INTERNATIONAL ISLAMIC UNIVERSITY ISLAMABAD
CONTOURING BY INDIRECT METHOD LAB MANUAL
GROUP 07
DEPARTMENT OF CIVIL ENGINEERING
FACULTY OF ENGINEERING & TECNOLOGY
 GROUP MEMBERS
SALMAN NISAR
31-FET/BSCE/F14
MUHAMMAD YASEEN
32-FET/BSCE/F14
MUHAMMAD ISMIAL
34-FET/BSCE/F14
MUHAMMAD JUNAID
35-FET/BSCE/F14
 METHODS OF CONTOURING :
i. Direct Method:
 Radial method
 Random method
i. Indirect Method:
Indirect method is quick, economic and less laborious than direct
method. The reduced level of a point on the surface of ground is
called spot height or spot level .In this method spot levels of selected
points are taken with a level and their levels are computed. The
horizontal positions of these points are measured or computed and
the points are plotted on the plan. The contours are then drawn by a
process called interpolation of contours from the levels of the guide
points.
It have further three categories, given below
 Grid or Square method
 Cross Section method
 Tachometric method
 Radial lines method
I. Grid or Square Method:
1) This method is suitable only if area is not very extensive. its
procedure is mention below.
2) Squares or grid method is suitable for contouring of plains or
gently sloping grounds.
o PROCEDURE
a) In this method area to be contoured is divided into series of squares,
and ends (corner) of each square is marked with pegs.
b) The size of square varies from 5m to 20m, depending upon the
contour intervals and nature of ground and scale of the desired map.
c) The squares not need to be same throughout and may vary depending
on requirements and field conditions.
d) The pegs are marked out and elevation of the ground at the corners of
the square are determined by a level.
e) The grid is plotted to the scale of the map and the spot levels of the
grid corners are entered.
f) The contours of desired values are then located by interpolation.
g) Special care should be taken to give the spot levels to the salient
features of the ground such as hilltops, deepest points of the
depressions.
h) The method is used for large scale mapping and at average
precision.
EXAMPLE=>
PROCEDURE:
• We have an area of 30m 30m and we want to convert it to grids or squares.
• Make 10m
.

