Turkey Thicket “Play DC Initiative”
                       and the new
                 Brookland Middle School
                                        Community Meeting
                                         March 23, 2013




BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
AGENDA
                                      • Introductions
                                      • Rules of the Road
                                      • Meeting Goals
                                      • Project History
                                      • What We Considered
                                      • Current Project Status
                                      • Site Options
                                      • Next Steps
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
COMMUNITY MEETING GOALS
     • Where is the school situated on the site
     • What is the status of the playground construction project
     • What is the timeline for the school and playground initiatives
     • What is the budget for the school and playground initiatives
     • How is the school and recreation center parking going to be
       addressed
     • Who makes the final decisions
     • How will information regarding the projects be communicated
       more effectively




BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
PROJECT HISTORY
     Turkey Thicket Park
     • Included in DPR “Play-DC” Initiative for outdoor space upgrades
       during 2013.
     • Design concept by Studio 39 developed in December 2012 based
       on community input.

     Brookland Middle School
     • Site selected for arts-focused middle school through efforts of DCPS
       and Ward 5 Council on Education.
     • SIT created to guide school development and share information.
     • Educational Specifications developed in mid-2012 – Program
       includes 23 classrooms, performance space and gymnasium.
     • Hartman-Cox/Grimm+Parker architectural team selected in
       December 2012 to begin concept designs.
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
WHAT WE HAVE CONSIDERED
     • Achieving a World Class Middle School
     • Playground Development Plan and Timeline
     • Stand-Alone or Co-Located School and Recreation Center
     • Tennis Courts and Exterior Park Amenities
     • Park Site Access
     • Recreation Center and School Facility Access
     • Pick-up and Drop-off
     • Traffic
     • Parking




BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
CURRENT PROJECT STATUS
     • MISSION CRITICAL: Find the Solution that Best Balances the
       Needs, Wants, Logistics, Budget & Timelines of All Parties
           • DGS, DPR, DCPS and the Community Working Together to Best
             Address the Neighborhood’s Needs
     • A Collaborative Effort to Create the Most Efficient and Useful Space
       for Both Turkey Thicket and Brookland Middle School
           • Brookland Middle School Budget = $50 million
           • Turkey Thicket Budget = Determined Based on Final Concept
     • DGS Will Oversee Project and Lead Communications Effort with
       Community Once Designs and Timeline are Finalized
           • DCPS and DPR are DGS’ Clients
           • Consistent Interaction with SIT Team, ANC, Playground Group,
             Community Groups and Neighborhood Residents
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
Aerial View of Current School Site




                                                         N

BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
CO-LOCATION OPTION WITH RECREATION CENTER                                                                          PROS:
                                                                            • Potentially more space for surface parking
                                                                   • School has closer and easier access to playing fields
                                                             • Shifting of park amenities provides a more flexible design
                                         • School has proper classroom orientation for natural light and energy efficiency
                                          • Shared school facilities provides for “expansion” of recreation center through
                                                                                                   shared use of amenities




CONS:
• DPR 2013 “Play DC” park upgrades delayed until 2014
• Potential increase in traffic along 10th St
• Park areas will be closed at times for school building construction
• Secure access point required between school population and rec center
  population
• Increased project budget due to demolition and rebuild of interior and exterior
  rec center amenities
• Areas within rec center will require temporary closure to construct                                             N
  reconfiguration & connection to school
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
STAND ALONE SCHOOL AT 10th Street                                                                                    PROS:

                                                   • School in close proximity to rec center to provide access to amenities
                                                             • Provides physical separation between school and rec center
                                                                              • Students have easy access to playing fields
                                                                              • School has better access to light and views
                                                                                     • School entrance on less active street




CONS:
• Less green space available for park use
• Additional exterior park facilities are involved in large construction project requiring
  extensive periods of closure for construction
• Project budget must be increased to demolish and rebuild outdoor rec areas and                                     N
  address site topography
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
STAND-ALONE SCHOOL AT SOUTH POINT OF PARK                                                                           PROS:

                                                                                      • School located at civic end of site
                                           • School has ideal classroom orientation for natural light and energy efficiency
                                           • Parking lots centrally located for possible shared use during non-school hours
                                                             • Provides physical separation between school and rec center
                                                                                      • School location is closer to Metro




