19. System Architecture Functional View Input Function 1 Process Function 2 Process Output A/R Function A/P Function Input Function 1 Process Function 2 Process Output
20. Data Interfaces System Name System(s) and Site(s) Providing Input System(s) and Site(s) Receiving Output Data Warehouse
29. Overview of Project Status Legend: Green = On schedule, or completed Yellow = Symptoms of, or actual problems exist, or re-baselining required Red = Date/Schedule has not been, or cannot be met = Current project stage May 01 02 Install. & Accept. Stage 95 Apr 01 02 Integration and Testing 84 Mar 01 02 Programming Stage 62 Project funding is not sufficient. Jan 01 02 Red Design Stage 31 Key resource has been out ill. Nov 1 01 Yellow Reg. Def. Stage 13 Completed Aug 30 01 Green Planning Stage 1 Explanation (Required) Finish Status Stage Name Task
Editor's Notes
SLIDE TITLE: Title Page FREQUENCY: This slide is used for first time reviews and will be replaced with the On-going cover slide for subsequent reviews PURPOSE: Identify the presentation SOURCE(S): Project Information PROCESS: Provide the Project Name and Date of the Review. Project icons or pictures may be provided, if desired. NOTE: Place a footer on each slide indicating the project name and that the slides are for “official use only.” This annotation appears on each of the template slides.