1) The document discusses the provision for external fire access for a building, assessing compliance with various code requirements for accessway dimensions, markings, openings, and hydrant placement.
2) It finds that most requirements are complied with, including minimum accessway widths of 6-8m, perimeter access of at least 1/4 of the site, proximity of accessways and openings to hydrants and building edges, and clear signage and markings.
3) Some non-compliances were noted, including an accessway edge positioned less than the required 2-10m from an opening, and lack of markings at accessway corners.
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Fire Code
1.
2.
3. GFA of largest floor is approximately 2100m2. From the given table, at least 1/4 of site access is needed. (Site provide 2/5 perimeter site access)GFA Fire access
4.
5. Volume in the range 28400m3 and 56800m3 requires ¼ perimeter accessway. The CC provide about 2/5 perimeter acessway.4.2.2 (c) (ii) (Comply) Similar to 4.2.2(b)(ii) . Volume = 42980m3 (approximate)
6. Provision for External Access for Fire Fighting 6m 4.2.2 (d) (i) (Comply) Accessway and access road paved with stone tiles to withstand loading capacity of 30 tonnes Driveway 6x15m 8x15m Access road 4m Accessway 4.2.2 (d) (ii) (Comply) Accessway width need to have a minimum of 6m. (BHCC accessway width at 6 and 8m)
10. Public Roads are NOT affected 4.2.2 (d) (ix) (Comply) No obstructions by trees or plants throughout accessway Refer to 4.2.2 (d) (vii)
11. Provision for External Access for Fire Fighting 4.2.2 (e)(i,ii) (Don’t Comply) No markings found. Corners are only marked by a normal concrete curb 4.2.2 (e) (iii) (NA) The accessway is not on a turf 4.2.2 (e) (iv) (Comply) The entrace of the accessway is marked with clear bold signs
12. Provision for External Access for Fire Fighting 4.2.3 (a) (Comply) Unobstructed access openings at regular intervals which is openable from outside and inside. Fixed windows are fitted with breakable glazing. 4.2.3 (b) (Comply) External opening on each storey level facing the accessway 4.2.3 (c) (Comply) Windowless façades facing accessways are accompanied by access openings at every level Refer to 4.2.3 (a)