WBFIN: WHAT AN EXCITING CHALLENGE!
Sophie Algoet, SAP NRB Program Manager
Christophe Soumoy, Program Director WBFIN NRB
1. Introduction
2. WBFin: Context and subjects
3. The challenges
4. Next Steps
5. Conclusions
2
3
Introduction
1. Introduction
2. WBFin: Context and subjects
3. The challenges
4. Next Steps
5. Conclusions
4
Background information
• Financial governance;
• Control / Transparency;
• Optimisation (financial flows);
• Decision support
• Digital process;
• Regulatory compliance
• Common solution to be deployed accros
SPW
Result - a market over 8 years
Strategic Objectives
Context and subjects
• Obsolescence (GCOM= +30 years old &
COBOL based)
• Regulatory requirements (EU) - Double-entry
accounting for the 2020 balance sheet;
• Requirements Walloon Digital Plan 2015;
• 20 years' decision process for the Walloon
Region's new accounting system;
• One SPW but 8 General Directorates of which
one is our counterpart.
• A build phase (build): 04/2018-01/2022 on 4 go life;
• Maintenance of these projects after a 2-year warranty (the RUN);
• Hosting, infrastructure operations (Managed Operations);
• For a budget of €88 million over 8 years including VAT. 5
1. Introduction
2. WBFin: Context and subjects
3. The challenges
4. Next Steps
5. Conclusions
6
The SPW applies quite strictly the use of the French language in its projects;
The world of SAP (software publisher, partners and consultants) works in
English;
How can we organise ourselves to find competent and French-speaking
consultants?
A project in French
7
What's the answer?
Use of resources from different French-speaking countries
8
The SPW agents, while participating in the project, must continue their daily work
The availability of SPW agents is therefore limited for the projects.
How to limit the impact on the customer in order to be able to carry out both the
daily work and their participation to the WBFin program?
Resources "available" at the SPW level
9
Optimisation of the use of each available hour of SPW resources
Integration of the project schedule into the SPW activities
Workshop planning includes:
Subject of the workshops
Positioning in the process flow
Presence in person
Subject specific workshops with selected participants
Hybrid approach co-developed with SAP Belgium-Luxembourg
Resources "available" at SPW
Answers?
10
Key elements of the SAP Activate Agile approach
(SAP recommendations)
Start with “SAP
Belgium Best
Practices” &
“Preconfigured Public
Sector” (To Be Build)
+
Solution Validation
instead of traditional
Business Blueprint
“Fit to Standard” workshops
with customer at the steering
wheel to drive priorities +
Agile Build
Tailor the solution in short time-
boxed sprints with frequent
inspection points by the customer
= Customer Value, Efficiency and Efficacy
Supported by SolMan 7.2 with Focused Build
11
EU has required all public services to publish their 2020 balance sheet in double-
entry form.
The SPW launched the project in April 2018.
How to comply with European regulation while the build phase will take 4 years?
Race against time
12
Phasing of the program in 4 go life;
A first go life in 2020: the passive phase;
Program fully operational in January 2022.
Race against time
The answers?
13
L1 versus L4
Scope & objectives of deliveries
Common L1-L4 SAP Systems for L4 - Active
L1 - September 2020
L4 - January 2022
L2 - January 2021
L3 - September 2021
SAP Systems for L1 - LiabilitiesData loading L1
Loading
L4 data
The SPW carries out its
business activities
through the complete
operational WBFin
solution.
Today
The SPW can prepare the balance sheet
GCOM Interface/Other SPW Sources
Loading
data L2,L3
14
DTIC wishes to have a solution that can evolve according to future demands;
Solution that must also be able to connect with existing systems in the SPW IT landscape;
Desire to maximise the use of off the shelf solution;
What solutions should be proposed to meet this demand?
Future proof solution
15
Solutions/Modules of the L4 delivery
The complete set of solutions after go life L4
S/4
(FI, AA, CO,
FM-
BCS,TRM,WF,BP,MM,
PSCD, HR)
xECM
GRC (AC/PC/IDM,
UIL/UIM)
BW/4
BPC
D
M
MDGVIM
PO
CTX
Addresses the integration and communication
between external applications and WBFin solutions
Addresses the BI theme, related reports, budget
preparation and consolidation
Addresses the business issues (finance, accounting,
budget, litigation, treasury, reports)
Addresses central monitoring of access right and GDPR
compliance
Addresses the theme of digital storage & publication,
desktop publishing, budget preparation and
consolidation
SAPSystemsforL4-Active
16
Transition from budget accounting to double-entry
accounting
For 30 years SPW has been working solely on the basis of budget accounting;
Today, because of the European request to provide a general double-entry
balance sheet, the work must be based on the general accounting;
How to manage this change within SPW?
17
Transition from budget accounting to double-entry
Accounting
What's the answer?
In addition to the technical projects, a project dedicated to change
management has been set up;
Proposition of a transversal approach to training management.
18
Change management
Part of the WBFIN program
19
Integration of WBFin into the SPW architecture
WBFin solutions do not replace 100% of the applications used at SPW.
WBFIN will be integrated in a landscape composed of many business
applications.
WBfin will also have to interface with federal applications such as the
National Registry.
How best to integrate WBFin into existing applications without risking
creating a giant interface spider web?
20
Setting up the interfaces in service mode
21
Data from several locations
What's the answer?
Interfaces in Service Mode
22
Data from several sources
GCOM Systems manages:
Expenses
Non-tax revenues
Litigation
Fonds en souffrance (FES)
The Walloon Regional Register
Other SPW systems contain information vital to the preparation of the
Balance Sheet (Go Life L1)
How to reconcile all this data to have a correct loading during
migration?
23
Data from several locations
What's the answer?
Setting up a specific task force for migration management;
Collaboration between legacy systems managers and the WBFin
cell;
A dedicated migration architecture that will integrate all inputs.
24
Conceptual Architecture Temporary Interface Go Life 1
25
1. Introduction
2. WBFin: Reminder of the context and subject
3. The challenges
4. Next Steps
5. Conclusions
26
Delivery of the passive phase (Go Life 1) will start in
September 2020;
Further work on Go Life 4;
Monitoring of change management by the SPW;
See you next year for an update after the start on
01/09/2020.
Next Steps
27
1. Introduction
2. WBFin: Context and subjects
3. The challenges
4. Next Steps
5. Conclusions
28
WBFin a wonderful challenge for both SPW and
NRB/DXC/SAP;
Technical challenge;
Transformation challenge;
Collaboration between the parties = only option
for success.
Conclusions
29
Thanks!
WBFIN