.
• Set the auto level at a point of known reduce level, and
take a back sight by help of auto level.
• Adding B.S value to B.M will give us H.I, whose mathematical formula
is
H.I=B.M + B.S => 100’+5.4’=105.4’
• . Now place staff rod at every corner of grid and note
readings.
10m grids throughout the area
• This is F.S, by subtracting these values from H.I we get R.L of that
point.
• A1 point has a F.S of 3.84’ so subtracting 3.84’ from 105.4’ which is H.I
will
Give us 101.56’ which is the R.L of A1 point.
• Similarly F.S of point A3 is 3.38’ and its reduce level becomes 102.02’
• This process goes until reduce level of last point D4 is found, which is
103.35’
PROCEDURE: CON’T
Interpolation by estimation method:
In this method contour lines are drawn between points by estimating
distances between points
STEPS:
1) when the grid points are A2= 102.5 feet elevation and
A1=101.56 feet elevation, then a contour line of 102 feet
elevation would be half way in between.
2) For points B2=102.08ft and A1=101.56ft, then a contour
line of 102ft will be more towards 102.08ft elevation
3) For points B2=102.08ft and B1=101.36ft, then a
contour line of 102ft will be more towards 102.08ft
elevation
4) For point C2=102’, so the contour point will be on c2.
6) For points C1=101.98ft and D2=102.2ft, then a contour
line of 102’will be more towards C1=101.98ft elevation.
5) For points C1=101.98ft and D1=102.2ft, then a contour
line of 102ft will be more towards C1=101.98ft elevation.
7) So contour lines of area 30m 30m by estimation method is given below
Interpolation of Grids by Arithmetical
calculation:
In method contour lines are drawn between ground
points by using formula given below:
elevationobetween twDistance
elevationLow-elevationHigh
elevationCentral-elevationHigh
=% 
STEPS:
1. Start by selecting a contour interval and two grid points.
2. This example starts with point of 102ft interval.
3. The distance between A1 and A2 is 1.inch so by putting
the values in following formula gives:
%=0.79
4. For points A1and B2, difference between these two is 2
inch and proportion difference is 0.36 as obvious from fig
5. For 102’ between B1=101.56’ and B2=102.08’ point, the
Calculation is given below;
6. For finding position of 102’ between C2=102’ and
C1=101.98’ for this there is no need of calculation.
7. For finding position of 102’ between C1=101.98’ and
D1=102.2’
8. For finding position of 102’ between C1=101.98’ and
D2=102.2’
9. So the contours of these lines are shown in below
diagram.
I. Cross Section method:
This method is most suitable for the survey of
long narrow strip such as road, railway, canal etc.
 PROCEDURE:
a) Cross section are run transverse to the center line
of work and representative points are marked along
the line of cross section.
b) The cross section line need not necessarily be at
right angles to the center line of work.
c) This may be inclined at any angle to the center line
if necessary.
d) This spacing of the cross section depend on the
topography of the country and the nature of survey
the common value is 20m to 30m in hilly country and
100m in flat country.
e) The level of the points along the section line are
plotted on the plan and contour are then interpolated
as usual.
 Example:
1. In this example the base line is 50m.
2. Two points are taken at each side of base line at 5m.
3. First of all H.I is found from the B.S=5ft and B.M=100ft
By formula mention below;
H.I=B.S+B.M
H.I=5ft+100ft
H.I=105ft
4. The reduce level of each point is found by simply
subtracting F.S of that point from H.I
’.
6. For point A3, F.S=4.44ft it’s R.L=100.56’.
7. F.S of point A2=4.29ft, its R.L becomes 100.71ft
8. F.S of point A1=4.33ft, its R.L becomes 100.67ft.
9. F.S of point A is 4.5ft and its R.L is 100.5ft
10. Similarly for last point F4, F.S=3.36ft and its R.L is
101.64ft.
11. So by this process the elevation of each point of this
example is found, and is shown in diagram below;
5. Suppose F.S of A4 is 4.54ft so its reduce level is
R.D=H.I-F.S=> R.L=105ft-4.54ft
R.L of point A4=100.49ft
Interpolation of cross section by estimation
method:
 In this example we try to find contour intervals of 101ft,
so for finding this contour interval throughout the cross
section steps are given below in details;
 As 101ft is closer to point D4=100.76’ than
E4=101.75’so this shows that contour interval=101ft
will be close to point D4.
 For point D4=100.76ft and E3=101.9’, again 101ft contour interval will
be near point D4.
 For point E3=101.9’ and D3=100.98ft, 101ft contour
interval will be near point D3.
 For point D3=100.98ft and E=101.3ft contour interval
of 101ft will be near point D3.
 For point D=100.86ft and E=101.3ft contour interval of
101ft will be near point D.
 For point D=100.86ft and E1=101.07ft, 101ft contour
interval will be near point E1.
 For point D1=100.27ft and E2=101.8ft, 101ft contour
interval will be closer to point D1.
 For point D1=100.27ft and E1=101.07ft, 101ft contour interval
will be more near to point E1.
So the whole contour interval can be plotted as
Interpolation of cross section by arithmetical
method:
In this method interpolation of points is done by the
process of proportion formula given below:
elevationobetween twDistance
elevationLow-elevationHigh
elevationCentral-elevationHigh
=% 
STEPS:
1) The contour interval between D4 and E4 is given
below:
2) For points D4 and E3 calculation is given below along
with fig:
3) For point E3 and D3 the calculation are given below
along with fig:
4)For point E and D3 calculation is given:
5) For points E and D calculation are given below:
6) For points D and E1 arithmetic calculation is given
below:
7) For points D1 and E1 calculation are given below:
8) For point D1 and E2 arithmetic calculation is given
below:
So the calculation can be plotted on map as:
I. Tachometric method:
Whenever contouring of very steep area such
as a “hill” is required tachometric method is used.
Procedure is given below.
 PROCEDURE:
a) Set up the tachometer at the top of the steep hill.
Tachometer is a theodolite fitted with stadia
diaphragm. The stadia diaphragm has three horizontal
parallel hairs instead of one as found in a conventional
cross hair diaphragm.
b) With the help of a tachometer it is possible to
determine the horizontal distance of the point from
the telescope as well its vertical level.
c) The steep hill is surveyed at three levels – the base of
the hill, the mid-level of the hill and the top level of the
hill.
I. Radial line method:
This method is convenient in hilly terrain
 PORCEDURE:
a. Radial line method in this method, a number of radial
lines are set out at known angular interval at each
station and points are marked at the ground at
convenient distance apart on the rays that are set.
b. Spot levels of these points are determined by leveling.
c. The points are plotted to the scale of the map and spot
levels are entered.
d. The contours of desired values are then located by
interpolation.
d) Using the tachometer reading are taken all around the
hill at equal angular intervals on all these three levels.
e) The radial plot thus obtained is worked in the office to
interpolate points of equal elevation for contour mapping.
Interpolation of contours:
• Drawing contour lines to produce a contouring of an area
requires the process of interpolation between points.
• Interpolation process means spacing the contours
proportionally between the plotted ground points.
• Contours can be interpolated by :
1. By estimation method
2. By arithmetical calculation method
3. By graphical method
1. Estimatiom method:
 The position of contour points between ground points
are estimated.
 The contour lines are then drawn through these points.
 This method is used for rough and usually used on
small scale maps.
 Interpolating can be done by estimation for low
precision maps.
2. Arithmetical calculation method:
 This method is employed when greater accuracy is
required.
 This is time consuming also.
 Positions of contours points among guide points are located
by arithmetic calculations.
 Formula is given below:
elevationobetween twDistance
elevationLow-elevationHigh
elevationCentral-elevationHigh
=% 
3. Graphical method:
 When higher accuracy is required and many contours
are to be made, this method is employed.
 This method of interpolation proves to be rapid and
easy.
 For this purpose a tracing paper is used.

