Project Integration Management
Knowledge
Area
Process
Initiating Planning Executing Monitoring & Contol Closing
Scope
• Develop
Project
Charter
• Develop Project
Management
Plan
• Direct and
Manage Project
Execution
• Monitor and Control
Project Work
• Perform Integrated
Change Control
• Close
Project
Enter phase/
Start project
Exit phase/
End project
Initiating
Processes
Closing
Processes
Planning
Processes
Executing
Processes
Monitoring &
Controlling Processes
Project Integration Management
• Process and activities needed to identify, define, combine, unify,
and coordinate the various processes and project management
activities within the Project Management Process Groups.
4.1 Develop Project Charter
• The process of developing a document that formally authorizes a project or a
phase and documenting initial requirements that satisfy the stakeholder’s
needs and expectations
Inputs
1. Project statement of
work
2. Business case
3. Contract
4. Enterprise environmental
factors
5. Organizational process
assets
Tools &
Techniques
1. Expert judgment
Outputs
1. Project charter
Develop Project Charter (Input)
• Project are authorized by someone external to the project such as sponsor, PMO, portfolio
steering committee.
• Project charter can be created by them or delegated to Project Manager.
• Statement of Work (SOW)
– A narrative description of products or services to be delivered by the project.
– The SOW references:
• Business need
• Product scope description
• Strategic plan
• Business case
» Provide the necessary information from business standpoint to determine whether or
not the project is worth the required investment.
Project Selection
Two categories:
1. Benefit measurement methods (Comparative approach)
• Murder board (a panel of people who try to shoot down a new project idea)
• Peer review
• Scoring models
• Economic models (described next)
2. Constrained optimization methods (Mathematical approach)
• Linear programming
• Integer programming
• Dynamic programming
• Multi-objective programming
Project Selection – Economic Models
• Present value (PV): The value today of future cash flows
• Net present value (NPV): Project with positive & greater NPV value is better
• Internal rate of return (IRR): Project with greater IRR value is better
• Payback period:
– The number of time periods it takes to recover your investment in the project before you start
accumulating profit.
• Benefit-cost ratio:
– compares the benefits to the costs of different options
– relates to costing projects and to determining what work should be done
– Project with greater benefit-cost ratio value is better
Youjust need to understand the following concepts
 n
r1
FV
PV 