More Related Content

What's hot

Hcl facilitates a leading home furnishing retailer optimize its operational i...
Hcl facilitates a leading home furnishing retailer optimize its operational i...Hcl facilitates a leading home furnishing retailer optimize its operational i...
Hcl facilitates a leading home furnishing retailer optimize its operational i...
Hcl Brand
 
Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501
petemail2k
 

What's hot (18)

SAP S/4HANA Finance and the Digital Core
SAP S/4HANA Finance and the Digital CoreSAP S/4HANA Finance and the Digital Core
SAP S/4HANA Finance and the Digital Core
 
Russia CEE-SECR 2014 - Leveraging SAP Hana
Russia CEE-SECR 2014  - Leveraging SAP HanaRussia CEE-SECR 2014  - Leveraging SAP Hana
Russia CEE-SECR 2014 - Leveraging SAP Hana
 
SAP Smart Financials 1.0
SAP Smart Financials 1.0SAP Smart Financials 1.0
SAP Smart Financials 1.0
 
Driving Accountability Through Disciplined Planning at Abercrombie & Fitch
Driving Accountability Through Disciplined Planning at Abercrombie & FitchDriving Accountability Through Disciplined Planning at Abercrombie & Fitch
Driving Accountability Through Disciplined Planning at Abercrombie & Fitch
 
