SlideShare a Scribd company logo
1 of 32
Download to read offline
Does Agile Address the 25 Point Federal IT Reformation Plan?

  Devin B. Hedge           PMI WDC                 Manoj Vadakkan
  Devin@devinhedge.com                             manoj@vadakkan.org
  Agile.devinhedge.com    PM in the AM             manoj.vadakkan.org
Who we are – Devin Hedge
20+ years of experience in the IT Industry
14 years of experience in the Agile Community

Certified Scrum Master (CSM)
Project Management Professional (PMP)

Agile Community Leader
    PMI Agile Community if Practice Webinars (http://agile.vc.pmi.org/)
    DC Lean Coffee (http://www.coactivate.org/projects/dc-lean-coffee/)


Speaker & Volunteer
    Agile Leadership Network (www.aplndc.com)
    Agile DC (www.agiledc.org)




                                                                          2
Who we are – Manoj Vadakkan
20 years of experience in the IT Industry
10 years of experience in Project management

Certified Scrum Master (CSM), Certified Scrum Professional (CSP)
Project Management Professional (PMP)

Agile Community Leader
    Agile Leadership Network (www.aplndc.com)
    Agile DC (www.agiledc.org)


Speaker & Writer
    Articles on www.scrumalliance.org
    Speaker at Seattle Scrum Gathering, Amsterdam Scrum Gathering, MN Govt IT
    Symposium




                                                                                3
Three points we are examining


Align the Acquisition process with the technology cycle
Deliver working features in short intervals
Align the Budget Process with technology cycle




                                                          4
ALIGN THE ACQUISITION
PROCESS WITH THE
TECHNOLOGY CYCLE
                        5
Acquisition
Problem
   Time lag between requirements definition and starting of
   delivery is too long & technology usually changes before
   the solution is delivered




Federal CIO’s Approach?
   Align the Acquisition Process with the Technology Cycle




                                                              6
Typical Stage Gate Methodology




                                 7
Today’s DoD Life Cycle                                                       Initial
                                                                                                                       Operational
                                 Milestone B                                                                           Capability

         Planning Phase                                                   Build Phase

                      43                                                           48

      Analysis of       Economic                                                                               MS C
      Alternatives      Analysis
                                                                       Development                                     Test
          14                29                                                40                                           5
                                                           91
                                                                         Metrics calculated by
Long Cycle-Time Driven by Processes                                      OASD(NII) on 32 Major
Developed to Counter a Cold                                              Automated Information
War Adversary In Industrial Age Society
                                                                         Systems (MAIS)


Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson
                                                                                                                                     8
Changing Landscape of Government IT
        Whereas in 1970, IT accounted for approx 20% of weapon system
        functionality, by 2000 it accounted for as much as 80%
        Today it is reported IT can deliver 90% or more of functionality

  Software is a consistent
  and persistent thread
  through all DoD system
  acquisition programs …
                                                                  If most IT systems in Government
                                                                  started as only accounting
                                                                  systems with little direct
                                                                  capabilities tied to IT, what
                                                                  percentage of mission capabilities
                                                                  rely on them today?

Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson
                                                                                                                           9
A Call for Change
        DoD Leadership Responsible for IT Hon John Grimes (Former
        ASD(NII)/DoD(CIO)
                 “Hardware development processes ill-suited to IT acquisition”
        LTG Charles Croom (Former DISA Commander)
                 “I would change the acquisition process in how the DoD buys IT in a New York minute….”
        LTG Jeff Sorenson (Army CIO/G-6)
                 “How we can make it better…. Policy –Acquiring IT not like tanks”

        Defense Acquisition Performance Assessment (3/2006) The current system
        is focused on programs, not on improving and standardizing the processes
        of acquisition; it inhibits rather than promotes steady improvement in
        achieving program success

        GAO Assessment on “Information Technology: DOD’s Acquisition Policies
        and Guidance Need To Incorporate Additional Best Practices And Controls”
        (July/2004) “As you know, the way in which DOD has historically acquired
        information technology (IT) systems has been cited as a root cause of these
        systems failing to deliver promised capabilities and benefits on time and
        within budget…”
Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson
                                                                                                                           10
Proposed New DoD IT Acquisition Process




Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson
                                                                                                                           11
An Even More “Agile” Acquisition Process




Combined Acquisition Lifecycle
                  IOC              Release 2         Release 3         Release 4              Maintenance
  JAD
         It 1     It 2   It 3   It 4       It 5   It 6       It 7   It 8       It 9   It 10      It 11      It 12




                                                                                                                    12
Flipping the Iron Triangle in Agile Contracts

    The plan creates                                          The Vision Creates
     cost/schedule                                             feature estimates
       estimates



Fixed                                         Features                     Cost                                    Date
                                                                                             Value-
                                                                                             Driven
                                                                                               ($)

                                                Plan-
                                                Driven

Estimated                   Cost                                    Date                   Features
Source: “Inverting the Iron Triangle” by Mike Cottmeyer (http://www.leadingagile.com/2008/04/inverting-the-iron-triangle/ )
and “Agile Contracts” by Jesse Fewell                                                                                         13
DELIVER WORKING
FEATURES IN SHORT
INTERVALS
                    14
Deliver working features in short intervals
Problem
   Delivering working functionality after several year and late




Federal CIO’s Approach?
   Deliver new working functionality to users at least every 12
   months.
   Delivering functionality in small chunks frequently
   Capturing and incorporating feedback during that process

                                                                  15
How is it working today?




                           16
How is it working today?
Our projects tend to be multiple years long
Our projects tend to not to deliver features for years
    In addition to be being late and over budget
Our project tend to spend many months upfront to get the
“requirements” and “grand design”




                                                           17
What can we do?
What can we do to start delivering early?
    Start early
    Deliver in small chunks
Start early?
    If we want to start early, we can’t wait for all the detail requirements written
    down
Deliver in small chunks?
    If we want to deliver in small chunks, we need to prioritize the chunks




                                                                                       18
How can weScrum Overview features in short intervals?
                  deliver working




Start with the high-
   level view of the
      requirements




                                       Start producing
               Elaborate a subset of
                                                         Gather feedback from   Release to Production
                        the features
                                                         the customer




                                                                                                        19
Deliver working features in short intervals
Practices suggested in the 25 point Implementation plan
    Deliver new working functionality to users at least every 12 months.
    Delivering capabilities in small chunks frequently
    Capturing and incorporating feedback during that process




                                                                           20
ALIGN THE BUDGET PROCESS
WITH TECHNOLOGY CYCLE

                           21
Align the Budget Process with technology cycle
Problem
   The rapid pace of technological change does not match
   well with the Federal government’s budget formulation and
   execution process




Federal CIO’s Approach?
   Align the Budget Process with the Technology Cycle




                                                               22
Recommendations from the Federal CIO
Work with Congress to develop IT budget models that align with
modular development
Develop supporting materials and guidance for flexible IT budget
models
Work with Congress to scale flexible IT budget models more broadly
Work with Congress to consolidate commodity IT spending under
Agency CIO




                                                                     23
Look Familiar?


Different Sources of Projects                    OMB - 300
 Federal CIO Initiative

        CIO Initiative

             LOB needs

                  Legislative




 • The Budget cycle is built based on horizon of predictability
 • The Budget categories reinforce long stage-gated development cycles
                                                                         24
Agile Budgeting Is Easier
Because Scope is a Negotiation or Highest Value and Cost/Schedule
are fixed…
    Budgeting is just about how many resources will be funded for the current
    fiscal year
    Most Enhancement/Maintenance contracts are already funded this way
    For Net New Capabilities Development or System Conversions, budget can be
    fixed and incrementally funded each progress iteration
    When the Initial Operational Capability (IOC) is achieved, go/no go for
    additional funding can be used to cut off spending on “frills” and that 40% of
    functions that are RARELY or NEVER USED.


Earned Value Is REAL and Tangible: Every iteration can be valuated
based on mission capability delivered, and either it was delivered or it
wasn’t. Period.




