_Understanding
The Doka Group
1868 Founded
5 Continents
70 Countries
160 Branches worldwide
1,215 Million € consolidated revenues
Umdasch Group
93 % Foreign share
> 6,100 Employees
The Doka Group – At a glance
Familiy business with almost 150 years of history
Milestones
Woodworking –
where it all
began
The year a
strong brand is
born – Doka
Going
International –
Doka Germany
Market entry
Overseas
Burj Khalifa
sets new
benchmark
Formwork
contract for 1 km
high Kingdom
Tower
Owners Hilde Umdasch
and Alfred Umdasch
2004 Doka beam H20 top
is introduced to the market
1965 Doka large-area formwork
streamlines forming operations
1996 Doka platform SCP
makes its construction-site debut
Formwork construction and shopfitting under one roof
A Company of the Umdasch Group
The heart of our operations
Headquarters in Austria
Formwork solutions – Made in Austria
Research & Development, Production & Operations
Research & Development
1990 R&D centre opens
100 Employees
200,000 Working hours/year
Josef
Umdasch
Research
Prize
Production & Operations
4 million m2 formwork sheets
1 million floor props
12 million linear metres formwork beams
250,000 load-bearing tower frames
180,000 framed formwork panels
Project Management
The right solution for every requirement
Doka Systems
1
2
3
5
6
1 System Components
Wall Systems
Floor Systems
Climbing Systems
Load-bearing Systems
Safety Systems
2
3
4
5
6
Tailored to project-specific and individual construction processes
Doka Services
Formwork instructor
Reconditioning service
Training
Formwork planning
Doka Safety
Doka Safety Initiative
to raise awareness of safety-related
issues at construction sites.
Doka experts for all construction sectors and methods
Doka Competence Centers
Bridges
High Rise
Tunnels
Power Plants
Mining
Fair-faced Concrete
Muskrat Falls
Labrador, Canada
Hydro power plant
Schiphol Amsterdam
Amsterdam, Netherlands
Cantilevered bridge
• Length: 284 m
• Height: 41 m
• Cycle time: 7-day cycle
• Span width: 142 m
Solbakk Tunnel
Stavanger, Norway
Two tunnels
• Length: each 185 m
• Length of concreting section: 6 m
• Cross sectional shape: curved/round
• Partly monolithic
Lot 194
Kuala Lumpur, Malaysia
Residential highrise
• Height: 235 m
• Number of storeys: 55
D3 Svrčinovec – Skalité
Svrčinovec – Skalité, Slovakia
Piers & carriageway slab
• Length of structure: 422 m
• Width of bridge: 31.41 m
Brenner Base Tunnel
Brenner, Austria
Wolf II – Saxener Tunnel
• Length of tunnel: 1 km
• Clear width: 9.26 m
• Clear height: 6.87 m
Juma Al Majid Tower
Dubai, United Arab Emirates
Residential highrise
• Height: 210 m
• Number of storeys: 50
Business Garden Warsaw
Warsaw, Poland
Office building & shopping area
ESO Supernova
Garching, Germany
Planetarium & Visitor Centre
• Usable area: 3,700 m²
• Planetarium dome: 14.00 m diameter
• Dome inclination: 23.5 °
World Trade Center Tower 3
New York, USA
Highrise
• Height: 300 m
• Number of storeys: 80
Nispo Viaduct
Morelia, Mexico
Bridge, Piers
• Height: 48 to 58 m
Midfield Terminal Complex
Abu Dhabi, United Arab Emirates
Airport
Thank you for your attention

Weitere ähnliche Inhalte

Was ist angesagt?

Customer Service as an Attitude
Customer Service as an AttitudeCustomer Service as an Attitude
Customer Service as an AttitudePoncela
 
AEGEE - Estiem - Agora Aachen
AEGEE - Estiem - Agora AachenAEGEE - Estiem - Agora Aachen
AEGEE - Estiem - Agora Aachenaegee.statutory
 
Steve Lewis Freelance resume 2010
Steve Lewis Freelance resume 2010Steve Lewis Freelance resume 2010
Steve Lewis Freelance resume 2010SteveCLewis
 
Module 9: Excursions
Module 9: ExcursionsModule 9: Excursions
Module 9: ExcursionsMohit Chhabra
 
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)Panchshil
 
Summer Cost Saver European Splendor With Cruise with SOTC Holidays
Summer Cost Saver European Splendor With Cruise with SOTC HolidaysSummer Cost Saver European Splendor With Cruise with SOTC Holidays
Summer Cost Saver European Splendor With Cruise with SOTC Holidaysansonjoseph18
 
