REPORT ON SITE VISIT




            Muhammad bin Ramlan
            P57600
            KKKA 6644
            2011/2012
            Lecturer: Ir Ishak bin Arshad
INTRODUCTION


A site visit for the Construction and Project Management class (KKKA 6644) was organized

by Ir Ishak on 14 October 2011. The location of the site visit was at Cheras, Kuala Lumpur. A

total of approximately 25 students attended the site visit. The agenda of the visit consist of

in-depth explanation by the contractor and consultant on the operation of the project. At

the end of the session, there was a questioning and answering session between the

students and the host. Countless valuable information was shared among both parties

regarding the visit especially on the operation of the project.


The purpose of this site visit is to provide the students with sound knowledge on how the

project management being handled throughout the whole project. The understanding of the

project management practice can be a good basis for the students in order for attaining

perceptive of project management in real life situation. Furthermore, this site visit can assist

the students on knowledge for the preparation of their future career.
PROJECT SUMMARY


Below is the summary of the project:


Project Title : Cadangan Pembinaan Bangunan Pra Klinikal Fakulti Perubatan Hospital

University Kebangsaan Malaysia, Yang Mengandungi 1 Blok Pentadbiran Dan Makmal 19

Tingkat, Blok M&E 3 Tingkat, Mukim Cheras, Kuala Lumpur.


Contract Value              : RM 160,000,000.00


Contract Period             : 24 Months


Commencement Date           : 17 May 2010


Completion Date             : 17 May 2012


Revised Work Program        : 17 September 2012


Physical Progress           : Ahead (0.13%) – As per 1 0ctober 2011


Client                      : Universiti Kebangsaan Malaysia


Architect                   : Damansara Architect


C & S Consultant            : GSA Ingeniur Sdn Bhd


M & E Consultant            : Senai Associates Sdn Bhd


QS Consultant               : Juruukur Bahan Antara


Contractor                  : Tim Sekata Sdn Bhd
PROJECT MANAGEMENT SYSTEM


Tim Sekata Sdn Bhd was appointed as the main contractor for this project. As the main

contractor, Tim Sekata Sdn Bhd is responsible to control the performance, the cost and the

schedule of the project. Tim Sekata Sdn Bhd will ensure that all the goals and objectives of

the project are to be achieved with great results. This is done thru precise planning,

organizing, directing and controlling.


To achieve this outcome, a good organizational structure is to be practiced. For a good

organizational structure to perform various tasks precisely, a good team is required to

deliver this purpose. This is done via segregating the task of each works with good

monitoring system. In this project, a Project Manager is responsible towards monitoring the

whole project as a whole. The Project Manager is assisted by Project Engineers, Mechanical

and Electrical coordinators, Quantity Surveyor, Safety Officer and also other project team

personnel. Each of the team members will report to the Project Manager and contribute for

the completion of the project.


Currently, from the physical progress of the project, it can be seen that the project is ahead

of schedule (0.13% - as per 1 0ctober 2011). This shows that a good management practice is

being organized on the development of this project. However, it is hoped that the schedule

will always be on track / ahead schedule since there are several elements that can delay the

project such as weather condition, machinery break down, material delays etc. The current

progress of the projects also shows that good planning and coordination between each

parties that involves in this projects are being well organized.
APPENDIX


1. Organizational Chart




2. S-Curve ( as per 17 September 2011)

Weitere ähnliche Inhalte

Was ist angesagt?

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedureayushida
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Modular coordination
Modular coordinationModular coordination
Modular coordinationAtul Verma
 
Pengenalan industri binaan ok
Pengenalan industri binaan okPengenalan industri binaan ok
Pengenalan industri binaan okamoi amore
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Unit 1 tender 1.1
Unit 1 tender 1.1Unit 1 tender 1.1
Unit 1 tender 1.1Mara
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 

Was ist angesagt? (20)

Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Pengenalan industri binaan ok
Pengenalan industri binaan okPengenalan industri binaan ok
Pengenalan industri binaan ok
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Unit 1 tender 1.1
Unit 1 tender 1.1Unit 1 tender 1.1
Unit 1 tender 1.1
 
Earthwork
EarthworkEarthwork
Earthwork
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 

Ähnlich wie Assignment 1 Site Visit Report

Ähnlich wie Assignment 1 Site Visit Report (20)

Khairul Annuar LinkedIn
Khairul Annuar LinkedInKhairul Annuar LinkedIn
Khairul Annuar LinkedIn
 
Done
DoneDone
Done
 
76 s201905
76 s20190576 s201905
76 s201905
 
Ici 2
Ici 2Ici 2
Ici 2
 
My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)
 
My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)
 
Ici project brief2
Ici project brief2Ici project brief2
Ici project brief2
 
Shaireen CV Dec 2015
Shaireen CV Dec 2015Shaireen CV Dec 2015
Shaireen CV Dec 2015
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
TOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptxTOP 10 TIPS FOR SUCCESSFUL.pptx
TOP 10 TIPS FOR SUCCESSFUL.pptx
 
TOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdfTOP 10 TIPS FOR SUCCESSFUL.pdf
TOP 10 TIPS FOR SUCCESSFUL.pdf
 
Project Management (Group)
Project Management (Group)Project Management (Group)
Project Management (Group)
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
Internship report
Internship reportInternship report
Internship report
 
Project background
Project backgroundProject background
Project background
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Resume latest
Resume latestResume latest
Resume latest
 
CV - Azwyn Abd Aziz
CV - Azwyn Abd AzizCV - Azwyn Abd Aziz
CV - Azwyn Abd Aziz
 

Mehr von armada7000

Sustainable Urban Design Report
Sustainable Urban Design ReportSustainable Urban Design Report
Sustainable Urban Design Reportarmada7000
 
