthesis-Design
Episode 55 :  Conceptual Process Synthesis-DesignEpisode 55 :  Conceptual Process Synthesis-Design
Episode 55 : Conceptual Process Synthesis-DesignSAJJAD KHUDHUR ABBAS
 

Was ist angesagt? (20)

C2 Acetylene Hydrogenation
C2 Acetylene HydrogenationC2 Acetylene Hydrogenation
C2 Acetylene Hydrogenation
 
Contact Process
Contact ProcessContact Process
Contact Process
 
13 l1-l2-reactor design
13 l1-l2-reactor design13 l1-l2-reactor design
13 l1-l2-reactor design
 
VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms
VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms
VULCAN Catalytic Reaction Guide - (106) Heterogeneous Reaction Mechanisms
 
Selection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsSelection of Internals for Distillation Columns
Selection of Internals for Distillation Columns
 
Ammonia plant efficiency
Ammonia plant efficiencyAmmonia plant efficiency
Ammonia plant efficiency
 
Troubleshooting of Catalytic Reactors
Troubleshooting of Catalytic ReactorsTroubleshooting of Catalytic Reactors
Troubleshooting of Catalytic Reactors
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical Supplement
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 
Catalytic Reforming: Catalyst, Process Technology and Operations Overview
Catalytic Reforming:  Catalyst, Process Technology and Operations OverviewCatalytic Reforming:  Catalyst, Process Technology and Operations Overview
Catalytic Reforming: Catalyst, Process Technology and Operations Overview
 
BE Chemical Engineering Design Project Production Of Propylene Oxide
BE Chemical Engineering Design Project   Production Of Propylene OxideBE Chemical Engineering Design Project   Production Of Propylene Oxide
BE Chemical Engineering Design Project Production Of Propylene Oxide
 
Electrochemical Characterization of Electrocatalysts .pptx
Electrochemical Characterization of Electrocatalysts .pptxElectrochemical Characterization of Electrocatalysts .pptx
Electrochemical Characterization of Electrocatalysts .pptx
 
Processing of petroleum types of reflux
Processing of petroleum types of refluxProcessing of petroleum types of reflux
Processing of petroleum types of reflux
 
Things That Can Go Wrong in a Methanol Distillation Column
Things That Can Go Wrong in a Methanol Distillation ColumnThings That Can Go Wrong in a Methanol Distillation Column
Things That Can Go Wrong in a Methanol Distillation Column
 
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
 
Steam Reforming - Common Problems
Steam Reforming - Common ProblemsSteam Reforming - Common Problems
Steam Reforming - Common Problems
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balance
 
Methane Steam Reformer Re-tube Studies
Methane Steam Reformer Re-tube StudiesMethane Steam Reformer Re-tube Studies
Methane Steam Reformer Re-tube Studies
 
Troubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsTroubleshooting in Distillation Columns
Troubleshooting in Distillation Columns
 
Episode 55 : Conceptual Process Synthesis-Design
Episode 55 :  Conceptual Process Synthesis-DesignEpisode 55 :  Conceptual Process Synthesis-Design
Episode 55 : Conceptual Process Synthesis-Design
 

Ähnlich wie Mega Planta De Etileno - Steam Cracking

SMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlantsSMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlantsDexter Vaz
 
07 ii-gas combined-cycle
07 ii-gas combined-cycle07 ii-gas combined-cycle
07 ii-gas combined-cycleIIT Kanpur
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaRazin Sazzad Molla
 
Catalog chptech gas_turbines
Catalog chptech gas_turbinesCatalog chptech gas_turbines
Catalog chptech gas_turbinesSez Ruleez
 
National fetilizers limited captive power plant
National fetilizers limited  captive power plantNational fetilizers limited  captive power plant
National fetilizers limited captive power plantNikhilesh joshi
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppeYash Shah
 
Competitive clean coal power utilizing pressurized fluidized bed combined cyc...
Competitive clean coal power utilizing pressurized fluidized bed combined cyc...Competitive clean coal power utilizing pressurized fluidized bed combined cyc...
Competitive clean coal power utilizing pressurized fluidized bed combined cyc...aoopee
 
nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...
nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...
nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...Shubham Mishra
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiencesD.Pawan Kumar
 