W6 Jesper Ackinger
W6 Jesper AckingerW6 Jesper Ackinger
W6 Jesper AckingerOECD CFE
 
Deutsch famous facts
Deutsch famous factsDeutsch famous facts
Deutsch famous factsSumedha
 
Taiwan Trade Mission to Slovakia
Taiwan Trade Mission to SlovakiaTaiwan Trade Mission to Slovakia
Taiwan Trade Mission to SlovakiaJuraj Kucera
 
Famous Places in Germany
Famous Places in GermanyFamous Places in Germany
Famous Places in GermanyDurga Shree
 
Crescent Foundry - MUNICIPAL
Crescent Foundry - MUNICIPALCrescent Foundry - MUNICIPAL
Crescent Foundry - MUNICIPALKabita Shaw
 
BMW : welt overview
BMW : welt overviewBMW : welt overview
BMW : welt overviewJSLENEWS
 
KOMPOZYT-EXPO 2015 BROCHURE
KOMPOZYT-EXPO 2015 BROCHUREKOMPOZYT-EXPO 2015 BROCHURE
KOMPOZYT-EXPO 2015 BROCHUREKOMPOZYT-EXPO ®
 
Module 2: History of Munich
Module 2: History of MunichModule 2: History of Munich
Module 2: History of MunichMohit Chhabra
 
exhibition photos
exhibition photosexhibition photos
exhibition photosWang Fajing
 

Was ist angesagt? (20)

Customer Service as an Attitude
Customer Service as an AttitudeCustomer Service as an Attitude
Customer Service as an Attitude
 
AEGEE - Estiem - Agora Aachen
AEGEE - Estiem - Agora AachenAEGEE - Estiem - Agora Aachen
AEGEE - Estiem - Agora Aachen
 
Steve Lewis Freelance resume 2010
Steve Lewis Freelance resume 2010Steve Lewis Freelance resume 2010
Steve Lewis Freelance resume 2010
 
Daimler AG - Press Information - Cars and Art.pdf
Daimler AG - Press Information - Cars and Art.pdfDaimler AG - Press Information - Cars and Art.pdf
Daimler AG - Press Information - Cars and Art.pdf
 
Constructor
ConstructorConstructor
Constructor
 
Berlin in just 10 minutes
Berlin in just 10 minutesBerlin in just 10 minutes
Berlin in just 10 minutes
 
Module 9: Excursions
Module 9: ExcursionsModule 9: Excursions
Module 9: Excursions
 
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
Commercial Projects in Kharadi Pune by World Trade Center (WTC Pune)
 
Summer Cost Saver European Splendor With Cruise with SOTC Holidays
Summer Cost Saver European Splendor With Cruise with SOTC HolidaysSummer Cost Saver European Splendor With Cruise with SOTC Holidays
Summer Cost Saver European Splendor With Cruise with SOTC Holidays
 
Shopex
ShopexShopex
Shopex
 
W6 Jesper Ackinger
W6 Jesper AckingerW6 Jesper Ackinger
W6 Jesper Ackinger
 
Deutsch famous facts
Deutsch famous factsDeutsch famous facts
Deutsch famous facts
 
Taiwan Trade Mission to Slovakia
Taiwan Trade Mission to SlovakiaTaiwan Trade Mission to Slovakia
Taiwan Trade Mission to Slovakia
 
Famous Places in Germany
Famous Places in GermanyFamous Places in Germany
Famous Places in Germany
 
Crescent Foundry - MUNICIPAL
Crescent Foundry - MUNICIPALCrescent Foundry - MUNICIPAL
Crescent Foundry - MUNICIPAL
 
BMW : welt overview
BMW : welt overviewBMW : welt overview
BMW : welt overview
 
KOMPOZYT-EXPO 2015 BROCHURE
KOMPOZYT-EXPO 2015 BROCHUREKOMPOZYT-EXPO 2015 BROCHURE
KOMPOZYT-EXPO 2015 BROCHURE
 
Module 2: History of Munich
Module 2: History of MunichModule 2: History of Munich
Module 2: History of Munich
 
Germany powerpoint
Germany powerpointGermany powerpoint
Germany powerpoint
 
exhibition photos
exhibition photosexhibition photos
exhibition photos
 

Andere mochten auch

14123991 hrm-project
14123991 hrm-project14123991 hrm-project
14123991 hrm-projectHemant Vora
 
