SlideShare a Scribd company logo
1 of 5
Download to read offline
the high performance portfolio:

EnginEEring MEtrics chEcklist

See how your engineering team measures up, using the checklist below to guide your conversations with them and track progress on the energy management actions identified
in this fact sheet. Consider requesting periodic reports against the metrics identified in each section, and use the space provided to record insights gained from the process.
More information about the following sections can be found in Managing Engineering Performance at http://www.betterbricks.com/track.aspx?link=graphics/
assets/documents/ManageEngineeringPerformance_d4.pdf.


Utility Bills
Action StepS                                                                               timeline           noteS

Review energy bills for accuracy and assess the building’s performance                     Monthly
  •	 Compare meter readings to billing data
  •	 Double-check rates and tariff schedule
  •	 Compare to prior months and same period in prior year to uncover any unusual
     variances (and determine whether variances are explained by vacancy, weather,
     etc., which are factored into the ENERGY STAR rating)
  •	 Calculate the average blended rate (total charges on the bill divided by total
     consumption – can be used to estimate potential savings from energy efficiency
     projects)
  •	 Identify when the peak demand occurs during the day
  •	 Identify opportunities for the building to perform load-shedding
  •	 Explore load-shedding programs offered by the electric utility company

Review water and sewer bills
  •	 Verify that water used in irrigation systems and cooling towers are separately        Once
     metered
  •	 Compare to prior months and same period in prior year to uncover any unusual          Monthly
     variances
monitor And report on the following metricS monthly, bASed on the Above Action StepS:
  h Rolling 13-month report showing electricity consumption, costs, average blended rate, and peak
    demand charges
  h Rolling 13-month report showing water / sewer consumption and costs and average blended rate
  h Comments explaining any major variances in utility usage or costs (unless these variances are
    normalized by the ENERGY STAR rating)
BUilding systems / operations and schedUling
Action StepS                                                                                 timeline    noteS

Calculate plug load, HVAC load, and lighting load to create a demand profile, in             Quarterly
order to determine where energy is used the most
 •	   Identify when each system typically runs, including weekends and holidays
 •	   Calculate cumulative watts or horsepower of all related equipment
 •	   Determine approximate load percentages of each set of building systems
 •	   Complete electricity demand profiles for each season to capture fluctuations

Monitor load profiles of each system over time to look for problems                          Monthly
 •	 Utilize EMS trend logging to diagnose the cause of energy waste

Utilize the building’s energy demand profile above to match building HVAC and                Monthly
lighting schedules to actual building occupancy and tenant needs
 •	 Identify where actual consumption varies from pre-set time schedules and
    programs
 •	 Determine optimal schedule of operations
 •	 Determine how long it takes the building to start up in the morning
 •	 Identify when systems are turning off at night
 •	 Based on trend logging, determine optimal start and stop times

Verify that schedules are optimized and systems are actually operating
according to the schedule
 •	 Review trend logs of actual consumption to verify that energy consumption                Monthly
    matches time schedules or the programs of other building control systems
 •	 Review and optimize schedules                                                            Quarterly
 •	 If trend logging data is not available, periodically visit the building after-hours to   Quarterly
    determine if lights and equipment are turning off appropriately
 •	 Calibrate thermostats, motion sensors, and other devices that affect the                 Quarterly
    building’s ability to operate according to set parameters
 •	 Identify tenant “shadow space” – or recently unoccupied areas of the building            Quarterly
    that may be shut down temporarily to save energy.
monitor And report on the following metricS, bASed on the Above Action StepS:
 h Provide monthly trend logging report for plug load, HVAC load and lighting load
 h Report against a targeted decrease
 h Explain any variances in loads or changes that were made to operational schedules
energy management systems
Action StepS                                                                        timeline       noteS

Evaluate how the EMS is being used
 •	 Determine what features the EMS is capable of                                   Annually
 •	 Confirm which are being used                                                    Annually
 •	 Determine which pieces of equipment the EMS controls                            Annually
 •	 Develop and implement strategies for maximizing the use and benefits            Quarterly
    of the EMS
 •	 Identify training opportunities for staff                                       Quarterly
 •	 Evaluate costs/benefits of upgrading the EMS or adding new features             Annually