FP = future value
r = interest rate
n = number of time period
Project Selection – Important Terms
• Economic Value Added (EVA):
– concerned with whether the project returns to the company more value than it costs.
• Opportunity Cost:
– the opportunity given up by selecting one project over another
• Sunk Costs:
– Are expended costs
– Should not be considered when deciding whether to continue with a troubled project.
• Lay of Diminishing Returns:
– after a certain point, adding more input/resource will not produce a proportional
increase in productivity
Project Selection – Important Terms
• Working Capital
– current assets minus current liabilities for an organization or
– amount of money the company has available to invest
• Depreciation
– Straight line depreciation
• The same amount of depreciation is taken each year.
– Accelerated depreciation
• Depreciates faster than straight line
• Two forms: (1) Double Declining Balance, (2) Sum of the Years Digits
Develop Project Charter (Tools & Techniques, Output)
• Expert Judgment, includes:
• Project Charter, includes:
– Project purpose or justification,
– Measurable project objectives and related success criteria,
– High-level requirements,
– High-level project description,
– High-level risks,
– Summary milestone schedule,
– Summary budget,
– Project approval requirements
– Assigned project manager, responsibility, and authority level
– Name and authority of the sponsor or other person(s) authorizing the project charter.
– Other unit within organization
– Consultants
– Stakeholders including customer or sponsor
– Subject matter experts
– PMO
– Industry groups
– Professional & technical association
4.2 Develop Project Management Plan
• The process of documenting the actions necessary to define, prepare, integrate
and coordinate all subsidiary plans.
Inputs
1. Project charter
2. Business case
3. Outputs from planning
processes
4. Enterprise environmental
factors
5. Organizational process
assets
Tools &
Techniques
1. Expert judgment
Outputs
1. Project management
plan
Project Management Plan (Output)
• The strategy for managing the project and the processes in each knowledge area
• Covers how you will define, plan, manage, and control the project.
• Also includes:
– Change management plan
– Configuration management plan
– Requirements management plan
– Process improvement plan
• How to handle a problem on a project?
» look at your management plan to see how you planned to handle such a
problem.
Baseline (Performance measurement baseline)
• The project management plan contains scope, schedule, and cost baselines,
against which the project manager will need to report project performance.
• Baseline created during planning.
– Scope baseline
The project scope statement, work breakdown structure (WBS), and WBS dictionary
– Schedule baseline
The agreed-upon schedule, including the start and stop times
– Cost baseline
The time-phased cost budget
• Deviations from baselines are often due to incomplete risk identification and risk
management.
Change Management Plan
• Describes how changes will be managed and controlled.
• Covers for the project as whole
• May includes:
– Change control procedures (how and who)
– The approval levels for authorizing changes
– The creation of a change control board to approve changes
– A plan outlining how changes will be managed and controlled
– Who should attend meetings regarding changes
– Tools to use to track and control changes
• Each knowledge area are described in the individual management plans
Configuration Management Plan
• Defines how you will manage changes to the deliverables and the resulting
documentation, including which organizational tools you will use
4.3 Direct & Manage Project Execution
• The process of performing the work defined in the project management plan to
achieve the project’s objectives.
Inputs
1. Project management
plan
2. Approved change
request
3. Enterprise environmental
factors
4. Organizational process
assets
Tools &
Techniques
1. Expert judgment
2. Management
information system
Outputs
1. Deliverables work
2. Performance
information
3. Change requests
4. Project management
plan updates
5. Project document
updates
4.4 Monitor & Control Project Work
• The process of tracking, reviewing, and regulating the progress to meet the
performance objectives defined in the project management plan.
Inputs
1. Project management
plan
2. Performance reports
3. Enterprise environmental
factors
4. Organizational process
assets
Tools &
Techniques
1. Expert judgment
Outputs
1. Change requests
2. Project management
plan updates
3. Project document
updates
4.5 Perform Integrated Change Control
• The process of reviewing all change requests, approving changes and
managing changes to deliverables, organizational process assets, project
documents and the project management plan.
Inputs
1. Project management
plan
2. Performance reports
3. Enterprise environmental
factors
4. Organizational process
assets
Tools &
Techniques
1. Expert judgment
Outputs
1. Change requests
2. Project management
plan updates
3. Project document
updates
4.6 Closing Project or Phase
• The process of of finalizing all activities across all of the Project Management
Process Groups to formally complete the project or phase.
Inputs
1. Project management
plan
2. Accepted deliverables
3. Organizational process
assets
Tools &
Techniques
1. Expert judgment
Outputs
1. Final product, service or
result
2. Organizational process
assets updates
Thank You
Next topic:
Project Scope Management

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
Project Planning And Controlling
Project Planning And ControllingProject Planning And Controlling
Project Planning And ControllingGiancarlo Berner
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementHossam Maghrabi
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Agus Suhanto
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management UploadBhuWan Khadka
 
Project Planning and Approval Process
Project Planning and Approval ProcessProject Planning and Approval Process
Project Planning and Approval ProcessAtif Nauman
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Agus Suhanto
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -Hossam Maghrabi
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - CostCybrary
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk managements. Akhlaque
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 

Was ist angesagt? (20)

9- PMP Training - Communication Management
9- PMP Training - Communication Management9- PMP Training - Communication Management
9- PMP Training - Communication Management
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
Project Planning And Controlling
Project Planning And ControllingProject Planning And Controlling
Project Planning And Controlling
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk Management
 
Pmp inititating process group
Pmp inititating process groupPmp inititating process group
Pmp inititating process group
 
12-PMP Training - Stakeholder Management
12-PMP Training - Stakeholder Management 12-PMP Training - Stakeholder Management
12-PMP Training - Stakeholder Management
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
Project Planning and Approval Process
Project Planning and Approval ProcessProject Planning and Approval Process
Project Planning and Approval Process
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - Cost
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk management
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 

Andere mochten auch

PMP Exam Preparation Course: 01 Project Management Framework
PMP Exam Preparation Course: 01 Project Management FrameworkPMP Exam Preparation Course: 01 Project Management Framework
PMP Exam Preparation Course: 01 Project Management FrameworkB M Shahrier Majumder, PMP, CSM
 
