Building it
PHASES OF A PROJECT
THREE PHASES OF A PROJECT
 Pre-construction
 Construction
 Post-construction
Within each phase, there are sub-phases
PRE-CONSTRUCTION PHASE
Pre-construction determines the ultimate
outcome of a project. At this stage, construction
contracting methodology must be determined.
 Concept
 Feasibility
 Design
PRE-CONSTRUCTION PHASE
Will the project be design/bid/build, or will a
construction manager be brought on board to
assist with the process?
 Concept
 Feasibility
 Design
PRE-CONSTRUCTION PHASE
The client’s responsibility is to:
 Address why the project is necessary
 Prepare a functional program
 Determine how will it be funded
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
At the conclusion of the pre-construction
phase, the following must be confirmed:
 Scope
 Cost
 Timing
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
“What is the purpose?”
Answer the “whys” of your project. The least
expensive stage of construction.
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
Functional program: list all your needs which will
fulfill the purpose.
Translate the functional program into a space plan.
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
At this point, the guidance of an architect or project
manager could be helpful, as it would expedite the
process by providing professional advice and
technical expertise.
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
A technical study is conducted to determine:
 Viability
 Cost
 Options
 Identification of constraints
 Schedule
PRE-CONSTRUCTION PHASE
This phase usually costs around 1% to 2%
of the project cost.
 Concept
 Feasibility
 Design
PRE-CONSTRUCTION PHASE
 Concept
 Feasibility
 Design
Purpose of the feasibility study:
 Determine what needs to be done to deliver the
project (a technical report)
 What will it cost?
 Is fulfilling the purpose viable under the constraints?
 What options are available to make it viable?
PRE-CONSTRUCTION PHASE
This phase usually costs around 8% to 10%
of the project cost.
 Concept
 Feasibility
 Design
DESIGN
Where the project begins to take shape. Now is the
time to make the right decisions.
Schematic Design
Design Development
Construction Documents
DESIGN
Schematic Design
Design Development
Construction Documents
 During this stage, a monitoring of the design
against the approved budget is essential.
 Milestone dates must be established and met.
 Logistics and schedule must be worked out.
A qualified project or construction manager has the
expertise to undertake these tasks.
DESIGN
Tendering Documents
(contract documents)
 Specifications, general conditions
 Drawings
 Instructions to bidders
 Addenda
DESIGN
Tendering:
Design/Bid/Build
 The work is tendered to general contractors
Construction Management
 The construction manager tenders the work, on
behalf of the client, to qualified trade contractors
CONSTRUCTION PHASE
During the Construction Phase, focus on
material procurement. Labour resources
are secondary.
Communication and planning are more
important than the technical aspects of
the physical construction.
Monitoring of progress is required to ensure:
 The budget is not being exceeded
 The schedule is on track
 The defined scope of work is not being compromised
POST-CONSTRUCTION PHASE
 Completion of deficiencies
 Completion of deferred work
 Issuance of close-out documents for
the owner’s use
 Commencement of the warranty
period
 Release of statutory holdback funds
Learnit buildit-manageit-141124083859-conversion-gate01

More Related Content

What's hot

ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016
Ed Santavicca
 
Project Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessProject Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing Process
Alin Veronika
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel
 
JINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CV
Jinu Louis
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Seta Ohanesian, PMP, LEED AP
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
KHAJA Raheemuddin
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
juwes
 

What's hot (18)

ESantavicca Resume March-2016
ESantavicca Resume March-2016ESantavicca Resume March-2016
ESantavicca Resume March-2016
 
Project Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessProject Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing Process
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex Projects
 
Project management chapter 9
Project management chapter 9Project management chapter 9
Project management chapter 9
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
JINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CV
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Neil Varma - Stages of Project Management
Neil Varma - Stages of Project ManagementNeil Varma - Stages of Project Management
Neil Varma - Stages of Project Management
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
Introduction to Project Management Assessment Notes
Introduction to Project Management Assessment NotesIntroduction to Project Management Assessment Notes
Introduction to Project Management Assessment Notes
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
 
Front End Design Benefits
Front End Design BenefitsFront End Design Benefits
Front End Design Benefits
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
Detailed project reports
Detailed project reportsDetailed project reports
Detailed project reports
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction Estimator
 

Viewers also liked

contaminacion
contaminacioncontaminacion
contaminacion
Mabe Lita
 
Constantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluariiConstantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluarii
Alexandra Nicolae
 
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
Mumin HACIMUSALAR
 

Viewers also liked (16)

IEEEmadC
IEEEmadCIEEEmadC
IEEEmadC
 
contaminacion
contaminacioncontaminacion
contaminacion
 
Nick stetz resume & portfolio
Nick stetz resume & portfolioNick stetz resume & portfolio
Nick stetz resume & portfolio
 
Nick stetz resume & portfolio
Nick stetz resume & portfolioNick stetz resume & portfolio
Nick stetz resume & portfolio
 
Yenilikçi düşünme ve fikir üretme teknikleri
Yenilikçi düşünme ve fikir üretme teknikleriYenilikçi düşünme ve fikir üretme teknikleri
Yenilikçi düşünme ve fikir üretme teknikleri
 
Seminar on Individual and Collective Bargaining
Seminar on Individual and Collective BargainingSeminar on Individual and Collective Bargaining
Seminar on Individual and Collective Bargaining
 
Hellp ppt
Hellp pptHellp ppt
Hellp ppt
 
İnovasyon nedir?
İnovasyon nedir?İnovasyon nedir?
İnovasyon nedir?
 
