More Related Content
Similar to Trane Chiller (20)
Trane Chiller
- 4. SETUP TO DRILL AND REAM FOR TAPER DOWEL PINS REQUIRED FOR PRECISE REASSEMBLY MATCH MARK ALL MATING PARTS BEFORE DISASSEMBLY
- 10. PUT ELBOW ON CART, SUPPORT SECURELY, COVER TO PROECT, AND PLACE ASIDE IN A SAFE AREA
- 12. FIRST STAGE INLET GUIDE VANE LIFTING BRACKET LIP ON END OF BRACKET TO CATCH INSIDE OF GUIDE VANE HOUSING