BE + web design pune
BE + web design puneBE + web design pune
BE + web design punebhakti pawar
 
Leadership CAR Presentation Group 2
Leadership CAR Presentation Group 2Leadership CAR Presentation Group 2
Leadership CAR Presentation Group 2Tara Curtis
 
Kumar Abhishek Sudhanshu1
Kumar Abhishek Sudhanshu1Kumar Abhishek Sudhanshu1
Kumar Abhishek Sudhanshu1Kumar Abhishek
 
行政院會 內政部簡報 汛期與颱風季節防救災(o=m)
行政院會 內政部簡報 汛期與颱風季節防救災(o=m)行政院會 內政部簡報 汛期與颱風季節防救災(o=m)
行政院會 內政部簡報 汛期與颱風季節防救災(o=m)releaseey
 
ELIXIR and ELIXIR-UK training activities
ELIXIR and ELIXIR-UK training activitiesELIXIR and ELIXIR-UK training activities
ELIXIR and ELIXIR-UK training activitiesELIXIR UK
 
Venta de servicios de arte o productos artísticos
Venta de servicios de arte o productos artísticosVenta de servicios de arte o productos artísticos
Venta de servicios de arte o productos artísticoscomovivirdelarte
 
Why care about your organisational culture v.1.2
Why care about your organisational culture v.1.2Why care about your organisational culture v.1.2
Why care about your organisational culture v.1.2Alex Gray
 
MM Bagali, PhD, HRM Project for MBA Institute
MM Bagali, PhD, HRM Project for MBA InstituteMM Bagali, PhD, HRM Project for MBA Institute
MM Bagali, PhD, HRM Project for MBA Institutedr m m bagali, phd in hr
 

Andere mochten auch (11)

14123991 hrm-project
14123991 hrm-project14123991 hrm-project
14123991 hrm-project
 
BE + web design pune
BE + web design puneBE + web design pune
BE + web design pune
 
HSE certificate
HSE certificateHSE certificate
HSE certificate
 
Leadership CAR Presentation Group 2
Leadership CAR Presentation Group 2Leadership CAR Presentation Group 2
Leadership CAR Presentation Group 2
 
CV_faiz with photo
CV_faiz with photoCV_faiz with photo
CV_faiz with photo
 
Kumar Abhishek Sudhanshu1
Kumar Abhishek Sudhanshu1Kumar Abhishek Sudhanshu1
Kumar Abhishek Sudhanshu1
 
行政院會 內政部簡報 汛期與颱風季節防救災(o=m)
行政院會 內政部簡報 汛期與颱風季節防救災(o=m)行政院會 內政部簡報 汛期與颱風季節防救災(o=m)
行政院會 內政部簡報 汛期與颱風季節防救災(o=m)
 
ELIXIR and ELIXIR-UK training activities
ELIXIR and ELIXIR-UK training activitiesELIXIR and ELIXIR-UK training activities
ELIXIR and ELIXIR-UK training activities
 
Venta de servicios de arte o productos artísticos
Venta de servicios de arte o productos artísticosVenta de servicios de arte o productos artísticos
Venta de servicios de arte o productos artísticos
 
Why care about your organisational culture v.1.2
Why care about your organisational culture v.1.2Why care about your organisational culture v.1.2
Why care about your organisational culture v.1.2
 
MM Bagali, PhD, HRM Project for MBA Institute
MM Bagali, PhD, HRM Project for MBA InstituteMM Bagali, PhD, HRM Project for MBA Institute
MM Bagali, PhD, HRM Project for MBA Institute
 

Ähnlich wie Doka unternehmenspräsentation 2016_en

Doka_Corporate Brochure
Doka_Corporate BrochureDoka_Corporate Brochure
Doka_Corporate BrochureMehdi Halet
 
Royal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptkahayami
 
İskeleler İçin İş Güvenliği-
İskeleler İçin İş Güvenliği-İskeleler İçin İş Güvenliği-
İskeleler İçin İş Güvenliği-İGY Zirve
 
50 years of Lindab (1959-2009)
50 years of Lindab (1959-2009)50 years of Lindab (1959-2009)
50 years of Lindab (1959-2009)Matchlighter
 
LWN Lufttechnik (www.lwn-lufttechnik.de)
LWN Lufttechnik (www.lwn-lufttechnik.de)LWN Lufttechnik (www.lwn-lufttechnik.de)
LWN Lufttechnik (www.lwn-lufttechnik.de)Alexander Kammerer
 
Presentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engPresentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engheavyindustry
 
ARCHIZINC TROPHY N° 6 - 2014
ARCHIZINC TROPHY N° 6 - 2014ARCHIZINC TROPHY N° 6 - 2014
ARCHIZINC TROPHY N° 6 - 2014VMZINC
 
Archizinc Trophy magazine n° 6
Archizinc Trophy magazine n° 6Archizinc Trophy magazine n° 6
Archizinc Trophy magazine n° 6VMZINC
 
Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil Statoil
 
Introduction Ah Industrial Eng
Introduction  Ah Industrial EngIntroduction  Ah Industrial Eng
Introduction Ah Industrial Enghenkschellekens
 
Electrical maintanance
Electrical maintananceElectrical maintanance
Electrical maintananceMadhan Gopal
 
Wind Energy Trends in Germany - Silke Luers, deutsche wind guard
Wind Energy Trends in Germany - Silke Luers, deutsche wind guardWind Energy Trends in Germany - Silke Luers, deutsche wind guard
Wind Energy Trends in Germany - Silke Luers, deutsche wind guardSustainableEnergyAut
 
Presentation Anizplast - a successful injection moulderrsion 110509
Presentation Anizplast -  a successful injection moulderrsion 110509Presentation Anizplast -  a successful injection moulderrsion 110509
Presentation Anizplast - a successful injection moulderrsion 110509dirkvanherck
 

Ähnlich wie Doka unternehmenspräsentation 2016_en (20)

FUMO Company 2016
FUMO Company 2016FUMO Company 2016
FUMO Company 2016
 
Allianz Riviera e Arena 92
Allianz Riviera e Arena 92 Allianz Riviera e Arena 92
Allianz Riviera e Arena 92
 
High Rise Makka Clock Tower
High Rise Makka Clock TowerHigh Rise Makka Clock Tower
High Rise Makka Clock Tower
 
Hug presentation
Hug presentationHug presentation
Hug presentation
 
Doka_Corporate Brochure
Doka_Corporate BrochureDoka_Corporate Brochure
Doka_Corporate Brochure
 
Royal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC corporate presentation
Royal IHC corporate presentation
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
 
İskeleler İçin İş Güvenliği-
İskeleler İçin İş Güvenliği-İskeleler İçin İş Güvenliği-
İskeleler İçin İş Güvenliği-
 
50 years of Lindab (1959-2009)
50 years of Lindab (1959-2009)50 years of Lindab (1959-2009)
50 years of Lindab (1959-2009)
 
LWN Lufttechnik (www.lwn-lufttechnik.de)
LWN Lufttechnik (www.lwn-lufttechnik.de)LWN Lufttechnik (www.lwn-lufttechnik.de)
LWN Lufttechnik (www.lwn-lufttechnik.de)
 
MEKA BULLETIN
MEKA BULLETINMEKA BULLETIN
MEKA BULLETIN
 
Presentation
PresentationPresentation
Presentation
 
Presentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engPresentation ep corporate src rev9 eng
Presentation ep corporate src rev9 eng
 
ARCHIZINC TROPHY N° 6 - 2014
ARCHIZINC TROPHY N° 6 - 2014ARCHIZINC TROPHY N° 6 - 2014
ARCHIZINC TROPHY N° 6 - 2014
 
Archizinc Trophy magazine n° 6
Archizinc Trophy magazine n° 6Archizinc Trophy magazine n° 6
Archizinc Trophy magazine n° 6
 
Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil
 
Introduction Ah Industrial Eng
Introduction  Ah Industrial EngIntroduction  Ah Industrial Eng
Introduction Ah Industrial Eng
 
Electrical maintanance
Electrical maintananceElectrical maintanance
Electrical maintanance
 
Wind Energy Trends in Germany - Silke Luers, deutsche wind guard
Wind Energy Trends in Germany - Silke Luers, deutsche wind guardWind Energy Trends in Germany - Silke Luers, deutsche wind guard
Wind Energy Trends in Germany - Silke Luers, deutsche wind guard
 
Presentation Anizplast - a successful injection moulderrsion 110509
Presentation Anizplast -  a successful injection moulderrsion 110509Presentation Anizplast -  a successful injection moulderrsion 110509
Presentation Anizplast - a successful injection moulderrsion 110509
 

Kürzlich hochgeladen

Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 

Kürzlich hochgeladen (20)

Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 

Doka unternehmenspräsentation 2016_en

  • 1. Copyright by Doka The Formwork Experts. Corporate Presentation | 2016 _Understanding The Doka Group
  • 2. 1868 Founded 5 Continents 70 Countries 160 Branches worldwide 1,215 Million € consolidated revenues Umdasch Group 93 % Foreign share > 6,100 Employees The Doka Group – At a glance
  • 3.
  • 4. Familiy business with almost 150 years of history Milestones Woodworking – where it all began The year a strong brand is born – Doka Going International – Doka Germany Market entry Overseas Burj Khalifa sets new benchmark Formwork contract for 1 km high Kingdom Tower Owners Hilde Umdasch and Alfred Umdasch 2004 Doka beam H20 top is introduced to the market 1965 Doka large-area formwork streamlines forming operations 1996 Doka platform SCP makes its construction-site debut
  • 5. Formwork construction and shopfitting under one roof A Company of the Umdasch Group
  • 6. The heart of our operations Headquarters in Austria Formwork solutions – Made in Austria Research & Development, Production & Operations
  • 7. Research & Development 1990 R&D centre opens 100 Employees 200,000 Working hours/year Josef Umdasch Research Prize
  • 8. Production & Operations 4 million m2 formwork sheets 1 million floor props 12 million linear metres formwork beams 250,000 load-bearing tower frames 180,000 framed formwork panels
  • 9.
  • 11. The right solution for every requirement Doka Systems 1 2 3 5 6 1 System Components Wall Systems Floor Systems Climbing Systems Load-bearing Systems Safety Systems 2 3 4 5 6
  • 12. Tailored to project-specific and individual construction processes Doka Services Formwork instructor Reconditioning service Training Formwork planning
  • 13. Doka Safety Doka Safety Initiative to raise awareness of safety-related issues at construction sites.
  • 14.
  • 15. Doka experts for all construction sectors and methods Doka Competence Centers Bridges High Rise Tunnels Power Plants Mining Fair-faced Concrete
  • 17. Schiphol Amsterdam Amsterdam, Netherlands Cantilevered bridge • Length: 284 m • Height: 41 m • Cycle time: 7-day cycle • Span width: 142 m
  • 18. Solbakk Tunnel Stavanger, Norway Two tunnels • Length: each 185 m • Length of concreting section: 6 m • Cross sectional shape: curved/round • Partly monolithic
  • 19. Lot 194 Kuala Lumpur, Malaysia Residential highrise • Height: 235 m • Number of storeys: 55
  • 20. D3 Svrčinovec – Skalité Svrčinovec – Skalité, Slovakia Piers & carriageway slab • Length of structure: 422 m • Width of bridge: 31.41 m
  • 21. Brenner Base Tunnel Brenner, Austria Wolf II – Saxener Tunnel • Length of tunnel: 1 km • Clear width: 9.26 m • Clear height: 6.87 m
  • 22. Juma Al Majid Tower Dubai, United Arab Emirates Residential highrise • Height: 210 m • Number of storeys: 50
  • 23. Business Garden Warsaw Warsaw, Poland Office building & shopping area
  • 24. ESO Supernova Garching, Germany Planetarium & Visitor Centre • Usable area: 3,700 m² • Planetarium dome: 14.00 m diameter • Dome inclination: 23.5 °
  • 25. World Trade Center Tower 3 New York, USA Highrise • Height: 300 m • Number of storeys: 80
  • 26. Nispo Viaduct Morelia, Mexico Bridge, Piers • Height: 48 to 58 m
  • 27. Midfield Terminal Complex Abu Dhabi, United Arab Emirates Airport
  • 28. Thank you for your attention

