SlideShare ist ein Scribd-Unternehmen logo
1 von 19
Downloaden Sie, um offline zu lesen
http://www.zhiyi.ltd/
1/19
Smart home assembly tutorial
202107015 V1.0
http://www.zhiyi.ltd/
2/19
Assembly tutorial
Step 1: Use the 4XM3*30 screws and 8XM3 nuts in the "AB screw package" to fix the smart home kit wood board A as shown in the figure:
Use two M3
nuts to fix
Note: When using screws to fix,
carefully look at the direction
of the front and back of the
board A
http://www.zhiyi.ltd/
3/19
Step 2: Use 2X M2*16 round head screws and 2X M2 nuts to fix the G90 servo as shown in the figure:
http://www.zhiyi.ltd/
4/19
Step 3: Fix the steering gear rotating bracket and B gear as shown in the figure:
http://www.zhiyi.ltd/
5/19
Step 4: Use 4X M3 nuts to fix the smart home window board B according to the normal rotation of the gear as shown in the figure:
The wiring of the
steering gear goes
through here
Warm reminder: When using the steering gear
and the window gear, please refer to the tutorial
item 14 for wiring first, and use the infrared
remote control to debug the normal rotation of
the window gear.
http://www.zhiyi.ltd/
6/19
Step 5: Use 4X M3*12 flat head screws to fix the LED module.
Here you need to lock
four nuts first
http://www.zhiyi.ltd/
7/19
Step 6: 2 X M2*10 round head screws; 2 X M2 nuts to fix the touch module, as shown in the figure:
http://www.zhiyi.ltd/
8/19
Step 7: Use 2 x M3*12 flat-head screws and 2 X M3 nuts in the "C screw package" to fix the LED module.
Warm reminder: When using screws to fix
the LED module, pay attention to the front
and back of the board.
http://www.zhiyi.ltd/
9/19
Step 8: Fix the RGB module and the relay module with 6 x M3*12 flat head screws; 6 x nuts respectively. Use 2 X M2*10 round head screws and 2 X M2 nuts to fix
the buzzer module as shown in the figure:
Warm reminder: When using
screws to fix, pay attention to
the front and back of the board.
http://www.zhiyi.ltd/
10/19
Step 9: Use the "DE screw pack" 4 X M3*10 flat head screws and 4 X M3 nuts; fix the small hinge with the wood board E and wood board D; as shown in the figure:
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
11/19
Step 10: Use the "DE screw pack" 2X M2*16 round head screws and 2X M2 screws to fix the G90 servo; at the same time use 2X M3*10+6 single-pass hexagonal
copper pillars and 2 X M3*8 round head screws, 2 X M3 nut fixes the RFID module; as shown in the figure:
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
12/19
Step 11: Use the "F screw pack" 4 X M3*12 flat head screws and 4 X M3 nuts to fix the LCD 1602 display module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
13/19
Step 12: Use 2X M2*10 round head screws and 2X M2 nuts to fix the DHT11 temperature and humidity module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
14/19
Step 13: Use the "G screw pack" 5X M3*10+6 single-pass hexagonal copper column and 5 X M3 nuts and M3*8 round head screws to fix the raindrop sensor
module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
15/19
Step 14: Use "H screw pack" 4 X M3*10+6 single-way hexagonal copper posts and M3*10 screws, 4 X M3 nuts to fix the MQ-2 gas sensor module; 2 X M2*10 round
head screws, 2 X M2 nut installs and fixes the infrared receiver module.
Warm reminder: When using screws
to fix, pay attention to the front and
back of the board.
http://www.zhiyi.ltd/
16/19
Step 15: Use 4 X M3*12 round head screws and 4 X M3 nuts to install and fix the fan module.
http://www.zhiyi.ltd/
17/19
Step 16: Use the "L screw pack" 4 X M3*12 flat head screws, 4 X M3 nuts to fix the battery box; at the same time, use 4 X M3*10+6 single-pass hexagonal copper
posts, 4 X M3*8 screws, 4 X M3 nut fixes the arduino nano expansion board.
Step 17: Wiring according to the following circuit diagram.
Expansion board G means GND; expansion board V means VCC; expansion board S means the pin number corresponding to arduino. (Note: the V corresponding to
the red line node connection represents the VCC corresponding to the connection pin number; the black line node connection corresponding to the G represents
the GND corresponding to the connection pin number)
http://www.zhiyi.ltd/
18/19
http://www.zhiyi.ltd/
19/19
Step 18: Use wooden bolts to assemble ABCDEFGHL boards.(Note: It can be completely fixed if assembled; the wooden bolt can also be used without it)

