SlideShare a Scribd company logo
1 of 3
ITEC-4750-01 Networking & Information Assurance Team


                             Scope Statement
Project Name: ITEC 4750 Senior Capstone Network Project
Team Members: Paul Szczepaniak, Teresa Barron, Brittany Gilstrap, Paul Spilman,
               Alexander Wang, Ronald Norton, Kimberly Pate & Jerry Bryan
Project Manager: Jerry Bryan
Date: Tuesday, August 30, 2011



Prepared By
 Document Owner(s)                            Project/Organization Role
 Jerry Bryan                                  Project Manager

 Brittany Gilstrap                            Scope Manager




Project Closure Report Version Control
 Version       Date       Author              Change Description
 1             8/30/11    Jerry Bryan         Create document.

 2             9/1/11     Brittany Gilstrap   Update document.

 3                                            Revise document.




Confidential
projectscopestatementupdated-13349664890436-phpapp02-120420190303-phpapp02.docx
Last printed 4/20/2012 5:02:00 PM
Project Scope Statement



Project Justification

 Kevin Floyd, CIO of FreeMax, requested this project to develop, and assist a company in meeting its networking
 goals. This will increase visibility of the company’s expertise to potential customers providing them a service, and
 improve profitability by providing standard tools, techniques, and project management knowledge to internal
 employees. It is very important to focus on the network to pay for itself within a year of completion.




Project Product
 1. Tools: The website will allow visitors to view listings, contact company, search listings, find an office location, and
    download files. These files will be in a PDF format.
 2. Visitors: Visitors will be encouraged to e-mail questions, comments, etc. to the company. The company will then
    forward the input to the correct personnel, and will then give a response.
 3. Listings: Listings on the website will have the correct and updated information with permissions from sellers.
    These files will be in a PDF format if downloaded or easily viewed within the web browser.
 4. Requests: There will be a function within the website for visitors to request more information, in which a sales
    agent will contact them.
 5. Links: All links on the website will be tested weekly, and all broken links will be fixed or removed.
 6. Security: The intranet site must provide several levels of security. All internal employees will have access to the
    entire intranet site when they enter their security information to access the intranet. Portions of the intranet will be
    available to current employees, and portions available to independent agents. The website will be secure from
    any attacks.
 7. Search feature: The intranet and website will have features to do searches through the databases that are
    appropriate to their needs.
 8. The intranet and website must be accessible using a standard Internet browser. Users must have appropriate
    application software to open tools.
 9. The intranet and website must be available 24 hours a day, 7 days a week, with one hour per week for system
    maintenance and other periodic maintenance, and must be updated daily with new listings.



Project Deliverables
 Project management-related deliverables: Business case, project charter, team contract, scope statement, work
 breakdown structure, budget, progress reports, Gantt chart, network system overview, ISP/hardware overview,
 company organizational overview, communications plan, final project presentation, final project report, lessons-
 learned report, and any other document required to manage the project.
 Product-related deliverables:
 1. Website: A website will be put together for the company, such information it will have includes: listings, office
     locations, about the company, search, and a contact page for any questions or comments.
 2. Database: A database will have all listings available with up to date information about houses for sell or rent, and
     will remove unavailable houses from inventory.
 3. Software: Software will include spreadsheets, word documents, graphics, project management tools, and any
     other software needed for any work related tasks.
 4. Intranet: The intranet will allow employees to view all listings, what listings are associated with an agent, what
     agents are employed, payments, technical support requests, security, and software.
 5. Network: The network will be secure for full-time employees within offices, and an unsecured network for use by
     independent agents who stop by the office for any form of work.
 6. Servers: There will be web, database, and e-mail servers for work related matters.
 7. Phone: The Company will be using a VOIP telephone system by Cisco.



Project Objective
 Define the network topology for each LAN that makes up the network, and define and describe the structure of the
 WAN to interconnect the various remote components of the network. Describe the types of equipment needed, and
 explain how to meet the performance reliability requirements. Discuss the relevant protocol choices for both the LANs
 and the WAN. Throughout each step of the project, address the three key areas in Networking: Confidentiality,
 Availability, and Integrity.




Confidential                                              Page 2                                                   4/20/2012
Project Scope Statement




Assumptions/Limitations
 The assumption is that this network will be planned out within the three month period before implementing.
 The limitations of this project include: the budget amount allotted into setting up the network, the amount of time plan
 and implement the network, and the offerings from ISP in areas.