Weitere ähnliche Inhalte

Was ist angesagt?

traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveyingPhurba Tamang
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1Bahzad5
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdfGokul Saud
 
5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTUVATSAL PATEL
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineersmusadoto
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1Decentumang
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 

Was ist angesagt? (20)

traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Surveying
Surveying Surveying
Surveying
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
 
5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Linear measurement
Linear measurement Linear measurement
Linear measurement
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Levelling
LevellingLevelling
Levelling
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
Contouring
ContouringContouring
Contouring
 
tacheometry surveying
tacheometry surveyingtacheometry surveying
tacheometry surveying
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 

Andere mochten auch

Bracing and shear wall mitigation
Bracing and shear wall mitigationBracing and shear wall mitigation
Bracing and shear wall mitigationLAKSHMI SURESAN
 
My Name is Lily (final)
My Name is Lily (final)My Name is Lily (final)
My Name is Lily (final)mish_white
 
Fotoverslag Superclub 31 januari
Fotoverslag Superclub 31 januariFotoverslag Superclub 31 januari
Fotoverslag Superclub 31 januarikerkinkollumerzwaag
 
10 Signs The Self-Storage Industry Is Taking Over
10 Signs The Self-Storage Industry Is Taking Over10 Signs The Self-Storage Industry Is Taking Over
10 Signs The Self-Storage Industry Is Taking OverIVR Technology Group
 
Direct method of contouring(26 30) DCE FET IIUI
Direct method of contouring(26 30) DCE FET IIUIDirect method of contouring(26 30) DCE FET IIUI
Direct method of contouring(26 30) DCE FET IIUIcivilengineerf14
 
Remembrance Day art work
Remembrance Day  art workRemembrance Day  art work
Remembrance Day art workJim Rieder
 
Estadísticas. CV. Términos Básicos.
Estadísticas. CV. Términos Básicos.Estadísticas. CV. Términos Básicos.
Estadísticas. CV. Términos Básicos.Yendry Lopez
 

Andere mochten auch (13)

Bracing and shear wall mitigation
Bracing and shear wall mitigationBracing and shear wall mitigation
Bracing and shear wall mitigation
 
Gatos
GatosGatos
Gatos
 
My Name is Lily (final)
My Name is Lily (final)My Name is Lily (final)
My Name is Lily (final)
 
Resume Tony
Resume TonyResume Tony
Resume Tony
 
Fotoverslag Superclub 31 januari
Fotoverslag Superclub 31 januariFotoverslag Superclub 31 januari
Fotoverslag Superclub 31 januari
 
10 Signs The Self-Storage Industry Is Taking Over
10 Signs The Self-Storage Industry Is Taking Over10 Signs The Self-Storage Industry Is Taking Over
10 Signs The Self-Storage Industry Is Taking Over
 
chikimiki intro
chikimiki introchikimiki intro
chikimiki intro
 
Direct method of contouring(26 30) DCE FET IIUI
Direct method of contouring(26 30) DCE FET IIUIDirect method of contouring(26 30) DCE FET IIUI
Direct method of contouring(26 30) DCE FET IIUI
 
Remembrance Day art work
Remembrance Day  art workRemembrance Day  art work
Remembrance Day art work
 
Peita Hatch CV
Peita Hatch CVPeita Hatch CV
Peita Hatch CV
 
Rizk Raouf CV
Rizk Raouf CVRizk Raouf CV
Rizk Raouf CV
 
Estadísticas. CV. Términos Básicos.
Estadísticas. CV. Términos Básicos.Estadísticas. CV. Términos Básicos.
Estadísticas. CV. Términos Básicos.
 