Intelligent afc public
Intelligent afc publicIntelligent afc public
Intelligent afc public
 
Sap s4 hana 1709 what's new in financial planning & analysis
Sap s4 hana 1709   what's new in financial planning & analysisSap s4 hana 1709   what's new in financial planning & analysis
Sap s4 hana 1709 what's new in financial planning & analysis
 
Hcl facilitates a leading home furnishing retailer optimize its operational i...
Hcl facilitates a leading home furnishing retailer optimize its operational i...Hcl facilitates a leading home furnishing retailer optimize its operational i...
Hcl facilitates a leading home furnishing retailer optimize its operational i...
 
Presentación de Unit4 en el Instituto de Empresas de Madrid
Presentación de Unit4 en el Instituto de Empresas de MadridPresentación de Unit4 en el Instituto de Empresas de Madrid
Presentación de Unit4 en el Instituto de Empresas de Madrid
 
Alisdair bach bio-show
Alisdair bach   bio-showAlisdair bach   bio-show
Alisdair bach bio-show
 
Professional Services in SAP S/4HANA Cloud 2102
Professional Services in SAP S/4HANA Cloud 2102Professional Services in SAP S/4HANA Cloud 2102
Professional Services in SAP S/4HANA Cloud 2102
 
Sap s4 hana 1709 what's new in finance v09 no hidden slides
Sap s4 hana 1709   what's new in finance v09 no hidden slidesSap s4 hana 1709   what's new in finance v09 no hidden slides
Sap s4 hana 1709 what's new in finance v09 no hidden slides
 
Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration Cockpit
 
About Inspiricon AG
About Inspiricon AGAbout Inspiricon AG
About Inspiricon AG
 
SAP Simple Finance
SAP Simple FinanceSAP Simple Finance
SAP Simple Finance
 
S/4 HANA presentation at INDUS
S/4 HANA presentation at INDUSS/4 HANA presentation at INDUS
S/4 HANA presentation at INDUS
 
S/4HANA Finance: New Features and Functionality
S/4HANA Finance: New Features and FunctionalityS/4HANA Finance: New Features and Functionality
S/4HANA Finance: New Features and Functionality
 
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and RoadmapSAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
SAP Financial Closing cockpit in SAP S/4HANA; status and Roadmap
 

Similar to NRB Sap Day 03/10/2019 - Wbfin What An Exciting Challenge - Sophie Algoet - Christophe Soummoy

Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal's CV _2016
Sahar Kamal's CV _2016
Sahar Kamal
 
Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall CV May 2014
Simon Hall CV May 2014
Simon Hall
 
2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx
ismailsheriff14
 

Similar to NRB Sap Day 03/10/2019 - Wbfin What An Exciting Challenge - Sophie Algoet - Christophe Soummoy (20)

Kanton Basel-Stadt Runs Magnolia: How to Switch to a Swiss Kanton to a New CMS
Kanton Basel-Stadt Runs Magnolia: How to Switch to a Swiss Kanton to a New CMSKanton Basel-Stadt Runs Magnolia: How to Switch to a Swiss Kanton to a New CMS
Kanton Basel-Stadt Runs Magnolia: How to Switch to a Swiss Kanton to a New CMS
 
Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal's CV _2016
Sahar Kamal's CV _2016
 
Vanbrabant Peter 04_2016
Vanbrabant Peter 04_2016Vanbrabant Peter 04_2016
Vanbrabant Peter 04_2016
 
Eurisc analytics and big data solutions
Eurisc analytics and big data solutionsEurisc analytics and big data solutions
Eurisc analytics and big data solutions
 
Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall CV May 2014
Simon Hall CV May 2014
 
Phil Evans Ecm Bio
Phil Evans Ecm BioPhil Evans Ecm Bio
Phil Evans Ecm Bio
 
CV-Kyramar-August 2016
CV-Kyramar-August 2016CV-Kyramar-August 2016
CV-Kyramar-August 2016
 
