SlideShare a Scribd company logo
1 of 2
Download to read offline
03-04-2011                                      Merchant Power plants
 Merchant Power plants
 By B.S. Meel

 Merchant power plants differ from traditional rate-based power plants as to: 1) how they are financed and 2)
 where they sell the electricity they generate.
 A merchant power plant is funded by investors and sells electricity in the competitive wholesale power market.
 Since a merchant plant is not required to serve any specific retail consumers, consumers are not obligated to pay
 for the construction, operations or maintenance of the plant.



 A traditional rate-based power plant, on the other hand, is built and operated by a regulated electric utility
 specifically to serve that utility’s retail customers. In return, the customers are obligated to pay for the plant’s
 construction, operations and maintenance.
 The merchant power plants are not tied up with long-term power purchase agreements (PPA). Independent
 power producers (IPPs) who opt for this route will have to do so at their own risk. Setting up a merchant plant
 would necessarily mean balance sheet financing by he developer, as financial institutions/lenders may as a rule,
 may not be comfortable with projects that don’t have long-term PPAs.
 Though this would appear to be a gamble, experts say the risk could be fully taken care of IPPs develop projects
 that deliver power at competitive rates. Given considerable demand-supply mismatch, sale of competitively –
 priced power should pose a problem. Consider that in between April and May’06, against a demand of 95,583
 MW, only 83,094 mw power was available – a peak shortage of 13.1%. This situation is likely to persist.
 Projections by the Central Electricity Authority show even if Xth Plan capacity addition together target of 32,084
 mw is met, the all India peak shortages would be at an average of 16.3% or 18,913 mw. The ministry of power
 intends to add 10,000 MW capacity addition through MPPs in 11th Plan.
 In its guidelines for the allocation of coal blocks and coal linkages for the power sector, the ministry of power
 said, “merchant power plants fill different niches in the market; some provide steady supplies to a power grid,
 while others fire up only when demand is highest and meet peak loads.” Merchant power plants operating
 competitively help assure that power is produces with efficiency and supplied to locations where it is needed
 most”.
 The government has set the plant size between 500 MW and 1,000mw. This is not merely because the national
 tariff policy mandates all new private sector projects to come through the competitive bidding process. There are
 transmission constraints as well. The transmission system will not be able to support evacuation of power from
 large sized merchant plants.
 To ensure that large volumes of power can be evacuated, dedicated transmission systems would be required.
 This would mean that customers for power produced by these plants have been tied up. Such projects would
 require transmission systems that are planned and executed in tandem with the generating plant. So that when the
 plant begins producing power, the transmission lines are in place to evacuate power from the plant to the
 consumer.
 Merchant plants, by definition, do not have pre-identified customers. This would mean that these plants would
 have to depend on redundancies in the existing transmission system to evacuate power. The ministry is working
 on a via media where the merchant plant of capacity 500 mw to 1000 mw can be accommodated in the national
 grid, which would have redundancies.
 The ministry of power, believes that a limited number of merchant plants will enable the development of an
 electricity market. “A few merchant plants of 500 mw to 1000 mw could be easily handled through the
 transmission system and it is an option for creating a market as it would promote power trading on short-term,
eefi.org/plugins/p2_news/printarticle.ph…                                                                          1/2
03-04-2011                                        Merchant Power plants
 medium –term and spot market basis.
 KEY ISSUES EN ROUTE
 But are we ready for the MPPs? Some of the key issues to be addressed in this regard are:
 There are acute shortages in the country and we ration out use of electricity. The demand-supply gap is large.
 The prices are fully regulated and there is no correlation between the cost of generation and the end-price paid
 by the consumer. There is a significant level of subsidy to all the consumer groups — in the form of lower-than-
 cost tariff or lower-than-cost recovery of infrastructure that go with the generation, transmission and distribution
 of electricity.
 Thefts, pilferage, losses and inefficiencies arising out of transmission and distribution are high. This has resulted in
 higher-than-normal wheeling charges for transmitting electricity. There is no common charge across the country
 for wheeling. States discourage wheeling and banking for captive and third-party use.
 Transmission — intra- and inter-State — is grossly inadequate. While Section 42 of the Electricity Act 2003
 promises open access, it will be far from reality unless significant capacities are created in transmission.
 Even 15 years after the power reforms policy, no private sector entry in transmission is seen or envisaged accept
 exception in the near future. PGCIL has the sole monopoly though efficient.
 Cross-Subsidy Surcharge for open access by unrelated buyer-seller combine as stipulated by the EA 2003 has
 not been clearly defined yet. In some cases such as Gujarat and Tamil Nadu, it is as high as Rs 3.50 per unit
 sold. In the case of Maharashtra, the MERC has declared this as nil.
 Some States, such as MP, have pegged this at lower than Re 1/-. There has been no stable policy from any of
 the States, though the Act stipulates that the surcharge is to be withdrawn in toto in five years.
 Given these conditions, how would an MPP sell its output? There is no private market. Conditions are not
 conducive for development of a private market in the near future. Even if it exists, the cost economics will be
 dictated by high wheeling charges and the cross-subsidy surcharge as the States would not give up the creamy
 layer and would continue to levy high surcharge.
 Selling to SEBs and discoms (distribution companies) during peak hours and lean season (summer) is a strong
 possibility. This is already being handled by NTPC and other agencies. There may be a few summers like last
 year when Maharashtra bought power at Rs 10 per unit. But these are far and few in between and MPPs cannot
 be set up based on summer demand alone. Trading licenses were encouraged but effectively there is no trading
 market, except between State utilities. No private trade has been signed so far, not even for a single unit of
 electricity.
 HITCH IN COAL
 The Ministry wants to encourage coal-based MPPs and allocate coal blocks to them. These plants cannot be
 switched on and off at will. They will require an eight- to ten-hour cycle time to stop and start, and even then the
 fuel loss is very high. MPPs typically have to supply whenever there is demand.
 Peaking stations are to operate only in the peak hours. This being so, coal is not a recommended fuel at all for
 MPPs. Natural gas is the only option. Given the pricing and availability, natural gas-based stations are not
 feasible unless supplies are assured.
 With so much uncertainty, who would finance the MPPs? While NTPC, BHEL, etc., alone can put up their
 balance sheet for these projects; no other private operator is capable of exposing their books for such ventures.
 Even in the case of NTPC or BHEL, they may set up a few peaking stations near the gas pipelines and but
 would not go for capacities such as 1000MW.
 Thus, given the complexity of the Indian market, the scheme for MPPs may remain a dream unless the market
 reforms totally and free access is made available to the consumer for creation of a competitive market.