                                                                                     25
Effect of Agile Budgeting on the IT Spending Cost Curve
2.5


  2


1.5
                                           Development
                                           Enhancements
  1
                                           Maintenance
                                           Log. (Enhancements)
0.5


  0
       BY      BY+1     BY+2     BY+3

-0.5




                                                                 26
Beyond Budgeting Principles
   Enabling a Continuous Adaptive Process




Beyond Budgeting: How Managers Can Break Free from the Annual Performance Trap by Jeremy Hope and Robin Frasier
                                                                                                                  27
An Even More “Agile” Acquisition Process




Combined Acquisition Lifecycle
                 IOC              Release 2         Release 3         Release 4              Maintenance
  JAD
          It 1   It 2   It 3   It 4       It 5   It 6       It 7   It 8       It 9   It 10      It 11      It 12




                                                                                                                   28
Challenges Implementing Agile Budgeting
Contracts, Contracts, Contracts

Legislation, Regulation, Policy and Procedures

Culture of “use it or lose it”




                                                  29
What’s Required
Congressional Support for Acquisition Regulation Changes

Education of the Entire Federal Contracting Officer Labor Pool

Education of the Entire Federal Contractor Community

Changes to the Mission Needs Identification and Requirements
Development process
    And by extension… changes to the budgeting lifecycle and OMB planning
    guidance




                                                                            30
QUESTIONS?
Devin B. Hedge         Manoj Vadakkan
Devin@devinhedge.com   manoj@vadakkan.org
Agile.devinhedge.com   manoj.vadakkan.org
                                            31
THANK YOU!
Devin B. Hedge         Manoj Vadakkan
Devin@devinhedge.com   manoj@vadakkan.org
Agile.devinhedge.com   manoj.vadakkan.org
                                            32

More Related Content

What's hot

SFIA Development Pathway
SFIA Development PathwaySFIA Development Pathway
SFIA Development Pathway
SFIA User Forum
 
Ibm puresystems deck for tcs abhed_11102012
Ibm puresystems  deck for tcs abhed_11102012Ibm puresystems  deck for tcs abhed_11102012
Ibm puresystems deck for tcs abhed_11102012
abhedk
 

What's hot (17)

Latest news phoenix
Latest news phoenixLatest news phoenix
Latest news phoenix
 
How Cash & Flexibility Are Driving Cloud Investment
How Cash & Flexibility Are Driving Cloud InvestmentHow Cash & Flexibility Are Driving Cloud Investment
How Cash & Flexibility Are Driving Cloud Investment
 
SFIA Development Pathway
SFIA Development PathwaySFIA Development Pathway
SFIA Development Pathway
 
Preventive IT Audit Case Study
Preventive IT Audit Case StudyPreventive IT Audit Case Study
Preventive IT Audit Case Study
 
Managing Intelligence
Managing IntelligenceManaging Intelligence
Managing Intelligence
 
Are You Ready for the Era of Big Data and Extreme Information Management?
Are You Ready for the Era of Big Data and Extreme Information Management?Are You Ready for the Era of Big Data and Extreme Information Management?
Are You Ready for the Era of Big Data and Extreme Information Management?
 
Cloud The Future Of The IT Department
Cloud   The Future Of The IT DepartmentCloud   The Future Of The IT Department
Cloud The Future Of The IT Department
 
Business Intelligence
Business IntelligenceBusiness Intelligence
Business Intelligence
 
Blue Slate Health IT award winning payer case study
Blue Slate Health IT award winning payer case studyBlue Slate Health IT award winning payer case study
Blue Slate Health IT award winning payer case study
 
Bizs Datasheet Gourangi 2009
Bizs Datasheet Gourangi 2009Bizs Datasheet Gourangi 2009
Bizs Datasheet Gourangi 2009
 
Ibm puresystems deck for tcs abhed_11102012
Ibm puresystems  deck for tcs abhed_11102012Ibm puresystems  deck for tcs abhed_11102012
Ibm puresystems deck for tcs abhed_11102012
 
Ecm strategy outline
Ecm strategy outlineEcm strategy outline
Ecm strategy outline
 
Lessons Learned: Business agility through open standards & cloud
Lessons Learned: Business agility through open standards & cloudLessons Learned: Business agility through open standards & cloud
Lessons Learned: Business agility through open standards & cloud
 
CIO Advisory Services Guide | White Paper from Brittenford Systems
CIO Advisory Services Guide | White Paper from Brittenford SystemsCIO Advisory Services Guide | White Paper from Brittenford Systems
CIO Advisory Services Guide | White Paper from Brittenford Systems
 
Social business and innovation
Social business and innovationSocial business and innovation
Social business and innovation
 
What is an information professional?
What is an information professional?What is an information professional?
What is an information professional?
 