Cv kyramar-august 2016
Cv kyramar-august 2016Cv kyramar-august 2016
Cv kyramar-august 2016
 
CV-Kyramar-August 2016
CV-Kyramar-August 2016CV-Kyramar-August 2016
CV-Kyramar-August 2016
 
Lbdc reflection; m&e; future linkages
Lbdc reflection; m&e; future linkagesLbdc reflection; m&e; future linkages
Lbdc reflection; m&e; future linkages
 
Janko Hahn
Janko HahnJanko Hahn
Janko Hahn
 
Innovative--Advantage_JC
Innovative--Advantage_JCInnovative--Advantage_JC
Innovative--Advantage_JC
 
Vinoth kumar ravi sap abap technical consultant
Vinoth kumar ravi sap abap technical consultantVinoth kumar ravi sap abap technical consultant
Vinoth kumar ravi sap abap technical consultant
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Management
 
Best Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit CrunchBest Practice Showcase Presentation Surviving The Credit Crunch
Best Practice Showcase Presentation Surviving The Credit Crunch
 
2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx
 
Q1 '22 Results.pdf
Q1 '22 Results.pdfQ1 '22 Results.pdf
Q1 '22 Results.pdf
 
Top Down and Bottom Up Planning at Breakthru Beverage Group
Top Down and Bottom Up Planning at Breakthru Beverage GroupTop Down and Bottom Up Planning at Breakthru Beverage Group
Top Down and Bottom Up Planning at Breakthru Beverage Group
 
Jeffrey page resume
Jeffrey page resumeJeffrey page resume
Jeffrey page resume
 
Pwc & sap dsiclosure management
Pwc & sap dsiclosure managementPwc & sap dsiclosure management
Pwc & sap dsiclosure management
 

More from NRB

More from NRB (20)

Le Groupe NRB : Le meilleur partenaire pour votre z/modernisation
Le Groupe NRB : Le meilleur partenaire pour votre z/modernisationLe Groupe NRB : Le meilleur partenaire pour votre z/modernisation
Le Groupe NRB : Le meilleur partenaire pour votre z/modernisation
 
Mainframe Day 2022 -The NRB Group - the best partner of your z-modernization.pdf
Mainframe Day 2022 -The NRB Group - the best partner of your z-modernization.pdfMainframe Day 2022 -The NRB Group - the best partner of your z-modernization.pdf
Mainframe Day 2022 -The NRB Group - the best partner of your z-modernization.pdf
 
The NRB Group mainframe day 2021 - Containerisation on Z - Paul Pilotto - Seb...
The NRB Group mainframe day 2021 - Containerisation on Z - Paul Pilotto - Seb...The NRB Group mainframe day 2021 - Containerisation on Z - Paul Pilotto - Seb...
The NRB Group mainframe day 2021 - Containerisation on Z - Paul Pilotto - Seb...
 
The NRB Group mainframe day 2021 - New Programming Languages on Z - Frank Van...
The NRB Group mainframe day 2021 - New Programming Languages on Z - Frank Van...The NRB Group mainframe day 2021 - New Programming Languages on Z - Frank Van...
The NRB Group mainframe day 2021 - New Programming Languages on Z - Frank Van...
 
The NRB Group mainframe day 2021 - DevOps on Z - Jerome Klimm - Benoit Ebner
The NRB Group mainframe day 2021 - DevOps on Z - Jerome Klimm - Benoit EbnerThe NRB Group mainframe day 2021 - DevOps on Z - Jerome Klimm - Benoit Ebner
The NRB Group mainframe day 2021 - DevOps on Z - Jerome Klimm - Benoit Ebner
 
The NRB Group mainframe day 2021 - Application Modernisation On Z - Sebastien...
The NRB Group mainframe day 2021 - Application Modernisation On Z - Sebastien...The NRB Group mainframe day 2021 - Application Modernisation On Z - Sebastien...
The NRB Group mainframe day 2021 - Application Modernisation On Z - Sebastien...
 