Hinweis der Redaktion

  1. Doka System Components • Composite and timber formwork beams • Formwork sheets • Floor props • Form-ties and suspension cones • Formwork accessories Doka Wall Systems • Framed formwork such as Framax Xlife and Frami Xlife • Timber-beam formwork such as DokaShape for complex construction geometries • Column formwork • Single-sided formwork Doka Floor Systems • Tableforms such as Dokamatic and Dokaflex tables • Panel floor formwork Dokadek 30 • Timber-beam floor formwork such as Dokaflex 30 tec and Dokaflex Doka Climbing Systems • Automatic climbing formwork such as Platform SCP, SKE plus • Crane-lifted climbing formwork such as MF240 or Dam formwork Doka Load-bearing Systems • Shoring towers such as Load-bearing tower Staxo 100 and Staxo 40 • Tunnel formwork DokaCC and SL-1 • Bridge formwork such as Cantilever forming traveller and Composite forming carriage Doka Safety Systems • Protection screen Xclimb 60 • Working and protection platforms such as the Platform system Xsafe plus • Guardrail systems such as the Edge protection system XP • Stair towers and ladder systems • Working scaffolds
  2. Muskrat Falls, Labrador, Canada Construction work: Astaldi Canada Type of structure: Hydro power plant Facts: taking into account the most stringent environmental conditions, LEED certified for sustainable construction Construction time: 2014 – 2017 The 824-MW hydraulic power plant at Muskrat Falls in Canada consists of a turbine building with four turbines, three dam constructions, six spillway piers, dividing and supporting walls and northern and southern operating areas. It is the second-largest hydraulic power plant in Canada. Temperatures that fall to –40°C are not infrequent on site and represent a huge challenge for construction work. Doka provided a project-specific formwork solution and set new standards for the measurement of concrete strength with the innovative Concremote system. Products used: Large-area formwork Top 50, Column formwork Top 50, Dam formwork D22, Load-bearing tower Staxo 100, Framed formwork Framax Xlife, Formwork planning, Formwork Instructor, pre-assembly, Concremote Challenge: • temperatures as low as -40 °C and constantly changing weather conditions • due to project size – on-site storage and assembly of formwork on-site subject to restrictions • customized shape of outer turbine walls demand that concrete and steel joins seamlessly • working safely and quickly Project solution: • individually adaptable formwork solutions for different weather conditions that were heated as needed. This made adherence to the construction schedule feasible. • use of only one load-bearing system on the site thanks to the universal usability of the Load-bearing tower Staxo 100. It is made for economical shoring of thin as well as 4 m thick floors of the powerhouse. • ladder systems such as stair towers and ladders built into the formwork solutions guarantee safe accessroutes. • Concrete strength measurement with Concremote is made for exact monitoring of hydration heat development. Stripping times, treatment times and the time for pre-stressing are derived online directly from the measured values. This allows a construction process that is safe and fast. • pre-assembled platforms and formwork panels supplied by Doka's Toronto branch resulted in accelerating the construction workflow and reducing on-site personnel costs • just-in-time deliveries permitted responding even to workflow changes with short notice • special formwork for outside walls of the turbines so that steel liner could be affixed without any problems
  3. Schiphol, Amsterdam, Netherlands Type: cantilevered bridge across the Amsterdam-Rhine Canal Construction work: Volker Wessels, Boskalis, Hochtief, DIF This large-scale project involved the construction of a total of three bridges with a span of 142 metres and an overall length of approx. 284 metres across the Amsterdam-Rhine Canal. It was particularly important during and after the construction of this bridge to maintain the shipping traffic along this important trade route. Type of structure: monolithic Length of structure: 284 m Height of structure: 41 m Span width: 142 m Cycle time: 7-day cycle Construction time: 2014 – 2015 Products used: Cantilever forming traveller, Load-bearing tower Staxo 100, Framed formwork Framax Xlife, Large-area formwork Top 50, Climbing formwork K, Dokaflex, Platform system Xsafe plus, Edge protection system XP, Ladder system XS Challenge: • restricted clearance – keeping ship traffic flowing below • building 3 bridges at once Project solution: • to begin with, piers and pier heads are built at both banks • thanks to the Cantilever forming traveller, traffic below was unimpeded during construction of the south, north and centre bridges with their respective widths of 17.60 m, 21.50 m and 11.50 m • the modular rentable construction adapts flexibly to the project-specific shapes of the three bridges • construction of 14 bridge sections up to approx. 5 m in weekly cycle • safe working conditions thanks to built-in Guardrail systems and Access systems