Create manual protocols for equipment / operations not supported by the EMS
system
 •	 Use trend logging information to determine the optimal building start-up and    Quarterly
    shut-down times.
monitor And report on the following metricS, bASed on the Above Action StepS:
 h Compare daily startup and shutdown times to the prior year
 h Record quarterly /annual reports on training/troubleshooting/testing of systems
 h Assess EMS effectiveness quarterly/annually based on manufacturer/installer optimized metrics
maintenance / preventive maintenance strategy
Action StepS                                                                          timeline    noteS

Determine the preventive maintenance profile for the building                         Annually
 •	 Determine which equipment / systems fall under “Reactive Maintenance” – if any.
 •	 Determine which equipment / systems fall under “Preventive Maintenance”
 •	 Determine which equipment / systems fall under “Predictive Maintenance”

Evaluate methodologies being used to predict maintenance needs                        Annually
 •	 Operating hours for major pieces of equipment
 •	 Data from sensors that measure equipment performance
 •	 Other diagnostic tools: e.g., the BetterBricks Symptom-Diagnosis tool
    (http://www.betterbricks.com/DetailPage.aspx?ID=493) and O&M Best
    Practices Guide (http://www.betterbricks.com/DetailPage.aspx?ID=494)
Determine a maintenance budget and schedule for the property                          Quarterly
 •	 Plan the maintenance schedule for each upcoming quarter
 •	 Identify repair requirements that fall outside of the budget and identify where
    funds can be reassigned
 •	 Evaluate if work should be done in-house or contracted out
 •	 Confirm that all maintenance from last quarter was performed; track the
    completion of each task, by month
Based on the above action steps, develop a quarterly report on the following:
 h Maintain an electronic, detailed record of maintenance performed, time required, parts used,
   inventories, system downtimes, and tenant complaints
 h Create a quarterly maintenance plan and budget, which becomes part of a “year in review”
   analysis of costs, savings and performance improvements associated with implementation of
   maintenance/equipment strategies
Benchmarking and tracking
Action StepS                                                                           timeline   noteS

Benchmark energy performance in ENERGY STAR’s Portfolio Manager                        Monthly
(www.energystar.gov)
 •	 Enter/update building occupancy, utility consumption and costs into ENERGY
    STAR’s tracking tool
 •	 Review energy performance data in Portfolio Manager to monitor changes
 •	 Investigate when the energy performance rating or energy intensity fluctuates by
    five percent in either direction
monitor And report on the following energy StAr metricS eAch month to provide A picture of how efficiently the building iS operAting:
 h   ENERGY STAR rating
 h   Energy intensity
 h   Written explanation for any variances exceeding 5% either up or down
 h   Progress against established goals
team QUalifications
Action StepS                                                                           timeline   noteS

Assess skills and capabilities of in-house engineering team                            Annually
 •	 Utilize reports and metrics developed above to determine where performance
    needs to be improved
 •	 Identify knowledge gaps between building needs and engineering capabilities
 •	 Identify equipment maintenance currently contracted out and why it is not
    performed in-house

Create a training plan                                                                 Annually
 •	 Identify training needs of in-house engineering team based on skills assessment
 •	 Identify training that may enable outsourced maintenance work to be done in-
    house
 •	 Determine where training can be obtained
review StAff performAnce And report on the following metricS AnnuAlly:
 h Number and type of training hours
 h Other reports to utilize to assess performance gaps:
    a. Response time to tenant requests
    b. Number of repeat tenant requests
    c. Customer surveys
    d. Vendor suggested performance metrics relating to equipment/systems
    e. Frequency of unplanned/unexpected equipment failure

More Related Content

What's hot

SLM Reports overview
SLM Reports overviewSLM Reports overview
SLM Reports overviewEvgeny Nuss
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projectsD.Pawan Kumar
 
Pms integration and scheduling
Pms integration and schedulingPms integration and scheduling
Pms integration and schedulingjimpyle
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)ravindradatar
 
Michael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulationMichael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulationThe Future Economy Network
 
Retrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsRetrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsWIGreenBuilding
 