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR eecfncci
 
Supercritical Power Plants
Supercritical Power PlantsSupercritical Power Plants
Supercritical Power PlantsErwan Yulianto
 
Co-generation and trigeneration by Varun Pratap Singh
Co-generation and trigeneration by Varun Pratap SinghCo-generation and trigeneration by Varun Pratap Singh
Co-generation and trigeneration by Varun Pratap SinghVarun Pratap Singh
 
Attachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportAttachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportCangTo Cheah
 
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfQuestion Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfPremBaboo4
 

Ähnlich wie Mega Planta De Etileno - Steam Cracking (20)

SMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlantsSMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlants
 
07 ii-gas combined-cycle
07 ii-gas combined-cycle07 ii-gas combined-cycle
07 ii-gas combined-cycle
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad Molla
 
Catalog chptech gas_turbines
Catalog chptech gas_turbinesCatalog chptech gas_turbines
Catalog chptech gas_turbines
 
National fetilizers limited captive power plant
National fetilizers limited  captive power plantNational fetilizers limited  captive power plant
National fetilizers limited captive power plant
 
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the PipelineVirtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppe
 
Competitive clean coal power utilizing pressurized fluidized bed combined cyc...
Competitive clean coal power utilizing pressurized fluidized bed combined cyc...Competitive clean coal power utilizing pressurized fluidized bed combined cyc...
Competitive clean coal power utilizing pressurized fluidized bed combined cyc...
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
P3_Hebling
P3_HeblingP3_Hebling
P3_Hebling
 
nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...
nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...
nitrogen_syngas_article_controlling_the_stresses_of-the_primary_reformer_may_...
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiences
 
Epa of cogen
Epa of cogenEpa of cogen
Epa of cogen
 
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
 
Coal vs gas Power generation
Coal vs gas Power generationCoal vs gas Power generation
Coal vs gas Power generation
 
Supercritical Power Plants
Supercritical Power PlantsSupercritical Power Plants
Supercritical Power Plants
 
Co-generation and trigeneration by Varun Pratap Singh
Co-generation and trigeneration by Varun Pratap SinghCo-generation and trigeneration by Varun Pratap Singh
Co-generation and trigeneration by Varun Pratap Singh
 
Attachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportAttachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection report
 
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfQuestion Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
 

Kürzlich hochgeladen

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 

Kürzlich hochgeladen (20)