  4. Solbakk Tunnel, Stavanger, Norway Construction work: Marti IAV Solbakk DA Type of structure: partly monolithic Construction time: 2015 – 2016 The Solbakk Tunnel is 14 km in length and is one of three tunnels forming the Ryfast Project, one of the longest underwater road tunnel projects in the world. The current ferry connection between Stavanger and Tau will be replaced by this tunnel at a maximum depth of 290 metres beneath the sea with two separate tunnels carrying traffic in either direction. Portal: Length of tunnel: 185 m each Clear width: 9.18 m | Clear height: 7.95 m Mining-type tunnel: Clear width: 10.38 m | Clear height: 7.69 m Products used: Heavy-duty supporting system SL-1, Large-area formwork Top 50, Working scaffold Modul Challenge: • regular geological testing during advancement in order to pour the tunnel's inner shell in case there is loose rock • formwork operations take place while the conveyor is running Project solution: • pre-assembled units allow the formwork traveller to be moved quickly to the tunnel location where it is used • sufficient space for removal of materials via conveyor belt during planning and execution of the formwork traveller will aid in rapid and unimpeded construction progress
  5. Lot 194, Kuala Lumpur, Malaysia Customer: MCC Overseas Building height: 235 m Number of storeys: 55 Type of structure: residential highrise Lot 194 is a new luxury residential building currently being constructed in the centre of Kuala Lumpur. The 235-metre-high building with 55 storeys provides enough space for the luxurious apartments and the elegant W Hotel. During the construction of this impressive tower, Doka formwork solutions are being used from the ground floor to the top floor, thereby ensuring a successful construction process. Products used: Dokamatic table, Dokaflex 1-2-4, Load-bearing tower Staxo 40, Large-area formwork Top 50, Climbing formwork MF240, Protection Screen Xclimb 60, Table Lifting System TLS
  6. D3 Svrčinovec – Skalité, Svrčinovec – Skalité, Slovakia Builder: Doprastav Export, s.r.o Construction work: VÁHOSTAV-SK, Doprastav, STRABAG, METROSTAV Length of structure: 422 m Width of bridge: 13.41 m Construction time: 2015 – 2016 Products used: Composite forming carriage, Framed formwork Framax Xlife, Climbing formwork MF240, Large-area formwork Top 50 Challenge: • construction of low and tall pylons in unusual shape • fast and safe assembly of the Composite forming carriage • adherence to tight construction schedule Project solution: • building the piers with demanding shape • a combination of Large-area formwork Top 50 and Climbing formwork MF240 was selected for the lower piers. The taller piers were formed quickly and smoothly with the hydraulic Automatic climbing formwork Xclimb 60. • construction of steel trough in incremental launching method and subsequent casting of deck-slab with Composite forming carriage from Doka • fast assembly thanks to the ability to pre-assemble a large portion of formwork units can be preassembled that are put together on-site from the safety of ground-level • thanks to system-based 'construction kit' the Composite forming carriage can be reused immediately on another project once the bridge has been completed
  7. Brenner Base Tunnel, Wolf II Exploration Conctract Secion – Saxener Tunnel , Brenner, Austria Construction work: Swietelsky Tunnelbau GmbH Type of structure: partly monolithic Length of tunnel: 1 km Clear width: 9.26 m Clear height: 6.87 m Construction time: 2015 – 2016 The construction section “Wolf II – Saxener Tunnel” forms part of the Brenner base tunnel. For this section with a length of 1 km Doka supplied a tailor-made fully hydraulic formwork solution including assembly by the ready-to-use team of Doka Austria. Products used: Heavy-duty supporting system SL-1, Large-area formwork Top 50 Challenge: • 1-day cycle • pre-assembled, easy-to-operate formwork traveller • self-driving formwork traveller for a longitudinal slope exceeding 10 % Project solution: • the mining-type formwork traveller moves along an extreme longitudinal grade exceeding 10 % and pours a 10-m long block every day • rentable steel formwork for tunnel construction comprised of individual panels with adaptable radius • the formwork is sturdy and can be re-used in subsequent projects
  8. Juma Al Majid Tower, Dubai, United Arab Emirates Contractor: Ali & Sons Contracting Company L.L.C Height: 210 m Number of storeys: 50 Type of structure: residential highrise Surrounded by a diversity of skyscrapers, the formwork and protection screen systems by Doka in their characteristic sunny yellow colour form a landmark in their own right. In this case they ensure rapid and safe building progress in the construction of the 50-storey Juma Al Majid Tower residential skyscraper. Products used: Large-area formwork Top 50, Climbing formwork 150F, Automatic climbing formwork SKE50 plus (corewall formwork), Automatic climbing formwork SKE100 (shearwall formwork), Automatic climbing formwork SKE50 (shearwall formwork), Protection screen Xclimb 60, Dokaflex 1-2-4, Panel floor formwork Dokadek 30, Load-bearing tower Staxo 40 & Staxo 100, Doka Table Lifting System (TLS) Challenge: A fully crane independent solution was required due to limited space on site, tight schedule and strict regulations with the metro being located close by. Project solution: Where previously concrete placing booms (CPB) were located on the slab itself, Doka’s SKE100 plus allows the CPB to be self-climbing, helping to maintain the pace of completing core walls in five-day cycles and the shear walls and columns in four.