09 projecthumanresourcemanagement
09 projecthumanresourcemanagement09 projecthumanresourcemanagement
09 projecthumanresourcemanagementDhamo daran
 
12 projectprocurementmanagement
12 projectprocurementmanagement12 projectprocurementmanagement
12 projectprocurementmanagementDhamo daran
 
PMP Preparation 1 - Framework
PMP Preparation 1 - FrameworkPMP Preparation 1 - Framework
PMP Preparation 1 - FrameworkAndrew Mikityuk
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing managementDhamo daran
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagementDhamo daran
 
10 projectcommunicationmanagement
10 projectcommunicationmanagement10 projectcommunicationmanagement
10 projectcommunicationmanagementDhamo daran
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Dhamo daran
 
Project initiating and planning
Project initiating and planningProject initiating and planning
Project initiating and planningSaad Al Jabri
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment ManagementSaad Al Jabri
 
Project communication management
Project communication managementProject communication management
Project communication managementSaad Al Jabri
 
PMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementPMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementAndrew Mikityuk
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaGlobalSkillup
 
PMP: Battle of the genders
PMP: Battle of the gendersPMP: Battle of the genders
PMP: Battle of the gendersSimplilearn
 

Andere mochten auch (20)

PMP Exam Preparation Course: 01 Project Management Framework
PMP Exam Preparation Course: 01 Project Management FrameworkPMP Exam Preparation Course: 01 Project Management Framework
PMP Exam Preparation Course: 01 Project Management Framework
 
09 projecthumanresourcemanagement
09 projecthumanresourcemanagement09 projecthumanresourcemanagement
09 projecthumanresourcemanagement
 
PMP Exam Preparation Course: 05 Project Time Management
PMP Exam Preparation Course: 05 Project Time ManagementPMP Exam Preparation Course: 05 Project Time Management
PMP Exam Preparation Course: 05 Project Time Management
 
12 projectprocurementmanagement
12 projectprocurementmanagement12 projectprocurementmanagement
12 projectprocurementmanagement
 
PMP Preparation 1 - Framework
PMP Preparation 1 - FrameworkPMP Preparation 1 - Framework
PMP Preparation 1 - Framework
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
10 projectcommunicationmanagement
10 projectcommunicationmanagement10 projectcommunicationmanagement
10 projectcommunicationmanagement
 
Project time management 1 final
Project time management 1 finalProject time management 1 final
Project time management 1 final
 
Chap013
Chap013Chap013
Chap013
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
Project initiating and planning
Project initiating and planningProject initiating and planning
Project initiating and planning
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment Management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project cost management
Project cost managementProject cost management
Project cost management
 
PMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration ManagementPMP Prep 3 - Project Integration Management
PMP Prep 3 - Project Integration Management
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
PMP: Battle of the genders
PMP: Battle of the gendersPMP: Battle of the genders
PMP: Battle of the genders
 
PMP Exam Notes
PMP Exam NotesPMP Exam Notes
PMP Exam Notes
 

Ähnlich wie 04 projectintegrationmanagement

DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 
04 project integration management
04  project integration management04  project integration management
04 project integration managementAla Ibrahim
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planningJeanette C. Patindol
 
Topic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfTopic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfHuyNguyen657394
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfHuyNguyen657394
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1Toe Myint Naing
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
Project management professional
Project management professionalProject management professional
Project management professionalRaynaITSTEP
 
Project Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study GuideProject Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study Guidemsrakesh
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptxagathamarlinee
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsAhmed Alageed
 

Ähnlich wie 04 projectintegrationmanagement (20)

DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
04 project integration management
04  project integration management04  project integration management
04 project integration management
 
PMP Prep Handout_Integration
PMP Prep Handout_IntegrationPMP Prep Handout_Integration
PMP Prep Handout_Integration
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Topic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdfTopic 4 - Project Management Process.pdf
Topic 4 - Project Management Process.pdf
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdf
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
Project management professional
Project management professionalProject management professional
Project management professional
 
Project Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study GuideProject Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study Guide
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptx
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
1. introduction
1. introduction1. introduction
1. introduction
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
4 integration
4 integration4 integration
4 integration
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes Groups
 