My CV
My CVMy CV
My CV
 
İleri hafıza teknikleri
İleri hafıza teknikleriİleri hafıza teknikleri
İleri hafıza teknikleri
 
Lucrarea de licenta in 10 pasi
Lucrarea de licenta in 10 pasiLucrarea de licenta in 10 pasi
Lucrarea de licenta in 10 pasi
 
Teoria şi metodologia evaluării
Teoria şi metodologia evaluăriiTeoria şi metodologia evaluării
Teoria şi metodologia evaluării
 
Evaluarea procesului didactic
Evaluarea procesului didacticEvaluarea procesului didactic
Evaluarea procesului didactic
 
Constantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluariiConstantin cucos teoria si metodologia evaluarii
Constantin cucos teoria si metodologia evaluarii
 
Qureshi CV updated (1)
Qureshi CV updated (1)Qureshi CV updated (1)
Qureshi CV updated (1)
 
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
PRESENTATION-Commissioning Experiences on Ammonia and Urea projects- Independ...
 

Similar to Learnit buildit-manageit-141124083859-conversion-gate01

Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
ChassyTesoro1
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
IOSR Journals
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pm
bhashem007
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidy
NASAPMC
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
Hamdija Velagic
 

Similar to Learnit buildit-manageit-141124083859-conversion-gate01 (20)

Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Construction process
Construction processConstruction process
Construction process
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
TOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptxTOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptx
 
TOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdfTOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdf
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptx
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Lec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdfLec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdf
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptx
 
Project development handbook rl website
Project development handbook rl websiteProject development handbook rl website
Project development handbook rl website
 
Project Development Handbook presentation
Project Development Handbook presentationProject Development Handbook presentation
Project Development Handbook presentation
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pm
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidy
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
StreamLine Program
StreamLine ProgramStreamLine Program
StreamLine Program
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
Project management
Project managementProject management
Project management
 

Recently uploaded

➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men 🔝Vijayawada🔝 E...
➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men  🔝Vijayawada🔝   E...➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men  🔝Vijayawada🔝   E...
➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men 🔝Vijayawada🔝 E...
amitlee9823
 
CHEAP Call Girls in Hauz Quazi (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Hauz Quazi  (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Hauz Quazi  (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Hauz Quazi (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...
(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...
(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...
motiram463
 
怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证
怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证
怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证
tufbav
 
Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝
Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝
Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证
怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证
怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证
ehyxf
 
Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...
Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...
Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...
drmarathore
 
Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...
Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...
Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...
Naicy mandal
 

Recently uploaded (20)

SM-N975F esquematico completo - reparación.pdf
SM-N975F esquematico completo - reparación.pdfSM-N975F esquematico completo - reparación.pdf
SM-N975F esquematico completo - reparación.pdf
 
➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men 🔝Vijayawada🔝 E...
➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men  🔝Vijayawada🔝   E...➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men  🔝Vijayawada🔝   E...
➥🔝 7737669865 🔝▻ Vijayawada Call-girls in Women Seeking Men 🔝Vijayawada🔝 E...
 
CHEAP Call Girls in Hauz Quazi (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Hauz Quazi  (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Hauz Quazi  (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Hauz Quazi (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...
(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...
(👉Ridhima)👉VIP Model Call Girls Mulund ( Mumbai) Call ON 9967824496 Starting ...
 
怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证
怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证
怎样办理维多利亚大学毕业证(UVic毕业证书)成绩单留信认证
 
Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Sanjay Nagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝
Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝
Call Now ≽ 9953056974 ≼🔝 Call Girls In Yusuf Sarai ≼🔝 Delhi door step delevry≼🔝
 
Call Girls Pimple Saudagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pimple Saudagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pimple Saudagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pimple Saudagar Call Me 7737669865 Budget Friendly No Advance Booking
 
怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证
怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证
怎样办理圣芭芭拉分校毕业证(UCSB毕业证书)成绩单留信认证
 
Deira Dubai Escorts +0561951007 Escort Service in Dubai by Dubai Escort Girls
Deira Dubai Escorts +0561951007 Escort Service in Dubai by Dubai Escort GirlsDeira Dubai Escorts +0561951007 Escort Service in Dubai by Dubai Escort Girls
Deira Dubai Escorts +0561951007 Escort Service in Dubai by Dubai Escort Girls
 
Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...
Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...
Abort pregnancy in research centre+966_505195917 abortion pills in Kuwait cyt...
 