CONS:
• Outdoor park space is reduced with less flexibility for outdoor space design and layout
• North end of site has topography changes which poses issues and additional costs
  for constructing playing fields
• All exterior park facilities are involved in the construction project, requiring
  extensive periods of closure for construction
• Project budget must be increased to demolish and rebuild outdoor rec areas and                                    N
  address site topography
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
STAND-ALONE SCHOOL ON EXPANDED EXISTING SCHOOL SITE                                                               PROS:

                                                       • Additional open space added between school and tennis courts
                                                           • Provides physical separation between school and rec center
                                                                   • Additional space available for parking or play-space
                                                                           • Minimal impact to 2013 “Play-DC” upgrades
                                                                            • School has civic presence on Michigan Ave




CONS:
• No Drop-off to offset street traffic on Mich. Ave.
• School constructed in close proximity to smaller scale houses
• Potentially reduces tennis courts and delays Play-DC upgrades
• Accessing fields from school requires crossing drive aisle and moderate walk
                                                                                                                  N
• Classroom orientation is not optimal for natural light and energy efficiency
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
STAND-ALONE SCHOOL ON EXISTING SCHOOL SITE                                                                         PROS:
                                                      • DPR 2013 “Play-DC” upgrades can continue for 2013 completion
                                            • School pickup and drop off drive helps alleviate traffic problems on streets
                                                    • Rec center would not experience any construction related closures
                                                     • School construction will have little impact on park and rec center
                                                                   • Provides separation between school and rec center
                                                                            • School has civic presence on Michigan Ave
                                                                                 • School can be built with budgeted funds




CONS:
• Limited site area available for surface parking
• School building abuts tennis courts and enclosure fence
• School constructed in close proximity to smaller scale houses
• Accessing fields from school requires crossing drive aisle and moderate walk
                                                                                                                   N
• Classroom orientation is not optimal for natural light and energy efficiency
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
Next Steps
               •       Posting of the presentation on the DGS website
               •       Collect additional comments from this presentation
               •       DGS to make recommendation to DPR and DCPS
               •       DGS, DPR and DCPS make final decision
               •       Next community meeting (Notification of Decision)
               •       Site Investigations and Traffic Study will continue
               •       Additional SIT team and community meetings schedule will be
                       announced (announcement of “Play DC” construction schedule,
                       site enhancements and parking will be discussed)




BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
Questions & Answers



                          Timeline and next steps are next….




BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
COMMUNITY MEETING GOALS
     • Where is the school situated on the site
     • What is the status of the playground construction project
     • What is the timeline for the school and playground initiatives
     • What is the budget for the school and playground initiatives
     • How is the school and recreation center parking going to be
       addressed
     • Who makes the final decisions
     • How will information regarding the projects be communicated
       more effectively




BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
BROOKLAND COMMUNITY MEETING – MARCH 23, 2013

More Related Content

Viewers also liked

Worldpay Valentines Day Survival Guide
Worldpay Valentines Day Survival GuideWorldpay Valentines Day Survival Guide
Worldpay Valentines Day Survival GuideHarry Ronaldson
 
Kalorama Park Community Meeting Presentation (October 21, 2014)
Kalorama Park Community Meeting Presentation (October 21, 2014)Kalorama Park Community Meeting Presentation (October 21, 2014)
Kalorama Park Community Meeting Presentation (October 21, 2014)DC Department of General Services
 
Ridge Road Community Meeting Architect Presentation (06-04-13)
Ridge Road Community Meeting Architect Presentation (06-04-13)Ridge Road Community Meeting Architect Presentation (06-04-13)
Ridge Road Community Meeting Architect Presentation (06-04-13)DC Department of General Services
 
Brookland Middle School Community Meeting Presentation (March 18, 2014)
Brookland Middle School Community Meeting Presentation (March 18, 2014)Brookland Middle School Community Meeting Presentation (March 18, 2014)
Brookland Middle School Community Meeting Presentation (March 18, 2014)DC Department of General Services
 
Brookland Middle School Community Meeting (November 16, 2013)
Brookland Middle School Community Meeting (November 16, 2013)Brookland Middle School Community Meeting (November 16, 2013)
Brookland Middle School Community Meeting (November 16, 2013)DC Department of General Services
 
Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)DC Department of General Services
 

Viewers also liked (9)

