SlideShare ist ein Scribd-Unternehmen logo
1 von 60
Downloaden Sie, um offline zu lesen
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                  Intensive Learning Session on Urban Planning under Market Economy




            Introduction To Traffic Management



                                      August 10, 2007

                                     JICA Study Team


August 7, 2007                                                                                      1
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
               Intensive Learning Session on Urban Planning under Market Economy



                                       Contents
  1.     Overview of traffic management
  2.     Data collection and identification of problems
  3.     Data Analysis
  4.     Formulation of solutions
  5.     Implementation of improvement measures
  6.     Operation and evaluation
  7.     Traffic Accident and Safety
  8.     Summary



August 7, 2007                                                                  2
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



        1. Overview of Traffic Management
      What is traffic management?
      Rational for traffic management.
      Traffic management process.




August 7, 2007                                                                 3
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



              What is Traffic Management?
      A set of traffic Engineering, Enforcement
      and Educational measures to make traffic
      more efficient and safer.
      No acquisition of additional land.
      Far less costly as compared with road
      construction or road widening.
      Can be implemented in a short time.
      Physical and operational measures.

August 7, 2007                                                                 4
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



            Objectives of Traffic Management
       General objectives:
           Make traffic more efficient.
           Enhance traffic safety
           Reduce pollutant emission
       Specific objectives:
           Promote public transport use
           Promote non-motorized transport (NMT)
           Restrict use of private cars (traffic demand
            management)

August 7, 2007                                                                 5
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



            Rationale for Traffic Management
       Not enough roads to accommodate
       growing traffic demand.
       Cannot keep constructing new roads even
       if fund is available.
       New approach that relies on:
        
            Improvement of public transport;
           Intensive management of travel demand; and
           Traffic management techniques to increase
            effective capacity of available road space.
August 7, 2007                                                                 6
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                 Traffic Management Process




August 7, 2007                                                                 7
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



     2. Data Collection & Problem Identifications
      Identification of problem (traffic congestion)
      and its location.
      Traffic survey.
          Various traffic surveys were conducted in this
           study.
      Opinion and behavior survey.




August 7, 2007                                                                 8
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                            Traffic Congestion
      Traffic congestion occurs when:
                     Demand>Capacity
      Even small excess demand can cause heavy
      congestion.




                     Heavy congestion in
                      Bangkok, Thailand
August 7, 2007                                                                 9
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                             Bottleneck Points
      A location where physical or effective
      capacity decreases and congestion starts.
       
           Intersection / roundabout
          Narrowed road section
          Roadside parking
       
           Bus stop
          High side friction



August 7, 2007                                                                 10
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                                 Traffic Survey
       Objectives: Obtain quantitative data that is
       required to identify traffic problem and
       formulate solutions.
       Type of survey:
        
            Intersection turning movement count
           Intersection inventory survey
           Traffic signal operation survey
           Traffic accident survey
           Travel time survey
August 7, 2007                                                                 11
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



     Intersection Turning Movement Count
      Essential for intersection capacity analysis.
      Counted in vehicle and converted to PCU
      (Passenger Car Unit) for peak hour.




August 7, 2007                                                                 12
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                               Intensive Learning Session on Urban Planning under Market Economy



                                              Travel Time Survey
                       To identify bottleneck and low speed section
                       along the survey route.
                       Test vehicle runs several times along survey
                       route and records time at waypoints.
                                Travel Time Survey                                                  Travel Time Survey (Speed)

             300                                                                   20.0
             250
                                                                                   15.0
             200


                                                                    Speed (km/h)
Time (sec)




             150
                                                                                   10.0
             100

             50                                                                     5.0

              0
                                                                                    0.0
                                 370




                                             640




                                                      940




                                                            1140
                   0


                         140




                                                                                          0


                                                                                              140




                                                                                                         370




                                                                                                                      640




                                                                                                                                       1140
                                                                                                                                 940
                                       Distance (m)                                                            Distance (m)




                           Time-Distance Chart                                                Travel Speed Chart
August 7, 2007                                                                                                      13
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                              3. Data Analysis
      Intersection capacity analysis.
      Traffic flow simulation.
      Traffic analysis software for PC.




August 7, 2007                                                                 14
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



              Intersection Capacity Analysis
      A procedure to analyze traffic operation at
      intersection.
      Helpful to examine critical movements and
      overall intersection performance.
      Applicable for both signalized and non-
      signalized intersection.




August 7, 2007                                                                 15
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



              Intersection Capacity Analysis
      Input data:
          Directional traffic volume
       
           Lane width and movement assignment
          Signal timing (for operational analysis of
           signalized intersection only)
      Analysis output:
          [Volume] / [Saturation Rate] for each movement
           and overall intersection
          A set of critical movements

August 7, 2007                                                                 16
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



      Example of Intersection Capacity Analysis




       PM peak hour traffic volume                            Lane width & assignment

                                                                        AM             PM
                                                 Max N-S V/S           0.32            0.33
                                                Max E-W V/S            0.40            0.49
                                                    Y Value            0.72            0.83
August 7, 2007                                                                 17
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Traffic Flow Simulation Software
      A set of computer programs that constructs
      virtual road network and simulates
      movements of individual vehicle on it.
      Performance of network under various road
      conditions and traffic demands can be
      tested.




August 7, 2007                                                                 18
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                         Input Data Required
      Link, node and network configuration:
          Length, grade, lane assignment, connection,
           turn pocket
      Traffic control at intersection:
          Signalized and unsignalized, vehicle detector
      Traffic volume and vehicle properties:
       
           Input volume, turning movement at intersection,
           vehicle performance by type, etc.