The NRB Group mainframe day 2021 - Security On Z - Guillaume Hoareau
The NRB Group mainframe day 2021 - Security On Z - Guillaume HoareauThe NRB Group mainframe day 2021 - Security On Z - Guillaume Hoareau
The NRB Group mainframe day 2021 - Security On Z - Guillaume Hoareau
 
The NRB Group mainframe day 2021 - IBM Z-Strategy & Roadmap - Adam John Sturg...
The NRB Group mainframe day 2021 - IBM Z-Strategy & Roadmap - Adam John Sturg...The NRB Group mainframe day 2021 - IBM Z-Strategy & Roadmap - Adam John Sturg...
The NRB Group mainframe day 2021 - IBM Z-Strategy & Roadmap - Adam John Sturg...
 
The NRB Group mainframe day 2021 - The NRB Group & The Mainframe - Pascal Laf...
The NRB Group mainframe day 2021 - The NRB Group & The Mainframe - Pascal Laf...The NRB Group mainframe day 2021 - The NRB Group & The Mainframe - Pascal Laf...
The NRB Group mainframe day 2021 - The NRB Group & The Mainframe - Pascal Laf...
 
Nrb Mainframe Day - z Data and AI - Michael Boeckx
Nrb Mainframe Day - z Data and AI - Michael BoeckxNrb Mainframe Day - z Data and AI - Michael Boeckx
Nrb Mainframe Day - z Data and AI - Michael Boeckx
 
Nrb Mainframe Day - Nrb Mainframe Strategy - Pascal Laffineur
Nrb Mainframe Day - Nrb Mainframe Strategy - Pascal LaffineurNrb Mainframe Day - Nrb Mainframe Strategy - Pascal Laffineur
Nrb Mainframe Day - Nrb Mainframe Strategy - Pascal Laffineur
 
Nrb Mainframe Day - Ibm z A Key Player In The Hybrid Cloud Journey - Bob Catteew
Nrb Mainframe Day - Ibm z A Key Player In The Hybrid Cloud Journey - Bob CatteewNrb Mainframe Day - Ibm z A Key Player In The Hybrid Cloud Journey - Bob Catteew
Nrb Mainframe Day - Ibm z A Key Player In The Hybrid Cloud Journey - Bob Catteew
 
Nrb Mainframe Day - NRB's Agile Software Factory In support of Application In...
Nrb Mainframe Day - NRB's Agile Software Factory In support of Application In...Nrb Mainframe Day - NRB's Agile Software Factory In support of Application In...
Nrb Mainframe Day - NRB's Agile Software Factory In support of Application In...
 
Nrb Mainframe Day z Data and AI - Leif Pedersen
Nrb Mainframe Day z Data and AI - Leif PedersenNrb Mainframe Day z Data and AI - Leif Pedersen
Nrb Mainframe Day z Data and AI - Leif Pedersen
 
Nrb Mainframe Day - z Legacy Innovation - New Architecture And Api Services -...
Nrb Mainframe Day - z Legacy Innovation - New Architecture And Api Services -...Nrb Mainframe Day - z Legacy Innovation - New Architecture And Api Services -...
Nrb Mainframe Day - z Legacy Innovation - New Architecture And Api Services -...
 
NRB Sap Day 03/10/2019 - Presentation The Nrb Group - Daniel Eycken
NRB Sap Day 03/10/2019 - Presentation The Nrb Group - Daniel Eycken NRB Sap Day 03/10/2019 - Presentation The Nrb Group - Daniel Eycken
NRB Sap Day 03/10/2019 - Presentation The Nrb Group - Daniel Eycken
 
NRB Sap Day 03/10/2019 - The Sap Intelligent Enterprise Strategy In Action - ...
NRB Sap Day 03/10/2019 - The Sap Intelligent Enterprise Strategy In Action - ...NRB Sap Day 03/10/2019 - The Sap Intelligent Enterprise Strategy In Action - ...
NRB Sap Day 03/10/2019 - The Sap Intelligent Enterprise Strategy In Action - ...
 