Top Rated Pune Call Girls Shirwal ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Shirwal ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Shirwal ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Shirwal ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Escorts Service Daryaganj - 9899900591 College Girls & Models 24/7
Escorts Service Daryaganj - 9899900591 College Girls & Models 24/7Escorts Service Daryaganj - 9899900591 College Girls & Models 24/7
Escorts Service Daryaganj - 9899900591 College Girls & Models 24/7
 
HLH PPT.ppt very important topic to discuss
HLH PPT.ppt very important topic to discussHLH PPT.ppt very important topic to discuss
HLH PPT.ppt very important topic to discuss
 
(=Towel) Dubai Call Girls O525547819 Call Girls In Dubai (Fav0r)
(=Towel) Dubai Call Girls O525547819 Call Girls In Dubai (Fav0r)(=Towel) Dubai Call Girls O525547819 Call Girls In Dubai (Fav0r)
(=Towel) Dubai Call Girls O525547819 Call Girls In Dubai (Fav0r)
 
Call Girls Chikhali Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chikhali Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chikhali Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chikhali Call Me 7737669865 Budget Friendly No Advance Booking
 
NO1 Verified Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi A...
NO1 Verified Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi A...NO1 Verified Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi A...
NO1 Verified Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi A...
 
Book Paid Lohegaon Call Girls Pune 8250192130Low Budget Full Independent High...
Book Paid Lohegaon Call Girls Pune 8250192130Low Budget Full Independent High...Book Paid Lohegaon Call Girls Pune 8250192130Low Budget Full Independent High...
Book Paid Lohegaon Call Girls Pune 8250192130Low Budget Full Independent High...
 
Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...
Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...
Makarba ( Call Girls ) Ahmedabad ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Rea...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
 

Learnit buildit-manageit-141124083859-conversion-gate01

  • 2. THREE PHASES OF A PROJECT  Pre-construction  Construction  Post-construction Within each phase, there are sub-phases
  • 3. PRE-CONSTRUCTION PHASE Pre-construction determines the ultimate outcome of a project. At this stage, construction contracting methodology must be determined.  Concept  Feasibility  Design
  • 4. PRE-CONSTRUCTION PHASE Will the project be design/bid/build, or will a construction manager be brought on board to assist with the process?  Concept  Feasibility  Design
  • 5. PRE-CONSTRUCTION PHASE The client’s responsibility is to:  Address why the project is necessary  Prepare a functional program  Determine how will it be funded
  • 6. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design At the conclusion of the pre-construction phase, the following must be confirmed:  Scope  Cost  Timing
  • 7. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design “What is the purpose?” Answer the “whys” of your project. The least expensive stage of construction.
  • 8. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design Functional program: list all your needs which will fulfill the purpose. Translate the functional program into a space plan.
  • 9. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design At this point, the guidance of an architect or project manager could be helpful, as it would expedite the process by providing professional advice and technical expertise.
  • 10. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design A technical study is conducted to determine:  Viability  Cost  Options  Identification of constraints  Schedule
  • 11. PRE-CONSTRUCTION PHASE This phase usually costs around 1% to 2% of the project cost.  Concept  Feasibility  Design
  • 12. PRE-CONSTRUCTION PHASE  Concept  Feasibility  Design Purpose of the feasibility study:  Determine what needs to be done to deliver the project (a technical report)  What will it cost?  Is fulfilling the purpose viable under the constraints?  What options are available to make it viable?
  • 13. PRE-CONSTRUCTION PHASE This phase usually costs around 8% to 10% of the project cost.  Concept  Feasibility  Design
  • 14. DESIGN Where the project begins to take shape. Now is the time to make the right decisions. Schematic Design Design Development Construction Documents
  • 15. DESIGN Schematic Design Design Development Construction Documents  During this stage, a monitoring of the design against the approved budget is essential.  Milestone dates must be established and met.  Logistics and schedule must be worked out. A qualified project or construction manager has the expertise to undertake these tasks.
  • 16. DESIGN Tendering Documents (contract documents)  Specifications, general conditions  Drawings  Instructions to bidders  Addenda
  • 17. DESIGN Tendering: Design/Bid/Build  The work is tendered to general contractors Construction Management  The construction manager tenders the work, on behalf of the client, to qualified trade contractors
  • 18. CONSTRUCTION PHASE During the Construction Phase, focus on material procurement. Labour resources are secondary. Communication and planning are more important than the technical aspects of the physical construction. Monitoring of progress is required to ensure:  The budget is not being exceeded  The schedule is on track  The defined scope of work is not being compromised
  • 19. POST-CONSTRUCTION PHASE  Completion of deficiencies  Completion of deferred work  Issuance of close-out documents for the owner’s use  Commencement of the warranty period  Release of statutory holdback funds