August 7, 2007                                                                 19
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                            Simulation Output
      Traffic data:
       
           Number of trips, traffic volume, delay
       
           Congestion data (max and average queue)
      Person data:
       
           Person-km, person-trips, delay/person
      Vehicle data:
       
           Moving time, delay time, queue time
      Energy and environment:
          Fuel consumption, pollutant emission

August 7, 2007                                                                 20
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                      Traffic Flow Animation




August 7, 2007                                                                 21
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



      Application of Traffic Flow Simulation
      Can be used for comparison and evaluation
      of various traffic improvement measures
      including:
          Intersection geometric improvement
          Signalization / Signal improvement
          Fly-over
          Traffic regulation (lane control, turn prohibition,
           parking control, one-way, etc.)
          Public transport improvement
          HOV (high occupancy vehicle) lane

August 7, 2007                                                                 22
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



   Advantage of Using Simulation Software
      Several traffic management measures can
      be tested and compared with minimal time
      and cost.
      Various measures of effectiveness (MoE)
      can be obtained.
      Visual presentation of road network and
      traffic operation available.



August 7, 2007                                                                 23
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



            Traffic Analysis Software for PC
      Intersection / arterial streets / network
      operation analysis software.
      Many package software are available:
       Highway capacity software                            SIG/CINEMA
       Passer II/III/IV                                     TRANSYT-
       SYNCHRO                                              7F
       SIMTRAFFIC                                           TSIS
       aaSIDRA




August 7, 2007                                                                 24
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                  4. Formulation of Solutions
      Traffic management instruments:
          Intersection geometric improvement
       
           Traffic signal
          Transit signal priority
          Traffic sign & road marking
          Traffic demand management
          Parking management



August 7, 2007                                                                 25
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Traffic Management Instruments
      Various technique is available and
      applicable to regulate vehicle and
      pedestrian flows.
      Basic rules are:
          Simplify traffic flow (reduce no. of movements)
          Segregate road users in space and time
          Increase capacity in order to accommodate
           more vehicles (supply side measure)
          Restrain traffic in order to reduce traffic volume
           (demand side measure)

August 7, 2007                                                                 26
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                 Traffic Engineering Solution
      What is “traffic engineering?”
          Traffic Engineering applies engineering
           principles to help solve transportation problems,
           and brings into play knowledge of psychology
           and habits of users of the transportation
           systems, aside from technical foundations.




August 7, 2007                                                                 27
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



              Traffic Engineering Measures




August 7, 2007                                                                 28
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



       Intersection Geometric Improvement
      Regulate vehicle and pedestrian
      movements at intersection by modifying
      intersection geometry.
      Basic rules
          Make intersection size as small as possible
          Keep number of approaches four or less
       
           Make approach angle close to 90 degree
          Provide left turn lane if necessary
          Provide refugee space for pedestrian
August 7, 2007                                                                 29
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



     Example of Intersection Geometric Improvement




                     Before                                          After

August 7, 2007                                                                 30
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



             Traffic Signal – Signal Warrant
      Signal warrant determines whether a traffic
      signal is required at a particular intersection
      or not.
      Factors to be considered:
         Traffic volume                             Nearby facility
         Left turn volume                           Traffic accident
         Pedestrian volume
         V/C ratio



August 7, 2007                                                                 31
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Traffic Signal – Basic Parameter
      Cycle (duration of 1 cycle, second)
      Split (ratio of green time against cycle, %)
      Offset (time difference between 2 signals with
      same cycle, second or %)




August 7, 2007                                                                 32
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



               Traffic Signal – Control Mode
  Category          Mode                      Technology                Cost           O/M

  Isolated          Fixed time                    Simple                Low            Easy

                    Time-of-day

                    Actuated

  Arterial          Coordinated

  Area              Responsive

                    Adaptive                 Sophisticated              High         Difficult
    O/M: Operation and maintenance
August 7, 2007                                                                 33
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                 Traffic Signal - Coordination
      Signals along arterial street are coordinated to
      maximize throughput and minimize delay




August 7, 2007                                                                 34
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



               Traffic Signal – Control Mode



          Fixed Time                 Time-of-day (TOD)                   Actuation




                  Coordinated                         Area Traffic Control
                                                      Traffic responsive/adaptive
August 7, 2007                                                                 35
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



             Traffic Signal – Manual Control
      Why manual control is not efficient?
          Control based on wrong perception
            – Minimizing stops instead of total throughput
          Effective only for light traffic
            – Not effective for near- or over-saturated traffic
       
           Local optimization at best
            – Coordination not considered, not network-wide
              optimization
          Fatigue and loss of attention
            – Human nature

August 7, 2007                                                                 36
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                      Intensive Learning Session on Urban Planning under Market Economy



                Traffic Signal – Long Cycle Time
         If cycle time is doubled, average delay is
         also doubled with same traffic volume

SHORT CYCLE TIME                                       LONG CYCLE TIME

                          GREEN            GREEN
                                                                                          GREEN
                RED                 RED
                                                                          RED
SIGNAL                                                 SIGNAL




         TIME      ARRIVAL                                      TIME     ARRIVAL




August 7, 2007                                                                     37
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                 Intensive Learning Session on Urban Planning under Market Economy



                   Platoon – Group of Vehicles
      In manual control, operator tends to wait for
      approaching vehicle - wrong practice!