Weitere ähnliche Inhalte

Ähnlich wie Project 17 Smart Home Assembly Tutorial.pdf

Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1Franck Lecluse
 
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdfA8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdfCristian A. Tissera
 
DrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfDrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfUsmanBhatti46
 
430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdf430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdfirina686209
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Solar
 
COOL
COOLCOOL
COOL2in1
 
Toughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsToughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsGlenda Hernandez
 
A8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdfA8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdfCristian A. Tissera
 
How to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong TableHow to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong TableBrixton Johansson
 
CoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation InstructionsCoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation InstructionsCoastal Joinery Hardware
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guidejaydeedee
 
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000Gherghescu Gabriel
 
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMANSAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMANAlisa Axtman
 

Ähnlich wie Project 17 Smart Home Assembly Tutorial.pdf (19)

Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1Ultimaker original assembly_manual_v1.1
Ultimaker original assembly_manual_v1.1
 
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdfA8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
A8-M Double sprinkler 3D Printer Installation Instructions-1.0.pdf
 
DrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdfDrawBotAssemblyUserGuideV3.pdf
DrawBotAssemblyUserGuideV3.pdf
 
EVANNEX EcoHitch for Tesla Model S Install Guide Final
EVANNEX EcoHitch for Tesla Model S Install Guide FinalEVANNEX EcoHitch for Tesla Model S Install Guide Final
EVANNEX EcoHitch for Tesla Model S Install Guide Final
 
430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdf430635547-Tronxy-x1-assembly-guide.pdf
430635547-Tronxy-x1-assembly-guide.pdf
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
 
Mobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation InstructionsMobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation Instructions
 
COOL
COOLCOOL
COOL
 
Toughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsToughbox-Assembly-Instructions
Toughbox-Assembly-Instructions
 
MSB manual
MSB manualMSB manual
MSB manual
 
A8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdfA8 3D Printer Installation Instructions-2016-6-30.pdf
A8 3D Printer Installation Instructions-2016-6-30.pdf
 
How to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong TableHow to Open Kettler Ping Pong Table
How to Open Kettler Ping Pong Table
 
Vxl itona tc61yy
Vxl itona tc61yyVxl itona tc61yy
Vxl itona tc61yy
 
Doc 1010
Doc 1010Doc 1010
Doc 1010
 
Parabody gs4-user-manual
Parabody gs4-user-manualParabody gs4-user-manual
Parabody gs4-user-manual
 
CoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation InstructionsCoFold Ultra Sliding Folding Door Gear Installation Instructions
CoFold Ultra Sliding Folding Door Gear Installation Instructions
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
AUDI A4 B5 1.8L 1996 BADY 55 12 rear lid vin 8 d xa 200 000
 
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMANSAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
SAMPLE SUB-ASSEMBLY DOCUMENT, ALISA AXTMAN
 

