10 - Project Communication Management
Project Management Training
Created by ejlp12@gmail.com, June 2010
Project Communication Management
Knowledge Area
Process
Initiating Planning Executing
Monitoring &
Contol
Closing
Communication
Indentify
Stakeholder
Plan
Communication
Distribute Information
Manage Stakeholders -
Expectations
Report
Performance
Enter phase/
Start project
Exit phase/
End project
Initiating
Processes
Closing
Processes
Planning
Processes
Executing
Processes
Monitoring &
Controlling Processes
Project Communication Management
• The process required to ensure timely and appropriate generation,
collection, distribution, storage, retrieval, and ultimate disposition of
project information.
• Project managers spend the majority of their time to communicate.
• Some potential dimensions of communication activity:
– Internal – external
– Formal – informal
– Vertical – horizontal
– Official – unofficial
– Written – oral
– Verbal –non-verbal
10.1 Identify Stakeholder
• The process of identifying all people or organizations impacted by the project,
and documenting relevant information regarding their interest, involvement, and
impact on project success.
Inputs
1. Project charter
2. Procurement
documents
3. Enterprise
environmental factors
4. Organizational process
assets
Tools &
Techniques
1. Stakeholder analysis
2. Expert judgment
Outputs
1. Stakeholder register
2. Stakeholder
management strategy
Stakeholder Analysis
• A technique of systematically gathering and analyzing quantitative & qualitative
information to determine whose interests should be taken into account throughout
the project.
• Step 1: Identify all potential project
stakeholders and relevant
information
• Step 2: Identify the potential impact or
support each stakeholder could
generate and classify them so as to
define an approach strategy.
• Step 3: Assess how key stakeholder
are likely to react or respond in
various situation Sample grid showing classification model
Keep
Satisfied
Manage
Closely
Keep
Informed
Monitor
(Minimum Effort)
Interest
Power
Low High
High
• A
• B
• C
• D
• E
• F
• G
• H
Output of Identify Stakeholder
• Stakeholder Register
Stakeholder Stakeholder interest(s) in
the project
Assessment of impact Potential strategies for gaining
support or reducing obstacles
Name
Contact
Information
Role in
Project
Department/
Supervisor
Company Impact Influence Main expectations
Attitude about
the project
Major requirement
• Stakeholder Management Strategy
- Defines an approach to increase the support and minimize negative impacts of
stakeholder.
- The information could be too sensitive to be shared.
- A common way of representing is by using a stakeholder analysis matrix.
10.2 Plan Communication
• The process of determining the project stakeholder information needs and
defining a communication approach.
Inputs
1. Stakeholder register
2. Stakeholder
management strategy
3. Enterprise
environmental factors
4. Organizational process
assets
Tools &
Techniques
1. Communication
requirement analysis
2. Communication
technology
3. Communication models
4. Communication
methods
Outputs
1. Communication
management plan
2. Project document
updates
90% of project manager’stime is spent for communication
Communication Requirement Analysis
• Includes communicating in all directions
• Determine and limit who will communicate
with whom and who will receive what
information.
Customer, sponsor, Functional
managers, and Team Members
Other
Project
Managers
Other
Projects
Other
Stakeholders
The
Project
2
)1( NN
• Consider the number of potential
communication channels or paths
• Formula:
Communication Model
• Basic Communication Model
– The components in the model need to be taken into account when discussing project
communications.
– The sender is responsible for making information clear and complete so that the
receiver can receive it correctly, and for confirming that it is properly understood.
SenderSender
Encode
Decode
Encode
Decode
Noise
Noise
Mediu
m
• To make effective communication, sender/receiver need to be aware of these factors:
- Nonverbal: 55% of all communication is nonverbal
- Paralingual: pitch and tone of voice
- Effective listening
Communication Methods
• Interactive Communication
– Most efficient way to ensure a common understanding
– E.g. meetings, phone calls, video conferencing