       (a) Start of Green                (b) Begining of Green             (c) End of Green




August 7, 2007                                                                 38
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                                Intensive Learning Session on Urban Planning under Market Economy



                                                        Platoon Profile
                        Green time is wasted as it is not fully
                        utilized
                        Efficiency decreases with longer cycle
                                   Platoon Pattern                                                         Cycle Length and Efficiency


                                                     Saturation flow level




                                                                             Vehicles/Unit Green
  Vehicles/Unit Green




                                                         Wasted
                                                         Green
                                                         Time



                                                                                                   100   120       140         160       180   200
                                       Green Time                                                                 Cycle Length (sec)


August 7, 2007                                                                                                                 39
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                        Transit Signal Priority
      Red signal is shortened or green signal is
      lengthened to minimized delay of bus




August 7, 2007                                                                 40
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Traffic Signs and Road Markings
      Effective tool to regulate traffic
      Mongolian standards established




August 7, 2007                                                                 41
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



   5. Implementation of Improvement Measures
      Cost estimate and funding
      Consultation with stakeholders
      Legislation and regulation
      Public relations




August 7, 2007                                                                 42
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                 Cost Estimate and Funding
      Realistic cost must be estimated using
      prevailing price of materials, cost of similar
      works and inquiry to potential suppliers /
      contractors.
      Fund must be secured from annual budget,
      special budget, or other sources.
      Long lead time must be considered for
      timely implementation.

August 7, 2007                                                                 43
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                Intensive Learning Session on Urban Planning under Market Economy



                Consultation with Stakeholder
        Share knowledge and experience and
        collaborate in formulating workable solution


    
        Participants: Driver
        (public, private),
        passenger, pedestrian,
        resident, shop owner,
        other government
        agencies (national and
        local)


August 7, 2007          Stakeholder Meeting in Jakarta, Indonesia 44
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



        Information & Education Campaign
      Disseminate information to foster road
      user’s cooperation




                     Traffic rule campaign
                      in Hanoi, Vietnam
August 7, 2007                                                                 45
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                 6. Operation and Evaluation
      Guidance and enforcement.
      Review and evaluation.




August 7, 2007                                                                 46
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                         Role of Traffic Police
      Enforcement of traffic rules.
      Apprehension of violators.
          Speeding,                                    No left turn violation
       
           Drunken driving                              One-way violation
          Red signal violation                      
                                                         No parking violation
      Traffic guidance and control.




August 7, 2007                                                                 47
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



          Traffic Control by Traffic Enforcer
      Get drivers and pedestrians to obey traffic rules
      and regulations – main task
      Human signal controller – secondary task
      Impromptu new traffic scheme not effective




                      Traffic police at work
August 7, 2007                                                                 48
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



              Existing Enforcement System
      Offence is settled on the spot with payment
      of fine in cash.
      Fine is the revenue for UB City.
      Total amount of fine: 500 mil. Tg. for 2006
      More amount expected for 2007.
      Suspension or revocation for severe
      offence.
      Offence is not recorded.

August 7, 2007                                                                 49
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Point System for Traffic Offence
      Demerit point is given to driver who
      committed traffic offence.
      Number of points depend on type of
      offence.
      Driving license is suspended or revoked if
      demerit points reach the certain level.
      Training or test is required for suspended or
      revoked drivers.
      No offence for certain period will reset or
      reduce demerit points.
August 7, 2007                                                                 50
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



              7. Traffic Accidents and Safety
       High accident rate compared with number of
       vehicles.
       High rate of pedestrian accidents.
       Accident prone locations:
           Intersection, roundabout, high traffic volume




            Accident prone
            locations
August 7, 2007                                                                 51
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                        Number of Accidents

   
                                                  Accidents

        Year                   Nation                  UB City                UB Share
        2000                    5,991                    5,074                   84.7%
        2001                    5,212                    4,394                   84.3%
        2002                    5,553                    4,358                   78.5%
        2003                    5,296                    3,892                   73.5%
        2004                    4,803                    3,557                   74.1%

August 7, 2007                                                                 52
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                                 Accident Type
                                                                                   
                                                      
                                                                          Property Damage
                 Fatality (person)            Injured (person)
                                                                              (mil. Tg.)

    Year   Nation    UB City    Share    Nation   UB City    Share    Nation    UB City    Share


   2000      338       141      41.7%    1,616      940      58.2%     483.2     215.6    44.6%


   2001      335        97      29.0%    1,812     1,078     59.5%     289.7     127.6    44.0%


   2002      327       122      37.3%    1,636      818      50.0%     658.3     384.4    58.4%


   2003      391       145      37.1%    1,224      692      56.5%     729.9     424.4    58.1%


   2004      385       102      26.5%    2,312     1,119     48.4%     354.3     127.4    36.0%


August 7, 2007                                                                 53
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                                Accident Type
  Type                                               Number                 Share
  Car - car                                                    11,864                  55.7%
  Car - pedestrian                                               8,477                 39.8%
  Immovable facilities                                              376                  1.8%
  Overturn                                                          335                  1.6%
  Fallen passenger                                                  104                  0.5%
  Car - bicycle                                                       81                 0.4%
  Car - animal                                                          0                0.0%
  Others                                                              68                 0.3%
  Total                                                        21,305  
August 7, 2007                                                                 54
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Traffic Safety Education - Policy
      Understanding of importance of education
      Curriculum suitable for recipient and local
      conditions
      Understanding of traffic rule and manner
      Participatory approach and hand-on training
      Evaluation of effect of safety education
      Review of curriculum to cope with changing needs
      of society
      Consideration of privacy
      Coordination with other organizations
August 7, 2007                                                                 55
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



           Safety Education – Target Group
      Different curriculum for each target group
          Small children
       