eefi.org/plugins/p2_news/printarticle.ph…                                                                              2/2

More Related Content

What's hot

Deregulation of electricity-background
Deregulation of electricity-backgroundDeregulation of electricity-background
Deregulation of electricity-backgroundPulakesh k kalita
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industryjerry patel
 
Derivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity MarketDerivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity MarketAmitava Nag
 
Competitive Power Markets
Competitive Power MarketsCompetitive Power Markets
Competitive Power Marketsrishi baid
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORANKUR MAHESHWARI
 
Electricity Reforms - An_Overview
Electricity Reforms - An_OverviewElectricity Reforms - An_Overview
Electricity Reforms - An_OverviewNzar Mohammad
 
Bidding strategies in deregulated power market
Bidding strategies in deregulated power marketBidding strategies in deregulated power market
Bidding strategies in deregulated power marketGautham Reddy
 
Electric utility primer john chowdhury 2012 final
Electric utility primer   john chowdhury 2012 finalElectric utility primer   john chowdhury 2012 final
Electric utility primer john chowdhury 2012 finalJohn Chowdhury
 
Deregulation of power sytem
Deregulation of power sytemDeregulation of power sytem
Deregulation of power sytemNallaNithya
 
Group2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countriesGroup2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countriesPulakesh k kalita
 
Day2: Mr. Pr ray
Day2: Mr. Pr rayDay2: Mr. Pr ray
Day2: Mr. Pr rayIPPAI
 
bidding strategies in indian restructured power market
bidding strategies in indian restructured power marketbidding strategies in indian restructured power market
bidding strategies in indian restructured power marketKomal Nigam
 
Day-3, Ms. Shruti Bhatia
Day-3, Ms. Shruti BhatiaDay-3, Ms. Shruti Bhatia
Day-3, Ms. Shruti BhatiaIPPAI
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...FEF Philippines
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNAIPPAI
 
Power procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle GenerationPower procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle GenerationAmitava Nag
 

What's hot (20)

Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Deregulation of electricity-background
Deregulation of electricity-backgroundDeregulation of electricity-background
Deregulation of electricity-background
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industry
 
Derivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity MarketDerivatives Contracts in Indian Electricity Market
Derivatives Contracts in Indian Electricity Market
 
Competitive Power Markets
Competitive Power MarketsCompetitive Power Markets
Competitive Power Markets
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTOR
 
Electricity Reforms - An_Overview
Electricity Reforms - An_OverviewElectricity Reforms - An_Overview
Electricity Reforms - An_Overview
 
Bidding strategies in deregulated power market
Bidding strategies in deregulated power marketBidding strategies in deregulated power market
Bidding strategies in deregulated power market
 