Applying a BPM Approach to Three Similar but Distinct Business Environments
Applying a BPM Approach to Three Similar but Distinct Business EnvironmentsApplying a BPM Approach to Three Similar but Distinct Business Environments
Applying a BPM Approach to Three Similar but Distinct Business Environments
 

Viewers also liked

Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"
Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"
Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"
Sylvain Carle
 
Networking in the cloud: An SDN primer
Networking in the cloud: An SDN primerNetworking in the cloud: An SDN primer
Networking in the cloud: An SDN primer
Midokura
 

Viewers also liked (7)

Webcom Mai 2010
Webcom Mai 2010Webcom Mai 2010
Webcom Mai 2010
 
Conférence de Damien Lefebvre : La révolution de la télé passera par l’expéri...
Conférence de Damien Lefebvre : La révolution de la télé passera par l’expéri...Conférence de Damien Lefebvre : La révolution de la télé passera par l’expéri...
Conférence de Damien Lefebvre : La révolution de la télé passera par l’expéri...
 
Soil APES
Soil APESSoil APES
Soil APES
 
Ère Numérique - Nouvel Écosystème Média
Ère Numérique - Nouvel Écosystème MédiaÈre Numérique - Nouvel Écosystème Média
Ère Numérique - Nouvel Écosystème Média
 
Nieuwjaarswensen
NieuwjaarswensenNieuwjaarswensen
Nieuwjaarswensen
 
Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"
Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"
Pelleter Des Nuages - Bâtir son infrastructure TI dans le "cloud"
 
Networking in the cloud: An SDN primer
Networking in the cloud: An SDN primerNetworking in the cloud: An SDN primer
Networking in the cloud: An SDN primer
 

Similar to Does Agile address the 25 point Federal IT Reformation plan?

OSD ATL class on Agile Acquisition
OSD ATL class on Agile AcquisitionOSD ATL class on Agile Acquisition
OSD ATL class on Agile Acquisition
John Weiler
 
Weiler slideshow
Weiler slideshowWeiler slideshow
Weiler slideshow
vjairam
 
Successful Technology Implementations Transcript
Successful Technology Implementations TranscriptSuccessful Technology Implementations Transcript
Successful Technology Implementations Transcript
Tom Floyd
 
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement InitiativesExploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Mahesh Singh
 
Prinya acis slide for swpark - it & information security human resource deve...
Prinya acis slide for swpark  - it & information security human resource deve...Prinya acis slide for swpark  - it & information security human resource deve...
Prinya acis slide for swpark - it & information security human resource deve...
TISA
 
Organizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerOrganizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements Composer
Kurt Solarte
 
Business Intelligence Research
Business Intelligence ResearchBusiness Intelligence Research
Business Intelligence Research
Dayou Yang
 
It aac defense-it-cloud2013
It aac defense-it-cloud2013It aac defense-it-cloud2013
It aac defense-it-cloud2013
John Weiler
 
Pcn solutions presentation
Pcn solutions presentationPcn solutions presentation
Pcn solutions presentation
Olivia Heditsian
 
Pcn solutions presentation
Pcn solutions presentationPcn solutions presentation
Pcn solutions presentation
Olivia Heditsian
 

Similar to Does Agile address the 25 point Federal IT Reformation plan? (20)

Military Command Post of the Future
Military Command Post of the FutureMilitary Command Post of the Future
Military Command Post of the Future
 
OSD ATL class on Agile Acquisition
OSD ATL class on Agile AcquisitionOSD ATL class on Agile Acquisition
OSD ATL class on Agile Acquisition
 
White paper Fujitsu Dynamic Infrastructures- a consistent approach to meeting...
White paper Fujitsu Dynamic Infrastructures- a consistent approach to meeting...White paper Fujitsu Dynamic Infrastructures- a consistent approach to meeting...
White paper Fujitsu Dynamic Infrastructures- a consistent approach to meeting...
 