Mehr von Dhamo daran (19)

Chap021
Chap021Chap021
Chap021
 
Chap020
Chap020Chap020
Chap020
 
Chap019
Chap019Chap019
Chap019
 
Chap018
Chap018Chap018
Chap018
 
Chap017
Chap017Chap017
Chap017
 
Chap016
Chap016Chap016
Chap016
 
Chap015
Chap015Chap015
Chap015
 
Chap014
Chap014Chap014
Chap014
 
Chap012
Chap012Chap012
Chap012
 
Chap011
Chap011Chap011
Chap011
 
Chap010
Chap010Chap010
Chap010
 
Chap009
Chap009Chap009
Chap009
 
Chap008
Chap008Chap008
Chap008
 
Chap007
Chap007Chap007
Chap007
 
Chap006
Chap006Chap006
Chap006
 
Chap005
Chap005Chap005
Chap005
 
Chap004
Chap004Chap004
Chap004
 
Chap003
Chap003Chap003
Chap003
 
Chap002
Chap002Chap002
Chap002
 

Kürzlich hochgeladen

Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
The State of AI in Insights and Research 2024: Results and Findings
The State of AI in Insights and Research 2024: Results and FindingsThe State of AI in Insights and Research 2024: Results and Findings
The State of AI in Insights and Research 2024: Results and FindingsRay Poynter
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Production of Monoclonal Antibodies by Hybridoma Technology.pptx
Production of Monoclonal Antibodies by Hybridoma Technology.pptxProduction of Monoclonal Antibodies by Hybridoma Technology.pptx
Production of Monoclonal Antibodies by Hybridoma Technology.pptxAnupkumar Sharma
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptxJonalynLegaspi2
 

Kürzlich hochgeladen (20)

Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
The State of AI in Insights and Research 2024: Results and Findings
The State of AI in Insights and Research 2024: Results and FindingsThe State of AI in Insights and Research 2024: Results and Findings
The State of AI in Insights and Research 2024: Results and Findings
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Production of Monoclonal Antibodies by Hybridoma Technology.pptx
Production of Monoclonal Antibodies by Hybridoma Technology.pptxProduction of Monoclonal Antibodies by Hybridoma Technology.pptx
Production of Monoclonal Antibodies by Hybridoma Technology.pptx
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
 

