Restricted © Siemens AG 2016 All rights reserved. Set the pace.
Configuration Engineering for Invitro-
Diagnostic (IVD) Product Development
Invited Talk, Stevens Institute of Technology
Author: Arnold Rudorfer
Date: March 29, 2016
Status: 1st draft
Restricted © Siemens AG 2016 All rights reserved.
2 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
This talk on Configuration Engineering (= Configuration
Management for Platform development) will discuss challenges,
solution approaches and engineering experiences in invitro-
diagnostic (IVD) product development. CE is an emerging
discipline in various industries (such as medical devices,
automotive, avionics/ space, …) which has developed from
Configuration Management practices for single products. Further,
examples presented will highlight the underlying CE concepts as
well as address tool issues including observed benefits over the
introduction.
Abstract of this Talk
Restricted © Siemens AG 2016 All rights reserved.
3 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Table of Contents
Business pressures, Configuration Engineering overview 6-122
Goals, Siemens Healthcare Laboratory Diagnostics 3-51
Appendix 24-273
Page
Challenges, approaches, engineering practices 13-213
Key takeaways 224
Restricted © Siemens AG 2016 All rights reserved.
4 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Goals of this Presentation
§ Provide an overview on
configuration management
challenges for platforms
and its solutions in a
practical context.
§ Share engineering practices
and benefits observed.
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Restricted © Siemens AG 2016 All rights reserved.
5 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Siemens Healthcare Laboratory Diagnostics
A Global Leader in Key Market Segments
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Largest Installed Base of Analytical Automation
Chemistry
Diagnostics ITLab Automation Molecular Point of Care
Hematology Hemostasis Immunoassay
Restricted © Siemens AG 2016 All rights reserved.
6 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Business Pressures for IVD Product Development
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Need to
industrialize
product
development
Costs
down
Product
variety
Cycle time
down
Complexity
growth
Configuration
Engineering
Platform-based
development
Focus of this talk
ALM
PLM
Restricted © Siemens AG 2016 All rights reserved.
7 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Configuration Management Defined
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
A disciplined, efficient workflow for evolving a product including its data
and associated procedural information from cradle to grave with
increasing precision and maturity.
Controlled
Input(s):
Product Needs:
§ Feature/ function
§ Problem reports
§ Enhancements
§ …
Product data:
§ Product structure
§ Product
configuration
§ Product
documentation
§ Design data
§ …
Output(s):
New approved
product data:
§ Product structures
§ Product
configurations
§ Product
documentation
§ Design data
§ …
Change history:
§ Audit/ traceability
§ Verification
§ …
Restricted © Siemens AG 2016 All rights reserved.
8 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Impact of Variety in IVD Product Development
External
variety
Address
market
segment
Internal variety Cost-effective
product
development
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
§ Infinite variety is not manageable (cost, timeline, quality, …)
§ Variety in product development needs to be consciously
managed.
Evolving discipline: Configuration Engineering
= Variant Management (what) + Configuration Management (how)
Restricted © Siemens AG 2016 All rights reserved.
9 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Concept End-to-End Configuration Engineering Workflow (1)
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Coordinate
and assess
Product Data
Setup
(1&2)
Establish
initial eBOM
structure
(3)
Plan track,
and review
and Track
product
release
(4, 5, & 6)
Configuration
Build
Management
(7)
Configuration
Change
Management
(8, 9, 10)
Prototype
Modification
Management
(11,12)
Restricted © Siemens AG 2016 All rights reserved.
10 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Concept End-to-End Configuration Engineering Workflow (2)
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
(per PDP phase gates)
§ gBOM
eBOM
mBOM
Feature 1 Feature 2 Feature 3 Feature N
Restricted © Siemens AG 2016 All rights reserved.
11 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Concept End-to-End Configuration Engineering Workflow (3)
eBOM
§ gBOM
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Feature 1 Feature 2 Feature 3 Feature N
Restricted © Siemens AG 2016 All rights reserved.
12 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Concept End-to-End Configuration Engineering Workflow (4)
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Restricted © Siemens AG 2016 All rights reserved.
13 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Structure of the Challenges, Approaches, Engineering Practices Employed
1 Managing product
variants
How do I structure, assess
and control product
variability?
2 Structure an efficient
and reliable change
management workflow
What is the best approach
for executing change
management?
3 Managing changes
across engineering
disciplines
What do you do to manage
and control product data
across development
projects?
4 Coordinating design
changes across
Engineering and
Manufacturing
How do I consistently
synchronize Engineering
and Manufacturing to
become faster and less
costly?
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Restricted © Siemens AG 2016 All rights reserved.
14 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Concept End-to-End Configuration Engineering Workflow (1)
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Coordinate
and assess
Product Data
Setup
(1&2)
Establish
initial eBOM
structure
(3)
Plan track,
and review
and Track
product
release
(4, 5, & 6)
Configuration
Build
Management
(7)
Configuration
Change
Management
(8, 9, 10)
Prototype
Modification
Management
(11,12)
Product
Variants
1
Manage change across disciplines
Efficient change management workflow
2
3
Coordinate change beyond
Engineering
4
Restricted © Siemens AG 2016 All rights reserved.
15 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Structure of Selected Challenges, Approach & Engineering Practices
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Challenge Approach
Engineering
Practice
Challenge, define a solution strategy
For each solution strategy, share ideas on
engineering practices
Illustrate benefits with supporting data
Restricted © Siemens AG 2016 All rights reserved.
16 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Solution Strategy Map for Configuration Engineering
# Challenge Approach Engineering Practice
1 Manage product
variants
§ Provide transparency on variation
points in product structure
§ Proactively manage variation points
in a configuration model
§ Generic platform