Weiler slideshow
Weiler slideshowWeiler slideshow
Weiler slideshow
 
SIIA & INPUT Webinar: Federal Cloud Computing Initiative Update
SIIA & INPUT Webinar: Federal Cloud Computing Initiative UpdateSIIA & INPUT Webinar: Federal Cloud Computing Initiative Update
SIIA & INPUT Webinar: Federal Cloud Computing Initiative Update
 
Successful Technology Implementations Transcript
Successful Technology Implementations TranscriptSuccessful Technology Implementations Transcript
Successful Technology Implementations Transcript
 
Congressional it reform-roadmap_2011
Congressional it reform-roadmap_2011Congressional it reform-roadmap_2011
Congressional it reform-roadmap_2011
 
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement InitiativesExploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
 
7 Steps to Pay Down the Interest on Your IT Technical Debt
7 Steps to Pay Down the Interest on Your IT Technical Debt7 Steps to Pay Down the Interest on Your IT Technical Debt
7 Steps to Pay Down the Interest on Your IT Technical Debt
 
Prinya acis slide for swpark - it & information security human resource deve...
Prinya acis slide for swpark  - it & information security human resource deve...Prinya acis slide for swpark  - it & information security human resource deve...
Prinya acis slide for swpark - it & information security human resource deve...
 
NJVC Implementation of Cloud Computing Solutions in Federal Agencies
NJVC Implementation of Cloud Computing Solutions in Federal AgenciesNJVC Implementation of Cloud Computing Solutions in Federal Agencies
NJVC Implementation of Cloud Computing Solutions in Federal Agencies
 
Sa002 abc
Sa002 abcSa002 abc
Sa002 abc
 
Organizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements ComposerOrganizing Design-Driven Development Using Rational Requirements Composer
Organizing Design-Driven Development Using Rational Requirements Composer
 
David Adams - Linkedin Information Architect Business Analyst - Web / Social ...
David Adams - Linkedin Information Architect Business Analyst - Web / Social ...David Adams - Linkedin Information Architect Business Analyst - Web / Social ...
David Adams - Linkedin Information Architect Business Analyst - Web / Social ...
 
Business Intelligence Research
Business Intelligence ResearchBusiness Intelligence Research
Business Intelligence Research
 
Research About Integration of PLM & BI
Research About Integration of PLM & BIResearch About Integration of PLM & BI
Research About Integration of PLM & BI
 
Accelerating the ML Lifecycle with an Enterprise-Grade Feature Store
Accelerating the ML Lifecycle with an Enterprise-Grade Feature StoreAccelerating the ML Lifecycle with an Enterprise-Grade Feature Store
Accelerating the ML Lifecycle with an Enterprise-Grade Feature Store
 
It aac defense-it-cloud2013
It aac defense-it-cloud2013It aac defense-it-cloud2013
It aac defense-it-cloud2013
 
Pcn solutions presentation
Pcn solutions presentationPcn solutions presentation
Pcn solutions presentation
 
Pcn solutions presentation
Pcn solutions presentationPcn solutions presentation
Pcn solutions presentation
 

Recently uploaded

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Recently uploaded (20)

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Does Agile address the 25 point Federal IT Reformation plan?