  9. Business Garden Warsaw, Warsaw, Poland 5 six-storey office buildings and shopping area Construction time: 2015-2016 Another phase of the “Business Garden” office complex is being built in the south of Warsaw, consisting of five six-storey office buildings and a shopping area. The building company in charge of construction chose Doka formwork technology for the in-situ concrete construction.
  10. ESO Supernova, Garching Germany Planetarium & Visitor Centre Planetarium dome: 14.00 m diameter, 17.40 m height, dome inclination 23.5° Usable area: 3,700 m² Dome inclination: 23.5 ° Builder: European Organisation for Astronomical Research in the Southern Hemisphere (ESO), Garching Design: Bernhardt + Partner Architects, Darmstadt Construction work: GROSSMANN Bau GmbH & Co. KG, Rosenheim A very unusual building, the ESO Supernova Planetarium and Visitor Centre, is being built at the headquarters of the European Organisation for Astronomical Research in the Southern Hemisphere (ESO). The inclined and at the same time curved walls present a considerable challenge with regard to the formwork. Each concreting cycle is different. Each formwork element is a unique item. It will fit in only one single place of the structure. And everything has to be delivered and returned again just-in-time. The Doka Formwork Technicians have developed an economical concept to master this, complete with 3D planning, element assembly and dismantling and logistics. Products used: 7,800 m² Large-area formwork Top 100 tec, 2,500 m³ Load-bearing tower Staxo 100, 220 running metres of platform, Edge protection system XP Services: Formwork planning, static calculations, Pre-assembly Service, Formwork instructor  
  11. World Trade Center Tower 3, New York, USA Construction company: Roger & Sons Height: 300 m Pouring section: 3,90 m Cycling time: 1 week Number of storeys: 80 Architect: Richard Rogers, Rogers Stirk Harbour + Partner 260.000 m² office and shop space Construction: 2014-2017 With a planned height of 80 storeys, Tower 3 is growing skywards in the heart of the World Trade Center complex. The skyscraper was designed by architect Richard Rogers, a winner of the prestigious Pritzker Prize, and offers over 260,000 m2 office and shop space. As in Towers 2 and 4 the formwork solution was provided by Doka. Products used : Automatic climbing formwork SKE100 plus, Framed Formwork Frami S, Large-area formwork Top 50 S, Table Lifting System TLS, Super Climber SCP, Doka Stair tower 250 Services: Formwork planning, Formwork instructor service
  12. Nispo Viaduct, Morelia, Mexico Type of structure: piers Piers height: between 48 to 58 metres Construction time: 2014-2015 Main Contractor: Mexpresa (Mexicana de Persfuerzo) ​ Doka's high-performance systems convince customers with their speed, safety and efficiency in the construction of this bridge in the town of Morelia in Mexico. Doka's professional technicians ensured on-time deliveries and reliable support on site. Products used: Framed formwork Frami Xlife, Supporting construction frame, Climbing formwork MF240, shaft platform ​​​​ ​​Services: Assembly drawings, Dis-assembly, Formwork Instructors, Formwork utilisation plans, Pre-assembly on site, Reconditioning, ​​​​Static calculatio​​n​
  13. Midfield Terminal Complex, Abu Dhabi International Airport, Abu Dhabi, United Arab Emirates Structure: Piers, Airport Terminal Construction company: Joint Venture TAV-CC-Arabtec Construction: 2013-2017 The Midfield Terminal Complex at Abu Dhabi International Airport is currently one of the most impressive construction projects in the Emirate and at the same time the core element in the growth strategy “Abu Dhabi Economic Vision 2030”. Doka is supporting the extension of the air traffic hub with high-performance formwork systems. Products used: Framed formwork Frami Xlife, Load-bearing tower Staxo 40, Large-area formwork Top 50 Services: Formwork planning, Formwork instructor, Site logistics, On-site engineering support Challenge: Providing a formwork solution tailored to the structure's unusual X-shape and the tight 15-month schedule for cast-in-place concrete construction. Project solution: Doka developed a customized formwork solution comprising Framed formwork Frami Xlife, Load-bearing tower Staxo 100 and Large-area formwork Top 50. A project coordinator, a team of technicians and a formwork instructor ensure efficient construction progress.