product structure
§ Modular product
architecture
§ Frontend configuration
engineering
2 Structure efficient
and reliable change
management
workflow
Deploy end-to-end change
management workflow to provide
always accurate, actionable data (as
automated as possible)
Standardized change
management workflow
3 Manage change
across engineering
disciplines
Integration of product and configuration
data, change can be synchronized
accurately across discipline
Integrated cross discipline
change management
4 Coordinate change
Beyond Engineering
Enable manufacturing to obtain
accurate engineering data to plan &
execute Manufacturing
Synchronized data
exchange of engineering to
manufacturing product data
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Restricted © Siemens AG 2016 All rights reserved.
17 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Manage Product Variants (1)
§ Explicit modeling of a generic product structure
defining commonality & variability
§ Consistently manage variation points in a
product and a configuration model for product
variants over time.
§ Automate creation and update of product &
configuration model using PLM tool(s).
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
1
Approach: Frontend Configuration Engineering
Benefits
§ Explicit modeling of product variants provides
precision for product scope.
§ Improve design speed and reuse supporting a
modular product architecture.
§ Enabler for a configure to order manufacturing
model.
Customer needs drive
product variants
Restricted © Siemens AG 2016 All rights reserved.
18 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Structure Efficient & Reliable Change Management Workflow (1)
§ End-to-end bill of material handling
(from a generic BOM, engineering
BOM to a manufacturing BOM.
§ Handling of BOM baselines according
to the level of design maturity and
product lifecycle
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
2
Approach: Standardized change management workflow
Benefits
§ Accurate controlled changes in a single
product data repository.
§ Reduced change cycle time with less
defects.
§ Increased engineering productivity
§ Audit proof documentation needed for
medical devices.
Change management workflow
needs to cover different phases of
lifecycle.
gBOM eBOM mBOM
Restricted © Siemens AG 2016 All rights reserved.
19 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Structure Efficient & Reliable Change Management Workflow (2)
§ Workflow supported change
management integrated for hardware,
software and firmware.
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
2
Approach: Standardized change management workflow
Benefits
§ Synchronize an emerging change with
prototype configuration data.
§ Change requests are integrated with
emerging problem reports and/or
enhancements.
§ Automation support for processing of
change requests (pre-defined,
templated, internal quality checks).
§ Measure product quality based on
change requests (e.g. stability, …)
For use in simple to more
complex change requests
Restricted © Siemens AG 2016 All rights reserved.
20 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Managing Change Across Disciplines
§ Integrated ALM/PLM tool provides
access to product data by engineering
disciplines, changes are synchronized
quickly across disciplines.
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
3
Approach: Cross-discipline change management workflow
Benefits
§ Open access to prototype configuration
data for all disciplines (HW, SW, FW).
§ Knowledge on design changes are
systematically captured and are made
retrievable.
§ Reduced errors, rework by having all
product data in a single database.
Sample for an integrated
change in a sub-system
Restricted © Siemens AG 2016 All rights reserved.
21 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Managing Change Across Disciplines
§ Apply concept of continuous integration
of upgrades into instrument prototypes
(similar to software).
§ Interface between ALM/PLM tool chain
to MRP system allows synchronization
and transparency for design changes.
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
4
Approach: Collaborating on Change Beyond Engineering
Benefits
§ Instrument prototype generation matures
earlier by means of controlled
deployment of upgrades.
§ Synchronization of eBOM and mBOM
structures.
§ Consistent traceability of design changes
for Engineering & Manufacturing
Design changes are identified
early and are continuously
integrated
Restricted © Siemens AG 2016 All rights reserved.
22 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Key Takeaways: Establishing Configuration Engineering in Your Organization
§ Development of CE needs diverse engineering perspectives
along the product development lifecycle (up- and down-stream).
§ Due to little prior published body of knowledge, start at a point
in a project that supports showing value to project stakeholders.
§ Lay out an end-to-end vision for where CE can add value and
has to lead the path.
§ For a multi-disciplinary domain such as IVD, select a tool-chain
which allows as many stakeholders as possible to collaborate
within the same workspace.
§ CE based on our own experiences needs to grow over time
delivering short-term gains to build credibility while keep the
grand vision in place.
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
What you need to consider when developing CE
Restricted © Siemens AG 2016 All rights reserved.
23 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Appendix
§ Reference documents
§ Contact details Arnold Rudorfer
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Restricted © Siemens AG 2016 All rights reserved.
24 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Reference Documents
§ Arnold Rudorfer, Alexander Evers: Configuration Engineering
workflow, August 2015
§ Siemens Healthcare Laboratory Diagnostics: Company
overview, 2016
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Restricted © Siemens AG 2016 All rights reserved.
25 Laboratory Diagnostics
Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology
Contact Details Arnold Rudorfer
► Goals, Siemens
LD
► Business
pressures, CE
overview
► Challenges,
approaches,
engineering
practices
► Key takeaways
► Appendix
Arnold Rudorfer is a Senior Engineering Leader Instrument
Development at Siemens Healthcare Laboratory Diagnostics. He has
more than twenty years systems development experience with a
focus on medical devices and enterprise platforms. His research
interests include requirements and systems engineering,
organizational change management, software technologies,
innovation- and business strategy. Mr. Rudorfer holds an MS in
software engineering and business administration from the University
of Technology Graz, Austria. Further, he is a INOCSE member and
PMP/MSP certified.
Arnold Rudorfer
Senior Engineering Leader
Product Lifecycle Management
Siemens Healthcare Laboratory Diagnostics
62 Flanders Bartley Road
Flanders, NJ, 07836
Cell: +1 609 954 2384
E-Mail: arnold.rudorfer@siemens.com