NRB Sap Day 03/10/2019 - Energy digital platform - David Dewe
NRB Sap Day 03/10/2019 - Energy digital platform - David DeweNRB Sap Day 03/10/2019 - Energy digital platform - David Dewe
NRB Sap Day 03/10/2019 - Energy digital platform - David Dewe
 
NRB Vmware vForum 2019
NRB Vmware vForum 2019NRB Vmware vForum 2019
NRB Vmware vForum 2019
 
NRB MAINFRAME DAY 08 - Toine Straathof - 8 key points for a successful transf...
NRB MAINFRAME DAY 08 - Toine Straathof - 8 key points for a successful transf...NRB MAINFRAME DAY 08 - Toine Straathof - 8 key points for a successful transf...
NRB MAINFRAME DAY 08 - Toine Straathof - 8 key points for a successful transf...
 

Recently uploaded

Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

NRB Sap Day 03/10/2019 - Wbfin What An Exciting Challenge - Sophie Algoet - Christophe Soummoy

  • 1. WBFIN: WHAT AN EXCITING CHALLENGE! Sophie Algoet, SAP NRB Program Manager Christophe Soumoy, Program Director WBFIN NRB
  • 2. 1. Introduction 2. WBFin: Context and subjects 3. The challenges 4. Next Steps 5. Conclusions 2
  • 4. 1. Introduction 2. WBFin: Context and subjects 3. The challenges 4. Next Steps 5. Conclusions 4
  • 5. Background information • Financial governance; • Control / Transparency; • Optimisation (financial flows); • Decision support • Digital process; • Regulatory compliance • Common solution to be deployed accros SPW Result - a market over 8 years Strategic Objectives Context and subjects • Obsolescence (GCOM= +30 years old & COBOL based) • Regulatory requirements (EU) - Double-entry accounting for the 2020 balance sheet; • Requirements Walloon Digital Plan 2015; • 20 years' decision process for the Walloon Region's new accounting system; • One SPW but 8 General Directorates of which one is our counterpart. • A build phase (build): 04/2018-01/2022 on 4 go life; • Maintenance of these projects after a 2-year warranty (the RUN); • Hosting, infrastructure operations (Managed Operations); • For a budget of €88 million over 8 years including VAT. 5
  • 6. 1. Introduction 2. WBFin: Context and subjects 3. The challenges 4. Next Steps 5. Conclusions 6
  • 7. The SPW applies quite strictly the use of the French language in its projects; The world of SAP (software publisher, partners and consultants) works in English; How can we organise ourselves to find competent and French-speaking consultants? A project in French 7
  • 8. What's the answer? Use of resources from different French-speaking countries 8
  • 9. The SPW agents, while participating in the project, must continue their daily work The availability of SPW agents is therefore limited for the projects. How to limit the impact on the customer in order to be able to carry out both the daily work and their participation to the WBFin program? Resources "available" at the SPW level 9
  • 10. Optimisation of the use of each available hour of SPW resources Integration of the project schedule into the SPW activities Workshop planning includes: Subject of the workshops Positioning in the process flow Presence in person Subject specific workshops with selected participants Hybrid approach co-developed with SAP Belgium-Luxembourg Resources "available" at SPW Answers? 10
  • 11. Key elements of the SAP Activate Agile approach (SAP recommendations) Start with “SAP Belgium Best Practices” & “Preconfigured Public Sector” (To Be Build) + Solution Validation instead of traditional Business Blueprint “Fit to Standard” workshops with customer at the steering wheel to drive priorities + Agile Build Tailor the solution in short time- boxed sprints with frequent inspection points by the customer = Customer Value, Efficiency and Efficacy Supported by SolMan 7.2 with Focused Build 11
  • 12. EU has required all public services to publish their 2020 balance sheet in double- entry form. The SPW launched the project in April 2018. How to comply with European regulation while the build phase will take 4 years? Race against time 12