  • 1. Does Agile Address the 25 Point Federal IT Reformation Plan? Devin B. Hedge PMI WDC Manoj Vadakkan Devin@devinhedge.com manoj@vadakkan.org Agile.devinhedge.com PM in the AM manoj.vadakkan.org
  • 2. Who we are – Devin Hedge 20+ years of experience in the IT Industry 14 years of experience in the Agile Community Certified Scrum Master (CSM) Project Management Professional (PMP) Agile Community Leader PMI Agile Community if Practice Webinars (http://agile.vc.pmi.org/) DC Lean Coffee (http://www.coactivate.org/projects/dc-lean-coffee/) Speaker & Volunteer Agile Leadership Network (www.aplndc.com) Agile DC (www.agiledc.org) 2
  • 3. Who we are – Manoj Vadakkan 20 years of experience in the IT Industry 10 years of experience in Project management Certified Scrum Master (CSM), Certified Scrum Professional (CSP) Project Management Professional (PMP) Agile Community Leader Agile Leadership Network (www.aplndc.com) Agile DC (www.agiledc.org) Speaker & Writer Articles on www.scrumalliance.org Speaker at Seattle Scrum Gathering, Amsterdam Scrum Gathering, MN Govt IT Symposium 3
  • 4. Three points we are examining Align the Acquisition process with the technology cycle Deliver working features in short intervals Align the Budget Process with technology cycle 4
  • 5. ALIGN THE ACQUISITION PROCESS WITH THE TECHNOLOGY CYCLE 5
  • 6. Acquisition Problem Time lag between requirements definition and starting of delivery is too long & technology usually changes before the solution is delivered Federal CIO’s Approach? Align the Acquisition Process with the Technology Cycle 6
  • 7. Typical Stage Gate Methodology 7
  • 8. Today’s DoD Life Cycle Initial Operational Milestone B Capability Planning Phase Build Phase 43 48 Analysis of Economic MS C Alternatives Analysis Development Test 14 29 40 5 91 Metrics calculated by Long Cycle-Time Driven by Processes OASD(NII) on 32 Major Developed to Counter a Cold Automated Information War Adversary In Industrial Age Society Systems (MAIS) Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson 8
  • 9. Changing Landscape of Government IT Whereas in 1970, IT accounted for approx 20% of weapon system functionality, by 2000 it accounted for as much as 80% Today it is reported IT can deliver 90% or more of functionality Software is a consistent and persistent thread through all DoD system acquisition programs … If most IT systems in Government started as only accounting systems with little direct capabilities tied to IT, what percentage of mission capabilities rely on them today? Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson 9
  • 10. A Call for Change DoD Leadership Responsible for IT Hon John Grimes (Former ASD(NII)/DoD(CIO) “Hardware development processes ill-suited to IT acquisition” LTG Charles Croom (Former DISA Commander) “I would change the acquisition process in how the DoD buys IT in a New York minute….” LTG Jeff Sorenson (Army CIO/G-6) “How we can make it better…. Policy –Acquiring IT not like tanks” Defense Acquisition Performance Assessment (3/2006) The current system is focused on programs, not on improving and standardizing the processes of acquisition; it inhibits rather than promotes steady improvement in achieving program success GAO Assessment on “Information Technology: DOD’s Acquisition Policies and Guidance Need To Incorporate Additional Best Practices And Controls” (July/2004) “As you know, the way in which DOD has historically acquired information technology (IT) systems has been cited as a root cause of these systems failing to deliver promised capabilities and benefits on time and within budget…” Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson 10
  • 11. Proposed New DoD IT Acquisition Process Source: "Acquisition of Information Technology Trends Within The Department of Defense", September 10, 2009, Don Johnson 11
  • 12. An Even More “Agile” Acquisition Process Combined Acquisition Lifecycle IOC Release 2 Release 3 Release 4 Maintenance JAD It 1 It 2 It 3 It 4 It 5 It 6 It 7 It 8 It 9 It 10 It 11 It 12 12
  • 13. Flipping the Iron Triangle in Agile Contracts The plan creates The Vision Creates cost/schedule feature estimates estimates Fixed Features Cost Date Value- Driven ($) Plan- Driven Estimated Cost Date Features Source: “Inverting the Iron Triangle” by Mike Cottmeyer (http://www.leadingagile.com/2008/04/inverting-the-iron-triangle/ ) and “Agile Contracts” by Jesse Fewell 13
  • 14. DELIVER WORKING FEATURES IN SHORT INTERVALS 14