Weitere ähnliche Inhalte

Was ist angesagt?

Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...IRJET Journal
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5WarrenFaeth
 
Architecture presentation 8
Architecture presentation 8Architecture presentation 8
Architecture presentation 8Anoush Ghamsari
 
M R Doody 2016 Resume
M R Doody 2016 ResumeM R Doody 2016 Resume
M R Doody 2016 ResumeMike Doody
 
Approach to Technology Transfer
Approach to Technology TransferApproach to Technology Transfer
Approach to Technology TransferProPharma Group
 
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...ijseajournal
 
Amed Resume[1]
Amed Resume[1]Amed Resume[1]
Amed Resume[1]aayubi
 
C10 project management
C10 project managementC10 project management
C10 project managementhakimizaki
 
Gulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGary Schaffer
 
Lect 1- software engineering
Lect 1- software engineeringLect 1- software engineering
Lect 1- software engineeringShraddha Shirsat
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015Steve Tate
 
A suite of tools for technology assessment
A suite of tools for technology assessmentA suite of tools for technology assessment
A suite of tools for technology assessmentNitish Mahajan
 

Was ist angesagt? (19)

DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...
DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...
DEVELOPING A HIGHER-CYCLED PRODUCT DESIGN CAE MODEL: THE EVOLUTION OF AUTOMOT...
 