• Push Communication
– Does not certify that it reached or understood
– E.g. letters, email, press release, faxes, voice mail
• Pull communication
– Used for very large information volumes, very large audiences
– E.g. intranet site, e-learning
Project manager cannot control all communications but should try to control to
prevent miscommunication, unclear directions, and scope creeps.
Communication Management Plan
Sample
Sample taken from PRINCETON PROJECT METHODOLOGY - PROJECT COMMUNICATION PLAN (rev. 10/03/03)
10.3 Distribute Information
• The process of making relevant information available to project stakeholders
as planned.
Inputs
1. Project management
plan
2. Performance reports
3. Organizational process
assets
Tools &
Techniques
1. Communication
methods
2. Information distribution
tools
Outputs
1. Organizational process
assets updates
Make surethe information arereceived, effective and efficient.
10.4 Manage Stakeholder Expectations
• The process of communicating and working with stakeholders to meet their
needs and addressing issues as they occur.
Inputs
1. Stakeholder register
2. Stakeholder
management strategy
3. Project management
plan
4. Issue log
5. Organizational process
assets
Tools &
Techniques
1. Communication
methods
2. Interpersonal skills
3. Management skills
Outputs
1. Organizational process
assets updates
2. Change requests
3. Project management
plan updates
4. Project document
updates
Managing Stakeholder Expectations
• Actively managing the expectation of stakeholders.
– Increase the likelihood of project acceptance by negotiating.
– Influencing their desire to achieve & maintain project goals.
• Addressing concerns that have not become issues yet
(anticipation).
• Clarifying and resolving issues that have been identified.
10.5 Report Performance
• The process of making relevant information available to project stakeholders
as planned.
Inputs
1. Project management
plan
2. Quality metrics
3. Quality checklist
4. Work performance
measurements
5. Approved change
requests
6. Deliverables
7. Organizational process
assets
Tools &
Techniques
1. Cause and effect
diagrams
2. Control charts
3. Flowcharting
4. Histogram
5. Pareto chart
6. Run chart
7. Scatter diagram
8. Statistical sampling
9. Inspection
10.Approved change
request s reviews
Outputs
1. Quality control
measurements
2. Validated changes
3. Validated deliverables
4. Organizational process
updates
5. Change requests
6. Project management
plan updates
7. Project document
updates
Report must betruthfuland not hide what is really going on.
BACKUP SLIDES
Exercise
Situation Communication Type
Updating the project plan
Presentations to management
Trying to solve a complex problem
Making notes regarding a telephone conversation
Making changes to a contact
Informing a team member of poor performance (first notice)
Informing a team member of poor performance (second notice)
Scheduling a meeting
Clarifying a work package
Requesting additional resources
Trying to discover the root cause of a problem
Sending an email to ask for clarification of an issue
Holding a milestone party
Conducting a bidder conference
Formal Written
Formal Verbal
Formal Written
Informal Written
Formal Written
Informal Verbal
Formal Written
Informal Written
Formal Written
Informal Verbal
Informal Verbal
Informal Written
Informal Verbal
Formal Verbal
Table taken from PMP Exam Prep 6th Edition, Rita Mulcahy.
PM Skills
• Interpersonal skills
• Management skills
• Presentation skills
• Negotiation
• Writing skill
• Public speaking
• Etc.
• Leadership
• Team building
• Motivation
• Communication
• Influencing
• Decision making
• Political & cultural awareness
• Negotiation
• Etc.
Effective Meeting
• Plan or prepare the meeting
– Set a time/schedule and determine the participants.
– Have a clear purpose for each meeting & communicate it in the invitation.
– Create the agenda and distribute it in advance.
• Stick to the plan (discipline)
– Begin on time, end on time.
– Introduce the moderator and stipulate who will keep the minutes.
– End every agenda with a summary and consensus of the participants.
• Good follow-up
– Send the minutes showing the result along with the to do list.
– Get feedback from the participants.
– Monitor the status of all action items.
Thank You
Next topic:
11-Project Risk Management