           Elementary, junior high, high school students
          Adults
          Elderly persons




August 7, 2007                                                                 56
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                              Education Menu
      Text book
      Traffic safety park
      Campaign and parade
      TV programs
      Training for Traffic Police




August 7, 2007                                                                 57
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                  Monitoring and Evaluation
      Essential for sustainability.
      Indicators
       
           Comparison of “before” and “after” data (traffic
           volume, travel time, delay, etc.)
          Number and severity of accidents
          Number of traffic offences
          Pedestrian environment (space, waiting time
           and path to cross intersection)
          Complaints

August 7, 2007                                                                 58
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
              Intensive Learning Session on Urban Planning under Market Economy



                                   8. Summary
      Effectiveness and limitations of traffic
      management measures must be properly
      understood (no almighty solution).
      Scientific approach must be taken (think
      before you tinker).
      Concerted and sustained efforts by all
      parties concerned is required (never ending
      task but do your best).

August 7, 2007                                                                 59
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                  Intensive Learning Session on Urban Planning under Market Economy




                                           ….END




August 7, 2007                                                                                      60

Weitere ähnliche Inhalte

Was ist angesagt?

Social considerations eng
Social considerations engSocial considerations eng
Social considerations engBayar Tsend
 
Introduction of History and Community of GTFS-JP
Introduction of History and Community of GTFS-JPIntroduction of History and Community of GTFS-JP
Introduction of History and Community of GTFS-JPMasaki Ito
 
Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning moscowuforum
 
Approach to Integrated Land Use & Transport within Spatial Planning Processes
Approach to Integrated Land Use & Transport within Spatial Planning ProcessesApproach to Integrated Land Use & Transport within Spatial Planning Processes
Approach to Integrated Land Use & Transport within Spatial Planning ProcessesWRI Ross Center for Sustainable Cities
 
1. secured transport hub a techno economic corridor(upsated 25th june 2012)
1. secured transport hub   a techno economic corridor(upsated 25th june 2012)1. secured transport hub   a techno economic corridor(upsated 25th june 2012)
1. secured transport hub a techno economic corridor(upsated 25th june 2012)Aneesh Suresh
 
Slums & Transportation: Bangalore, India
Slums & Transportation: Bangalore, IndiaSlums & Transportation: Bangalore, India
Slums & Transportation: Bangalore, Indiajameswhitcombriley
 
JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJaspal Singh
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patnaMd Faizan Danish
 
(Bj lee)user centered public transit information services
(Bj lee)user centered public transit information services(Bj lee)user centered public transit information services
(Bj lee)user centered public transit information servicesBackjin Lee
 

Was ist angesagt? (11)

Social considerations eng
Social considerations engSocial considerations eng
Social considerations eng
 
Introduction of History and Community of GTFS-JP
Introduction of History and Community of GTFS-JPIntroduction of History and Community of GTFS-JP
Introduction of History and Community of GTFS-JP
 
Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning
 
BUS PROCUREMENT
BUS PROCUREMENTBUS PROCUREMENT
BUS PROCUREMENT
 
JnNURM Guidelines
JnNURM GuidelinesJnNURM Guidelines
JnNURM Guidelines
 
Approach to Integrated Land Use & Transport within Spatial Planning Processes
Approach to Integrated Land Use & Transport within Spatial Planning ProcessesApproach to Integrated Land Use & Transport within Spatial Planning Processes
Approach to Integrated Land Use & Transport within Spatial Planning Processes
 
1. secured transport hub a techno economic corridor(upsated 25th june 2012)
1. secured transport hub   a techno economic corridor(upsated 25th june 2012)1. secured transport hub   a techno economic corridor(upsated 25th june 2012)
1. secured transport hub a techno economic corridor(upsated 25th june 2012)
 
Slums & Transportation: Bangalore, India
Slums & Transportation: Bangalore, IndiaSlums & Transportation: Bangalore, India
Slums & Transportation: Bangalore, India
 
JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi Experience
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patna
 
(Bj lee)user centered public transit information services
(Bj lee)user centered public transit information services(Bj lee)user centered public transit information services
(Bj lee)user centered public transit information services
 

Andere mochten auch

Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.Bayar Tsend
 
презентаци 10162013
презентаци 10162013презентаци 10162013
презентаци 10162013Bayar Tsend
 
1[1].land readjustment mongolia
1[1].land readjustment mongolia1[1].land readjustment mongolia
1[1].land readjustment mongoliaBayar Tsend
 
Adb 28.06.13 mongol
Adb 28.06.13 mongolAdb 28.06.13 mongol
Adb 28.06.13 mongolBayar Tsend
 
Intro to urban planning eng
Intro to urban planning engIntro to urban planning eng
Intro to urban planning engBayar Tsend
 
Land use plan and land management eng
Land use plan and land management engLand use plan and land management eng
Land use plan and land management engBayar Tsend
 
Urban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmpsUrban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmpsBayar Tsend
 

Andere mochten auch (7)

Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.
 