Electric utility primer john chowdhury 2012 final
Electric utility primer   john chowdhury 2012 finalElectric utility primer   john chowdhury 2012 final
Electric utility primer john chowdhury 2012 final
 
Deregulation of power sytem
Deregulation of power sytemDeregulation of power sytem
Deregulation of power sytem
 
Group2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countriesGroup2 current scenario of deregulation in developed and developing countries
Group2 current scenario of deregulation in developed and developing countries
 
Day2: Mr. Pr ray
Day2: Mr. Pr rayDay2: Mr. Pr ray
Day2: Mr. Pr ray
 
bidding strategies in indian restructured power market
bidding strategies in indian restructured power marketbidding strategies in indian restructured power market
bidding strategies in indian restructured power market
 
Electricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_newElectricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_new
 
Day-3, Ms. Shruti Bhatia
Day-3, Ms. Shruti BhatiaDay-3, Ms. Shruti Bhatia
Day-3, Ms. Shruti Bhatia
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
 
Power sector in nigeria
Power sector in nigeriaPower sector in nigeria
Power sector in nigeria
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
CAPSTONE FINAL VERSION
CAPSTONE FINAL VERSIONCAPSTONE FINAL VERSION
CAPSTONE FINAL VERSION
 
Power procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle GenerationPower procurement through TBCB for Bundle Generation
Power procurement through TBCB for Bundle Generation
 

Viewers also liked

E Merchant Presentation
E Merchant PresentationE Merchant Presentation
E Merchant PresentationHouang PingKi
 
Principles of Price Regulation
Principles of Price RegulationPrinciples of Price Regulation
Principles of Price RegulationLeonardo ENERGY
 
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...Société Française d'Energie Nucléaire
 
Electricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - PricingElectricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - PricingLeonardo ENERGY
 
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...European University Institute
 
Regulating Electricity Market
Regulating Electricity MarketRegulating Electricity Market
Regulating Electricity MarketJustinas Pagirys
 
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...Louie Mark Quizon
 
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial OrganizationDr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial OrganizationEconomist
 
Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...ARERA
 

Viewers also liked (12)

Electricity Economics
Electricity EconomicsElectricity Economics
Electricity Economics
 
E Merchant Presentation
E Merchant PresentationE Merchant Presentation
E Merchant Presentation
 
Principles of Price Regulation
Principles of Price RegulationPrinciples of Price Regulation
Principles of Price Regulation
 
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
Jean-Yves OLLIER, CEO of the French Regulatory Commission of Energy (Atoms fo...
 
Electricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - PricingElectricity Markets Regulation - Lesson 8 - Pricing
Electricity Markets Regulation - Lesson 8 - Pricing
 
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
Regulation of electricity DSOs and TSOs in a context of massive renewable ene...
 
Regulating Electricity Market
Regulating Electricity MarketRegulating Electricity Market
Regulating Electricity Market
 
A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...
A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...
A Case Study of Economic Load Dispatch for a Thermal Power Plant using Partic...
 
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
 
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial OrganizationDr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
Dr. Alejandro Díaz-Bautista, Professor of Economics and Industrial Organization
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...Tariff and quality regulation in the electricity sector for the fifth regulat...
Tariff and quality regulation in the electricity sector for the fifth regulat...
 

Similar to Merchant power plants

Abhishek_Gawde_RMBM_Solar_Maharashtra
Abhishek_Gawde_RMBM_Solar_MaharashtraAbhishek_Gawde_RMBM_Solar_Maharashtra
Abhishek_Gawde_RMBM_Solar_MaharashtraAbhishek Gawde
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...Harsh Shah
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demandsJay Ranvir
 
After All Its Tranmission Stupid, 25 Mar 2023.pptx
After All Its Tranmission Stupid, 25 Mar 2023.pptxAfter All Its Tranmission Stupid, 25 Mar 2023.pptx
After All Its Tranmission Stupid, 25 Mar 2023.pptxKashif Mateen Ansari
 
Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...
Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...
Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...Divyesh Kumar
 
11. Open Access- Intra State, Inter State.pdf
11.  Open Access- Intra State, Inter State.pdf11.  Open Access- Intra State, Inter State.pdf
11. Open Access- Intra State, Inter State.pdfKriteshKumar12
 
Winter package is coming
Winter package is comingWinter package is coming
Winter package is comingArne Koeppel
 
Re connect newsletter xxvi
Re connect newsletter xxviRe connect newsletter xxvi
Re connect newsletter xxviVibhav Nuwal
 