04 projectintegrationmanagement

  • 1. 5 - Project Integration Management Project Management Training Created by ejlp12@gmail.com, June 2010
  • 2. Project Integration Management Knowledge Area Process Initiating Planning Executing Monitoring & Contol Closing Scope • Develop Project Charter • Develop Project Management Plan • Direct and Manage Project Execution • Monitor and Control Project Work • Perform Integrated Change Control • Close Project Enter phase/ Start project Exit phase/ End project Initiating Processes Closing Processes Planning Processes Executing Processes Monitoring & Controlling Processes
  • 3. Project Integration Management • Process and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.
  • 4. 4.1 Develop Project Charter • The process of developing a document that formally authorizes a project or a phase and documenting initial requirements that satisfy the stakeholder’s needs and expectations Inputs 1. Project statement of work 2. Business case 3. Contract 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Project charter
  • 5. Develop Project Charter (Input) • Project are authorized by someone external to the project such as sponsor, PMO, portfolio steering committee. • Project charter can be created by them or delegated to Project Manager. • Statement of Work (SOW) – A narrative description of products or services to be delivered by the project. – The SOW references: • Business need • Product scope description • Strategic plan • Business case » Provide the necessary information from business standpoint to determine whether or not the project is worth the required investment.
  • 6. Project Selection Two categories: 1. Benefit measurement methods (Comparative approach) • Murder board (a panel of people who try to shoot down a new project idea) • Peer review • Scoring models • Economic models (described next) 2. Constrained optimization methods (Mathematical approach) • Linear programming • Integer programming • Dynamic programming • Multi-objective programming
  • 7. Project Selection – Economic Models • Present value (PV): The value today of future cash flows • Net present value (NPV): Project with positive & greater NPV value is better • Internal rate of return (IRR): Project with greater IRR value is better • Payback period: – The number of time periods it takes to recover your investment in the project before you start accumulating profit. • Benefit-cost ratio: – compares the benefits to the costs of different options – relates to costing projects and to determining what work should be done – Project with greater benefit-cost ratio value is better Youjust need to understand the following concepts  n r1 FV PV   FP = future value r = interest rate n = number of time period
  • 8. Project Selection – Important Terms • Economic Value Added (EVA): – concerned with whether the project returns to the company more value than it costs. • Opportunity Cost: – the opportunity given up by selecting one project over another • Sunk Costs: – Are expended costs – Should not be considered when deciding whether to continue with a troubled project. • Lay of Diminishing Returns: – after a certain point, adding more input/resource will not produce a proportional increase in productivity
  • 9. Project Selection – Important Terms • Working Capital – current assets minus current liabilities for an organization or – amount of money the company has available to invest • Depreciation – Straight line depreciation • The same amount of depreciation is taken each year. – Accelerated depreciation • Depreciates faster than straight line • Two forms: (1) Double Declining Balance, (2) Sum of the Years Digits
  • 10. Develop Project Charter (Tools & Techniques, Output) • Expert Judgment, includes: • Project Charter, includes: – Project purpose or justification, – Measurable project objectives and related success criteria, – High-level requirements, – High-level project description, – High-level risks, – Summary milestone schedule, – Summary budget, – Project approval requirements – Assigned project manager, responsibility, and authority level – Name and authority of the sponsor or other person(s) authorizing the project charter. – Other unit within organization – Consultants – Stakeholders including customer or sponsor – Subject matter experts – PMO – Industry groups – Professional & technical association
  • 11. 4.2 Develop Project Management Plan • The process of documenting the actions necessary to define, prepare, integrate and coordinate all subsidiary plans. Inputs 1. Project charter 2. Business case 3. Outputs from planning processes 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Project management plan
  • 12. Project Management Plan (Output) • The strategy for managing the project and the processes in each knowledge area • Covers how you will define, plan, manage, and control the project. • Also includes: – Change management plan – Configuration management plan – Requirements management plan – Process improvement plan • How to handle a problem on a project? » look at your management plan to see how you planned to handle such a problem.
  • 13. Baseline (Performance measurement baseline) • The project management plan contains scope, schedule, and cost baselines, against which the project manager will need to report project performance. • Baseline created during planning. – Scope baseline The project scope statement, work breakdown structure (WBS), and WBS dictionary – Schedule baseline The agreed-upon schedule, including the start and stop times – Cost baseline The time-phased cost budget • Deviations from baselines are often due to incomplete risk identification and risk management.
  • 14. Change Management Plan • Describes how changes will be managed and controlled. • Covers for the project as whole • May includes: – Change control procedures (how and who) – The approval levels for authorizing changes – The creation of a change control board to approve changes – A plan outlining how changes will be managed and controlled – Who should attend meetings regarding changes – Tools to use to track and control changes • Each knowledge area are described in the individual management plans
  • 15. Configuration Management Plan • Defines how you will manage changes to the deliverables and the resulting documentation, including which organizational tools you will use
  • 16. 4.3 Direct & Manage Project Execution • The process of performing the work defined in the project management plan to achieve the project’s objectives. Inputs 1. Project management plan 2. Approved change request 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Management information system Outputs 1. Deliverables work 2. Performance information 3. Change requests 4. Project management plan updates 5. Project document updates
  • 17. 4.4 Monitor & Control Project Work • The process of tracking, reviewing, and regulating the progress to meet the performance objectives defined in the project management plan. Inputs 1. Project management plan 2. Performance reports 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Change requests 2. Project management plan updates 3. Project document updates
  • 18. 4.5 Perform Integrated Change Control • The process of reviewing all change requests, approving changes and managing changes to deliverables, organizational process assets, project documents and the project management plan. Inputs 1. Project management plan 2. Performance reports 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Change requests 2. Project management plan updates 3. Project document updates
  • 19. 4.6 Closing Project or Phase • The process of of finalizing all activities across all of the Project Management Process Groups to formally complete the project or phase. Inputs 1. Project management plan 2. Accepted deliverables 3. Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Final product, service or result 2. Organizational process assets updates
  • 20. Thank You Next topic: Project Scope Management