 Overall Project Priority:
   High      Medium        Low

 Comments:




 Approved By:            _____________________________
 Project Manager : _____________________________ Date: ____/____/______




Confidential                                             Page 3                                                  4/20/2012

More Related Content

What's hot

Planning and Resourcing a Project
Planning and Resourcing a ProjectPlanning and Resourcing a Project
Planning and Resourcing a ProjectNishant Munjal
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Preliminary Scope Statement Template
Preliminary Scope Statement TemplatePreliminary Scope Statement Template
Preliminary Scope Statement TemplateMelanieRos
 
2. Project management body of knowledge
2. Project management body of knowledge2. Project management body of knowledge
2. Project management body of knowledgeBhuWan Khadka
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPM Solutions
 
Proje başlangıç toplantısı
Proje başlangıç toplantısıProje başlangıç toplantısı
Proje başlangıç toplantısıSavaş Şakar
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Failjpstewar
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2Anand Bobade
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management BhuWan Khadka
 
Procurement Management Knowledge Area
Procurement Management Knowledge AreaProcurement Management Knowledge Area
Procurement Management Knowledge AreaJoshua Render
 
Project Management Controlling And Monitoring PowerPoint Presentation Slides
Project Management Controlling And Monitoring PowerPoint Presentation SlidesProject Management Controlling And Monitoring PowerPoint Presentation Slides
Project Management Controlling And Monitoring PowerPoint Presentation SlidesSlideTeam
 

What's hot (20)

Planning and Resourcing a Project
Planning and Resourcing a ProjectPlanning and Resourcing a Project
Planning and Resourcing a Project
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Preliminary Scope Statement Template
Preliminary Scope Statement TemplatePreliminary Scope Statement Template
Preliminary Scope Statement Template
 
Pmstudy exam_1
Pmstudy exam_1Pmstudy exam_1
Pmstudy exam_1
 
2. Project management body of knowledge
2. Project management body of knowledge2. Project management body of knowledge
2. Project management body of knowledge
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar Slides
 
Proje başlangıç toplantısı
Proje başlangıç toplantısıProje başlangıç toplantısı
Proje başlangıç toplantısı
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 
Project Estimating
Project EstimatingProject Estimating
Project Estimating
 
Procurement Management Knowledge Area
Procurement Management Knowledge AreaProcurement Management Knowledge Area
Procurement Management Knowledge Area
 
Project Management Controlling And Monitoring PowerPoint Presentation Slides
Project Management Controlling And Monitoring PowerPoint Presentation SlidesProject Management Controlling And Monitoring PowerPoint Presentation Slides
Project Management Controlling And Monitoring PowerPoint Presentation Slides
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Business case a_caponera
Business case a_caponeraBusiness case a_caponera
Business case a_caponera
 

Similar to Project Scope Statement

CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docxCLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docxmonicafrancis71118
 
1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to solTatianaMajor22
 
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docxBUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docxjasoninnes20
 
Project Charter and Management Plan Project ClientOr.docx
Project Charter and Management Plan Project ClientOr.docxProject Charter and Management Plan Project ClientOr.docx
Project Charter and Management Plan Project ClientOr.docxbriancrawford30935
 
CIS337– Networking in Business Unit 6 Assignment Final
CIS337– Networking in Business  Unit 6 Assignment FinalCIS337– Networking in Business  Unit 6 Assignment Final
CIS337– Networking in Business Unit 6 Assignment FinalVinaOconner450
 
CIS337– Networking in Business Unit 7 Assignment Final
CIS337– Networking in Business  Unit 7 Assignment FinalCIS337– Networking in Business  Unit 7 Assignment Final
CIS337– Networking in Business Unit 7 Assignment FinalVinaOconner450
 
Questioning Strategies Part 1 Questioning StrategiesSocial .docx
Questioning Strategies Part 1 Questioning StrategiesSocial .docxQuestioning Strategies Part 1 Questioning StrategiesSocial .docx
Questioning Strategies Part 1 Questioning StrategiesSocial .docxaudeleypearl
 
Final Report Summary Group Effort
Final Report Summary Group EffortFinal Report Summary Group Effort
Final Report Summary Group Effortbrittanyjespersen
 