4213ijsea01 (1)
4213ijsea01 (1)4213ijsea01 (1)
4213ijsea01 (1)
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
1
11
1
 
Architecture presentation 8
Architecture presentation 8Architecture presentation 8
Architecture presentation 8
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
M R Doody 2016 Resume
M R Doody 2016 ResumeM R Doody 2016 Resume
M R Doody 2016 Resume
 
Approach to Technology Transfer
Approach to Technology TransferApproach to Technology Transfer
Approach to Technology Transfer
 
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
 
Amed Resume[1]
Amed Resume[1]Amed Resume[1]
Amed Resume[1]
 
C10 project management
C10 project managementC10 project management
C10 project management
 
Gulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGulfstream Mfg Eng Resume
Gulfstream Mfg Eng Resume
 
Lect 1- software engineering
Lect 1- software engineeringLect 1- software engineering
Lect 1- software engineering
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015
 
A suite of tools for technology assessment
A suite of tools for technology assessmentA suite of tools for technology assessment
A suite of tools for technology assessment
 
Slcm sharbani bhattacharya
Slcm sharbani bhattacharyaSlcm sharbani bhattacharya
Slcm sharbani bhattacharya
 

Ähnlich wie Configuration Engineering for Invitro-Diagnostic Product Development

Ronan Maxwell CV Dec 2015
Ronan Maxwell CV Dec 2015Ronan Maxwell CV Dec 2015
Ronan Maxwell CV Dec 2015Ronan Maxwell
 
A C Product Design
A C Product DesignA C Product Design
A C Product DesignJoe Harsany
 
Touch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology IncTouch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology IncAvalue Technology
 
Touch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology IncTouch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology IncAvalue Technology
 
Product Design and Development.ppt
Product Design and Development.pptProduct Design and Development.ppt
Product Design and Development.pptZeeshanRasheed42
 
3rd Annual Displaybank San Jose Conference
3rd Annual Displaybank San Jose Conference3rd Annual Displaybank San Jose Conference
3rd Annual Displaybank San Jose ConferenceGaryDyal
 
MRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers TestinmonialsMRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers TestinmonialsMattSHoyt
 
There is a system out there! SW Engineering Education from Programming to Eng...
There is a system out there! SW Engineering Education from Programming to Eng...There is a system out there! SW Engineering Education from Programming to Eng...
There is a system out there! SW Engineering Education from Programming to Eng...Prof. Amir Tomer
 
Anoop-Philip_resume
Anoop-Philip_resumeAnoop-Philip_resume
Anoop-Philip_resumeAnoop Philip
 
Fl lab collection_05_2011_en
Fl lab collection_05_2011_enFl lab collection_05_2011_en
Fl lab collection_05_2011_enVahid RG-zadeh
 
Kevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.QualityKevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.QualityKevin Hiller
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2John Setty
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant ResumeMohamed Thalha
 

Ähnlich wie Configuration Engineering for Invitro-Diagnostic Product Development (20)

Ronan Maxwell CV Dec 2015
Ronan Maxwell CV Dec 2015Ronan Maxwell CV Dec 2015
Ronan Maxwell CV Dec 2015
 
A C Product Design
A C Product DesignA C Product Design
A C Product Design
 
Helder_CV
Helder_CVHelder_CV
Helder_CV
 
Touch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology IncTouch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology Inc
 
Touch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology IncTouch The Future with Avalue Technology Inc
Touch The Future with Avalue Technology Inc
 
Product Design and Development.ppt
Product Design and Development.pptProduct Design and Development.ppt
Product Design and Development.ppt
 
3rd Annual Displaybank San Jose Conference
3rd Annual Displaybank San Jose Conference3rd Annual Displaybank San Jose Conference
3rd Annual Displaybank San Jose Conference
 
MRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers TestinmonialsMRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers Testinmonials
 
JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 
Sasmos Report
Sasmos ReportSasmos Report
Sasmos Report
 
Thomson CV
Thomson CVThomson CV
Thomson CV
 
Shaktikumar_Potdar
Shaktikumar_PotdarShaktikumar_Potdar
Shaktikumar_Potdar
 
There is a system out there! SW Engineering Education from Programming to Eng...
There is a system out there! SW Engineering Education from Programming to Eng...There is a system out there! SW Engineering Education from Programming to Eng...
There is a system out there! SW Engineering Education from Programming to Eng...
 
