Introduction
3
As an old adage says, corrosion prevention must
start at the blackboard, at the design stage. A good
design at the blackboard is no more costly than a
bad design, a bad design is always more expensive
than a good design in reality. Technical design inclu-
des the aspects of design that directly bear on the
proper technical functioning of the product attributes
that describe how it works and how it is made.
Design configuration has a critical role to play in the
service life of components.
4
The following factors influence the service life of equipment
5
Environmental factors affecting service life of equipment
6
Causes of Failures in the Context of Design
1) Breakdown of protective system. Many protective surf -
ace treatments, such as coating and welding, may not be
very effective because of the presence of surface
irregularities, voids, surface porosity, undercuts, and general
surface roughness.
2) Poor fabrication. Factors, such as improper welding,
excessive cold working and excess machining lead to
failure.
3) Lack of accessibility. In complex systems, machinery,
and components, there might be inaccessible areas due to
lack of design insight where it may not be possible to carry
out the corrosion protection measures.
7
4) Structural heterogeneity in materials. Joining similar
materials with structural differences, such as differences in
thermo-mechanical processing, grain size, number of
impurity elements, grain boundary segregates, may cause
deviation from the performance expected.
5) Operating conditions. Factors, such as temperature,
pressure, and velocity, influence the service life if allowed
to exceed the prescribed limits.
Causes of Failures in the Context of Design
8
Design rules
9
Design rules
10
11
12
A few designs to minimize
crevice corrosion
Larger radius is preferred for higher velocities in
order to avoid erosion–corrosion
13
CONCLUSIONS
14
Reference :-
Corrosion engineering by Mars G. Fontana
Corrosion engineering principles and practice Mc Graw Hill
15

Weitere ähnliche Inhalte

Was ist angesagt?

Corrosion prevention
Corrosion preventionCorrosion prevention
Corrosion preventionHarish Chopra
 
CORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptxCORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptxRajesh Bhurke
 
Corrosion ppt part 1
Corrosion ppt  part 1Corrosion ppt  part 1
Corrosion ppt part 1Swastika Das
 
Rate of Corrosion And Types of Corrosion
Rate of Corrosion And Types of CorrosionRate of Corrosion And Types of Corrosion
Rate of Corrosion And Types of Corrosionrealistic_friend
 
phosphate coating on alloys
phosphate coating on alloysphosphate coating on alloys
phosphate coating on alloysengrktk
 
Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...
Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...
Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...Saad Bin Hasan
 
(Pitting corrosion and crevice corrosion)
(Pitting  corrosion  and crevice  corrosion)(Pitting  corrosion  and crevice  corrosion)
(Pitting corrosion and crevice corrosion)Mustafa Hasan
 
Corrosion and its Control.ppt
Corrosion and its Control.pptCorrosion and its Control.ppt
Corrosion and its Control.pptakramAwad2
 
Corrosion types & prevention
Corrosion types & preventionCorrosion types & prevention
Corrosion types & preventionvishalbailur1
 
Types of corrosions
Types of corrosionsTypes of corrosions
Types of corrosionsAmar Ilindra
 

Was ist angesagt? (20)

Corrosion prevention
Corrosion preventionCorrosion prevention
Corrosion prevention
 
Corrosion
CorrosionCorrosion
Corrosion
 
CORROSIVE DAMAGE IN METALS AND ITS PREVENTION
CORROSIVE DAMAGE IN METALS AND ITS PREVENTIONCORROSIVE DAMAGE IN METALS AND ITS PREVENTION
CORROSIVE DAMAGE IN METALS AND ITS PREVENTION
 
Corrosion
CorrosionCorrosion
Corrosion
 
CORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptxCORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptx
 
Erosion Corrosion
Erosion Corrosion Erosion Corrosion
Erosion Corrosion
 
Corrosion presentation
Corrosion presentationCorrosion presentation
Corrosion presentation
 
Corrosion
Corrosion  Corrosion
Corrosion
 
Corrosion ppt part 1
Corrosion ppt  part 1Corrosion ppt  part 1
Corrosion ppt part 1
 
Rate of Corrosion And Types of Corrosion
Rate of Corrosion And Types of CorrosionRate of Corrosion And Types of Corrosion
Rate of Corrosion And Types of Corrosion
 
phosphate coating on alloys
phosphate coating on alloysphosphate coating on alloys
phosphate coating on alloys
 
cathodic protection
cathodic protectioncathodic protection
cathodic protection
 
Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...
Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...
Potentiostatic polarization curve of active-passive metal (Fe) & Flade potent...
 