Market Based Criteria for Congestion Management and Transmission Pricing
Market Based Criteria for Congestion Management and Transmission PricingMarket Based Criteria for Congestion Management and Transmission Pricing
Market Based Criteria for Congestion Management and Transmission PricingIJERA Editor
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
EURELECTRIC Views on Demand-Side Participation
EURELECTRIC Views on Demand-Side ParticipationEURELECTRIC Views on Demand-Side Participation
EURELECTRIC Views on Demand-Side Participationdavidtrebolle
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementpakistanvisionaryforum
 
V&A Solar Power Business Opportunity
V&A Solar Power Business OpportunityV&A Solar Power Business Opportunity
V&A Solar Power Business OpportunityKhawaja M Saleem
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 

Similar to Merchant power plants (20)

Abhishek_Gawde_RMBM_Solar_Maharashtra
Abhishek_Gawde_RMBM_Solar_MaharashtraAbhishek_Gawde_RMBM_Solar_Maharashtra
Abhishek_Gawde_RMBM_Solar_Maharashtra
 
A present energy scenario
A present energy scenarioA present energy scenario
A present energy scenario
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demands
 
After All Its Tranmission Stupid, 25 Mar 2023.pptx
After All Its Tranmission Stupid, 25 Mar 2023.pptxAfter All Its Tranmission Stupid, 25 Mar 2023.pptx
After All Its Tranmission Stupid, 25 Mar 2023.pptx
 
Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...
Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...
Systems Analysis for Tata Power Corporation’s (TPC) distribution business in ...
 
11. Open Access- Intra State, Inter State.pdf
11.  Open Access- Intra State, Inter State.pdf11.  Open Access- Intra State, Inter State.pdf
11. Open Access- Intra State, Inter State.pdf
 
Prakhar report
Prakhar reportPrakhar report
Prakhar report
 
COMPETITIVE MARKET
COMPETITIVE MARKET COMPETITIVE MARKET
COMPETITIVE MARKET
 
Winter package is coming
Winter package is comingWinter package is coming
Winter package is coming
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
power systems.pdf
power systems.pdfpower systems.pdf
power systems.pdf
 
Re connect newsletter xxvi
Re connect newsletter xxviRe connect newsletter xxvi
Re connect newsletter xxvi
 
Market Based Criteria for Congestion Management and Transmission Pricing
Market Based Criteria for Congestion Management and Transmission PricingMarket Based Criteria for Congestion Management and Transmission Pricing
Market Based Criteria for Congestion Management and Transmission Pricing
 
EMconcept.pptx
EMconcept.pptxEMconcept.pptx
EMconcept.pptx
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
EURELECTRIC Views on Demand-Side Participation
EURELECTRIC Views on Demand-Side ParticipationEURELECTRIC Views on Demand-Side Participation
EURELECTRIC Views on Demand-Side Participation
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its management
 
V&A Solar Power Business Opportunity
V&A Solar Power Business OpportunityV&A Solar Power Business Opportunity
V&A Solar Power Business Opportunity
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 