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 

Mega Planta De Etileno - Steam Cracking

  • 1. Mega-olefin plant design: Reality now Bigger is better, when planning future ethylene processing capacity C. P. Bowen and D. F. Jones, Shaw Energy & Chemicals, Houston, Texas Comments? Write: editorial@HydrocarbonProcessing.com The olefin industry continues to expand and upgrade its capacity and equipment. Present olefin- plant capacities, investment costs, equipment delivery schedules and construction timetables represent many of the industry's major challenges. These concerns were true in the late 1990s when the largest cracking furnaces (ethane and naphtha types) were constructed, and when the largest total plant capacities approached 1,500,000 tpy (1.5 MMtpy). As current projects, prices and participants have extended plant sizes and upstream/downstream links, these challenges must be addressed in conjunction with key equipment manufacturers. Ongoing design of key equipment corresponds to respective nominal naphtha/ethane cracking capacities of 1.5 MMtpy to 2 MMtpy for future ethylene plant designs. Market trends. Olefin production capacity has virtually doubled in the past 15 years. Current capacity is approximately 130 MMtpy and demand is about 114 MMtpy. Global ethylene growth rate is still approximately 4.5%/yr, and processing capacity is forecast to double again by 2025. Various alternative production routes to ethylene/propylene have been recently proposed, but the bulk of new production will still come from conventional steam crackers. Corresponding plant capacity projections. As a consequence to the total olefin growth rate during the past generation, steam cracker maximum capacities have increased from 0.5 MMtpy ethylene (late 1970s) to 1.5 MMtpy today. At present, there are over 30 units with 1+ MMtpy of processing capability in service or under construction. The industry has correspondingly increased individual equipment item sizes, and, in anticipation of even larger plant capacities, is now developing even larger key equipment items. The steam-cracking industry is not unique in this trend. Refinery units have doubled during the same time frame (200 Mbpd to 400 Mbpd); petrochemical derivative units have also increased unit size by a similar factor as per ethylene units. Investment cost vs. capacity. A standard relationship between investment and plant capacity for most olefin units is linked to a factor ranging from 0.65 to 0.85. Accordingly, larger olefin units can generate higher cost production margins. But this involves several investment concerns including equipment and operational reliability, availability of essential feedstocks and adequate product disposal. Feedstock, energy and chemical plant investment costs have significantly increased during the last five years. At the turn of the century, the reference cost for a standard naphtha-cracking ethylene plant was ±$1,000/ton ethylene per year. At present, that cost is 40% higher due to the higher cost of basic and specialty materials, increasing fabrication sales costs, construction team availability and general engineering costs. So, the combination of higher unit costs offset by investment costs vs. capacity factors further encourages the olefins industry to move to higher capacity facilities.
  • 2. Fig. 1 Current mega-plants incorporate significantly higher cracking furnace capacities and performance flexibility. Equipment size trends. The industry has responded well to the increasing plant capacity demands and improved operational efficiency. Accordingly, equipment disposition and item count within today's olefin units is actually less than it was a generation before. New plant designs have increased specific capacities of key items significantly. Newer olefin facilities have integrated several heat and mass transfer facilities, combined various equipment vessels, expanded catalytic reactor capacities, extended heat pump links between standard compressors and fractionators, and significantly increased key equipment duties/capacities. Specific data related to key olefin equipment items will be further discussed. Cracking furnaces. Early smaller ethylene plants often contained up to 20 individual cracking furnaces. For example, a major European unit, constructed 35 years ago, had an initial processing capacity of 450 Mtpy and used 16 fresh-feed furnaces plus two recycle furnaces. Today, the standard liquid-feed furnace sizes are seven times larger. Gas-feed cracking furnaces produce even higher ethylene yield outputs. The latest designs for liquids-cracking furnaces use symmetrical U-type radiant coils; thus, furnace capacities have increased by up to 25% within identical radiant firebox dimensions. One of the largest naphtha-cracking furnaces currently under construction will produce 190 Mtpy of ethylene. Key design features in this unit are: • Dual radiant cell design (each cell contains 112 U-type coils) • Total radiant firebox floor firing with relatively large low-NOx burners • Radiant cells may be separately decoked; decoking effluent directed into radiant firebox to minimize decoke effluent contaminants • Multi-pass convection section including slot for future SCR—selective NOx catalytic reduction • Variable RPM induced flue gas fan to optimize combustion conditions during startup/decoke/turn-down • Modular system design-fabrication of entire furnace to facilitate construction phase • Individual double-tube selective linear exchangers (SLEs) are directly connected to each radiant coil outlet; total quench heat recovery is achieved in each SLE per each unit. • For heavy feedstocks, the cracked effluent is cooled to at higher temperature and is subsequently directly quenched with quench oil to reduce main transfer line operating temperatures