Kürzlich hochgeladen

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 

Kürzlich hochgeladen (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 

Project 17 Smart Home Assembly Tutorial.pdf

  • 2. http://www.zhiyi.ltd/ 2/19 Assembly tutorial Step 1: Use the 4XM3*30 screws and 8XM3 nuts in the "AB screw package" to fix the smart home kit wood board A as shown in the figure: Use two M3 nuts to fix Note: When using screws to fix, carefully look at the direction of the front and back of the board A
  • 3. http://www.zhiyi.ltd/ 3/19 Step 2: Use 2X M2*16 round head screws and 2X M2 nuts to fix the G90 servo as shown in the figure:
  • 4. http://www.zhiyi.ltd/ 4/19 Step 3: Fix the steering gear rotating bracket and B gear as shown in the figure:
  • 5. http://www.zhiyi.ltd/ 5/19 Step 4: Use 4X M3 nuts to fix the smart home window board B according to the normal rotation of the gear as shown in the figure: The wiring of the steering gear goes through here Warm reminder: When using the steering gear and the window gear, please refer to the tutorial item 14 for wiring first, and use the infrared remote control to debug the normal rotation of the window gear.
  • 6. http://www.zhiyi.ltd/ 6/19 Step 5: Use 4X M3*12 flat head screws to fix the LED module. Here you need to lock four nuts first
  • 7. http://www.zhiyi.ltd/ 7/19 Step 6: 2 X M2*10 round head screws; 2 X M2 nuts to fix the touch module, as shown in the figure:
  • 8. http://www.zhiyi.ltd/ 8/19 Step 7: Use 2 x M3*12 flat-head screws and 2 X M3 nuts in the "C screw package" to fix the LED module. Warm reminder: When using screws to fix the LED module, pay attention to the front and back of the board.
  • 9. http://www.zhiyi.ltd/ 9/19 Step 8: Fix the RGB module and the relay module with 6 x M3*12 flat head screws; 6 x nuts respectively. Use 2 X M2*10 round head screws and 2 X M2 nuts to fix the buzzer module as shown in the figure: Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 10. http://www.zhiyi.ltd/ 10/19 Step 9: Use the "DE screw pack" 4 X M3*10 flat head screws and 4 X M3 nuts; fix the small hinge with the wood board E and wood board D; as shown in the figure: Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 11. http://www.zhiyi.ltd/ 11/19 Step 10: Use the "DE screw pack" 2X M2*16 round head screws and 2X M2 screws to fix the G90 servo; at the same time use 2X M3*10+6 single-pass hexagonal copper pillars and 2 X M3*8 round head screws, 2 X M3 nut fixes the RFID module; as shown in the figure: Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 12. http://www.zhiyi.ltd/ 12/19 Step 11: Use the "F screw pack" 4 X M3*12 flat head screws and 4 X M3 nuts to fix the LCD 1602 display module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 13. http://www.zhiyi.ltd/ 13/19 Step 12: Use 2X M2*10 round head screws and 2X M2 nuts to fix the DHT11 temperature and humidity module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 14. http://www.zhiyi.ltd/ 14/19 Step 13: Use the "G screw pack" 5X M3*10+6 single-pass hexagonal copper column and 5 X M3 nuts and M3*8 round head screws to fix the raindrop sensor module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 15. http://www.zhiyi.ltd/ 15/19 Step 14: Use "H screw pack" 4 X M3*10+6 single-way hexagonal copper posts and M3*10 screws, 4 X M3 nuts to fix the MQ-2 gas sensor module; 2 X M2*10 round head screws, 2 X M2 nut installs and fixes the infrared receiver module. Warm reminder: When using screws to fix, pay attention to the front and back of the board.
  • 16. http://www.zhiyi.ltd/ 16/19 Step 15: Use 4 X M3*12 round head screws and 4 X M3 nuts to install and fix the fan module.
  • 17. http://www.zhiyi.ltd/ 17/19 Step 16: Use the "L screw pack" 4 X M3*12 flat head screws, 4 X M3 nuts to fix the battery box; at the same time, use 4 X M3*10+6 single-pass hexagonal copper posts, 4 X M3*8 screws, 4 X M3 nut fixes the arduino nano expansion board. Step 17: Wiring according to the following circuit diagram. Expansion board G means GND; expansion board V means VCC; expansion board S means the pin number corresponding to arduino. (Note: the V corresponding to the red line node connection represents the VCC corresponding to the connection pin number; the black line node connection corresponding to the G represents the GND corresponding to the connection pin number)
  • 19. http://www.zhiyi.ltd/ 19/19 Step 18: Use wooden bolts to assemble ABCDEFGHL boards.(Note: It can be completely fixed if assembled; the wooden bolt can also be used without it)