Kajang Sim City Simulation
Kajang Sim City SimulationKajang Sim City Simulation
Kajang Sim City Simulationarmada7000
 
KA6414_Sustainable Kajang
KA6414_Sustainable KajangKA6414_Sustainable Kajang
KA6414_Sustainable Kajangarmada7000
 
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable EconomyP57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economyarmada7000
 
P57600 Lusas Presentation
P57600 Lusas PresentationP57600 Lusas Presentation
P57600 Lusas Presentationarmada7000
 
P57600 Lusas Report
P57600 Lusas ReportP57600 Lusas Report
P57600 Lusas Reportarmada7000
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
 
KA6564 Assignment 3
KA6564 Assignment 3KA6564 Assignment 3
KA6564 Assignment 3armada7000
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2armada7000
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1armada7000
 
Assignment 3 Gantt Chart
Assignment 3 Gantt ChartAssignment 3 Gantt Chart
Assignment 3 Gantt Chartarmada7000
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdownarmada7000
 
KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12armada7000
 
KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11armada7000
 
KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1armada7000
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4armada7000
 
KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3armada7000
 
KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1armada7000
 
Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5armada7000
 
Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2armada7000
 

Mehr von armada7000 (20)

Sustainable Urban Design Report
Sustainable Urban Design ReportSustainable Urban Design Report
Sustainable Urban Design Report
 
Kajang Sim City Simulation
Kajang Sim City SimulationKajang Sim City Simulation
Kajang Sim City Simulation
 
KA6414_Sustainable Kajang
KA6414_Sustainable KajangKA6414_Sustainable Kajang
KA6414_Sustainable Kajang
 
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable EconomyP57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
 
P57600 Lusas Presentation
P57600 Lusas PresentationP57600 Lusas Presentation
P57600 Lusas Presentation
 
P57600 Lusas Report
P57600 Lusas ReportP57600 Lusas Report
P57600 Lusas Report
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
KA6564 Assignment 3
KA6564 Assignment 3KA6564 Assignment 3
KA6564 Assignment 3
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1
 
Assignment 3 Gantt Chart
Assignment 3 Gantt ChartAssignment 3 Gantt Chart
Assignment 3 Gantt Chart
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdown
 
KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12
 
KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11
 
KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4
 
KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3
 
KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1
 
Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5
 
Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2
 

Assignment 1 Site Visit Report

  • 1. REPORT ON SITE VISIT Muhammad bin Ramlan P57600 KKKA 6644 2011/2012 Lecturer: Ir Ishak bin Arshad
  • 2. INTRODUCTION A site visit for the Construction and Project Management class (KKKA 6644) was organized by Ir Ishak on 14 October 2011. The location of the site visit was at Cheras, Kuala Lumpur. A total of approximately 25 students attended the site visit. The agenda of the visit consist of in-depth explanation by the contractor and consultant on the operation of the project. At the end of the session, there was a questioning and answering session between the students and the host. Countless valuable information was shared among both parties regarding the visit especially on the operation of the project. The purpose of this site visit is to provide the students with sound knowledge on how the project management being handled throughout the whole project. The understanding of the project management practice can be a good basis for the students in order for attaining perceptive of project management in real life situation. Furthermore, this site visit can assist the students on knowledge for the preparation of their future career.
  • 3. PROJECT SUMMARY Below is the summary of the project: Project Title : Cadangan Pembinaan Bangunan Pra Klinikal Fakulti Perubatan Hospital University Kebangsaan Malaysia, Yang Mengandungi 1 Blok Pentadbiran Dan Makmal 19 Tingkat, Blok M&E 3 Tingkat, Mukim Cheras, Kuala Lumpur. Contract Value : RM 160,000,000.00 Contract Period : 24 Months Commencement Date : 17 May 2010 Completion Date : 17 May 2012 Revised Work Program : 17 September 2012 Physical Progress : Ahead (0.13%) – As per 1 0ctober 2011 Client : Universiti Kebangsaan Malaysia Architect : Damansara Architect C & S Consultant : GSA Ingeniur Sdn Bhd M & E Consultant : Senai Associates Sdn Bhd QS Consultant : Juruukur Bahan Antara Contractor : Tim Sekata Sdn Bhd
  • 4. PROJECT MANAGEMENT SYSTEM Tim Sekata Sdn Bhd was appointed as the main contractor for this project. As the main contractor, Tim Sekata Sdn Bhd is responsible to control the performance, the cost and the schedule of the project. Tim Sekata Sdn Bhd will ensure that all the goals and objectives of the project are to be achieved with great results. This is done thru precise planning, organizing, directing and controlling. To achieve this outcome, a good organizational structure is to be practiced. For a good organizational structure to perform various tasks precisely, a good team is required to deliver this purpose. This is done via segregating the task of each works with good monitoring system. In this project, a Project Manager is responsible towards monitoring the whole project as a whole. The Project Manager is assisted by Project Engineers, Mechanical and Electrical coordinators, Quantity Surveyor, Safety Officer and also other project team personnel. Each of the team members will report to the Project Manager and contribute for the completion of the project. Currently, from the physical progress of the project, it can be seen that the project is ahead of schedule (0.13% - as per 1 0ctober 2011). This shows that a good management practice is being organized on the development of this project. However, it is hoped that the schedule will always be on track / ahead schedule since there are several elements that can delay the project such as weather condition, machinery break down, material delays etc. The current progress of the projects also shows that good planning and coordination between each parties that involves in this projects are being well organized.
  • 5. APPENDIX 1. Organizational Chart 2. S-Curve ( as per 17 September 2011)