  • 3. Multi-stage startup/shutdown control facilities provide necessary uniform operations and avoid equipment damage due to emergency conditions • The 190-Mtpy U furnace consumes about 200 MW fuel and generates 100 metric tons/hr super high-pressure (SHP) steam • Operating run length for such furnaces is typically about 45 days. Representative cracking furnace capacities are listed in Fig. 2. Fig. 2 Recent North American mega-furnace designs. Main train compressors. Virtually all ethylene plants today incorporate a single cracked-gas compression system. Earlier units sometimes used twin parallel units or even a spare unit. Some units prior to 1970 consisted of multiple reciprocating compressors. High-capacity centrifugal compressors represent many design, fabrication and operational challenges. Today, there are few compressor manufacturers who can meet mega-capacity requirements. Recent design extensions and definitions include: • Naphtha-type cracking requires low suction pressures (0.17 barg– 0.30 barg) to optimize cracking selectivity. Discharge pressure is typically about 35 barg to permit downstream condensation of methane vs. ethylene refrigerant. Maximum interstage discharge temperatures should ideally not exceed 90°C. Accordingly, such system normally requires five stages in series. • Typical suction volumetric flow for a 1.5-MMtpy ethylene naphtha cracker compressor 3 ranges from 500,000 m3/h to 700,000 m /h. The LP body for recent larger scale plants has either been a large, double flow machine, or, in some plants two parallel flow LP bodies. Typically, the impellers in process Stage 2 (MP body section) are very similar in flow coefficient to each of the double flow impellers in process Stage 1 (double flow LP body or two parallel single flow bodies). Each stage often consists of three impellers. But the diameter and rotating shaft length for the 3D impellers sometimes limit the impeller count for such double flow casings to only two impellers per stage. • The cracked-gas compressor (CGC) will either consist of three or four casings, depending on capacity and vendor. The three casing arrangement is normally a double flow LP casing for stage one; a single flow MP casing for Stages 2 and 3; and a single flow HP casing for Stages 4 and 5. In some cases, vendors have selected four compressor bodies, two parallel flow LP bodies for Stage 1 and the MP and HP bodies similar to the three body arrangement described previously. • Client input is required during the selection of the first-stage compressor flow 2 coefficient— = f (volume flow, diameter  , RPM). Long-term plans to increase plant capacity will impact this decision (See Fig. 3). • Client input is also required for train layout considerations. For 1.5-MMtpy-naphtha crackers, the cracked gas API normal condition can absorb power in the range of 90
  • 4. MW to 100 MW. Operating two trains in series, LP/MP and HP, respectively, is to be considered. In a single-train arrangement, normally the impeller/diffuser pairs selected for Stages 1 and 2 will operate at optimum efficiency. The performance for Stages 3, 4 and 5 are progressively compromised by the rotational speed dictated by Stages 1 and 2. In mega-plant sizes, the power saved by operating Stages 4 and 5 at a higher optimum speed can be significant. • Ethane-cracking compressors can be optimally designed for higher suction pressures (~1.3 barg) and slightly lower discharge pressures, and accordingly have only four stages. Ethane cracking yield molecular count is about two whereas naphtha yield is approximately four molecules per feed molecule. Ethane-cracker cryogenic fractionation is essentially ethylene/hydrogen; hence, the demethanizer system pressure is somewhat lower than that of the naphtha generated ethylene/methane/hydrogen system. Accordingly, the ethane-cracker CGC and its upstream quench area system are smaller in terms of both volumetric flow and energy demand. • For reference purposes, ethane-cracker CGC capacity and power are typically only 75% of that of the equivalent ethylene capacity naphtha cracker. Based on present commercially available designs, the corresponding single compressor/driver maximum capacities are about 1.5-MMtpy ethylene from naphtha and 2 MMtpy ethylene from ethane. • Client input into the final selection of impeller flow coefficient will impact future uprate potential. It also impacts capital investment (casing size), operating cost (polytropic efficiency at operating flow coefficient relative to peak efficiency flow coefficient) and reliability (impeller stress and/or critical speed margin). For example, very high flow coefficient impellers, bordering on mixed-flow designs, have a significantly higher aspect ratio (axial stage length vs. diameter) than lower flow coefficient designs. Critical speed margin can be compromised by selecting very high flow