Energy audit & conservation studies for commercial premises
Energy audit & conservation studies for commercial premisesEnergy audit & conservation studies for commercial premises
Energy audit & conservation studies for commercial premisesravindradatar
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction EngineersAmit Kumar Senapati, PMP®
 
Upstream vs Pipeline Flow Computer
Upstream vs Pipeline Flow ComputerUpstream vs Pipeline Flow Computer
Upstream vs Pipeline Flow ComputerSchneider Electric
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning WorksCx Associates
 
Operational Costing and Capacity Management
Operational Costing and Capacity ManagementOperational Costing and Capacity Management
Operational Costing and Capacity Managementfmi_igf
 
Energy conservation Opportunities - Offices
Energy conservation Opportunities - OfficesEnergy conservation Opportunities - Offices
Energy conservation Opportunities - Officesravindradatar
 
Tpcg Utility Optimization Executive Presentation 6.1.10
Tpcg Utility Optimization Executive Presentation 6.1.10Tpcg Utility Optimization Executive Presentation 6.1.10
Tpcg Utility Optimization Executive Presentation 6.1.10rbeesley
 

What's hot (18)

SLM Reports overview
SLM Reports overviewSLM Reports overview
SLM Reports overview
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
Pms integration and scheduling
Pms integration and schedulingPms integration and scheduling
Pms integration and scheduling
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)
 
Project managment 6
Project managment 6Project managment 6
Project managment 6
 
Michael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulationMichael brogden darren evans lcbb 160517 performance versus regulation
Michael brogden darren evans lcbb 160517 performance versus regulation
 
Retrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsRetrocommissioning of Existing Buildings
Retrocommissioning of Existing Buildings
 
Omar's CV
Omar's CVOmar's CV
Omar's CV
 
Energy audit & conservation studies for commercial premises
Energy audit & conservation studies for commercial premisesEnergy audit & conservation studies for commercial premises
Energy audit & conservation studies for commercial premises
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction Engineers
 
Upstream vs Pipeline Flow Computer
Upstream vs Pipeline Flow ComputerUpstream vs Pipeline Flow Computer
Upstream vs Pipeline Flow Computer
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning Works
 
Operational Costing and Capacity Management
Operational Costing and Capacity ManagementOperational Costing and Capacity Management
Operational Costing and Capacity Management
 
Energy conservation Opportunities - Offices
Energy conservation Opportunities - OfficesEnergy conservation Opportunities - Offices
Energy conservation Opportunities - Offices
 
Tpcg Utility Optimization Executive Presentation 6.1.10
Tpcg Utility Optimization Executive Presentation 6.1.10Tpcg Utility Optimization Executive Presentation 6.1.10
Tpcg Utility Optimization Executive Presentation 6.1.10
 
Beeville MLT_Administratively Complete Management Plans_Robert Bradley
Beeville MLT_Administratively Complete Management Plans_Robert BradleyBeeville MLT_Administratively Complete Management Plans_Robert Bradley
Beeville MLT_Administratively Complete Management Plans_Robert Bradley
 

Similar to Engineering Metrics Checklist for Commercial Buildings

2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water SupplyAlliance To Save Energy
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.LongBun1
 
ASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdfASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdfThanhLe921354
 
HVAC heating ventilation and air condition
HVAC heating ventilation and air conditionHVAC heating ventilation and air condition
HVAC heating ventilation and air conditionEaintThawtarLinpc26
 
What to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities ManagementWhat to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities ManagementeSightEnergy
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Anish Maman
 
Energy management system slide 2
Energy management system slide 2Energy management system slide 2
Energy management system slide 2shaufiq boboy
 
Energy Audit Report Presentation
Energy Audit Report PresentationEnergy Audit Report Presentation
Energy Audit Report PresentationFurqan Ullah Mir
 
System Planning and Reliability
System Planning and ReliabilitySystem Planning and Reliability
System Planning and ReliabilityAdithya Ballaji
 
Metering techniques and practical examples
Metering techniques and practical examplesMetering techniques and practical examples
Metering techniques and practical examplesibrahim2841
 
Energy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptxEnergy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptxJawaharlal37
 
Retrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyRetrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyDivya Kothari
 

Similar to Engineering Metrics Checklist for Commercial Buildings (20)

2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.
 