Group12FinalProject
Group12FinalProjectGroup12FinalProject
Group12FinalProject
 

Ähnlich wie LAB MANUAL contouring by indirect method . dce: fet: iiui

Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)civilengineerf14
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfKumkumaIp
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by skSalman Khan
 
contourlines-161212065738.pdf
contourlines-161212065738.pdfcontourlines-161212065738.pdf
contourlines-161212065738.pdfshucaybcabdi
 
Brief ContourLines power point for surveying engineering
Brief ContourLines power point for surveying engineeringBrief ContourLines power point for surveying engineering
Brief ContourLines power point for surveying engineeringdejenemulu
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsBahzad5
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Doreen Yeo
 
S2 6 theodolites
S2 6 theodolitesS2 6 theodolites
S2 6 theodolitesEst
 
UNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxUNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxADCET, Ashta
 
contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdfshucaybcabdi
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring SurveyingBahzad5
 
Tacheometric-Surveying.ppt
Tacheometric-Surveying.pptTacheometric-Surveying.ppt
Tacheometric-Surveying.pptADCET, Ashta
 

Ähnlich wie LAB MANUAL contouring by indirect method . dce: fet: iiui (20)

Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by sk
 
contourlines-161212065738.pdf
contourlines-161212065738.pdfcontourlines-161212065738.pdf
contourlines-161212065738.pdf
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Brief ContourLines power point for surveying engineering
Brief ContourLines power point for surveying engineeringBrief ContourLines power point for surveying engineering
Brief ContourLines power point for surveying engineering
 
ContourLines.ppt
ContourLines.pptContourLines.ppt
ContourLines.ppt
 
ContourLines (4).ppt
ContourLines (4).pptContourLines (4).ppt
ContourLines (4).ppt
 
unit-3.ppt
unit-3.pptunit-3.ppt
unit-3.ppt
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Laboratory manual surveying_ii
Laboratory manual surveying_iiLaboratory manual surveying_ii
Laboratory manual surveying_ii
 
S2 6 theodolites
S2 6 theodolitesS2 6 theodolites
S2 6 theodolites
 
UNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxUNit no 1 Contouring.pptx
UNit no 1 Contouring.pptx
 
contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdf
 
Contouring
ContouringContouring
Contouring
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
 
EDP.pptx
EDP.pptxEDP.pptx
EDP.pptx
 
Tacheometric-Surveying.ppt
Tacheometric-Surveying.pptTacheometric-Surveying.ppt
Tacheometric-Surveying.ppt
 

Kürzlich hochgeladen

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 

Kürzlich hochgeladen (20)