Surface coating jawahar
Surface coating jawaharSurface coating jawahar
Surface coating jawahar
 
Corrosion Research
Corrosion ResearchCorrosion Research
Corrosion Research
 
(Pitting corrosion and crevice corrosion)
(Pitting  corrosion  and crevice  corrosion)(Pitting  corrosion  and crevice  corrosion)
(Pitting corrosion and crevice corrosion)
 
Corrosion and its Control.ppt
Corrosion and its Control.pptCorrosion and its Control.ppt
Corrosion and its Control.ppt
 
Corrosion control
Corrosion controlCorrosion control
Corrosion control
 
Corrosion types & prevention
Corrosion types & preventionCorrosion types & prevention
Corrosion types & prevention
 
Types of corrosions
Types of corrosionsTypes of corrosions
Types of corrosions
 

Ähnlich wie Design corrosion

Causes, Detection And Repair Of Cracks in Building
Causes, Detection And Repair Of Cracks in BuildingCauses, Detection And Repair Of Cracks in Building
Causes, Detection And Repair Of Cracks in BuildingIRJET Journal
 
A Review on Factors Affecting the Sheet Metal Blanking Process
A Review on Factors Affecting the Sheet Metal Blanking ProcessA Review on Factors Affecting the Sheet Metal Blanking Process
A Review on Factors Affecting the Sheet Metal Blanking ProcessIJMER
 
A life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityA life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityOkeme Esegine PMP
 
Charaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A reviewCharaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A reviewijtsrd
 
Charaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A reviewCharaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A reviewijtsrd
 
A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...
A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...
A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...IRJET Journal
 
20141125_074915
20141125_07491520141125_074915
20141125_074915Sam Ihtfp
 
Precast Refractory Shape Article TFL
Precast Refractory Shape Article TFLPrecast Refractory Shape Article TFL
Precast Refractory Shape Article TFLPaul Fisher
 
IRJET- Research Case Study for Types, Causes, Preventive Measures and Adv...
IRJET-  	  Research Case Study for Types, Causes, Preventive Measures and Adv...IRJET-  	  Research Case Study for Types, Causes, Preventive Measures and Adv...
IRJET- Research Case Study for Types, Causes, Preventive Measures and Adv...IRJET Journal
 
IRJET - Failure in Commercial Building and Management - Case Study
IRJET - Failure in Commercial Building and Management - Case StudyIRJET - Failure in Commercial Building and Management - Case Study
IRJET - Failure in Commercial Building and Management - Case StudyIRJET Journal
 
IRJET- Study of Pre-Engineered Building
IRJET-  	  Study of Pre-Engineered BuildingIRJET-  	  Study of Pre-Engineered Building
IRJET- Study of Pre-Engineered BuildingIRJET Journal
 
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDesign for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDFMPro
 
Statistical methods to optimize process parameters to minimmize
Statistical methods to optimize process parameters to minimmizeStatistical methods to optimize process parameters to minimmize
Statistical methods to optimize process parameters to minimmizeIAEME Publication
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...IRJET Journal
 
FE Analysis for Investment Casting and Computer Simulation: A Review
FE Analysis for Investment Casting and Computer Simulation: A ReviewFE Analysis for Investment Casting and Computer Simulation: A Review
FE Analysis for Investment Casting and Computer Simulation: A Reviewijsrd.com
 

Ähnlich wie Design corrosion (20)

Causes, Detection And Repair Of Cracks in Building
Causes, Detection And Repair Of Cracks in BuildingCauses, Detection And Repair Of Cracks in Building
Causes, Detection And Repair Of Cracks in Building
 
A Review on Factors Affecting the Sheet Metal Blanking Process
A Review on Factors Affecting the Sheet Metal Blanking ProcessA Review on Factors Affecting the Sheet Metal Blanking Process
A Review on Factors Affecting the Sheet Metal Blanking Process
 
A life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityA life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrity
 
Charaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A reviewCharaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A review
 
Charaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A reviewCharaterization of Coatings on Tool: A review
Charaterization of Coatings on Tool: A review
 
A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...
A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...
A Review on Causes, Prevention, Repair and Maintenance of Cracks in Building ...
 