Recently uploaded

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 

Recently uploaded (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 

Merchant power plants

  • 1. 03-04-2011 Merchant Power plants Merchant Power plants By B.S. Meel Merchant power plants differ from traditional rate-based power plants as to: 1) how they are financed and 2) where they sell the electricity they generate. A merchant power plant is funded by investors and sells electricity in the competitive wholesale power market. Since a merchant plant is not required to serve any specific retail consumers, consumers are not obligated to pay for the construction, operations or maintenance of the plant. A traditional rate-based power plant, on the other hand, is built and operated by a regulated electric utility specifically to serve that utility’s retail customers. In return, the customers are obligated to pay for the plant’s construction, operations and maintenance. The merchant power plants are not tied up with long-term power purchase agreements (PPA). Independent power producers (IPPs) who opt for this route will have to do so at their own risk. Setting up a merchant plant would necessarily mean balance sheet financing by he developer, as financial institutions/lenders may as a rule, may not be comfortable with projects that don’t have long-term PPAs. Though this would appear to be a gamble, experts say the risk could be fully taken care of IPPs develop projects that deliver power at competitive rates. Given considerable demand-supply mismatch, sale of competitively – priced power should pose a problem. Consider that in between April and May’06, against a demand of 95,583 MW, only 83,094 mw power was available – a peak shortage of 13.1%. This situation is likely to persist. Projections by the Central Electricity Authority show even if Xth Plan capacity addition together target of 32,084 mw is met, the all India peak shortages would be at an average of 16.3% or 18,913 mw. The ministry of power intends to add 10,000 MW capacity addition through MPPs in 11th Plan. In its guidelines for the allocation of coal blocks and coal linkages for the power sector, the ministry of power said, “merchant power plants fill different niches in the market; some provide steady supplies to a power grid, while others fire up only when demand is highest and meet peak loads.” Merchant power plants operating competitively help assure that power is produces with efficiency and supplied to locations where it is needed most”. The government has set the plant size between 500 MW and 1,000mw. This is not merely because the national tariff policy mandates all new private sector projects to come through the competitive bidding process. There are transmission constraints as well. The transmission system will not be able to support evacuation of power from large sized merchant plants. To ensure that large volumes of power can be evacuated, dedicated transmission systems would be required. This would mean that customers for power produced by these plants have been tied up. Such projects would require transmission systems that are planned and executed in tandem with the generating plant. So that when the plant begins producing power, the transmission lines are in place to evacuate power from the plant to the consumer. Merchant plants, by definition, do not have pre-identified customers. This would mean that these plants would have to depend on redundancies in the existing transmission system to evacuate power. The ministry is working on a via media where the merchant plant of capacity 500 mw to 1000 mw can be accommodated in the national grid, which would have redundancies. The ministry of power, believes that a limited number of merchant plants will enable the development of an electricity market. “A few merchant plants of 500 mw to 1000 mw could be easily handled through the transmission system and it is an option for creating a market as it would promote power trading on short-term, eefi.org/plugins/p2_news/printarticle.ph… 1/2
  • 2. 03-04-2011 Merchant Power plants medium –term and spot market basis. KEY ISSUES EN ROUTE But are we ready for the MPPs? Some of the key issues to be addressed in this regard are: There are acute shortages in the country and we ration out use of electricity. The demand-supply gap is large. The prices are fully regulated and there is no correlation between the cost of generation and the end-price paid by the consumer. There is a significant level of subsidy to all the consumer groups — in the form of lower-than- cost tariff or lower-than-cost recovery of infrastructure that go with the generation, transmission and distribution of electricity. Thefts, pilferage, losses and inefficiencies arising out of transmission and distribution are high. This has resulted in higher-than-normal wheeling charges for transmitting electricity. There is no common charge across the country for wheeling. States discourage wheeling and banking for captive and third-party use. Transmission — intra- and inter-State — is grossly inadequate. While Section 42 of the Electricity Act 2003 promises open access, it will be far from reality unless significant capacities are created in transmission. Even 15 years after the power reforms policy, no private sector entry in transmission is seen or envisaged accept exception in the near future. PGCIL has the sole monopoly though efficient. Cross-Subsidy Surcharge for open access by unrelated buyer-seller combine as stipulated by the EA 2003 has not been clearly defined yet. In some cases such as Gujarat and Tamil Nadu, it is as high as Rs 3.50 per unit sold. In the case of Maharashtra, the MERC has declared this as nil. Some States, such as MP, have pegged this at lower than Re 1/-. There has been no stable policy from any of the States, though the Act stipulates that the surcharge is to be withdrawn in toto in five years. Given these conditions, how would an MPP sell its output? There is no private market. Conditions are not conducive for development of a private market in the near future. Even if it exists, the cost economics will be dictated by high wheeling charges and the cross-subsidy surcharge as the States would not give up the creamy layer and would continue to levy high surcharge. Selling to SEBs and discoms (distribution companies) during peak hours and lean season (summer) is a strong possibility. This is already being handled by NTPC and other agencies. There may be a few summers like last year when Maharashtra bought power at Rs 10 per unit. But these are far and few in between and MPPs cannot be set up based on summer demand alone. Trading licenses were encouraged but effectively there is no trading market, except between State utilities. No private trade has been signed so far, not even for a single unit of electricity. HITCH IN COAL The Ministry wants to encourage coal-based MPPs and allocate coal blocks to them. These plants cannot be switched on and off at will. They will require an eight- to ten-hour cycle time to stop and start, and even then the fuel loss is very high. MPPs typically have to supply whenever there is demand. Peaking stations are to operate only in the peak hours. This being so, coal is not a recommended fuel at all for MPPs. Natural gas is the only option. Given the pricing and availability, natural gas-based stations are not feasible unless supplies are assured. With so much uncertainty, who would finance the MPPs? While NTPC, BHEL, etc., alone can put up their balance sheet for these projects; no other private operator is capable of exposing their books for such ventures. Even in the case of NTPC or BHEL, they may set up a few peaking stations near the gas pipelines and but would not go for capacities such as 1000MW. Thus, given the complexity of the Indian market, the scheme for MPPs may remain a dream unless the market reforms totally and free access is made available to the consumer for creation of a competitive market. eefi.org/plugins/p2_news/printarticle.ph… 2/2