  • 15. Deliver working features in short intervals Problem Delivering working functionality after several year and late Federal CIO’s Approach? Deliver new working functionality to users at least every 12 months. Delivering functionality in small chunks frequently Capturing and incorporating feedback during that process 15
  • 16. How is it working today? 16
  • 17. How is it working today? Our projects tend to be multiple years long Our projects tend to not to deliver features for years In addition to be being late and over budget Our project tend to spend many months upfront to get the “requirements” and “grand design” 17
  • 18. What can we do? What can we do to start delivering early? Start early Deliver in small chunks Start early? If we want to start early, we can’t wait for all the detail requirements written down Deliver in small chunks? If we want to deliver in small chunks, we need to prioritize the chunks 18
  • 19. How can weScrum Overview features in short intervals? deliver working Start with the high- level view of the requirements Start producing Elaborate a subset of Gather feedback from Release to Production the features the customer 19
  • 20. Deliver working features in short intervals Practices suggested in the 25 point Implementation plan Deliver new working functionality to users at least every 12 months. Delivering capabilities in small chunks frequently Capturing and incorporating feedback during that process 20
  • 21. ALIGN THE BUDGET PROCESS WITH TECHNOLOGY CYCLE 21
  • 22. Align the Budget Process with technology cycle Problem The rapid pace of technological change does not match well with the Federal government’s budget formulation and execution process Federal CIO’s Approach? Align the Budget Process with the Technology Cycle 22
  • 23. Recommendations from the Federal CIO Work with Congress to develop IT budget models that align with modular development Develop supporting materials and guidance for flexible IT budget models Work with Congress to scale flexible IT budget models more broadly Work with Congress to consolidate commodity IT spending under Agency CIO 23
  • 24. Look Familiar? Different Sources of Projects OMB - 300 Federal CIO Initiative CIO Initiative LOB needs Legislative • The Budget cycle is built based on horizon of predictability • The Budget categories reinforce long stage-gated development cycles 24
  • 25. Agile Budgeting Is Easier Because Scope is a Negotiation or Highest Value and Cost/Schedule are fixed… Budgeting is just about how many resources will be funded for the current fiscal year Most Enhancement/Maintenance contracts are already funded this way For Net New Capabilities Development or System Conversions, budget can be fixed and incrementally funded each progress iteration When the Initial Operational Capability (IOC) is achieved, go/no go for additional funding can be used to cut off spending on “frills” and that 40% of functions that are RARELY or NEVER USED. Earned Value Is REAL and Tangible: Every iteration can be valuated based on mission capability delivered, and either it was delivered or it wasn’t. Period. 25
  • 26. Effect of Agile Budgeting on the IT Spending Cost Curve 2.5 2 1.5 Development Enhancements 1 Maintenance Log. (Enhancements) 0.5 0 BY BY+1 BY+2 BY+3 -0.5 26
  • 27. Beyond Budgeting Principles Enabling a Continuous Adaptive Process Beyond Budgeting: How Managers Can Break Free from the Annual Performance Trap by Jeremy Hope and Robin Frasier 27
  • 28. An Even More “Agile” Acquisition Process Combined Acquisition Lifecycle IOC Release 2 Release 3 Release 4 Maintenance JAD It 1 It 2 It 3 It 4 It 5 It 6 It 7 It 8 It 9 It 10 It 11 It 12 28
  • 29. Challenges Implementing Agile Budgeting Contracts, Contracts, Contracts Legislation, Regulation, Policy and Procedures Culture of “use it or lose it” 29
  • 30. What’s Required Congressional Support for Acquisition Regulation Changes Education of the Entire Federal Contracting Officer Labor Pool Education of the Entire Federal Contractor Community Changes to the Mission Needs Identification and Requirements Development process And by extension… changes to the budgeting lifecycle and OMB planning guidance 30
  • 31. QUESTIONS? Devin B. Hedge Manoj Vadakkan Devin@devinhedge.com manoj@vadakkan.org Agile.devinhedge.com manoj.vadakkan.org 31
  • 32. THANK YOU! Devin B. Hedge Manoj Vadakkan Devin@devinhedge.com manoj@vadakkan.org Agile.devinhedge.com manoj.vadakkan.org 32