20141125_074915
20141125_07491520141125_074915
20141125_074915
 
Precast Refractory Shape Article TFL
Precast Refractory Shape Article TFLPrecast Refractory Shape Article TFL
Precast Refractory Shape Article TFL
 
B04520614
B04520614B04520614
B04520614
 
De4301615618
De4301615618De4301615618
De4301615618
 
IRJET- Research Case Study for Types, Causes, Preventive Measures and Adv...
IRJET-  	  Research Case Study for Types, Causes, Preventive Measures and Adv...IRJET-  	  Research Case Study for Types, Causes, Preventive Measures and Adv...
IRJET- Research Case Study for Types, Causes, Preventive Measures and Adv...
 
IRJET - Failure in Commercial Building and Management - Case Study
IRJET - Failure in Commercial Building and Management - Case StudyIRJET - Failure in Commercial Building and Management - Case Study
IRJET - Failure in Commercial Building and Management - Case Study
 
Gk2511681173
Gk2511681173Gk2511681173
Gk2511681173
 
Gk2511681173
Gk2511681173Gk2511681173
Gk2511681173
 
IRJET- Study of Pre-Engineered Building
IRJET-  	  Study of Pre-Engineered BuildingIRJET-  	  Study of Pre-Engineered Building
IRJET- Study of Pre-Engineered Building
 
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDesign for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should Follow
 
Statistical methods to optimize process parameters to minimmize
Statistical methods to optimize process parameters to minimmizeStatistical methods to optimize process parameters to minimmize
Statistical methods to optimize process parameters to minimmize
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...
 
FE Analysis for Investment Casting and Computer Simulation: A Review
FE Analysis for Investment Casting and Computer Simulation: A ReviewFE Analysis for Investment Casting and Computer Simulation: A Review
FE Analysis for Investment Casting and Computer Simulation: A Review
 
FA1.pptx
FA1.pptxFA1.pptx
FA1.pptx
 

Kürzlich hochgeladen

10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptxAdityaGoogle
 
1- Practice occupational health and safety procedures.pptx
1- Practice occupational health and safety procedures.pptx1- Practice occupational health and safety procedures.pptx
1- Practice occupational health and safety procedures.pptxMel Paras
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxPavan Mohan Neelamraju
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackinghadarpinhas1
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studydhruvamdhruvil123
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHbirinder2
 
Machine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdfMachine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdfadeyimikaipaye
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Ayisha586983
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliNimot Muili
 

Kürzlich hochgeladen (20)

10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx10 AsymmetricKey Cryptography students.pptx
10 AsymmetricKey Cryptography students.pptx
 
1- Practice occupational health and safety procedures.pptx
1- Practice occupational health and safety procedures.pptx1- Practice occupational health and safety procedures.pptx
1- Practice occupational health and safety procedures.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptx
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and tracking
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain study
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRH
 
Machine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdfMachine Learning 5G Federated Learning.pdf
Machine Learning 5G Federated Learning.pdf
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
 

Design corrosion

  • 4. As an old adage says, corrosion prevention must start at the blackboard, at the design stage. A good design at the blackboard is no more costly than a bad design, a bad design is always more expensive than a good design in reality. Technical design inclu- des the aspects of design that directly bear on the proper technical functioning of the product attributes that describe how it works and how it is made. Design configuration has a critical role to play in the service life of components. 4
  • 5. The following factors influence the service life of equipment 5
  • 6. Environmental factors affecting service life of equipment 6
  • 7. Causes of Failures in the Context of Design 1) Breakdown of protective system. Many protective surf - ace treatments, such as coating and welding, may not be very effective because of the presence of surface irregularities, voids, surface porosity, undercuts, and general surface roughness. 2) Poor fabrication. Factors, such as improper welding, excessive cold working and excess machining lead to failure. 3) Lack of accessibility. In complex systems, machinery, and components, there might be inaccessible areas due to lack of design insight where it may not be possible to carry out the corrosion protection measures. 7
  • 8. 4) Structural heterogeneity in materials. Joining similar materials with structural differences, such as differences in thermo-mechanical processing, grain size, number of impurity elements, grain boundary segregates, may cause deviation from the performance expected. 5) Operating conditions. Factors, such as temperature, pressure, and velocity, influence the service life if allowed to exceed the prescribed limits. Causes of Failures in the Context of Design 8
  • 11. 11
  • 12. 12 A few designs to minimize crevice corrosion Larger radius is preferred for higher velocities in order to avoid erosion–corrosion
  • 13. 13
  • 14. CONCLUSIONS 14 Reference :- Corrosion engineering by Mars G. Fontana Corrosion engineering principles and practice Mc Graw Hill