coefficient impellers. Such high-flow coefficient impellers can also limit train speed based on operating impeller stress. • Since cracked gas invariably contains concentrations of hydrogen sulfide up to 1,000 ppm, the operating stress limits of the compressor impellers must be lower than that of the equivalent sulfur-free compression condition. Today, essentially all CGC compressors are designed per NACE. • All critical duty centrifugal compressors are equipped with dry-gas seals. Dry-gas seal systems improve unit reliability and reduce maintenance, such as the avoidance of lube-oil contamination of the cracked gas and refrigerant inventories associated with legacy oil seal systems. • Continuous clean-water injection facilities are installed for CGC compressor temperature suppression. The vendors have specific limitations on injection rate and water particulate size to minimize erosion while minimizing temperature rise and its resultant positive impact on run length. Many users also install an intermittent wash-oil injection for cleaning. Considering the modest capital required, it is recommended to design and install both systems during construction. As noted, water injection is continuous, except when the oil is injected for cleaning. The frequency for cleaning is site specific and established during operation of the plant. • Internal coatings of both stationary and rotating elements of the CGC compressor are used by many olefin facilities as a preventive measure to fouling. Such coatings are often re-installed at each plant scheduled turn-around. • An essential element in verifying the integrity of the compressor system is shop testing, as shown in Fig. 4. Component material verification, testing and dimensional compliance are consistent with current world-scale plant practices. As with the present practice, system energy levels demand section by section compressor thermodynamic performance testing and individual body mechanical testing. The requirement for string testing is user specific.
  • 5. Fig. 3 Typical centrifugal compressor impeller configuration and efficiency vs. flow coefficient, typical trend for a centrifugal compressor. Fig. 4 Main train compressor testing at the fabrication shop. Refrigerant compressors. In ethylene plant design, the respective power demands of the ethylene refrigerant compressor and propylene (or propane) refrigerant compressor are approximately 1/3 and 1/2 of that of the CGC: • The C2, C3 refrigerant compressor capacities are smaller than that of the cracked-gas machine. Ethylene product export is typically high-pressure ambient vapor. When ethylene users are not available, the plant is often designed for storage, where the product must be exported temporarily as cryogenic liquid. The vapor product condition typically defines the API "Normal" condition for the refrigerant compressors. The intermittent liquid condition often defines the API "Rated" condition. The volumetric differential between these two conditions can be significant, and can drive the API
  • 6. Normal condition toward surge. Initial compressor impeller/diffuser selection, number of stages (head per stage) and relative Mach number (rotational speed) all impact the compressor stability, and should be evaluated carefully prior to order. • Depending on the precise recovery scheme design, liquid-ethane-feed cracker C3 refrigerant compressor may have only two or three stages. Naphtha-cracker designs are typically more complex (~ four stages) due to the minimum feedstock refrigeration credit and range of products and co-products. • Most C2 refrigerant compressors, which are typically combined with C2 fractionation heat pump duty are designed with four stages. In some cases, the C2 refrigerant compressor duty requires five stages, and two compressor bodies. • The refrigerant compressors are not exposed to component sulfur; therefore, they are not required to be manufactured to NACE requirements. However, the relatively low operating temperatures for these machines require materials of construction that can maintain sufficient ductility throughout the operating range. • Depending on the plant location and available utilities, some C3 refrigerant compressors use air-cooled C3 condensers. The discharge pressure must be correspondingly higher than water-cooled condenser systems. Final discharge pressure has a second order impact on the selection, and virtually all C3 systems are designed with a single-body C3 compressor. • Certain of the critical sized equipment related to the refrigerant compression systems are the respective low-temperature plate-fin reboilers/condensers and the refrigerant condensers (Fig. 5). Fig. 5 Axially split, radial flow inline compressor for olefins refrigeration service. Steam turbine drivers. Key design criteria include: • Fixed-rpm steam turbine drivers above 200 MW are currently available. Variable-rpm units, as implemented for ethylene plants, are currently limited to 80 MW. We anticipate that the next-generation steam turbine variable-rpm drivers will shortly be rated at 100- MW capacities. • Critical-duty drivers are supplied by steam pressures from 100 barg to 300 barg. Ethylene plants are designed to supply steam from 66 barg to 130 barg. Higher