  • 13. Phasing of the program in 4 go life; A first go life in 2020: the passive phase; Program fully operational in January 2022. Race against time The answers? 13
  • 14. L1 versus L4 Scope & objectives of deliveries Common L1-L4 SAP Systems for L4 - Active L1 - September 2020 L4 - January 2022 L2 - January 2021 L3 - September 2021 SAP Systems for L1 - LiabilitiesData loading L1 Loading L4 data The SPW carries out its business activities through the complete operational WBFin solution. Today The SPW can prepare the balance sheet GCOM Interface/Other SPW Sources Loading data L2,L3 14
  • 15. DTIC wishes to have a solution that can evolve according to future demands; Solution that must also be able to connect with existing systems in the SPW IT landscape; Desire to maximise the use of off the shelf solution; What solutions should be proposed to meet this demand? Future proof solution 15
  • 16. Solutions/Modules of the L4 delivery The complete set of solutions after go life L4 S/4 (FI, AA, CO, FM- BCS,TRM,WF,BP,MM, PSCD, HR) xECM GRC (AC/PC/IDM, UIL/UIM) BW/4 BPC D M MDGVIM PO CTX Addresses the integration and communication between external applications and WBFin solutions Addresses the BI theme, related reports, budget preparation and consolidation Addresses the business issues (finance, accounting, budget, litigation, treasury, reports) Addresses central monitoring of access right and GDPR compliance Addresses the theme of digital storage & publication, desktop publishing, budget preparation and consolidation SAPSystemsforL4-Active 16
  • 17. Transition from budget accounting to double-entry accounting For 30 years SPW has been working solely on the basis of budget accounting; Today, because of the European request to provide a general double-entry balance sheet, the work must be based on the general accounting; How to manage this change within SPW? 17
  • 18. Transition from budget accounting to double-entry Accounting What's the answer? In addition to the technical projects, a project dedicated to change management has been set up; Proposition of a transversal approach to training management. 18
  • 19. Change management Part of the WBFIN program 19
  • 20. Integration of WBFin into the SPW architecture WBFin solutions do not replace 100% of the applications used at SPW. WBFIN will be integrated in a landscape composed of many business applications. WBfin will also have to interface with federal applications such as the National Registry. How best to integrate WBFin into existing applications without risking creating a giant interface spider web? 20
  • 21. Setting up the interfaces in service mode 21 Data from several locations What's the answer?
  • 23. Data from several sources GCOM Systems manages: Expenses Non-tax revenues Litigation Fonds en souffrance (FES) The Walloon Regional Register Other SPW systems contain information vital to the preparation of the Balance Sheet (Go Life L1) How to reconcile all this data to have a correct loading during migration? 23
  • 24. Data from several locations What's the answer? Setting up a specific task force for migration management; Collaboration between legacy systems managers and the WBFin cell; A dedicated migration architecture that will integrate all inputs. 24
  • 25. Conceptual Architecture Temporary Interface Go Life 1 25
  • 26. 1. Introduction 2. WBFin: Reminder of the context and subject 3. The challenges 4. Next Steps 5. Conclusions 26
  • 27. Delivery of the passive phase (Go Life 1) will start in September 2020; Further work on Go Life 4; Monitoring of change management by the SPW; See you next year for an update after the start on 01/09/2020. Next Steps 27
  • 28. 1. Introduction 2. WBFin: Context and subjects 3. The challenges 4. Next Steps 5. Conclusions 28
  • 29. WBFin a wonderful challenge for both SPW and NRB/DXC/SAP; Technical challenge; Transformation challenge; Collaboration between the parties = only option for success. Conclusions 29