презентаци 10162013
презентаци 10162013презентаци 10162013
презентаци 10162013
 
1[1].land readjustment mongolia
1[1].land readjustment mongolia1[1].land readjustment mongolia
1[1].land readjustment mongolia
 
Adb 28.06.13 mongol
Adb 28.06.13 mongolAdb 28.06.13 mongol
Adb 28.06.13 mongol
 
Intro to urban planning eng
Intro to urban planning engIntro to urban planning eng
Intro to urban planning eng
 
Land use plan and land management eng
Land use plan and land management engLand use plan and land management eng
Land use plan and land management eng
 
Urban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmpsUrban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmps
 

Ähnlich wie Traffic managementforpolice

Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...
Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...
Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...WRI Ross Center for Sustainable Cities
 
IRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET Journal
 
Ortigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping DocumentationOrtigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping DocumentationiBoP Asia
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIIRJET Journal
 
GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...
GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...
GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...AI Publications
 
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...IRJET Journal
 
International Benchmarking of business models enacted by main MaaS providers
International Benchmarking of business models enacted by main MaaS providersInternational Benchmarking of business models enacted by main MaaS providers
International Benchmarking of business models enacted by main MaaS providersJacopo Farina
 
Pedestrianisation of Commercial Area: A Case Study of Aminabad, Lucknow
Pedestrianisation of Commercial Area: A Case Study of Aminabad, LucknowPedestrianisation of Commercial Area: A Case Study of Aminabad, Lucknow
Pedestrianisation of Commercial Area: A Case Study of Aminabad, LucknowIRJET Journal
 
Accessibility analysis of public transport networks in urban areas
Accessibility analysis of public transport networks in urban areasAccessibility analysis of public transport networks in urban areas
Accessibility analysis of public transport networks in urban areasMayank Bansal
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...Emmanuel Mongaya
 
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityAppraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityeSAT Publishing House
 
IRJET- Assessment of Pedestrian Level of Service at Major Market
IRJET- Assessment of Pedestrian Level of Service at Major MarketIRJET- Assessment of Pedestrian Level of Service at Major Market
IRJET- Assessment of Pedestrian Level of Service at Major MarketIRJET Journal
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - ReducedBenya Manajitt
 
Junghoon Lee
Junghoon LeeJunghoon Lee
Junghoon LeeOECD CFE
 
The role of SPV in Transportation Sector
The role of SPV in Transportation SectorThe role of SPV in Transportation Sector
The role of SPV in Transportation SectorJaspal Singh
 
Transit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bodTransit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bodAyala Solzi Tertman
 
Public Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ India
Public Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ IndiaPublic Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ India
Public Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ IndiaWRI Ross Center for Sustainable Cities
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...IRJET Journal
 
A Model-Driven Solution to support Smart Mobility Planning
A Model-Driven Solution to support Smart Mobility PlanningA Model-Driven Solution to support Smart Mobility Planning
A Model-Driven Solution to support Smart Mobility Planningantbucc
 

Ähnlich wie Traffic managementforpolice (20)

Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...
Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...
Parking and Transit Oriented Developments (TODs) by Dr. Paul Barter & Mr. Paw...
 
IRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit System
 
Ortigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping DocumentationOrtigas New Mobility Mapping Documentation
Ortigas New Mobility Mapping Documentation
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...
GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...
GIS-based Road Network Analysis and Bus Route Evaluation in Futian District, ...
 
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...IRJET-  	  Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
 
International Benchmarking of business models enacted by main MaaS providers
International Benchmarking of business models enacted by main MaaS providersInternational Benchmarking of business models enacted by main MaaS providers
International Benchmarking of business models enacted by main MaaS providers
 
Pedestrianisation of Commercial Area: A Case Study of Aminabad, Lucknow
Pedestrianisation of Commercial Area: A Case Study of Aminabad, LucknowPedestrianisation of Commercial Area: A Case Study of Aminabad, Lucknow
Pedestrianisation of Commercial Area: A Case Study of Aminabad, Lucknow
 
Accessibility analysis of public transport networks in urban areas
Accessibility analysis of public transport networks in urban areasAccessibility analysis of public transport networks in urban areas
Accessibility analysis of public transport networks in urban areas
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityAppraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
 
IRJET- Assessment of Pedestrian Level of Service at Major Market
IRJET- Assessment of Pedestrian Level of Service at Major MarketIRJET- Assessment of Pedestrian Level of Service at Major Market
IRJET- Assessment of Pedestrian Level of Service at Major Market
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - Reduced
 
Junghoon Lee
Junghoon LeeJunghoon Lee
Junghoon Lee
 
The role of SPV in Transportation Sector
The role of SPV in Transportation SectorThe role of SPV in Transportation Sector
The role of SPV in Transportation Sector
 
Transit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bodTransit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bod
 
Public Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ India
Public Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ IndiaPublic Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ India
Public Bicycle Sharing - Opportunities in India - Amit Bhatt, EMBARQ India
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
A Model-Driven Solution to support Smart Mobility Planning
A Model-Driven Solution to support Smart Mobility PlanningA Model-Driven Solution to support Smart Mobility Planning
A Model-Driven Solution to support Smart Mobility Planning
 
An
AnAn
An
 

Mehr von Bayar Tsend

матрын ордны ерөнхий шинж
матрын ордны ерөнхий шинжматрын ордны ерөнхий шинж
матрын ордны ерөнхий шинжBayar Tsend
 
2015 хагас жилийн тайлан
2015 хагас жилийн тайлан2015 хагас жилийн тайлан
2015 хагас жилийн тайланBayar Tsend
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД Bayar Tsend
 
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904 ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904 Bayar Tsend
 
Гэр хорооллын дахин төлөвлөлтийн хувилбарууд
Гэр хорооллын дахин төлөвлөлтийн хувилбаруудГэр хорооллын дахин төлөвлөлтийн хувилбарууд
Гэр хорооллын дахин төлөвлөлтийн хувилбаруудBayar Tsend
 
битумын контейнер
битумын контейнер битумын контейнер
битумын контейнер Bayar Tsend
 