Anoop-Philip_resume
Anoop-Philip_resumeAnoop-Philip_resume
Anoop-Philip_resume
 
Fl lab collection_05_2011_en
Fl lab collection_05_2011_enFl lab collection_05_2011_en
Fl lab collection_05_2011_en
 
Tooltech
TooltechTooltech
Tooltech
 
Kevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.QualityKevin Hiller Resume.Reliability.Quality
Kevin Hiller Resume.Reliability.Quality
 
Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant Resume
 

Mehr von Arnold Rudorfer

Ein Requirements Engineering Referenzmodell
Ein Requirements Engineering ReferenzmodellEin Requirements Engineering Referenzmodell
Ein Requirements Engineering ReferenzmodellArnold Rudorfer
 
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...Arnold Rudorfer
 
Scr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 WorkshopScr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 WorkshopArnold Rudorfer
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5Arnold Rudorfer
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4Arnold Rudorfer
 
201108 qz systematisches_re
201108 qz systematisches_re201108 qz systematisches_re
201108 qz systematisches_reArnold Rudorfer
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Arnold Rudorfer
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Arnold Rudorfer
 
Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3Arnold Rudorfer
 
Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8Arnold Rudorfer
 
Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3Arnold Rudorfer
 
Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8Arnold Rudorfer
 
SYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam KeynoteSYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam KeynoteArnold Rudorfer
 
MedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-EbertMedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-EbertArnold Rudorfer
 

Mehr von Arnold Rudorfer (18)

Ein Requirements Engineering Referenzmodell
Ein Requirements Engineering ReferenzmodellEin Requirements Engineering Referenzmodell
Ein Requirements Engineering Referenzmodell
 
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
 
Scr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 WorkshopScr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 Workshop
 
S5rud
S5rudS5rud
S5rud
 
Reconf2012 V4
Reconf2012 V4Reconf2012 V4
Reconf2012 V4
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4
 
201108 qz systematisches_re
201108 qz systematisches_re201108 qz systematisches_re
201108 qz systematisches_re
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1
 
Scrum Med02232011 V4
Scrum Med02232011 V4Scrum Med02232011 V4
Scrum Med02232011 V4
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1
 
Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3
 
Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8
 
Refsq 2011 03 29 V3
Refsq 2011 03 29 V3Refsq 2011 03 29 V3
Refsq 2011 03 29 V3
 
Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3
 
Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8
 
SYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam KeynoteSYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam Keynote
 
MedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-EbertMedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-Ebert
 

Kürzlich hochgeladen

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 

Kürzlich hochgeladen (20)

DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 

Configuration Engineering for Invitro-Diagnostic Product Development

  • 1. Restricted © Siemens AG 2016 All rights reserved. Set the pace. Configuration Engineering for Invitro- Diagnostic (IVD) Product Development Invited Talk, Stevens Institute of Technology Author: Arnold Rudorfer Date: March 29, 2016 Status: 1st draft
  • 2. Restricted © Siemens AG 2016 All rights reserved. 2 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology This talk on Configuration Engineering (= Configuration Management for Platform development) will discuss challenges, solution approaches and engineering experiences in invitro- diagnostic (IVD) product development. CE is an emerging discipline in various industries (such as medical devices, automotive, avionics/ space, …) which has developed from Configuration Management practices for single products. Further, examples presented will highlight the underlying CE concepts as well as address tool issues including observed benefits over the introduction. Abstract of this Talk
  • 3. Restricted © Siemens AG 2016 All rights reserved. 3 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Table of Contents Business pressures, Configuration Engineering overview 6-122 Goals, Siemens Healthcare Laboratory Diagnostics 3-51 Appendix 24-273 Page Challenges, approaches, engineering practices 13-213 Key takeaways 224
  • 4. Restricted © Siemens AG 2016 All rights reserved. 4 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Goals of this Presentation § Provide an overview on configuration management challenges for platforms and its solutions in a practical context. § Share engineering practices and benefits observed. ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix
  • 5. Restricted © Siemens AG 2016 All rights reserved. 5 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Siemens Healthcare Laboratory Diagnostics A Global Leader in Key Market Segments ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Largest Installed Base of Analytical Automation Chemistry Diagnostics ITLab Automation Molecular Point of Care Hematology Hemostasis Immunoassay
  • 6. Restricted © Siemens AG 2016 All rights reserved. 6 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Business Pressures for IVD Product Development ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Need to industrialize product development Costs down Product variety Cycle time down Complexity growth Configuration Engineering Platform-based development Focus of this talk ALM PLM
  • 7. Restricted © Siemens AG 2016 All rights reserved. 7 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Configuration Management Defined ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix A disciplined, efficient workflow for evolving a product including its data and associated procedural information from cradle to grave with increasing precision and maturity. Controlled Input(s): Product Needs: § Feature/ function § Problem reports § Enhancements § … Product data: § Product structure § Product configuration § Product documentation § Design data § … Output(s): New approved product data: § Product structures § Product configurations § Product documentation § Design data § … Change history: § Audit/ traceability § Verification § …
  • 8. Restricted © Siemens AG 2016 All rights reserved. 8 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Impact of Variety in IVD Product Development External variety Address market segment Internal variety Cost-effective product development ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix § Infinite variety is not manageable (cost, timeline, quality, …) § Variety in product development needs to be consciously managed. Evolving discipline: Configuration Engineering = Variant Management (what) + Configuration Management (how)
  • 9. Restricted © Siemens AG 2016 All rights reserved. 9 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Concept End-to-End Configuration Engineering Workflow (1) ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Coordinate and assess Product Data Setup (1&2) Establish initial eBOM structure (3) Plan track, and review and Track product release (4, 5, & 6) Configuration Build Management (7) Configuration Change Management (8, 9, 10) Prototype Modification Management (11,12)
  • 10. Restricted © Siemens AG 2016 All rights reserved. 10 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Concept End-to-End Configuration Engineering Workflow (2) ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix (per PDP phase gates) § gBOM eBOM mBOM Feature 1 Feature 2 Feature 3 Feature N
  • 11. Restricted © Siemens AG 2016 All rights reserved. 11 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Concept End-to-End Configuration Engineering Workflow (3) eBOM § gBOM ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Feature 1 Feature 2 Feature 3 Feature N
  • 12. Restricted © Siemens AG 2016 All rights reserved. 12 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Concept End-to-End Configuration Engineering Workflow (4) ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix
  • 13. Restricted © Siemens AG 2016 All rights reserved. 13 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Structure of the Challenges, Approaches, Engineering Practices Employed 1 Managing product variants How do I structure, assess and control product variability? 2 Structure an efficient and reliable change management workflow What is the best approach for executing change management? 3 Managing changes across engineering disciplines What do you do to manage and control product data across development projects? 4 Coordinating design changes across Engineering and Manufacturing How do I consistently synchronize Engineering and Manufacturing to become faster and less costly? ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix
  • 14. Restricted © Siemens AG 2016 All rights reserved. 14 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Concept End-to-End Configuration Engineering Workflow (1) ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Coordinate and assess Product Data Setup (1&2) Establish initial eBOM structure (3) Plan track, and review and Track product release (4, 5, & 6) Configuration Build Management (7) Configuration Change Management (8, 9, 10) Prototype Modification Management (11,12) Product Variants 1 Manage change across disciplines Efficient change management workflow 2 3 Coordinate change beyond Engineering 4
  • 15. Restricted © Siemens AG 2016 All rights reserved. 15 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Structure of Selected Challenges, Approach & Engineering Practices ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Challenge Approach Engineering Practice Challenge, define a solution strategy For each solution strategy, share ideas on engineering practices Illustrate benefits with supporting data