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 

LAB MANUAL contouring by indirect method . dce: fet: iiui

  • 1. INTERNATIONAL ISLAMIC UNIVERSITY ISLAMABAD CONTOURING BY INDIRECT METHOD LAB MANUAL GROUP 07 DEPARTMENT OF CIVIL ENGINEERING FACULTY OF ENGINEERING & TECNOLOGY
  • 2.  GROUP MEMBERS SALMAN NISAR 31-FET/BSCE/F14 MUHAMMAD YASEEN 32-FET/BSCE/F14 MUHAMMAD ISMIAL 34-FET/BSCE/F14 MUHAMMAD JUNAID 35-FET/BSCE/F14
  • 3.  METHODS OF CONTOURING :
  • 4. i. Direct Method:  Radial method  Random method i. Indirect Method: Indirect method is quick, economic and less laborious than direct method. The reduced level of a point on the surface of ground is called spot height or spot level .In this method spot levels of selected points are taken with a level and their levels are computed. The horizontal positions of these points are measured or computed and the points are plotted on the plan. The contours are then drawn by a process called interpolation of contours from the levels of the guide points. It have further three categories, given below  Grid or Square method  Cross Section method  Tachometric method  Radial lines method
  • 5. I. Grid or Square Method: 1) This method is suitable only if area is not very extensive. its procedure is mention below. 2) Squares or grid method is suitable for contouring of plains or gently sloping grounds. o PROCEDURE a) In this method area to be contoured is divided into series of squares, and ends (corner) of each square is marked with pegs. b) The size of square varies from 5m to 20m, depending upon the contour intervals and nature of ground and scale of the desired map. c) The squares not need to be same throughout and may vary depending on requirements and field conditions. d) The pegs are marked out and elevation of the ground at the corners of the square are determined by a level. e) The grid is plotted to the scale of the map and the spot levels of the grid corners are entered. f) The contours of desired values are then located by interpolation. g) Special care should be taken to give the spot levels to the salient features of the ground such as hilltops, deepest points of the depressions. h) The method is used for large scale mapping and at average precision.
  • 7. PROCEDURE: • We have an area of 30m 30m and we want to convert it to grids or squares. • Make 10m .  . • Set the auto level at a point of known reduce level, and take a back sight by help of auto level. • Adding B.S value to B.M will give us H.I, whose mathematical formula is H.I=B.M + B.S => 100’+5.4’=105.4’ • . Now place staff rod at every corner of grid and note readings. 10m grids throughout the area • This is F.S, by subtracting these values from H.I we get R.L of that point. • A1 point has a F.S of 3.84’ so subtracting 3.84’ from 105.4’ which is H.I will Give us 101.56’ which is the R.L of A1 point.
  • 8. • Similarly F.S of point A3 is 3.38’ and its reduce level becomes 102.02’ • This process goes until reduce level of last point D4 is found, which is 103.35’ PROCEDURE: CON’T
  • 9. Interpolation by estimation method: In this method contour lines are drawn between points by estimating distances between points STEPS: 1) when the grid points are A2= 102.5 feet elevation and A1=101.56 feet elevation, then a contour line of 102 feet elevation would be half way in between. 2) For points B2=102.08ft and A1=101.56ft, then a contour line of 102ft will be more towards 102.08ft elevation
  • 10. 3) For points B2=102.08ft and B1=101.36ft, then a contour line of 102ft will be more towards 102.08ft elevation 4) For point C2=102’, so the contour point will be on c2.
  • 11. 6) For points C1=101.98ft and D2=102.2ft, then a contour line of 102’will be more towards C1=101.98ft elevation. 5) For points C1=101.98ft and D1=102.2ft, then a contour line of 102ft will be more towards C1=101.98ft elevation.
  • 12. 7) So contour lines of area 30m 30m by estimation method is given below
  • 13. Interpolation of Grids by Arithmetical calculation: In method contour lines are drawn between ground points by using formula given below: elevationobetween twDistance elevationLow-elevationHigh elevationCentral-elevationHigh =%  STEPS: 1. Start by selecting a contour interval and two grid points. 2. This example starts with point of 102ft interval. 3. The distance between A1 and A2 is 1.inch so by putting the values in following formula gives:
  • 14. %=0.79 4. For points A1and B2, difference between these two is 2 inch and proportion difference is 0.36 as obvious from fig
  • 15. 5. For 102’ between B1=101.56’ and B2=102.08’ point, the Calculation is given below; 6. For finding position of 102’ between C2=102’ and C1=101.98’ for this there is no need of calculation.
  • 16. 7. For finding position of 102’ between C1=101.98’ and D1=102.2’ 8. For finding position of 102’ between C1=101.98’ and D2=102.2’
  • 17. 9. So the contours of these lines are shown in below diagram.
  • 18. I. Cross Section method: This method is most suitable for the survey of long narrow strip such as road, railway, canal etc.  PROCEDURE: a) Cross section are run transverse to the center line of work and representative points are marked along the line of cross section. b) The cross section line need not necessarily be at right angles to the center line of work. c) This may be inclined at any angle to the center line if necessary. d) This spacing of the cross section depend on the topography of the country and the nature of survey the common value is 20m to 30m in hilly country and 100m in flat country. e) The level of the points along the section line are plotted on the plan and contour are then interpolated as usual.