Сайжруулсан асфальтыг авто замд ашиглах боломжууд
Сайжруулсан асфальтыг авто замд ашиглах боломжуудСайжруулсан асфальтыг авто замд ашиглах боломжууд
Сайжруулсан асфальтыг авто замд ашиглах боломжуудBayar Tsend
 
Битумын контейнер/ Bitumen container
Битумын контейнер/ Bitumen containerБитумын контейнер/ Bitumen container
Битумын контейнер/ Bitumen containerBayar Tsend
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01Bayar Tsend
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛАЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛBayar Tsend
 
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГАБАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГАBayar Tsend
 
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛБАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛBayar Tsend
 
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014 УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014 Bayar Tsend
 
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...Bayar Tsend
 
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...Bayar Tsend
 
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулгагазар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулгаBayar Tsend
 
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842Bayar Tsend
 
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...Bayar Tsend
 
Accountability mechanism 06112012 mon
Accountability mechanism 06112012 monAccountability mechanism 06112012 mon
Accountability mechanism 06112012 monBayar Tsend
 
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842Bayar Tsend
 

Mehr von Bayar Tsend (20)

матрын ордны ерөнхий шинж
матрын ордны ерөнхий шинжматрын ордны ерөнхий шинж
матрын ордны ерөнхий шинж
 
2015 хагас жилийн тайлан
2015 хагас жилийн тайлан2015 хагас жилийн тайлан
2015 хагас жилийн тайлан
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
 
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904 ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
 
Гэр хорооллын дахин төлөвлөлтийн хувилбарууд
Гэр хорооллын дахин төлөвлөлтийн хувилбаруудГэр хорооллын дахин төлөвлөлтийн хувилбарууд
Гэр хорооллын дахин төлөвлөлтийн хувилбарууд
 
битумын контейнер
битумын контейнер битумын контейнер
битумын контейнер
 
Сайжруулсан асфальтыг авто замд ашиглах боломжууд
Сайжруулсан асфальтыг авто замд ашиглах боломжуудСайжруулсан асфальтыг авто замд ашиглах боломжууд
Сайжруулсан асфальтыг авто замд ашиглах боломжууд
 
Битумын контейнер/ Bitumen container
Битумын контейнер/ Bitumen containerБитумын контейнер/ Bitumen container
Битумын контейнер/ Bitumen container
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛАЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
 
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГАБАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
 
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛБАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
 
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014 УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
 
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
 
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
 
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулгагазар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
 
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
 
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
 
Accountability mechanism 06112012 mon
Accountability mechanism 06112012 monAccountability mechanism 06112012 mon
Accountability mechanism 06112012 mon
 