Energy Audit.pptx
Energy Audit.pptxEnergy Audit.pptx
Energy Audit.pptx
 
EAM-PPT-converted.pdf
EAM-PPT-converted.pdfEAM-PPT-converted.pdf
EAM-PPT-converted.pdf
 
Energy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptxEnergy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptx
 
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
 
ASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdfASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdf
 
HVAC heating ventilation and air condition
HVAC heating ventilation and air conditionHVAC heating ventilation and air condition
HVAC heating ventilation and air condition
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy audit
Energy auditEnergy audit
Energy audit
 
1st module.pdf
1st module.pdf1st module.pdf
1st module.pdf
 
What to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities ManagementWhat to consider when integrating energy into Facilities Management
What to consider when integrating energy into Facilities Management
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)
 
Energy management system slide 2
Energy management system slide 2Energy management system slide 2
Energy management system slide 2
 
Energy Audit Report Presentation
Energy Audit Report PresentationEnergy Audit Report Presentation
Energy Audit Report Presentation
 
System Planning and Reliability
System Planning and ReliabilitySystem Planning and Reliability
System Planning and Reliability
 
Metering techniques and practical examples
Metering techniques and practical examplesMetering techniques and practical examples
Metering techniques and practical examples
 
Energy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptxEnergy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptx
 
Retrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyRetrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy Efficiency
 
Energy audit
Energy auditEnergy audit
Energy audit
 

More from BetterBricks

Leasing & Energy Allocations in Commercial Buildings
Leasing & Energy  Allocations in Commercial BuildingsLeasing & Energy  Allocations in Commercial Buildings
Leasing & Energy Allocations in Commercial BuildingsBetterBricks
 
Green Building Rating sSystem
Green Building Rating sSystemGreen Building Rating sSystem
Green Building Rating sSystemBetterBricks
 
Energy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial BuildingsEnergy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial BuildingsBetterBricks
 
Energy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial BuildingsEnergy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial BuildingsBetterBricks
 
Energy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial BuildingsEnergy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial BuildingsBetterBricks
 
Energy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and MisperceptionsEnergy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and MisperceptionsBetterBricks
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your buildingBetterBricks
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your buildingBetterBricks
 
Carbon, Energy and Your Building
Carbon, Energy and Your BuildingCarbon, Energy and Your Building
Carbon, Energy and Your BuildingBetterBricks
 
Building tune ups for commercial buildings
Building tune ups for commercial buildingsBuilding tune ups for commercial buildings
Building tune ups for commercial buildingsBetterBricks
 
The Energy Efficiency Playbook: Everything you need to know about purchasing...
The Energy Efficiency Playbook:  Everything you need to know about purchasing...The Energy Efficiency Playbook:  Everything you need to know about purchasing...
The Energy Efficiency Playbook: Everything you need to know about purchasing...BetterBricks
 
10 Goals for Green Leasing
10 Goals for Green Leasing10 Goals for Green Leasing
10 Goals for Green LeasingBetterBricks
 
Energy in Healthcare Fact Sheet
Energy in Healthcare Fact SheetEnergy in Healthcare Fact Sheet
Energy in Healthcare Fact SheetBetterBricks
 
Targeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalTargeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalBetterBricks
 
Green Building Index National Overview
Green Building Index National OverviewGreen Building Index National Overview
Green Building Index National OverviewBetterBricks
 

More from BetterBricks (16)

Leasing & Energy Allocations in Commercial Buildings
Leasing & Energy  Allocations in Commercial BuildingsLeasing & Energy  Allocations in Commercial Buildings
Leasing & Energy Allocations in Commercial Buildings
 
Green Building Rating sSystem
Green Building Rating sSystemGreen Building Rating sSystem
Green Building Rating sSystem
 
Energy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial BuildingsEnergy Transparency & Reporting for Commercial Buildings
Energy Transparency & Reporting for Commercial Buildings
 
Energy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial BuildingsEnergy Tracking & Accounting for Commercial Buildings
Energy Tracking & Accounting for Commercial Buildings
 