  • 19.  Example: 1. In this example the base line is 50m. 2. Two points are taken at each side of base line at 5m. 3. First of all H.I is found from the B.S=5ft and B.M=100ft By formula mention below; H.I=B.S+B.M H.I=5ft+100ft H.I=105ft 4. The reduce level of each point is found by simply subtracting F.S of that point from H.I ’.
  • 20. 6. For point A3, F.S=4.44ft it’s R.L=100.56’. 7. F.S of point A2=4.29ft, its R.L becomes 100.71ft 8. F.S of point A1=4.33ft, its R.L becomes 100.67ft. 9. F.S of point A is 4.5ft and its R.L is 100.5ft 10. Similarly for last point F4, F.S=3.36ft and its R.L is 101.64ft. 11. So by this process the elevation of each point of this example is found, and is shown in diagram below; 5. Suppose F.S of A4 is 4.54ft so its reduce level is R.D=H.I-F.S=> R.L=105ft-4.54ft R.L of point A4=100.49ft
  • 21.
  • 22. Interpolation of cross section by estimation method:  In this example we try to find contour intervals of 101ft, so for finding this contour interval throughout the cross section steps are given below in details;  As 101ft is closer to point D4=100.76’ than E4=101.75’so this shows that contour interval=101ft will be close to point D4.
  • 23.  For point D4=100.76ft and E3=101.9’, again 101ft contour interval will be near point D4.  For point E3=101.9’ and D3=100.98ft, 101ft contour interval will be near point D3.
  • 24.  For point D3=100.98ft and E=101.3ft contour interval of 101ft will be near point D3.  For point D=100.86ft and E=101.3ft contour interval of 101ft will be near point D.
  • 25.  For point D=100.86ft and E1=101.07ft, 101ft contour interval will be near point E1.  For point D1=100.27ft and E2=101.8ft, 101ft contour interval will be closer to point D1.
  • 26.  For point D1=100.27ft and E1=101.07ft, 101ft contour interval will be more near to point E1.
  • 27. So the whole contour interval can be plotted as
  • 28. Interpolation of cross section by arithmetical method: In this method interpolation of points is done by the process of proportion formula given below: elevationobetween twDistance elevationLow-elevationHigh elevationCentral-elevationHigh =%  STEPS: 1) The contour interval between D4 and E4 is given below:
  • 29. 2) For points D4 and E3 calculation is given below along with fig:
  • 30. 3) For point E3 and D3 the calculation are given below along with fig: 4)For point E and D3 calculation is given:
  • 31. 5) For points E and D calculation are given below: 6) For points D and E1 arithmetic calculation is given below:
  • 32. 7) For points D1 and E1 calculation are given below: 8) For point D1 and E2 arithmetic calculation is given below:
  • 33. So the calculation can be plotted on map as:
  • 34. I. Tachometric method: Whenever contouring of very steep area such as a “hill” is required tachometric method is used. Procedure is given below.  PROCEDURE: a) Set up the tachometer at the top of the steep hill. Tachometer is a theodolite fitted with stadia diaphragm. The stadia diaphragm has three horizontal parallel hairs instead of one as found in a conventional cross hair diaphragm. b) With the help of a tachometer it is possible to determine the horizontal distance of the point from the telescope as well its vertical level. c) The steep hill is surveyed at three levels – the base of the hill, the mid-level of the hill and the top level of the hill.
  • 35. I. Radial line method: This method is convenient in hilly terrain  PORCEDURE: a. Radial line method in this method, a number of radial lines are set out at known angular interval at each station and points are marked at the ground at convenient distance apart on the rays that are set. b. Spot levels of these points are determined by leveling. c. The points are plotted to the scale of the map and spot levels are entered. d. The contours of desired values are then located by interpolation. d) Using the tachometer reading are taken all around the hill at equal angular intervals on all these three levels. e) The radial plot thus obtained is worked in the office to interpolate points of equal elevation for contour mapping.
  • 36. Interpolation of contours: • Drawing contour lines to produce a contouring of an area requires the process of interpolation between points. • Interpolation process means spacing the contours proportionally between the plotted ground points. • Contours can be interpolated by : 1. By estimation method 2. By arithmetical calculation method 3. By graphical method
  • 37. 1. Estimatiom method:  The position of contour points between ground points are estimated.  The contour lines are then drawn through these points.  This method is used for rough and usually used on small scale maps.  Interpolating can be done by estimation for low precision maps.
  • 38. 2. Arithmetical calculation method:  This method is employed when greater accuracy is required.  This is time consuming also.  Positions of contours points among guide points are located by arithmetic calculations.  Formula is given below: elevationobetween twDistance elevationLow-elevationHigh elevationCentral-elevationHigh =% 
  • 39. 3. Graphical method:  When higher accuracy is required and many contours are to be made, this method is employed.  This method of interpolation proves to be rapid and easy.  For this purpose a tracing paper is used.