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
 

Traffic managementforpolice

  • 1. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Introduction To Traffic Management August 10, 2007 JICA Study Team August 7, 2007 1
  • 2. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Contents 1. Overview of traffic management 2. Data collection and identification of problems 3. Data Analysis 4. Formulation of solutions 5. Implementation of improvement measures 6. Operation and evaluation 7. Traffic Accident and Safety 8. Summary August 7, 2007 2
  • 3. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 1. Overview of Traffic Management What is traffic management? Rational for traffic management. Traffic management process. August 7, 2007 3
  • 4. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy What is Traffic Management? A set of traffic Engineering, Enforcement and Educational measures to make traffic more efficient and safer. No acquisition of additional land. Far less costly as compared with road construction or road widening. Can be implemented in a short time. Physical and operational measures. August 7, 2007 4
  • 5. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Objectives of Traffic Management General objectives:  Make traffic more efficient.  Enhance traffic safety  Reduce pollutant emission Specific objectives:  Promote public transport use  Promote non-motorized transport (NMT)  Restrict use of private cars (traffic demand management) August 7, 2007 5
  • 6. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Rationale for Traffic Management Not enough roads to accommodate growing traffic demand. Cannot keep constructing new roads even if fund is available. New approach that relies on:  Improvement of public transport;  Intensive management of travel demand; and  Traffic management techniques to increase effective capacity of available road space. August 7, 2007 6
  • 7. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Management Process August 7, 2007 7
  • 8. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 2. Data Collection & Problem Identifications Identification of problem (traffic congestion) and its location. Traffic survey.  Various traffic surveys were conducted in this study. Opinion and behavior survey. August 7, 2007 8
  • 9. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Congestion Traffic congestion occurs when: Demand>Capacity Even small excess demand can cause heavy congestion. Heavy congestion in Bangkok, Thailand August 7, 2007 9
  • 10. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Bottleneck Points A location where physical or effective capacity decreases and congestion starts.  Intersection / roundabout  Narrowed road section  Roadside parking  Bus stop  High side friction August 7, 2007 10
  • 11. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Survey Objectives: Obtain quantitative data that is required to identify traffic problem and formulate solutions. Type of survey:  Intersection turning movement count  Intersection inventory survey  Traffic signal operation survey  Traffic accident survey  Travel time survey August 7, 2007 11
  • 12. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Intersection Turning Movement Count Essential for intersection capacity analysis. Counted in vehicle and converted to PCU (Passenger Car Unit) for peak hour. August 7, 2007 12
  • 13. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Travel Time Survey To identify bottleneck and low speed section along the survey route. Test vehicle runs several times along survey route and records time at waypoints. Travel Time Survey Travel Time Survey (Speed) 300 20.0 250 15.0 200 Speed (km/h) Time (sec) 150 10.0 100 50 5.0 0 0.0 370 640 940 1140 0 140 0 140 370 640 1140 940 Distance (m) Distance (m) Time-Distance Chart Travel Speed Chart August 7, 2007 13
  • 14. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 3. Data Analysis Intersection capacity analysis. Traffic flow simulation. Traffic analysis software for PC. August 7, 2007 14
  • 15. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Intersection Capacity Analysis A procedure to analyze traffic operation at intersection. Helpful to examine critical movements and overall intersection performance. Applicable for both signalized and non- signalized intersection. August 7, 2007 15
  • 16. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Intersection Capacity Analysis Input data:  Directional traffic volume  Lane width and movement assignment  Signal timing (for operational analysis of signalized intersection only) Analysis output:  [Volume] / [Saturation Rate] for each movement and overall intersection  A set of critical movements August 7, 2007 16
  • 17. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Example of Intersection Capacity Analysis PM peak hour traffic volume Lane width & assignment AM PM Max N-S V/S 0.32 0.33 Max E-W V/S 0.40 0.49 Y Value 0.72 0.83 August 7, 2007 17
  • 18. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Flow Simulation Software A set of computer programs that constructs virtual road network and simulates movements of individual vehicle on it. Performance of network under various road conditions and traffic demands can be tested. August 7, 2007 18
  • 19. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Input Data Required Link, node and network configuration:  Length, grade, lane assignment, connection, turn pocket Traffic control at intersection:  Signalized and unsignalized, vehicle detector Traffic volume and vehicle properties:  Input volume, turning movement at intersection, vehicle performance by type, etc. August 7, 2007 19
  • 20. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Simulation Output Traffic data:  Number of trips, traffic volume, delay  Congestion data (max and average queue) Person data:  Person-km, person-trips, delay/person Vehicle data:  Moving time, delay time, queue time Energy and environment:  Fuel consumption, pollutant emission August 7, 2007 20
  • 21. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Flow Animation August 7, 2007 21
  • 22. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Application of Traffic Flow Simulation Can be used for comparison and evaluation of various traffic improvement measures including:  Intersection geometric improvement  Signalization / Signal improvement  Fly-over  Traffic regulation (lane control, turn prohibition, parking control, one-way, etc.)  Public transport improvement  HOV (high occupancy vehicle) lane August 7, 2007 22
  • 23. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Advantage of Using Simulation Software Several traffic management measures can be tested and compared with minimal time and cost. Various measures of effectiveness (MoE) can be obtained. Visual presentation of road network and traffic operation available. August 7, 2007 23
  • 24. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Analysis Software for PC Intersection / arterial streets / network operation analysis software. Many package software are available: Highway capacity software SIG/CINEMA Passer II/III/IV TRANSYT- SYNCHRO 7F SIMTRAFFIC TSIS aaSIDRA August 7, 2007 24
  • 25. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 4. Formulation of Solutions Traffic management instruments:  Intersection geometric improvement  Traffic signal  Transit signal priority  Traffic sign & road marking  Traffic demand management  Parking management August 7, 2007 25
  • 26. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Management Instruments Various technique is available and applicable to regulate vehicle and pedestrian flows. Basic rules are:  Simplify traffic flow (reduce no. of movements)  Segregate road users in space and time  Increase capacity in order to accommodate more vehicles (supply side measure)  Restrain traffic in order to reduce traffic volume (demand side measure) August 7, 2007 26
  • 27. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Engineering Solution What is “traffic engineering?”  Traffic Engineering applies engineering principles to help solve transportation problems, and brings into play knowledge of psychology and habits of users of the transportation systems, aside from technical foundations. August 7, 2007 27
  • 28. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Engineering Measures August 7, 2007 28
  • 29. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Intersection Geometric Improvement Regulate vehicle and pedestrian movements at intersection by modifying intersection geometry. Basic rules  Make intersection size as small as possible  Keep number of approaches four or less  Make approach angle close to 90 degree  Provide left turn lane if necessary  Provide refugee space for pedestrian August 7, 2007 29