  • 16. Restricted © Siemens AG 2016 All rights reserved. 16 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Solution Strategy Map for Configuration Engineering # Challenge Approach Engineering Practice 1 Manage product variants § Provide transparency on variation points in product structure § Proactively manage variation points in a configuration model § Generic platform product structure § Modular product architecture § Frontend configuration engineering 2 Structure efficient and reliable change management workflow Deploy end-to-end change management workflow to provide always accurate, actionable data (as automated as possible) Standardized change management workflow 3 Manage change across engineering disciplines Integration of product and configuration data, change can be synchronized accurately across discipline Integrated cross discipline change management 4 Coordinate change Beyond Engineering Enable manufacturing to obtain accurate engineering data to plan & execute Manufacturing Synchronized data exchange of engineering to manufacturing product data ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix
  • 17. Restricted © Siemens AG 2016 All rights reserved. 17 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Manage Product Variants (1) § Explicit modeling of a generic product structure defining commonality & variability § Consistently manage variation points in a product and a configuration model for product variants over time. § Automate creation and update of product & configuration model using PLM tool(s). ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix 1 Approach: Frontend Configuration Engineering Benefits § Explicit modeling of product variants provides precision for product scope. § Improve design speed and reuse supporting a modular product architecture. § Enabler for a configure to order manufacturing model. Customer needs drive product variants
  • 18. Restricted © Siemens AG 2016 All rights reserved. 18 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Structure Efficient & Reliable Change Management Workflow (1) § End-to-end bill of material handling (from a generic BOM, engineering BOM to a manufacturing BOM. § Handling of BOM baselines according to the level of design maturity and product lifecycle ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix 2 Approach: Standardized change management workflow Benefits § Accurate controlled changes in a single product data repository. § Reduced change cycle time with less defects. § Increased engineering productivity § Audit proof documentation needed for medical devices. Change management workflow needs to cover different phases of lifecycle. gBOM eBOM mBOM
  • 19. Restricted © Siemens AG 2016 All rights reserved. 19 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Structure Efficient & Reliable Change Management Workflow (2) § Workflow supported change management integrated for hardware, software and firmware. ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix 2 Approach: Standardized change management workflow Benefits § Synchronize an emerging change with prototype configuration data. § Change requests are integrated with emerging problem reports and/or enhancements. § Automation support for processing of change requests (pre-defined, templated, internal quality checks). § Measure product quality based on change requests (e.g. stability, …) For use in simple to more complex change requests
  • 20. Restricted © Siemens AG 2016 All rights reserved. 20 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Managing Change Across Disciplines § Integrated ALM/PLM tool provides access to product data by engineering disciplines, changes are synchronized quickly across disciplines. ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix 3 Approach: Cross-discipline change management workflow Benefits § Open access to prototype configuration data for all disciplines (HW, SW, FW). § Knowledge on design changes are systematically captured and are made retrievable. § Reduced errors, rework by having all product data in a single database. Sample for an integrated change in a sub-system
  • 21. Restricted © Siemens AG 2016 All rights reserved. 21 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Managing Change Across Disciplines § Apply concept of continuous integration of upgrades into instrument prototypes (similar to software). § Interface between ALM/PLM tool chain to MRP system allows synchronization and transparency for design changes. ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix 4 Approach: Collaborating on Change Beyond Engineering Benefits § Instrument prototype generation matures earlier by means of controlled deployment of upgrades. § Synchronization of eBOM and mBOM structures. § Consistent traceability of design changes for Engineering & Manufacturing Design changes are identified early and are continuously integrated
  • 22. Restricted © Siemens AG 2016 All rights reserved. 22 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Key Takeaways: Establishing Configuration Engineering in Your Organization § Development of CE needs diverse engineering perspectives along the product development lifecycle (up- and down-stream). § Due to little prior published body of knowledge, start at a point in a project that supports showing value to project stakeholders. § Lay out an end-to-end vision for where CE can add value and has to lead the path. § For a multi-disciplinary domain such as IVD, select a tool-chain which allows as many stakeholders as possible to collaborate within the same workspace. § CE based on our own experiences needs to grow over time delivering short-term gains to build credibility while keep the grand vision in place. ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix What you need to consider when developing CE
  • 23. Restricted © Siemens AG 2016 All rights reserved. 23 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Appendix § Reference documents § Contact details Arnold Rudorfer ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix
  • 24. Restricted © Siemens AG 2016 All rights reserved. 24 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Reference Documents § Arnold Rudorfer, Alexander Evers: Configuration Engineering workflow, August 2015 § Siemens Healthcare Laboratory Diagnostics: Company overview, 2016 ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix
  • 25. Restricted © Siemens AG 2016 All rights reserved. 25 Laboratory Diagnostics Arnold Rudorfer, Technical Talk @ Stevens Institute of Technology Contact Details Arnold Rudorfer ► Goals, Siemens LD ► Business pressures, CE overview ► Challenges, approaches, engineering practices ► Key takeaways ► Appendix Arnold Rudorfer is a Senior Engineering Leader Instrument Development at Siemens Healthcare Laboratory Diagnostics. He has more than twenty years systems development experience with a focus on medical devices and enterprise platforms. His research interests include requirements and systems engineering, organizational change management, software technologies, innovation- and business strategy. Mr. Rudorfer holds an MS in software engineering and business administration from the University of Technology Graz, Austria. Further, he is a INOCSE member and PMP/MSP certified. Arnold Rudorfer Senior Engineering Leader Product Lifecycle Management Siemens Healthcare Laboratory Diagnostics 62 Flanders Bartley Road Flanders, NJ, 07836 Cell: +1 609 954 2384 E-Mail: arnold.rudorfer@siemens.com