  • 7. pressure systems are typically more efficient; their steam system operating conditions require very high-quality boiler feedwater (BFW) pre-treatment contaminant removal, de-ionization and de-phlegmation. High-power turbine drivers incorporate various intermediate steam pressure extraction systems. Ethylene plant turbines driving compressors are typically designed as extraction condensing. Normal operating conditions dictate the extraction section design, and startup normally defines the condensing section design. • Close-cycle ethylene plant steam systems involve relatively high capacity steam turbine condensation fractions. Accordingly, the lowest pressure turbine blades are relatively long and operating speeds often approach blade mechanical design limits. More efficient systems, particularly for high-capacity units, maximize medium/low pressure steam export opportunities and consequently reduce the condensing phase traffic. Consequently, this design reduces the condensing section volume and required blade length, and resultant tip speed and mechanical stress. • Another operating adjustment involves steam turbine condenser exhaust pressure. During startup or reduced duty operation, the compressor power demand is reduced and, accordingly, the steam exhaust pressure can be higher. The condensation temperature is consequently higher; the flowrate can be higher, and the HP or MP extraction rates can be conveniently reduced. Hence, the turbine blade mechanical tip speed limits can be consequently avoided. • It is expected that the mega-plant cracked gas and C3 drivers will both operate on the highest pressure steam available within the system. The C2 driver can be designed to operate at the highest (SHP) steam pressure, or possibly an intermediate pressure (HP), depending on location specifics. • Over the past two decades, advanced steam turbine coatings have been successfully installed in olefin plant applications. The resulting reliability and run-length improvements attributed to steam turbine stationary and rotating coatings warrant evaluation of these options. • For the 1.5-MMtpy-naphtha crackers or 2-MMtpy-gas crackers referenced, the CGC driver requirement is nominally 100-MW. This condition exceeds the power of steam turbine mechanical drive systems currently operating in the market. Some vendors have completed feasibility and are willing to build 100 MW, single-driver CGC drivers. As noted earlier, compressor power consumption optimization compels the consideration of two drivers. Many other technical factors influence the driver selection including: trip and throttle valve number and size, valve chest references, number of control sections, blade references, etc. Preferred vendor selection, user preference and risk aversion will impact the final decision for one driver vs. two drivers for the cracked-gas train. Main fractionating towers. Mega-olefin plants include several major towers. Earlier designs often involved semi-tower delivery and in-situ upper/lower section welding. Today, entire towers can be delivered without such construction challenges. A 1-MMtpy naphtha cracker ethylene unit will typically include up to four towers weighing over 1,000 tons. However, freight transport systems adjacent to ports can handle towers of up to 2,000 tons; equivalent major erection facilities can also handle such items. As plants become larger, the vessel diameters increase on a square root ratio. In certain cases, the diameters and corresponding weight of vessels and towers can be reduced by reducing the reflux ratio and increasing the tray count. Such optimum dimensions apply to the major ethylene and propylene fractionators. Other multi-tower sequences can be adapted to reduce duty, e.g., combination rectifier/stripper towers. The largest single duty in most naphtha crackers is the C3 fractionator. Its standard reflux ratio may be up to 15:1; thus, both tray count and diameter are extended duties. For reference, a 600-Mtpy polymer-grade propylene fractionator will typically consist of a two series tower system; the respective diameters could be up to 7 m, with 115 m in length and the corresponding weight up to 1,350 tons.
  • 8. Another major tower is the quench-oil tower. A heavy-naphtha feedstock 1-MMtpy ethylene unit quench tower would be approximately 13 m in diameter and up to 45 m tall. Erection weight for such a unit would exceed 1,100 tons. Fig. 6 shows an example unit. Fig. 6 The 1,000+ ton quench-oil tower is a key element in this heavy cracking feedstock mega unit. Ethane or ethane/propane crackers incorporate a quench-water tower in a similar role. That vessel may be of equivalent size/weight to the naphtha-cracker quench-oil tower. But, as mentioned previously, if the ethane cracking coil outlet pressure is elevated (e.g., 1.8 barg vs. 0.6 barg) the downstream quench system and cracked-gas compression system are of reduced physical size. Such a high-pressure ethane cracker producing 1.5 MMtpy of ethylene would incorporate a quench-water tower of only 8.5 m in diameter and 30 m in height with a weight of approximately 500 tons. If however the same plant was based on lower conventional coil outlet pressure, the volumetric cracked gas flowrate would be approximately doubled with a corresponding increase in quench tower diameter and weight. The other major fractionator tower is the ethylene-ethane splitter. The present current recovery scheme