Running head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docxRunning head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docxtodd271
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final DocumentationJennifer Cordes
 
IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxpriestmanmable
 
Pmw2 k3ni 1-1a
Pmw2 k3ni 1-1aPmw2 k3ni 1-1a
Pmw2 k3ni 1-1ahariclant1
 
Business Case Capstone IIConnie FarrisColorado T.docx
Business Case Capstone IIConnie FarrisColorado T.docxBusiness Case Capstone IIConnie FarrisColorado T.docx
Business Case Capstone IIConnie FarrisColorado T.docxjasoninnes20
 
Overall Project ScenarioCorporation Techs provides remote and on.docx
Overall Project ScenarioCorporation Techs provides remote and on.docxOverall Project ScenarioCorporation Techs provides remote and on.docx
Overall Project ScenarioCorporation Techs provides remote and on.docxhoney690131
 
Week Four JournalObjectiveYou will identify key ethical proble.docx
Week Four JournalObjectiveYou will identify key ethical proble.docxWeek Four JournalObjectiveYou will identify key ethical proble.docx
Week Four JournalObjectiveYou will identify key ethical proble.docxalanfhall8953
 
Assignment 5 Technical Term PaperThe Technical Term Paper will in.docx
Assignment 5 Technical Term PaperThe Technical Term Paper will in.docxAssignment 5 Technical Term PaperThe Technical Term Paper will in.docx
Assignment 5 Technical Term PaperThe Technical Term Paper will in.docxrosemariebrayshaw
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarterrichlan421
 

Similar to Project Scope Statement (20)

CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docxCLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
 
FinalDocument
FinalDocumentFinalDocument
FinalDocument
 
1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol
 
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docxBUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
 
Project Charter and Management Plan Project ClientOr.docx
Project Charter and Management Plan Project ClientOr.docxProject Charter and Management Plan Project ClientOr.docx
Project Charter and Management Plan Project ClientOr.docx
 
CIS337– Networking in Business Unit 6 Assignment Final
CIS337– Networking in Business  Unit 6 Assignment FinalCIS337– Networking in Business  Unit 6 Assignment Final
CIS337– Networking in Business Unit 6 Assignment Final
 
CIS337– Networking in Business Unit 7 Assignment Final
CIS337– Networking in Business  Unit 7 Assignment FinalCIS337– Networking in Business  Unit 7 Assignment Final
CIS337– Networking in Business Unit 7 Assignment Final
 
Questioning Strategies Part 1 Questioning StrategiesSocial .docx
Questioning Strategies Part 1 Questioning StrategiesSocial .docxQuestioning Strategies Part 1 Questioning StrategiesSocial .docx
Questioning Strategies Part 1 Questioning StrategiesSocial .docx
 
Final Report Summary Group Effort
Final Report Summary Group EffortFinal Report Summary Group Effort
Final Report Summary Group Effort
 
Running head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docxRunning head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docx
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final Documentation
 
IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docx
 
Pmw2 k3ni 1-1a
Pmw2 k3ni 1-1aPmw2 k3ni 1-1a
Pmw2 k3ni 1-1a
 
PROPOSAL_FINAL
PROPOSAL_FINALPROPOSAL_FINAL
PROPOSAL_FINAL
 
Business Case Capstone IIConnie FarrisColorado T.docx
Business Case Capstone IIConnie FarrisColorado T.docxBusiness Case Capstone IIConnie FarrisColorado T.docx
Business Case Capstone IIConnie FarrisColorado T.docx
 
Overall Project ScenarioCorporation Techs provides remote and on.docx
Overall Project ScenarioCorporation Techs provides remote and on.docxOverall Project ScenarioCorporation Techs provides remote and on.docx
Overall Project ScenarioCorporation Techs provides remote and on.docx
 
Week Four JournalObjectiveYou will identify key ethical proble.docx
Week Four JournalObjectiveYou will identify key ethical proble.docxWeek Four JournalObjectiveYou will identify key ethical proble.docx
Week Four JournalObjectiveYou will identify key ethical proble.docx
 
Assignment 5 Technical Term PaperThe Technical Term Paper will in.docx
Assignment 5 Technical Term PaperThe Technical Term Paper will in.docxAssignment 5 Technical Term PaperThe Technical Term Paper will in.docx
Assignment 5 Technical Term PaperThe Technical Term Paper will in.docx
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarter
 