More Related Content

What's hot

Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk management
s. Akhlaque
 

What's hot (20)

7- PMP Training - Quality Management
7- PMP Training - Quality Management7- PMP Training - Quality Management
7- PMP Training - Quality Management
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk management
 
12-PMP Training - Stakeholder Management
12-PMP Training - Stakeholder Management 12-PMP Training - Stakeholder Management
12-PMP Training - Stakeholder Management
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
Project Planning And Controlling
Project Planning And ControllingProject Planning And Controlling
Project Planning And Controlling
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 
Pmp risk chapter 11
Pmp risk chapter 11Pmp risk chapter 11
Pmp risk chapter 11
 
PMP PMBOK5 project management processes
PMP PMBOK5 project management processesPMP PMBOK5 project management processes
PMP PMBOK5 project management processes
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
Project Planning and Approval Process
Project Planning and Approval ProcessProject Planning and Approval Process
Project Planning and Approval Process
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
Project risk management
Project risk managementProject risk management
Project risk management
 
06 project time management m
06 project time management m06 project time management m
06 project time management m
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 

Viewers also liked

Evaluacion final daysi m. feliz
Evaluacion final daysi m. felizEvaluacion final daysi m. feliz
Evaluacion final daysi m. feliz
hshshshshk
 
DAMAC REAL ESTATE DEVELOPMENT REPORT 2015
DAMAC REAL ESTATE DEVELOPMENT REPORT 2015DAMAC REAL ESTATE DEVELOPMENT REPORT 2015
DAMAC REAL ESTATE DEVELOPMENT REPORT 2015
Kushagra Mangal
 

Viewers also liked (17)

Presentacion maxwell
Presentacion maxwellPresentacion maxwell
Presentacion maxwell
 
Lluvia de ideas grupo4
Lluvia de ideas grupo4Lluvia de ideas grupo4
Lluvia de ideas grupo4
 
Portofolio 1
Portofolio 1Portofolio 1
Portofolio 1
 
Plano de negócio em pirâmide
Plano de negócio em pirâmidePlano de negócio em pirâmide
Plano de negócio em pirâmide
 
Resume 1
Resume 1Resume 1
Resume 1
 
Evaluacion final daysi m. feliz
Evaluacion final daysi m. felizEvaluacion final daysi m. feliz
Evaluacion final daysi m. feliz
 
Linea angela
Linea angelaLinea angela
Linea angela
 
Shell houston open live
Shell houston open liveShell houston open live
Shell houston open live
 
DAMAC REAL ESTATE DEVELOPMENT REPORT 2015
DAMAC REAL ESTATE DEVELOPMENT REPORT 2015DAMAC REAL ESTATE DEVELOPMENT REPORT 2015
DAMAC REAL ESTATE DEVELOPMENT REPORT 2015
 
Apuntes fiscal i (1)
Apuntes fiscal i (1)Apuntes fiscal i (1)
Apuntes fiscal i (1)
 
Organización y planificacion de la seguridad industrial
Organización y planificacion de la seguridad industrialOrganización y planificacion de la seguridad industrial
Organización y planificacion de la seguridad industrial
 
PMP Exam Preparation Course: 05 Project Time Management
PMP Exam Preparation Course: 05 Project Time ManagementPMP Exam Preparation Course: 05 Project Time Management
PMP Exam Preparation Course: 05 Project Time Management
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
09 projecthumanresourcemanagement
09 projecthumanresourcemanagement09 projecthumanresourcemanagement
09 projecthumanresourcemanagement
 
PMP Exam Preparation Course: 01 Project Management Framework
PMP Exam Preparation Course: 01 Project Management FrameworkPMP Exam Preparation Course: 01 Project Management Framework
PMP Exam Preparation Course: 01 Project Management Framework
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
12 projectprocurementmanagement
12 projectprocurementmanagement12 projectprocurementmanagement
12 projectprocurementmanagement
 

Similar to 10 projectcommunicationmanagement

PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
ejlp12
 

Similar to 10 projectcommunicationmanagement (20)

Session 16 4th edition
Session 16 4th editionSession 16 4th edition
Session 16 4th edition
 
Project communications management
Project communications managementProject communications management
Project communications management
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
communications.pdf.pdf
communications.pdf.pdfcommunications.pdf.pdf
communications.pdf.pdf
 
Communication management
Communication management Communication management
Communication management
 
Project managment 9
Project managment  9Project managment  9
Project managment 9
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentation
 
Project Communications Management
Project Communications ManagementProject Communications Management
Project Communications Management
 
10. Project Communications Management.pptx
10. Project Communications Management.pptx10. Project Communications Management.pptx
10. Project Communications Management.pptx
 
10.0 Project Communications Management Overview
10.0 Project Communications Management Overview10.0 Project Communications Management Overview
10.0 Project Communications Management Overview
 