design minimizes the duty on this tower but it is nonetheless of major proportions and weight. A 1.5-MMtpy ethylene fractionator is approximately 7 m in diameter and 60 m in length with a weight of 500 tons. Major heat exchangers. The largest heat exchangers on many plants are the various air coolers, which can represent up to 50% of the total plant cooling duty. The installed area of such mega plants poses problems. In most cases, the horizontal air coolers will be installed above mega pipe racks—up to 20 m in elevation. Major air coolers will consist of 4–6 rows of up to possibly 20 m in length. Many Middle East plants have restricted seawater usage for cooling, but the ambient-air temperature range forces air coolers to operate at high condensing temperature/pressure. Steam turbine condensers may also be air coolers; these are frequently installed in triangular overhead formats to maximize available duty per unit plot area.
  • 9. Shell-and-tube heat exchangers have also been extended beyond their traditional dimensions. One of the latest mega plants have incorporated single mega exchangers in high-capacity services such as cracked-gas intercoolers/aftercoolers, refrigerant condensers and fractionator 2 condensers. Such exchangers are up to 2,000 m surface area per shell with single pass tubes of 13 m in length. Mega units typically relax the delta in temperatures and pressure drops across such exchangers and thereby reduce the surface area and process-side flow dimensions. Key benefits from such designs are linked to the associated piping and installation advantages. Plate-fin exchangers have also been significantly increased in sizes and capacity as a consequence of mega unit decisions. The manufacturing facilities and techniques have been 3 upgraded so that unit exchangers volumetric size may extend up to 18 m per core and parallel/series requirements are minimized. Various related improvements have also been incorporated into plate-fin exchangers that directly benefit mega-plant systems, e.g., anti- corrosion metallurgy, upstream protective guard beds, integrated tower reboilers/condensers, etc. Piping systems. The proportional cost of the piping system in mega plans can be as high as 40% of total investment cost. Incremental cost elements include design, fabrication, associated valving, installation, insulation, testing, pre-commissioning and initial start-up. A major US pipe fabrication company is highly aware of these project elements and has promoted induction heating/bending fabrication techniques to minimize piping bending components and related welding. Further mega unit features. Operating companies continue to extend capacities on many similar plants. However, we must recognize that the cost:capacity advantage is less pronounced at super high capacities, and various associated feedstock, product, utility, emission aspects pose more difficult operational challenges. Nonetheless, we anticipate continuing plant capacities in the 1-1.5 MMtpy range where key design elements have been successfully achieved. Fig. 7 indicates a recent related mega-capacity unit. Fig. 7 This recently completed mega-unit was the first joint venture ethylene project and the first unique EPC LSTK unit in China, currently under expansion. A further similar mega-plant petrochemical-refining joint design philosophy has recently been implemented. Several projects are now under design and construction for Middle East and South American units based on the concept of enhanced fluid catalytic cracking (FCC) schemes linked with conventional ethane and /or naphtha type steam crackers. Later in 2008, a mega plant will start up producing approximately 1.5 MMtpy of ethylene and 1 MMtpy of propylene. Various product recovery facilities and energy supply/demand systems are integrated, and both the FCC unit converter system and steam-cracker equipment items incorporate mega-plant design philosophies. In the role as technology/engineering/construction company, we work closely with operating companies and key equipment manufacturing companies in order to implement effective mega-plant cost/capacity designs of joint benefit to all parties—Bigger is Better. HP
  • 10. The authors Colin P. Bowen is the vice president of olefins business development for Shaw's Energy & Chemicals Group (formerly Stone & Webster), where he has worked for approximately 40 years. He is a graduate of Birmingham University and Imperial College, UK. Mr. Bowen is a senior member of AIChE, IChemE and IMechE. He was secretary of AIChE's Fuels & Petrochemicals Division and is Shaw's member on the AIChE Ethylene Producers Committee. He has worked in the global petrochemical industry in a range of contractor positions and has contributed significantly to many ethylene projects during his career. Daniel Jones is the executive director of furnace technology Shaw's Energy & Chemicals Group (formerly Stone & Webster) in Houston, Texas. Mr. Jones has worked in the petroleum industry for 28 years. His varied experience includes engineered equipment systems for subsea drilling, oil and gas production, gas pipelines, refining and petrochemical applications. His responsibilities have included engineering, marketing, sales and executive management. He is a graduate of the University of Pennsylvania with a BS degree in mechanical engineering.