Final package
Final packageFinal package
Final package
 

Project Scope Statement

  • 1. ITEC-4750-01 Networking & Information Assurance Team Scope Statement Project Name: ITEC 4750 Senior Capstone Network Project Team Members: Paul Szczepaniak, Teresa Barron, Brittany Gilstrap, Paul Spilman, Alexander Wang, Ronald Norton, Kimberly Pate & Jerry Bryan Project Manager: Jerry Bryan Date: Tuesday, August 30, 2011 Prepared By Document Owner(s) Project/Organization Role Jerry Bryan Project Manager Brittany Gilstrap Scope Manager Project Closure Report Version Control Version Date Author Change Description 1 8/30/11 Jerry Bryan Create document. 2 9/1/11 Brittany Gilstrap Update document. 3 Revise document. Confidential projectscopestatementupdated-13349664890436-phpapp02-120420190303-phpapp02.docx Last printed 4/20/2012 5:02:00 PM
  • 2. Project Scope Statement Project Justification Kevin Floyd, CIO of FreeMax, requested this project to develop, and assist a company in meeting its networking goals. This will increase visibility of the company’s expertise to potential customers providing them a service, and improve profitability by providing standard tools, techniques, and project management knowledge to internal employees. It is very important to focus on the network to pay for itself within a year of completion. Project Product 1. Tools: The website will allow visitors to view listings, contact company, search listings, find an office location, and download files. These files will be in a PDF format. 2. Visitors: Visitors will be encouraged to e-mail questions, comments, etc. to the company. The company will then forward the input to the correct personnel, and will then give a response. 3. Listings: Listings on the website will have the correct and updated information with permissions from sellers. These files will be in a PDF format if downloaded or easily viewed within the web browser. 4. Requests: There will be a function within the website for visitors to request more information, in which a sales agent will contact them. 5. Links: All links on the website will be tested weekly, and all broken links will be fixed or removed. 6. Security: The intranet site must provide several levels of security. All internal employees will have access to the entire intranet site when they enter their security information to access the intranet. Portions of the intranet will be available to current employees, and portions available to independent agents. The website will be secure from any attacks. 7. Search feature: The intranet and website will have features to do searches through the databases that are appropriate to their needs. 8. The intranet and website must be accessible using a standard Internet browser. Users must have appropriate application software to open tools. 9. The intranet and website must be available 24 hours a day, 7 days a week, with one hour per week for system maintenance and other periodic maintenance, and must be updated daily with new listings. Project Deliverables Project management-related deliverables: Business case, project charter, team contract, scope statement, work breakdown structure, budget, progress reports, Gantt chart, network system overview, ISP/hardware overview, company organizational overview, communications plan, final project presentation, final project report, lessons- learned report, and any other document required to manage the project. Product-related deliverables: 1. Website: A website will be put together for the company, such information it will have includes: listings, office locations, about the company, search, and a contact page for any questions or comments. 2. Database: A database will have all listings available with up to date information about houses for sell or rent, and will remove unavailable houses from inventory. 3. Software: Software will include spreadsheets, word documents, graphics, project management tools, and any other software needed for any work related tasks. 4. Intranet: The intranet will allow employees to view all listings, what listings are associated with an agent, what agents are employed, payments, technical support requests, security, and software. 5. Network: The network will be secure for full-time employees within offices, and an unsecured network for use by independent agents who stop by the office for any form of work. 6. Servers: There will be web, database, and e-mail servers for work related matters. 7. Phone: The Company will be using a VOIP telephone system by Cisco. Project Objective Define the network topology for each LAN that makes up the network, and define and describe the structure of the WAN to interconnect the various remote components of the network. Describe the types of equipment needed, and explain how to meet the performance reliability requirements. Discuss the relevant protocol choices for both the LANs and the WAN. Throughout each step of the project, address the three key areas in Networking: Confidentiality, Availability, and Integrity. Confidential Page 2 4/20/2012
  • 3. Project Scope Statement Assumptions/Limitations The assumption is that this network will be planned out within the three month period before implementing. The limitations of this project include: the budget amount allotted into setting up the network, the amount of time plan and implement the network, and the offerings from ISP in areas. Overall Project Priority: High Medium Low Comments: Approved By: _____________________________ Project Manager : _____________________________ Date: ____/____/______ Confidential Page 3 4/20/2012