Roosevelt High School Modernization Community Meeting
Roosevelt High School Modernization Community Meeting  Roosevelt High School Modernization Community Meeting
Roosevelt High School Modernization Community Meeting
 
Worldpay Valentines Day Survival Guide
Worldpay Valentines Day Survival GuideWorldpay Valentines Day Survival Guide
Worldpay Valentines Day Survival Guide
 
Kalorama Park Community Meeting Presentation (October 21, 2014)
Kalorama Park Community Meeting Presentation (October 21, 2014)Kalorama Park Community Meeting Presentation (October 21, 2014)
Kalorama Park Community Meeting Presentation (October 21, 2014)
 
Ridge Road Community Meeting Architect Presentation (06-04-13)
Ridge Road Community Meeting Architect Presentation (06-04-13)Ridge Road Community Meeting Architect Presentation (06-04-13)
Ridge Road Community Meeting Architect Presentation (06-04-13)
 
Hearst Elementary School - Update & Modernization Timeline
Hearst Elementary School - Update & Modernization TimelineHearst Elementary School - Update & Modernization Timeline
Hearst Elementary School - Update & Modernization Timeline
 
Brookland Middle School Community Meeting Presentation (March 18, 2014)
Brookland Middle School Community Meeting Presentation (March 18, 2014)Brookland Middle School Community Meeting Presentation (March 18, 2014)
Brookland Middle School Community Meeting Presentation (March 18, 2014)
 
Brookland Middle School Community Meeting (November 16, 2013)
Brookland Middle School Community Meeting (November 16, 2013)Brookland Middle School Community Meeting (November 16, 2013)
Brookland Middle School Community Meeting (November 16, 2013)
 
Taft Field Community Meeting Presentation (June 11, 2014)
Taft Field Community Meeting Presentation (June 11, 2014)Taft Field Community Meeting Presentation (June 11, 2014)
Taft Field Community Meeting Presentation (June 11, 2014)
 
Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)
 

More from DC Department of General Services

Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)DC Department of General Services
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...DC Department of General Services
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)DC Department of General Services
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)DC Department of General Services
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)DC Department of General Services
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)DC Department of General Services
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)DC Department of General Services
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)DC Department of General Services
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)DC Department of General Services
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)DC Department of General Services
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)DC Department of General Services
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...DC Department of General Services
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)DC Department of General Services
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)DC Department of General Services
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)DC Department of General Services
 

More from DC Department of General Services (20)

Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
 
Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)
 
Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
 

Recently uploaded

15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 

Recently uploaded (9)

15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 

Brookland & Turkey Thicket Community Meeting (03 23-13)

