2. STRATEGY & APPROACH FOR SMART
CITIES
2
Retrofitting Model (area >500 acres)
Redevelopment Model(area>50 acres)
Green-Field Model(area>250 acres)
Pan-City Development Model(whole city)
3. • Redevelopment of old Government housing colonies has been identified
as one of the strategies to overcome housing shortage.
• Optimum utilization of land by applying a higher Floor Area Ratio
(FAR) as permissible under the latest master plan 2021 norms.
• Kidwai Nagar (East) has been identified as one of the colonies for
redevelopment as General Pool Residential Accommodation (GPRA) .
National Buildings
Construction Corp. Ltd.
Background
6. Plot Area 86 Acres
Area under Darya Khan Tomb 14 acres
Area under Redevelopment 72 acres
Car parking provided in basement 10639 nos
Existing green area 13%
Green area provided 47%
Project Area Details
7. Salient Features of the Project
• Self sustainable model with social infrastructure,
Dedicated Cycle , Jogging Tracks & Parks.
• Open area over 76% including Lush Green
cover in place of Existing 28% open area.
• “WALK TO WORK” concept, 10% of the
residential units will be allotted to the office block
users.
• Vehicle free Residential Zone
• Underground Parking for 10639 vehicles
8. Salient Features of Office Complex
• Towers - G+10 & G+4
• Separate Entry & Exit from Ring Road
• Large Plazas within Blocks
• Access Control System
• High Speed Lifts
• Higher Floor Heights
• Direct Vehicular entry to Basements
• 100% Power Backup for Offices
• 100% Air-conditioned Office Spaces
• BTU Metering System
• Fire Fighting & Detection System
9. Salient Features of Residential Complex
• 78 Towers
• Walk able distance from nearest Metro
Station
• Milk booths & ATM’s at every 200m
• Local Shopping Centre
• Primary & 2 Senior Secondary Schools
• Banquet Hall
• Dispensary
• Sprawling Landscapes with Gardens and
Pathways
• Kids Play Areas
10. SMART FEATURES
• Waste Water Management Plant
• Solar Heating System
• Solar Lighting System
• Solid & Green Waste Management Plant
• Preservation of existing trees & Development of more green areas.
• Rain Water Harvesting System
• Plastic waste to fuel converter plant
• Bio-digester Toilet
• Zero landfill Area
11. • GRIHA Rated Project .
• Solar Water Heaters and fitted Solar Street Lighting. LED fixtures.
• CNG Based Gensets.
• Use of DGU ( Double Glazed Units) Glazed panels which cuts Heat Transmission by
35%. 1500 mm wide balconies to act as shade.
• Dual Plumbing System.
• IBMS for Office Blocks.
• 12 Mtrs High Barricading all around Project site during Construction.
• Retention of Existing 33% Trees out of existing 2600. Proposed to plant 18000 Trees
• 12 Mtrs Green belt is being Provided all-around Complex .
Environmental Features
12. Zero Waste - Working on Zero Waste policy right from Construction phase.
Construction & Demolition Waste Recycling Plant In Situ with Zero
Waste is operational.
Zero Sewage - Bio-digester toilet installed for disposing human waste in
eco friendly manners.
Zero Discharge into Sewerage System. 2 Nos 1500 KLD Sewage
Treatment Plant for Sewage treatment. Treated water will be reused for
horticulture, flushing and cooling towers.
Zero Litter - Solid Waste Management. No litter will go out of the colony
including Plastic. PLASTIC WASTE will be converted into FUEL
Zero Project
13. • Organic Waste Converter equipments of 1.5 tonne capacity for converting
household organic waste to compost.
• Pallet Making Machine for converting horticultural waste into fuel pellets has also
been installed.
• The pellets are used as fuel and compost is used for horticulture purpose.
• Approx. 2500 sq. ft. covered finished shed for plant & 1500 sq. ft. covered finished
shed for segregation have been provided.
14
SOLID WASTE MANAGEMENT SYSTEM
14. WASTE WATER TREATMENT PLANT
15
Use : Treated water is used for irrigation purpose
through pipe network laid in the whole campus.
Sludge cakes are used as manure with in the
complex.
Monitoring : Laboratory has been set up in the complex and on
daily basis monitoring of BOD, COD, TSS and pH of
treated water is being done.