  • 30. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Example of Intersection Geometric Improvement Before After August 7, 2007 30
  • 31. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal – Signal Warrant Signal warrant determines whether a traffic signal is required at a particular intersection or not. Factors to be considered: Traffic volume Nearby facility Left turn volume Traffic accident Pedestrian volume V/C ratio August 7, 2007 31
  • 32. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal – Basic Parameter Cycle (duration of 1 cycle, second) Split (ratio of green time against cycle, %) Offset (time difference between 2 signals with same cycle, second or %) August 7, 2007 32
  • 33. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal – Control Mode Category Mode Technology Cost O/M Isolated Fixed time Simple Low Easy Time-of-day Actuated Arterial Coordinated Area Responsive Adaptive Sophisticated High Difficult O/M: Operation and maintenance August 7, 2007 33
  • 34. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal - Coordination Signals along arterial street are coordinated to maximize throughput and minimize delay August 7, 2007 34
  • 35. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal – Control Mode Fixed Time Time-of-day (TOD) Actuation Coordinated Area Traffic Control Traffic responsive/adaptive August 7, 2007 35
  • 36. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal – Manual Control Why manual control is not efficient?  Control based on wrong perception – Minimizing stops instead of total throughput  Effective only for light traffic – Not effective for near- or over-saturated traffic  Local optimization at best – Coordination not considered, not network-wide optimization  Fatigue and loss of attention – Human nature August 7, 2007 36
  • 37. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signal – Long Cycle Time If cycle time is doubled, average delay is also doubled with same traffic volume SHORT CYCLE TIME LONG CYCLE TIME GREEN GREEN GREEN RED RED RED SIGNAL SIGNAL TIME ARRIVAL TIME ARRIVAL August 7, 2007 37
  • 38. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Platoon – Group of Vehicles In manual control, operator tends to wait for approaching vehicle - wrong practice! (a) Start of Green (b) Begining of Green (c) End of Green August 7, 2007 38
  • 39. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Platoon Profile Green time is wasted as it is not fully utilized Efficiency decreases with longer cycle Platoon Pattern Cycle Length and Efficiency Saturation flow level Vehicles/Unit Green Vehicles/Unit Green Wasted Green Time 100 120 140 160 180 200 Green Time Cycle Length (sec) August 7, 2007 39
  • 40. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Transit Signal Priority Red signal is shortened or green signal is lengthened to minimized delay of bus August 7, 2007 40
  • 41. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Signs and Road Markings Effective tool to regulate traffic Mongolian standards established August 7, 2007 41
  • 42. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 5. Implementation of Improvement Measures Cost estimate and funding Consultation with stakeholders Legislation and regulation Public relations August 7, 2007 42
  • 43. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Cost Estimate and Funding Realistic cost must be estimated using prevailing price of materials, cost of similar works and inquiry to potential suppliers / contractors. Fund must be secured from annual budget, special budget, or other sources. Long lead time must be considered for timely implementation. August 7, 2007 43
  • 44. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Consultation with Stakeholder Share knowledge and experience and collaborate in formulating workable solution  Participants: Driver (public, private), passenger, pedestrian, resident, shop owner, other government agencies (national and local) August 7, 2007 Stakeholder Meeting in Jakarta, Indonesia 44
  • 45. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Information & Education Campaign Disseminate information to foster road user’s cooperation Traffic rule campaign in Hanoi, Vietnam August 7, 2007 45
  • 46. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 6. Operation and Evaluation Guidance and enforcement. Review and evaluation. August 7, 2007 46
  • 47. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Role of Traffic Police Enforcement of traffic rules. Apprehension of violators.  Speeding,  No left turn violation  Drunken driving  One-way violation  Red signal violation  No parking violation Traffic guidance and control. August 7, 2007 47
  • 48. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Control by Traffic Enforcer Get drivers and pedestrians to obey traffic rules and regulations – main task Human signal controller – secondary task Impromptu new traffic scheme not effective Traffic police at work August 7, 2007 48
  • 49. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Existing Enforcement System Offence is settled on the spot with payment of fine in cash. Fine is the revenue for UB City. Total amount of fine: 500 mil. Tg. for 2006 More amount expected for 2007. Suspension or revocation for severe offence. Offence is not recorded. August 7, 2007 49
  • 50. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Point System for Traffic Offence Demerit point is given to driver who committed traffic offence. Number of points depend on type of offence. Driving license is suspended or revoked if demerit points reach the certain level. Training or test is required for suspended or revoked drivers. No offence for certain period will reset or reduce demerit points. August 7, 2007 50
  • 51. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 7. Traffic Accidents and Safety High accident rate compared with number of vehicles. High rate of pedestrian accidents. Accident prone locations:  Intersection, roundabout, high traffic volume Accident prone locations August 7, 2007 51
  • 52. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Number of Accidents   Accidents Year Nation UB City UB Share 2000 5,991 5,074 84.7% 2001 5,212 4,394 84.3% 2002 5,553 4,358 78.5% 2003 5,296 3,892 73.5% 2004 4,803 3,557 74.1% August 7, 2007 52
  • 53. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Accident Type         Property Damage Fatality (person) Injured (person) (mil. Tg.) Year Nation UB City Share Nation UB City Share Nation UB City Share 2000 338 141 41.7% 1,616 940 58.2% 483.2 215.6 44.6% 2001 335 97 29.0% 1,812 1,078 59.5% 289.7 127.6 44.0% 2002 327 122 37.3% 1,636 818 50.0% 658.3 384.4 58.4% 2003 391 145 37.1% 1,224 692 56.5% 729.9 424.4 58.1% 2004 385 102 26.5% 2,312 1,119 48.4% 354.3 127.4 36.0% August 7, 2007 53
  • 54. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Accident Type Type Number Share Car - car 11,864 55.7% Car - pedestrian 8,477 39.8% Immovable facilities 376 1.8% Overturn 335 1.6% Fallen passenger 104 0.5% Car - bicycle 81 0.4% Car - animal 0 0.0% Others 68 0.3% Total 21,305   August 7, 2007 54
  • 55. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Traffic Safety Education - Policy Understanding of importance of education Curriculum suitable for recipient and local conditions Understanding of traffic rule and manner Participatory approach and hand-on training Evaluation of effect of safety education Review of curriculum to cope with changing needs of society Consideration of privacy Coordination with other organizations August 7, 2007 55
  • 56. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Safety Education – Target Group Different curriculum for each target group  Small children  Elementary, junior high, high school students  Adults  Elderly persons August 7, 2007 56
  • 57. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Education Menu Text book Traffic safety park Campaign and parade TV programs Training for Traffic Police August 7, 2007 57
  • 58. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Monitoring and Evaluation Essential for sustainability. Indicators  Comparison of “before” and “after” data (traffic volume, travel time, delay, etc.)  Number and severity of accidents  Number of traffic offences  Pedestrian environment (space, waiting time and path to cross intersection)  Complaints August 7, 2007 58
  • 59. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy 8. Summary Effectiveness and limitations of traffic management measures must be properly understood (no almighty solution). Scientific approach must be taken (think before you tinker). Concerted and sustained efforts by all parties concerned is required (never ending task but do your best). August 7, 2007 59
  • 60. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy ….END August 7, 2007 60