  • 1. Turkey Thicket “Play DC Initiative” and the new Brookland Middle School Community Meeting March 23, 2013 BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 2. AGENDA • Introductions • Rules of the Road • Meeting Goals • Project History • What We Considered • Current Project Status • Site Options • Next Steps BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 3. COMMUNITY MEETING GOALS • Where is the school situated on the site • What is the status of the playground construction project • What is the timeline for the school and playground initiatives • What is the budget for the school and playground initiatives • How is the school and recreation center parking going to be addressed • Who makes the final decisions • How will information regarding the projects be communicated more effectively BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 4. PROJECT HISTORY Turkey Thicket Park • Included in DPR “Play-DC” Initiative for outdoor space upgrades during 2013. • Design concept by Studio 39 developed in December 2012 based on community input. Brookland Middle School • Site selected for arts-focused middle school through efforts of DCPS and Ward 5 Council on Education. • SIT created to guide school development and share information. • Educational Specifications developed in mid-2012 – Program includes 23 classrooms, performance space and gymnasium. • Hartman-Cox/Grimm+Parker architectural team selected in December 2012 to begin concept designs. BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 5. WHAT WE HAVE CONSIDERED • Achieving a World Class Middle School • Playground Development Plan and Timeline • Stand-Alone or Co-Located School and Recreation Center • Tennis Courts and Exterior Park Amenities • Park Site Access • Recreation Center and School Facility Access • Pick-up and Drop-off • Traffic • Parking BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 6. CURRENT PROJECT STATUS • MISSION CRITICAL: Find the Solution that Best Balances the Needs, Wants, Logistics, Budget & Timelines of All Parties • DGS, DPR, DCPS and the Community Working Together to Best Address the Neighborhood’s Needs • A Collaborative Effort to Create the Most Efficient and Useful Space for Both Turkey Thicket and Brookland Middle School • Brookland Middle School Budget = $50 million • Turkey Thicket Budget = Determined Based on Final Concept • DGS Will Oversee Project and Lead Communications Effort with Community Once Designs and Timeline are Finalized • DCPS and DPR are DGS’ Clients • Consistent Interaction with SIT Team, ANC, Playground Group, Community Groups and Neighborhood Residents BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 7. Aerial View of Current School Site N BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 8. CO-LOCATION OPTION WITH RECREATION CENTER PROS: • Potentially more space for surface parking • School has closer and easier access to playing fields • Shifting of park amenities provides a more flexible design • School has proper classroom orientation for natural light and energy efficiency • Shared school facilities provides for “expansion” of recreation center through shared use of amenities CONS: • DPR 2013 “Play DC” park upgrades delayed until 2014 • Potential increase in traffic along 10th St • Park areas will be closed at times for school building construction • Secure access point required between school population and rec center population • Increased project budget due to demolition and rebuild of interior and exterior rec center amenities • Areas within rec center will require temporary closure to construct N reconfiguration & connection to school BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 9. STAND ALONE SCHOOL AT 10th Street PROS: • School in close proximity to rec center to provide access to amenities • Provides physical separation between school and rec center • Students have easy access to playing fields • School has better access to light and views • School entrance on less active street CONS: • Less green space available for park use • Additional exterior park facilities are involved in large construction project requiring extensive periods of closure for construction • Project budget must be increased to demolish and rebuild outdoor rec areas and N address site topography BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 10. STAND-ALONE SCHOOL AT SOUTH POINT OF PARK PROS: • School located at civic end of site • School has ideal classroom orientation for natural light and energy efficiency • Parking lots centrally located for possible shared use during non-school hours • Provides physical separation between school and rec center • School location is closer to Metro CONS: • Outdoor park space is reduced with less flexibility for outdoor space design and layout • North end of site has topography changes which poses issues and additional costs for constructing playing fields • All exterior park facilities are involved in the construction project, requiring extensive periods of closure for construction • Project budget must be increased to demolish and rebuild outdoor rec areas and N address site topography BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 11. STAND-ALONE SCHOOL ON EXPANDED EXISTING SCHOOL SITE PROS: • Additional open space added between school and tennis courts • Provides physical separation between school and rec center • Additional space available for parking or play-space • Minimal impact to 2013 “Play-DC” upgrades • School has civic presence on Michigan Ave CONS: • No Drop-off to offset street traffic on Mich. Ave. • School constructed in close proximity to smaller scale houses • Potentially reduces tennis courts and delays Play-DC upgrades • Accessing fields from school requires crossing drive aisle and moderate walk N • Classroom orientation is not optimal for natural light and energy efficiency BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 12. STAND-ALONE SCHOOL ON EXISTING SCHOOL SITE PROS: • DPR 2013 “Play-DC” upgrades can continue for 2013 completion • School pickup and drop off drive helps alleviate traffic problems on streets • Rec center would not experience any construction related closures • School construction will have little impact on park and rec center • Provides separation between school and rec center • School has civic presence on Michigan Ave • School can be built with budgeted funds CONS: • Limited site area available for surface parking • School building abuts tennis courts and enclosure fence • School constructed in close proximity to smaller scale houses • Accessing fields from school requires crossing drive aisle and moderate walk N • Classroom orientation is not optimal for natural light and energy efficiency BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 13. Next Steps • Posting of the presentation on the DGS website • Collect additional comments from this presentation • DGS to make recommendation to DPR and DCPS • DGS, DPR and DCPS make final decision • Next community meeting (Notification of Decision) • Site Investigations and Traffic Study will continue • Additional SIT team and community meetings schedule will be announced (announcement of “Play DC” construction schedule, site enhancements and parking will be discussed) BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 14. Questions & Answers Timeline and next steps are next…. BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 15. COMMUNITY MEETING GOALS • Where is the school situated on the site • What is the status of the playground construction project • What is the timeline for the school and playground initiatives • What is the budget for the school and playground initiatives • How is the school and recreation center parking going to be addressed • Who makes the final decisions • How will information regarding the projects be communicated more effectively BROOKLAND COMMUNITY MEETING – MARCH 23, 2013
  • 16. BROOKLAND COMMUNITY MEETING – MARCH 23, 2013