Energy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial BuildingsEnergy Efficient Purchasing Guidelines for Commercial Buildings
Energy Efficient Purchasing Guidelines for Commercial Buildings
 
Energy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and MisperceptionsEnergy Efficiency, Myths and Misperceptions
Energy Efficiency, Myths and Misperceptions
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your building
 
Carbon, energy and your building
Carbon, energy and your buildingCarbon, energy and your building
Carbon, energy and your building
 
Carbon, Energy and Your Building
Carbon, Energy and Your BuildingCarbon, Energy and Your Building
Carbon, Energy and Your Building
 
Building tune ups for commercial buildings
Building tune ups for commercial buildingsBuilding tune ups for commercial buildings
Building tune ups for commercial buildings
 
The Energy Efficiency Playbook: Everything you need to know about purchasing...
The Energy Efficiency Playbook:  Everything you need to know about purchasing...The Energy Efficiency Playbook:  Everything you need to know about purchasing...
The Energy Efficiency Playbook: Everything you need to know about purchasing...
 
10 Goals for Green Leasing
10 Goals for Green Leasing10 Goals for Green Leasing
10 Goals for Green Leasing
 
Energy in Healthcare Fact Sheet
Energy in Healthcare Fact SheetEnergy in Healthcare Fact Sheet
Energy in Healthcare Fact Sheet
 
Targeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalTargeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance Hospital
 
Green Building Index National Overview
Green Building Index National OverviewGreen Building Index National Overview
Green Building Index National Overview
 
Powerful Business
Powerful BusinessPowerful Business
Powerful Business
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 

Recently uploaded (20)

VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 

Engineering Metrics Checklist for Commercial Buildings

  • 1. the high performance portfolio: EnginEEring MEtrics chEcklist See how your engineering team measures up, using the checklist below to guide your conversations with them and track progress on the energy management actions identified in this fact sheet. Consider requesting periodic reports against the metrics identified in each section, and use the space provided to record insights gained from the process. More information about the following sections can be found in Managing Engineering Performance at http://www.betterbricks.com/track.aspx?link=graphics/ assets/documents/ManageEngineeringPerformance_d4.pdf. Utility Bills Action StepS timeline noteS Review energy bills for accuracy and assess the building’s performance Monthly • Compare meter readings to billing data • Double-check rates and tariff schedule • Compare to prior months and same period in prior year to uncover any unusual variances (and determine whether variances are explained by vacancy, weather, etc., which are factored into the ENERGY STAR rating) • Calculate the average blended rate (total charges on the bill divided by total consumption – can be used to estimate potential savings from energy efficiency projects) • Identify when the peak demand occurs during the day • Identify opportunities for the building to perform load-shedding • Explore load-shedding programs offered by the electric utility company Review water and sewer bills • Verify that water used in irrigation systems and cooling towers are separately Once metered • Compare to prior months and same period in prior year to uncover any unusual Monthly variances monitor And report on the following metricS monthly, bASed on the Above Action StepS: h Rolling 13-month report showing electricity consumption, costs, average blended rate, and peak demand charges h Rolling 13-month report showing water / sewer consumption and costs and average blended rate h Comments explaining any major variances in utility usage or costs (unless these variances are normalized by the ENERGY STAR rating)
  • 2. BUilding systems / operations and schedUling Action StepS timeline noteS Calculate plug load, HVAC load, and lighting load to create a demand profile, in Quarterly order to determine where energy is used the most • Identify when each system typically runs, including weekends and holidays • Calculate cumulative watts or horsepower of all related equipment • Determine approximate load percentages of each set of building systems • Complete electricity demand profiles for each season to capture fluctuations Monitor load profiles of each system over time to look for problems Monthly • Utilize EMS trend logging to diagnose the cause of energy waste Utilize the building’s energy demand profile above to match building HVAC and Monthly lighting schedules to actual building occupancy and tenant needs • Identify where actual consumption varies from pre-set time schedules and programs • Determine optimal schedule of operations • Determine how long it takes the building to start up in the morning • Identify when systems are turning off at night • Based on trend logging, determine optimal start and stop times Verify that schedules are optimized and systems are actually operating according to the schedule • Review trend logs of actual consumption to verify that energy consumption Monthly matches time schedules or the programs of other building control systems • Review and optimize schedules Quarterly • If trend logging data is not available, periodically visit the building after-hours to Quarterly determine if lights and equipment are turning off appropriately • Calibrate thermostats, motion sensors, and other devices that affect the Quarterly building’s ability to operate according to set parameters • Identify tenant “shadow space” – or recently unoccupied areas of the building Quarterly that may be shut down temporarily to save energy. monitor And report on the following metricS, bASed on the Above Action StepS: h Provide monthly trend logging report for plug load, HVAC load and lighting load h Report against a targeted decrease h Explain any variances in loads or changes that were made to operational schedules
  • 3. energy management systems Action StepS timeline noteS Evaluate how the EMS is being used • Determine what features the EMS is capable of Annually • Confirm which are being used Annually • Determine which pieces of equipment the EMS controls Annually • Develop and implement strategies for maximizing the use and benefits Quarterly of the EMS • Identify training opportunities for staff Quarterly • Evaluate costs/benefits of upgrading the EMS or adding new features Annually Create manual protocols for equipment / operations not supported by the EMS system • Use trend logging information to determine the optimal building start-up and Quarterly shut-down times. monitor And report on the following metricS, bASed on the Above Action StepS: h Compare daily startup and shutdown times to the prior year h Record quarterly /annual reports on training/troubleshooting/testing of systems h Assess EMS effectiveness quarterly/annually based on manufacturer/installer optimized metrics
  • 4. maintenance / preventive maintenance strategy Action StepS timeline noteS Determine the preventive maintenance profile for the building Annually • Determine which equipment / systems fall under “Reactive Maintenance” – if any. • Determine which equipment / systems fall under “Preventive Maintenance” • Determine which equipment / systems fall under “Predictive Maintenance” Evaluate methodologies being used to predict maintenance needs Annually • Operating hours for major pieces of equipment • Data from sensors that measure equipment performance • Other diagnostic tools: e.g., the BetterBricks Symptom-Diagnosis tool (http://www.betterbricks.com/DetailPage.aspx?ID=493) and O&M Best Practices Guide (http://www.betterbricks.com/DetailPage.aspx?ID=494) Determine a maintenance budget and schedule for the property Quarterly • Plan the maintenance schedule for each upcoming quarter • Identify repair requirements that fall outside of the budget and identify where funds can be reassigned • Evaluate if work should be done in-house or contracted out • Confirm that all maintenance from last quarter was performed; track the completion of each task, by month Based on the above action steps, develop a quarterly report on the following: h Maintain an electronic, detailed record of maintenance performed, time required, parts used, inventories, system downtimes, and tenant complaints h Create a quarterly maintenance plan and budget, which becomes part of a “year in review” analysis of costs, savings and performance improvements associated with implementation of maintenance/equipment strategies
  • 5. Benchmarking and tracking Action StepS timeline noteS Benchmark energy performance in ENERGY STAR’s Portfolio Manager Monthly (www.energystar.gov) • Enter/update building occupancy, utility consumption and costs into ENERGY STAR’s tracking tool • Review energy performance data in Portfolio Manager to monitor changes • Investigate when the energy performance rating or energy intensity fluctuates by five percent in either direction monitor And report on the following energy StAr metricS eAch month to provide A picture of how efficiently the building iS operAting: h ENERGY STAR rating h Energy intensity h Written explanation for any variances exceeding 5% either up or down h Progress against established goals team QUalifications Action StepS timeline noteS Assess skills and capabilities of in-house engineering team Annually • Utilize reports and metrics developed above to determine where performance needs to be improved • Identify knowledge gaps between building needs and engineering capabilities • Identify equipment maintenance currently contracted out and why it is not performed in-house Create a training plan Annually • Identify training needs of in-house engineering team based on skills assessment • Identify training that may enable outsourced maintenance work to be done in- house • Determine where training can be obtained review StAff performAnce And report on the following metricS AnnuAlly: h Number and type of training hours h Other reports to utilize to assess performance gaps: a. Response time to tenant requests b. Number of repeat tenant requests c. Customer surveys d. Vendor suggested performance metrics relating to equipment/systems e. Frequency of unplanned/unexpected equipment failure