Project managent communication
Project managent communicationProject managent communication
Project managent communication
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
4. Communication Management
4. Communication Management4. Communication Management
4. Communication Management
 
Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 
Communication management
Communication managementCommunication management
Communication management
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
10 communication
10 communication10 communication
10 communication
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdf
 

More from Dhamo daran (20)

Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
Chap021
Chap021Chap021
Chap021
 
Chap020
Chap020Chap020
Chap020
 
Chap019
Chap019Chap019
Chap019
 
Chap018
Chap018Chap018
Chap018
 
Chap017
Chap017Chap017
Chap017
 
Chap016
Chap016Chap016
Chap016
 
Chap015
Chap015Chap015
Chap015
 
Chap014
Chap014Chap014
Chap014
 
Chap013
Chap013Chap013
Chap013
 
Chap012
Chap012Chap012
Chap012
 
Chap011
Chap011Chap011
Chap011
 
Chap010
Chap010Chap010
Chap010
 
Chap009
Chap009Chap009
Chap009
 
Chap008
Chap008Chap008
Chap008
 
Chap007
Chap007Chap007
Chap007
 
Chap006
Chap006Chap006
Chap006
 
Chap005
Chap005Chap005
Chap005
 

Recently uploaded

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

10 projectcommunicationmanagement

  • 1. 10 - Project Communication Management Project Management Training Created by ejlp12@gmail.com, June 2010
  • 2. Project Communication Management Knowledge Area Process Initiating Planning Executing Monitoring & Contol Closing Communication Indentify Stakeholder Plan Communication Distribute Information Manage Stakeholders - Expectations Report Performance Enter phase/ Start project Exit phase/ End project Initiating Processes Closing Processes Planning Processes Executing Processes Monitoring & Controlling Processes
  • 3. Project Communication Management • The process required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information. • Project managers spend the majority of their time to communicate. • Some potential dimensions of communication activity: – Internal – external – Formal – informal – Vertical – horizontal – Official – unofficial – Written – oral – Verbal –non-verbal
  • 4. 10.1 Identify Stakeholder • The process of identifying all people or organizations impacted by the project, and documenting relevant information regarding their interest, involvement, and impact on project success. Inputs 1. Project charter 2. Procurement documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Stakeholder analysis 2. Expert judgment Outputs 1. Stakeholder register 2. Stakeholder management strategy
  • 5. Stakeholder Analysis • A technique of systematically gathering and analyzing quantitative & qualitative information to determine whose interests should be taken into account throughout the project. • Step 1: Identify all potential project stakeholders and relevant information • Step 2: Identify the potential impact or support each stakeholder could generate and classify them so as to define an approach strategy. • Step 3: Assess how key stakeholder are likely to react or respond in various situation Sample grid showing classification model Keep Satisfied Manage Closely Keep Informed Monitor (Minimum Effort) Interest Power Low High High • A • B • C • D • E • F • G • H
  • 6. Output of Identify Stakeholder • Stakeholder Register Stakeholder Stakeholder interest(s) in the project Assessment of impact Potential strategies for gaining support or reducing obstacles Name Contact Information Role in Project Department/ Supervisor Company Impact Influence Main expectations Attitude about the project Major requirement • Stakeholder Management Strategy - Defines an approach to increase the support and minimize negative impacts of stakeholder. - The information could be too sensitive to be shared. - A common way of representing is by using a stakeholder analysis matrix.
  • 7. 10.2 Plan Communication • The process of determining the project stakeholder information needs and defining a communication approach. Inputs 1. Stakeholder register 2. Stakeholder management strategy 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Communication requirement analysis 2. Communication technology 3. Communication models 4. Communication methods Outputs 1. Communication management plan 2. Project document updates 90% of project manager’stime is spent for communication
  • 8. Communication Requirement Analysis • Includes communicating in all directions • Determine and limit who will communicate with whom and who will receive what information. Customer, sponsor, Functional managers, and Team Members Other Project Managers Other Projects Other Stakeholders The Project 2 )1( NN • Consider the number of potential communication channels or paths • Formula:
  • 9. Communication Model • Basic Communication Model – The components in the model need to be taken into account when discussing project communications. – The sender is responsible for making information clear and complete so that the receiver can receive it correctly, and for confirming that it is properly understood. SenderSender Encode Decode Encode Decode Noise Noise Mediu m • To make effective communication, sender/receiver need to be aware of these factors: - Nonverbal: 55% of all communication is nonverbal - Paralingual: pitch and tone of voice - Effective listening
  • 10. Communication Methods • Interactive Communication – Most efficient way to ensure a common understanding – E.g. meetings, phone calls, video conferencing • Push Communication – Does not certify that it reached or understood – E.g. letters, email, press release, faxes, voice mail • Pull communication – Used for very large information volumes, very large audiences – E.g. intranet site, e-learning Project manager cannot control all communications but should try to control to prevent miscommunication, unclear directions, and scope creeps.
  • 11. Communication Management Plan Sample Sample taken from PRINCETON PROJECT METHODOLOGY - PROJECT COMMUNICATION PLAN (rev. 10/03/03)
  • 12. 10.3 Distribute Information • The process of making relevant information available to project stakeholders as planned. Inputs 1. Project management plan 2. Performance reports 3. Organizational process assets Tools & Techniques 1. Communication methods 2. Information distribution tools Outputs 1. Organizational process assets updates Make surethe information arereceived, effective and efficient.
  • 13. 10.4 Manage Stakeholder Expectations • The process of communicating and working with stakeholders to meet their needs and addressing issues as they occur. Inputs 1. Stakeholder register 2. Stakeholder management strategy 3. Project management plan 4. Issue log 5. Organizational process assets Tools & Techniques 1. Communication methods 2. Interpersonal skills 3. Management skills Outputs 1. Organizational process assets updates 2. Change requests 3. Project management plan updates 4. Project document updates
  • 14. Managing Stakeholder Expectations • Actively managing the expectation of stakeholders. – Increase the likelihood of project acceptance by negotiating. – Influencing their desire to achieve & maintain project goals. • Addressing concerns that have not become issues yet (anticipation). • Clarifying and resolving issues that have been identified.
  • 15. 10.5 Report Performance • The process of making relevant information available to project stakeholders as planned. Inputs 1. Project management plan 2. Quality metrics 3. Quality checklist 4. Work performance measurements 5. Approved change requests 6. Deliverables 7. Organizational process assets Tools & Techniques 1. Cause and effect diagrams 2. Control charts 3. Flowcharting 4. Histogram 5. Pareto chart 6. Run chart 7. Scatter diagram 8. Statistical sampling 9. Inspection 10.Approved change request s reviews Outputs 1. Quality control measurements 2. Validated changes 3. Validated deliverables 4. Organizational process updates 5. Change requests 6. Project management plan updates 7. Project document updates Report must betruthfuland not hide what is really going on.
  • 17. Exercise Situation Communication Type Updating the project plan Presentations to management Trying to solve a complex problem Making notes regarding a telephone conversation Making changes to a contact Informing a team member of poor performance (first notice) Informing a team member of poor performance (second notice) Scheduling a meeting Clarifying a work package Requesting additional resources Trying to discover the root cause of a problem Sending an email to ask for clarification of an issue Holding a milestone party Conducting a bidder conference Formal Written Formal Verbal Formal Written Informal Written Formal Written Informal Verbal Formal Written Informal Written Formal Written Informal Verbal Informal Verbal Informal Written Informal Verbal Formal Verbal Table taken from PMP Exam Prep 6th Edition, Rita Mulcahy.
  • 18. PM Skills • Interpersonal skills • Management skills • Presentation skills • Negotiation • Writing skill • Public speaking • Etc. • Leadership • Team building • Motivation • Communication • Influencing • Decision making • Political & cultural awareness • Negotiation • Etc.
  • 19. Effective Meeting • Plan or prepare the meeting – Set a time/schedule and determine the participants. – Have a clear purpose for each meeting & communicate it in the invitation. – Create the agenda and distribute it in advance. • Stick to the plan (discipline) – Begin on time, end on time. – Introduce the moderator and stipulate who will keep the minutes. – End every agenda with a summary and consensus of the participants. • Good follow-up – Send the minutes showing the result along with the to do list. – Get feedback from the participants. – Monitor the status of all action items.